Top Banner
PJ Energy NER 300 Unit Financial Analysis of Innovative Energy Technologies Erica Berta Trainee September 2013
13

PRESENTATION ERICA BERTA 24.09

Apr 14, 2017

Download

Documents

Erica Berta
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PRESENTATION ERICA BERTA 24.09

PJEnergyNER300Unit

FinancialAnalysisofInnovativeEnergyTechnologies

EricaBertaTrainee

September2013

Page 2: PRESENTATION ERICA BERTA 24.09

Scopeoftheresearchandmethodsapplied

• CompileadatabasecollectingrelevantcostsandrevenuesofinnovativeRENandCCSprojects

• CalculateLCOE,IRR,CostofstoringCO2,evaluatefuturesavingspotential

• Runasensitivityanalysisoninputcosts,endproductpricesandcapacityfactors

24/09/2013 FinancialAnalysisof innovative EnergyProjects 2

Page 3: PRESENTATION ERICA BERTA 24.09

ProjectsOverview

• Bioenergy:3newprojects+5oldprojects- Sensitivityonfeedstockcosts,endproductprices- Doublecountingrule

• Wind:3newprojects+4oldprojects- Sensitivityonloadfactor

• CSP:3newprojects+1oldproject-SensitivityonCAPEX,irradiationvalues

• Ocean:4newprojects- Sensitivityonloadfactor,CAPEX

• CCS:1newproject

324/09/2013 FinancialAnalysisof innovative EnergyProjects

Page 4: PRESENTATION ERICA BERTA 24.09

BioenergyAnalysis

1.05 1.010.64

1.36 1.36

0.9

23% 26% 32%

BIODIESELEUNYMEXARGUSRMEFOBRdam

BIODIESELEUFAMEOARGUSFOBRdam

EUETHANOLNEWFOBT2

DOUBLECOUNTINGMECHANISM

First genprice

Second genprice

Price diff.

424/09/2013 FinancialAnalysisof innovative EnergyProjects

Page 5: PRESENTATION ERICA BERTA 24.09

BioenergyAnalysis

5

1.02

1.401.26

1.101.25

1.32

1.88

0.61

0.95

1.14

0.67

0.89

1.63

0.48

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

1.80

2.00

ETHANOL 1 ETHANOL 2 METHANOL 1 METHANOL 2 BIODIESEL1 BIODIESEL2 BIODIESEL3 PYROLYSISOIL1

EUR/l

LCOEOFALLBIOENERGYPROJECTSINEUR/lbiodieseleq.

LCOE EUR/leq NETLCOE EUR/leq 1stGENERATIONBIODIESELETHANOL T2FOB 2NDGENERATIONBIODIESEL 2NDGENERATIONETBEFUELOIL GASOLINE EU

EUR/lgasolineeq. EUR/lbiodiesel eq. EUR/ldieseleq.

