Page 1: Presentatio Pmi

PMI(PMBOK)

Presented By:Bhuphender

MSIT, Clark University

Page 2: Presentatio Pmi

Content

1 INTRODUCTION

2 UNDERSTANDING THE PROJECT ENVIRONMENT

3 GNERAL MANAGEMENT KNOWLEDGE AND SKILL

4 PROJECT STAKE HOLDER

5 THE PRODUCT LIFE CYCLE

6 PROJECT MANAGEMENT PROCESS

7 PROJECT MANAGEMENT KNOWLEDGE AREAS

8 EXTRA RULES

9 REFERENCES

PMBOK By Bhuphender, MSIT, Clark

Page 3: Presentatio Pmi

INTRODUCTIONWhat is Project? A project is a temporary undertaken to create a unique

product, service, or result.

Temporary: Temporary mean the every project has a definite beginning and a definite end.

Unique Products, Services, or Result: A project creates unique deliverables, which are products, Services, or results.

PMBOK By Bhuphender, MSIT, Clark

Page 4: Presentatio Pmi

INTRODUCTIONWhat is Project Management? Project management is a methodical approach to

planning and guiding project processes from start to finish. According to the Project Management Institute, the processes are guided through five stages: initiation, planning, executing, controlling, and closing.

PMBOK By Bhuphender, MSIT, Clark

Page 5: Presentatio Pmi

UNDERSTANDING THE PROJECT ENVIRONMENT

Virtually all project are planned and implemented in a social, economic, and environmental context and have intended and unintended positive and negative impacts.

Cultural and social environment: economic, demographic, education, ethical, ethnic, religious, etc.

International and political environment: international, national, regional and local law, politics.

Physical environment: ecology and physical geography.

PMBOK By Bhuphender, MSIT, Clark

Page 6: Presentatio Pmi

GNERAL MANAGEMENT KNOWLEDGE AND SKILL

General management provides the foundation for building project management skill and is often essential for project manager.

Interpersonal Skills: Effective Communication,

Influencing the organization, leadership, motivation, negotiation and conflict management, problem Solving.

PMBOK By Bhuphender, MSIT, Clark

Page 7: Presentatio Pmi

PROJECT STAKE HOLDER Project Stakeholder are individual and organizations

that are actively involved in the project, or whose interests may be affected as a result of project execution or project completion.

PMBOK By Bhuphender, MSIT, Clark

Page 8: Presentatio Pmi

THE PRODUCT LIFE CYCLE

Project managers or the organization can divide project into phases to provide better management control with appropriate links to the ongoing operation of the performing organization. Collectively, these phase are known as the project life cycle.

PMBOK By Bhuphender, MSIT, Clark

Page 9: Presentatio Pmi

PROJECT MANAGEMENT PROCESS

The Project Management Processes are presented as discrete element with well defined interfaces.

PMBOK By Bhuphender, MSIT, Clark

Page 10: Presentatio Pmi

The integrative nature of process groups is more complex than the basic plan-do-check-act cycle. However ,the enhanced cycle can be applied to the interrelationships within and among the process groups.

PMBOK By Bhuphender, MSIT, Clark

Page 11: Presentatio Pmi

PMBOK By Bhuphender, MSIT, Clark

Page 12: Presentatio Pmi

PROJECT MANAGEMENT KNOWLEDGE AREAS

PMBOK By Bhuphender, MSIT, Clark

Page 13: Presentatio Pmi

PROJECT INTEGRATION MANAGEMENT

The project integration management knowledge area includes processes that are required to ensure all the project's components are coordinated.

Project Charter: A formal document issued by senior management which explains the purpose of the project including the business needs the project and the resulting product. It provides the project manager with the authority to apply organizational resources to project activities.

PMBOK By Bhuphender, MSIT, Clark

Page 14: Presentatio Pmi

PMBOK By Bhuphender, MSIT, Clark

Page 15: Presentatio Pmi

PMBOK By Bhuphender, MSIT, Clark

Page 16: Presentatio Pmi

PROJECT SCOPE MANAGEMENT

The project scope management knowledge area is defined by the processes that limit and control the work included in a project. These processes ensure that all the work of the project is included.

Work Breakdown Structure (WBS) :A deliverable-oriented grouping of project elements which organizes and defines the total scope of the project.

PMBOK By Bhuphender, MSIT, Clark

Page 17: Presentatio Pmi

PMBOK By Bhuphender, MSIT, Clark

Page 18: Presentatio Pmi

PMBOK By Bhuphender, MSIT, Clark

Page 19: Presentatio Pmi

PROJECT TIME MANAGEMENT

Project Time Management is a subset of project management that includes the processes required to ensure timely completion of the project.

