11PKM VISIPKM VISI “Valuable Is SMART Improvement” LIMESTONE DOSING EQUIPEMNTLIMESTONE DOSING EQUIPEMNT
33PKM VISIPKM VISI “Valuable Is SMART Improvement” LIMESTONE DOSING EQUIPEMNTLIMESTONE DOSING EQUIPEMNT
LANGKAH ILANGKAH IMENENTUKAN TEMAMENENTUKAN TEMA
Untuk mendukung Untuk mendukung Visi ManajememVisi Manajemem, yaitu: , yaitu: PT. Semen Baturaja (Persero)PT. Semen Baturaja (Persero) Perusahan yang Perusahan yang
EfisienEfisien, , Berdaya SaingBerdaya Saing dan dan TumbuhTumbuh. .
Salah cara adalah Salah cara adalah menurunkan Harga Pokok Produksimenurunkan Harga Pokok Produksi. Di Unit Penggilingan Semen Pabrik . Di Unit Penggilingan Semen Pabrik
Baturaja, Baturaja, dilakukan subtitusi bahan kedilakukan subtitusi bahan ke--33, yaitu , yaitu LimestoneLimestone..
Sampai saat ini, Sampai saat ini, penambahan Limestonepenambahan Limestone di Proses di Proses Penggilingan Semen PBRPenggilingan Semen PBR menggunakan menggunakan
tenaga manusia, dimana tenaga manusia, dimana proporsi masih dibawah 2%proporsi masih dibawah 2%. .
Untuk mengefisienkan proses penambahan Limestone, pada bulan JulUntuk mengefisienkan proses penambahan Limestone, pada bulan Juli 2009 dibentuk Proyek i 2009 dibentuk Proyek
Kendali Mutu (PKM), yang diberi nama:Kendali Mutu (PKM), yang diberi nama:
VISIVISI
((VValuablealuable IIss SSMARTMART IImprovementmprovement))Dengan Objek: Dengan Objek:
PENGARUH PENAMBAHAN LIMESTONEPENGARUH PENAMBAHAN LIMESTONEPengaruh penambahan Limestone sebagai bahan kePengaruh penambahan Limestone sebagai bahan ke--3 terhadap kehalusan semen (blaine)3 terhadap kehalusan semen (blaine)
Blaine Bahan Baku OPC (Original)Blaine Bahan Baku OPC (Original)97,0% Clinker 97,0% Clinker 30 cm30 cm22/ g/ g :: 2900 cm2900 cm22/ g/ g
3,0% Gypsum3,0% Gypsum 100 cm100 cm22/ g/ g :: 300 cm300 cm22/ g (Max 5%)/ g (Max 5%)TotalTotal :: 3200 cm3200 cm22/ g/ g
Blaine Bahan Baku OPC (With Limestone)Blaine Bahan Baku OPC (With Limestone)95,0% Clinker 95,0% Clinker 30 cm30 cm22/ g/ g :: 2840 cm2840 cm22/ g/ g
PENGARUH PENAMBAHAN LIMESTONEPENGARUH PENAMBAHAN LIMESTONEPengaruh penambahan Limestone sebagai bahan kePengaruh penambahan Limestone sebagai bahan ke--3 terhadap kehalusan semen (blaine)3 terhadap kehalusan semen (blaine)
Blaine Bahan Baku PPC (With Limestone)Blaine Bahan Baku PPC (With Limestone)85,0% Clinker 85,0% Clinker 30 cm30 cm22/ g/ g :: 2541 cm2541 cm22/ g/ g
3,0% Gypsum3,0% Gypsum 100 cm100 cm22/ g/ g :: 300 cm300 cm22/ g/ g12,0% Limestone12,0% Limestone 70 cm70 cm22/ g/ g :: 840 cm840 cm22/ g/ g
Penambahan LimestonePenambahan Limestone dapat dapat meningkatkanmeningkatkan kehalusan semen (kehalusan semen (blaineblaine) ) karenakarena tingkat tingkat kekerasan kekerasan LimestoneLimestone yang yang lebih rendahlebih rendah daridari pada pada ClinkerClinker, , dandan sifat sifat LimestoneLimestone yang yang membantmembantu proses u proses penggilingan Clinkerpenggilingan Clinker didi dalam dalam Finish MillFinish Mill (Tube Mill dengan Grinding Ball). (Tube Mill dengan Grinding Ball).