24/09/2013 FinancialAnalysisof innovative EnergyProjects

Page 6: PRESENTATION ERICA BERTA 24.09

WindAnalysis

0

50

100

150

200

250

300

350

400

450

WIND1SE WIND2AT WIND3DE WIND4BE WIND5BE WIND6PT WIND7FR

EUR/MWh

LCOO&M LCOInvestment EUR/MWh

OffshoreOnshore VAWT

Onshore Benchmark

Offshore Benchmark95

130

225

140

230

430

80

0%

20%

40%

60%

80%

100%WIND4 CAPEX

Technicalcontingencies

DevelopmentCosts

Siteinfrastructure

Capitalequipment 0%

20%

40%

60%

80%

100%

WIND6CAPEXBREAKDOWN

DevelopmentCosts

Siteinfrastructure

Capitalequipment

4% 3% 4%

7%4%

6%

3%

WIND1SE

WIND2AT

WIND3DE

WIND4BE

WIND5BE

WIND6PT

WIND7FR

O&Mcost

6

Page 7: PRESENTATION ERICA BERTA 24.09

CSPAnalysis

56%

90%78%

61%

16%

15%

24%19%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

CSP1 CSP2 CSP3 CSP4

CAPEXBREAKDOWNIN%

Installation andCommissioning

DevelopmentCosts

SiteInfrastructure

CapitalEquipment

11%

5%

10%

28%

0%

10%

20%

30%

40%

50%

60%

70%

80%

0

50

100

150

200

250

300

350

400

450

CSP1 CSP2 CSP3 CSP4

EUR/MWh

LCOEBREAKDOWN JRCVALUES

LCOEInvestment LCOEO&M LCOEFUEL Difference from basecase

310

260

390

305

Stirling

Benchmark CSP

Solar Tower

724/09/2013 FinancialAnalysisof innovative EnergyProjects

Page 8: PRESENTATION ERICA BERTA 24.09

OceanAnalysis

547

396

301 291

30

121

7548

21

12

80

0

100

200

300

400

500

600

700

OTEC1FR WAVE 2IE TIDAL3UK TIDAL4UK

EUR/MWh

LCOEWITH5%DISCOUNTRATE

Investment O&Mcosts Insurance cost

530460

340

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

OTEC1FR WAVE2IE TIDAL3UK TIDAL4UK

CAPEX COSTBREAKDOWN OCEANENERGY:RELATIVEVALUES

Contingencies Intangible Assets

Installation andCommissioning Development Costs

CapitalEquipment

8

600

24/09/2013 FinancialAnalysisof innovative EnergyProjects

Page 9: PRESENTATION ERICA BERTA 24.09

9

SensitivityAnalysis

• LCOEmostreactivetocapacityfactor changes(Wind,Ocean,CSP)

• LowersensitivityforCAPEXchanges

• Bioenergy:moresensitivitytoendproductpricesthantofeedstockcosts

24/09/2013 FinancialAnalysisof innovative EnergyProjects

Page 10: PRESENTATION ERICA BERTA 24.09

CCSAnalysis

58

26

47

-16

-40

-20

0

20

40

60

80

100

120

140

EUR/MWh

POST 4UK:Levelised costsofgreenproductionwith CCSEUR/MWh

Avoided carbon costs

Storage

Transport

Capture

BasePlantw/oCO2costs

Storagecosts:335EUR/tCO2LCOE:120EUR/MWhT&Stariffof120EUR/tCO2stored

1024/09/2013 FinancialAnalysisof innovative EnergyProjects

149

66

120

0

50

100

150

200

250

300

350

400

EUR/tCO2

LevelisedCO2storagecostsEUR/tCO2

Baseplant Capture Storage

Page 11: PRESENTATION ERICA BERTA 24.09

ComparisonwiththeotherCCSprojects

0

50

100

150

200

250

CCSPOST 1(Pol)

CCSPOST 2(Ita)

CCSPOST 3(UK)

CCSPOST 4(UK)

CCSPRE(UK)

CCSOXY(UK)

CCSLCOEEUR/MWhegreen

Baseplant(w/oCO2costs) CaptureTransport StorageAvoidedhydrocarboncosts

120 115110

175210

120

0

50

100

150

200

250

300

350

400

450

CCSPOST1(Pol)

CCSPOST2(Ita)

CCSPOST3(UK)

CCSPOST4(UK)

CCSOXY(UK)

CCSIndustrial

(NL)

CCSPRE(UK)

CostofStoringCO2(EUR/tCO2)

Baseplant Capture Transport Storage

110 110140

165170

430

335

CCSAnalysis

1124/09/2013 FinancialAnalysisof innovative EnergyProjects

Page 12: PRESENTATION ERICA BERTA 24.09

CO2abatementcurveforCCSandinnovativeRENtechnologies

12

-

200

400

600

800

1,000

1,200

1,400

1,600

1,800

2,000

EUR/TCO2

OVERALLCO2AVOIDANCECOST

CCS:100-170

WIND:180-300

2° GEN.BIOFUELS:400-600CSP:600-800

OCEAN: >1000

24/09/2013 FinancialAnalysisof innovative EnergyProjects

Page 13: PRESENTATION ERICA BERTA 24.09

ThankYouforyourattention!

Questions?