Critical Path Method (CPM): A network analysis technique used to predict project duration by analyzing which path has the least amount of scheduling flexibility. Early dates are calculated using a forward pass; late dates are calculated using a backwards pass.

PMBOK By Bhuphender, MSIT, Clark

Page 20: Presentatio Pmi

PMBOK By Bhuphender, MSIT, Clark

Page 21: Presentatio Pmi

PMBOK By Bhuphender, MSIT, Clark

Page 22: Presentatio Pmi

PROJECT COST MANAGEMENT

The project cost management knowledge area includes processes to ensure that a project is completed on time and within budget.

Cost Performance Index (CPI): The ratio of budgeted costs to actual costs (BCWP / ACWP). CPI is often used to predict the magnitude of a possible cost overrun using the following formula: original cost estimate/CPI = projected cost at completion

PMBOK By Bhuphender, MSIT, Clark

Page 23: Presentatio Pmi

PMBOK By Bhuphender, MSIT, Clark

Page 24: Presentatio Pmi

PROJECT QUALITY MANAGEMENT

The project quality management knowledge area is comprised of the set of processes that ensure the result of a project meets the needs for which the project was executed.

Control: The process of comparing actual performance with planned performance, analyzing variances, evaluating possible alternatives, and taking appropriate corrective action as needed.

PMBOK By Bhuphender, MSIT, Clark

Page 25: Presentatio Pmi

PMBOK By Bhuphender, MSIT, Clark

Page 26: Presentatio Pmi

PROJECT HUMAN RESOURCE MANAGEMENT

People are a major part of any project. There are several different people required and at various times. All the people have to be used effectively in order for the project to succeed. Project Human Resources Management includes the processes to make this part of the project successful.

PMBOK By Bhuphender, MSIT, Clark

Page 27: Presentatio Pmi

PROJECT COMMUNICATION MANAGEMENT

There is a substantial amount of communications that must occur in any project. Information must be generated in a timely manner. It must also be collected, disseminated, stored, and destroyed at the appropriate time.

Communications requirements: sum of the information requirements of the project stakeholders.

PMBOK By Bhuphender, MSIT, Clark

Page 28: Presentatio Pmi

PMBOK By Bhuphender, MSIT, Clark

What actually happen?

Page 29: Presentatio Pmi

PMBOK By Bhuphender, MSIT, Clark

Page 30: Presentatio Pmi

PROJECT RISK MANAGEMENT

Risk management must be an integral part of any project. Everything does not always happen as planned. Project risk management contains the processes for identifying, analyzing, and responding to project risk.

Risk Identification: Determining which risk events are likely to affect the project.

PMBOK By Bhuphender, MSIT, Clark

Page 31: Presentatio Pmi

PMBOK By Bhuphender, MSIT, Clark

Page 32: Presentatio Pmi

PROJECT PROCUREMENT MANAGEMENT

The project procurement management knowledge area includes processes that are used to manage what to procure and when to procure it.

Price Forecast: based on information gathered and analyzed about demand and supply. This forecast provides a prediction of short and long term prices and the underlying reasons for those trends.

PMBOK By Bhuphender, MSIT, Clark

Page 33: Presentatio Pmi

PMBOK By Bhuphender, MSIT, Clark

Page 34: Presentatio Pmi

EXTRA RULES

Source: Nasa 100 rules of project manager.

Rule 9: The boss may not know how to do the work but he has to know what he wants. The boss had better find out what he expects and wants if he doesn't know. A blind leader tends to go in circles.

Rule 10: Not all successful managers are competent and not all failed managers are incompetent. Luck still plays a part in success or failure but luck favors the competent hard working manager.

PMBOK By Bhuphender, MSIT, Clark

Page 35: Presentatio Pmi

• Rule 17: Talk is not cheap; but the best way to understand a personnel or technical problem is to talk to the right people. Lack of talk at the right levels is deadly.

• Rule 20: You cannot watch everything. What you can watch is the people. They have to know you will not accept a poor job.

• Rule 54: There is only one solution to a weak project manager in industry—get rid of him fast. The main job of a project manager in industry is to keep the customer happy. Make sure the one working with you knows that it is not flattery but on-schedule, on-cost, and a good product that makes you happy.

PMBOK By Bhuphender, MSIT, Clark

Page 36: Presentatio Pmi

REFERENCES

• Pmbok• Google.com• Nasa 100 rules for project manager

PMBOK By Bhuphender, MSIT, Clark

Page 37: Presentatio Pmi

PMBOK By Bhuphender, MSIT, Clark

Question