66PKM VISIPKM VISI “Valuable Is SMART Improvement” LIMESTONE DOSING EQUIPEMNTLIMESTONE DOSING EQUIPEMNT
PENGARUH PENAMBAHAN LIMESTONEPENGARUH PENAMBAHAN LIMESTONEPengaruh penambahan Limestone sebagai bahan kePengaruh penambahan Limestone sebagai bahan ke--3 terhadap kehalusan semen (blaine)3 terhadap kehalusan semen (blaine)
BlaineBlaine11 (Desain)(Desain) == 3200 cm3200 cm22/ g / g kWh/tkWh/t1 1 (Desain)(Desain) == 39,0 kWh/ t (sebagai contoh)39,0 kWh/ t (sebagai contoh)BlaineBlaine22 == 3280 cm3280 cm22/ g / g kWh/tkWh/t2 2 == kWh/tkWh/t11 exp {(Blaineexp {(Blaine22 –– BlaineBlaine11) . 0,49/ 1000}) . 0,49/ 1000}
Dengan penambahan 2% Limestone untuk kondisi di atas, kWh/ t untDengan penambahan 2% Limestone untuk kondisi di atas, kWh/ t untuk Blaine 3280 cmuk Blaine 3280 cm22/ g relatif / g relatif sama dengan Blaine 3200 cmsama dengan Blaine 3200 cm22/ g, yaitu: 39,0 kWh/ t. / g, yaitu: 39,0 kWh/ t.
Penambahan Limestone dapat Penambahan Limestone dapat meningkatkanmeningkatkan kehalusan semen (kehalusan semen (blaineblaine), ), tanpa menaikkan kWh/ ttanpa menaikkan kWh/ tuntuk proses penggilingan semen dengan untuk proses penggilingan semen dengan kapasitas produksikapasitas produksi yang yang samasama..
Atau Atau
Penambahan Limestone dapat Penambahan Limestone dapat meningkatkan kapasitas produksimeningkatkan kapasitas produksi, , tanpa menaikkan kWh/ ttanpa menaikkan kWh/ t untuk untuk proses penggilingan semen dengan tingkat kehalusan semen (proses penggilingan semen dengan tingkat kehalusan semen (blaineblaine) yang ) yang samasama..
77PKM VISIPKM VISI “Valuable Is SMART Improvement” LIMESTONE DOSING EQUIPEMNTLIMESTONE DOSING EQUIPEMNT
TEMPAT LIMESTONE DOSING EQUIPMENTTEMPAT LIMESTONE DOSING EQUIPMENT
Karena Cement Mill Pabrik Baturaja merupakan modifikasi Raw MillKarena Cement Mill Pabrik Baturaja merupakan modifikasi Raw Mill, maka agak susah untuk , maka agak susah untuk
menambahkan peralatan baru, yaitu Limestone Dosing Equipment.menambahkan peralatan baru, yaitu Limestone Dosing Equipment.
Hal ini disebabkan ruang kosong yang tersedia di Cement Mill BuiHal ini disebabkan ruang kosong yang tersedia di Cement Mill Building terbatas, untuk titik lding terbatas, untuk titik
penambahan Limestone. penambahan Limestone.
Sedangkan untuk penambahan Limestone di luar Cement Mill BuildinSedangkan untuk penambahan Limestone di luar Cement Mill Building, memakan biaya yang g, memakan biaya yang
Penambahan Limestone dilakukan Penambahan Limestone dilakukan dengan menambahkan Limestone dengan menambahkan Limestone di proporsi dengan Feed Cement di proporsi dengan Feed Cement MillMill
Posisi:Posisi:
1. Belt Conveyor Z1A021. Belt Conveyor Z1A02
2. Belt Conveyor Z1A032. Belt Conveyor Z1A03
3. Belt Conveyor Z1J043. Belt Conveyor Z1J04
Panambahan Limestone di Belt Panambahan Limestone di Belt Conveyor Z1J04 tidak dapat Conveyor Z1J04 tidak dapat dilakukan karena tidak ada ruang dilakukan karena tidak ada ruang kosong untuk menambahkan Binkosong untuk menambahkan Bin
1212PKM VISIPKM VISI “Valuable Is SMART Improvement” LIMESTONE DOSING EQUIPEMNTLIMESTONE DOSING EQUIPEMNT
TEMPAT LIMESTONE DOSING EQUIPMENTTEMPAT LIMESTONE DOSING EQUIPMENT
58.4358.4358.4358.4382,0482,04--ROI ROI DesemberDesember 20092009
4% Limestone4% Limestone
4 4 –– 17%17%
3 3 –– 12.75 12.75 tphtph
4 4 –– 17%17%
3 3 –– 12.75 12.75 tphtph
4 4 –– 9%9%
3 3 –– 6.75 6.75 tphtphUp 3%Up 3%
Feed Rate Feed Rate
(% Or (% Or tphtph))
90.190.190.190.146.446.4--Capacity Bin (t)Capacity Bin (t)
YesYesYesYesYesYesNoNoControl QCXControl QCX
PilihanPilihan VVPilihanPilihan IVIVPilihanPilihan IIIIPilihanPilihan II
1616PKM VISIPKM VISI “Valuable Is SMART Improvement” LIMESTONE DOSING EQUIPEMNTLIMESTONE DOSING EQUIPEMNT
LANGKAH IVLANGKAH IVMEMBUAT RENCANA DAN TARGET PERBAIKANMEMBUAT RENCANA DAN TARGET PERBAIKAN
RUANG KOSONG UNTUK LIMESTONE DOSING EQUIPMENTRUANG KOSONG UNTUK LIMESTONE DOSING EQUIPMENT
Lokasi Limestone Dosing Equipment dengan sebelum memindahkan TanLokasi Limestone Dosing Equipment dengan sebelum memindahkan Tangga di Lantai 3 gga di Lantai 3 -- 5 5 Cement Mill Building.Cement Mill Building.
Space 4571 mm Length x 2300 mm Width x 13845 mm HeightSpace 4571 mm Length x 2300 mm Width x 13845 mm Height
1717PKM VISIPKM VISI “Valuable Is SMART Improvement” LIMESTONE DOSING EQUIPEMNTLIMESTONE DOSING EQUIPEMNT
LANGKAH IVLANGKAH IVMEMBUAT RENCANA DAN TARGET PERBAIKANMEMBUAT RENCANA DAN TARGET PERBAIKAN
RUANG KOSONG UNTUK LIMESTONE DOSING EQUIPMENTRUANG KOSONG UNTUK LIMESTONE DOSING EQUIPMENT
LantaiLantai 3 Cement Mill Building3 Cement Mill Building LantaiLantai 4 Cement Mill Building4 Cement Mill Building LantaiLantai 5 Cement Mill Building5 Cement Mill Building
1818PKM VISIPKM VISI “Valuable Is SMART Improvement” LIMESTONE DOSING EQUIPEMNTLIMESTONE DOSING EQUIPEMNT
LANGKAH IVLANGKAH IVMEMBUAT RENCANA DAN TARGET PERBAIKANMEMBUAT RENCANA DAN TARGET PERBAIKAN
RUANG KOSONG UNTUK LIMESTONE DOSING EQUIPMENTRUANG KOSONG UNTUK LIMESTONE DOSING EQUIPMENT
Lokasi Limestone Dosing Equipment dengan setelah memindahkan TanLokasi Limestone Dosing Equipment dengan setelah memindahkan Tangga di Lantai 3 gga di Lantai 3 -- 5 5 Cement Mill Building, dan memasang Reversible Belt Conveyor untuCement Mill Building, dan memasang Reversible Belt Conveyor untuk pengisian Limestone Bin.k pengisian Limestone Bin.
1919PKM VISIPKM VISI “Valuable Is SMART Improvement” LIMESTONE DOSING EQUIPEMNTLIMESTONE DOSING EQUIPEMNT
LANGKAH IVLANGKAH IVMEMBUAT RENCANA DAN TARGET PERBAIKANMEMBUAT RENCANA DAN TARGET PERBAIKAN
Belt Conveyor U1J90 Belt Conveyor U1J90 untukuntuk pengisianpengisian Limestone Bin Limestone Bin dandan Gypsum Bin, Gypsum Bin, sepertiseperti Belt Conveyor Belt Conveyor U1J85 yang U1J85 yang dapatdapat mengisimengisi Gypsum Bin Gypsum Bin dandan Clinker Bin.Clinker Bin.
LokasiLokasi Reversible Belt Conveyor U1J90Reversible Belt Conveyor U1J90
2121PKM VISIPKM VISI “Valuable Is SMART Improvement” LIMESTONE DOSING EQUIPEMNTLIMESTONE DOSING EQUIPEMNT
LANGKAH IVLANGKAH IVMEMBUAT RENCANA DAN TARGET PERBAIKANMEMBUAT RENCANA DAN TARGET PERBAIKAN
Drive Motor yang Drive Motor yang akanakan digunakandigunakan Belt Conveyor Belt Conveyor U1J90 U1J90 didi GudangGudang PabrikPabrik Baturaja.Baturaja.
2222PKM VISIPKM VISI “Valuable Is SMART Improvement” LIMESTONE DOSING EQUIPEMNTLIMESTONE DOSING EQUIPEMNT
LANGKAH IVLANGKAH IVMEMBUAT RENCANA DAN TARGET PERBAIKANMEMBUAT RENCANA DAN TARGET PERBAIKAN
ProsesProses PemasanganPemasangan Limestone Bin Limestone Bin DiDi Support Yang Support Yang TelahTelah DibuatDibuat, Dan , Dan PemasanganPemasangan Limestone Limestone
WeigherWeigher..
3535PKM VISIPKM VISI “Valuable Is SMART Improvement” LIMESTONE DOSING EQUIPEMNTLIMESTONE DOSING EQUIPEMNT
ProsesProses PembongkaranPembongkaran Belt Conveyor U1J85 Yang Lama Dan Belt Conveyor U1J85 Yang Lama Dan ReposisiReposisi Head U1J85 Head U1J85 MenjadiMenjadi
Head U1J90. Head U1J90.
4242PKM VISIPKM VISI “Valuable Is SMART Improvement” LIMESTONE DOSING EQUIPEMNTLIMESTONE DOSING EQUIPEMNT
ProsesProses ComisioningComisioning PengisianPengisian Gypsum Dan Limestone Gypsum Dan Limestone DenganDengan AlatAlat Transport Yang Transport Yang BaruBaru..
4444PKM VISIPKM VISI “Valuable Is SMART Improvement” LIMESTONE DOSING EQUIPEMNTLIMESTONE DOSING EQUIPEMNT
4.4. DiDi Outlet Limestone Bin, Outlet Limestone Bin, TerdapatTerdapat Material Yang Material Yang JatuhJatuh Dari Belt Dari Belt WeigherWeigher Z1C01 Z1C01 ArahArah MotorMotor
4747PKM VISIPKM VISI “Valuable Is SMART Improvement” LIMESTONE DOSING EQUIPEMNTLIMESTONE DOSING EQUIPEMNT
LANGKAH VILANGKAH VIEVALUASI HASILEVALUASI HASIL PERBAIKANPERBAIKAN
4848PKM VISIPKM VISI “Valuable Is SMART Improvement” LIMESTONE DOSING EQUIPEMNTLIMESTONE DOSING EQUIPEMNT
LANGKAH VILANGKAH VIEVALUASI HASILEVALUASI HASIL PERBAIKANPERBAIKAN
Record Record HasilHasil Cement Mill Cement Mill PabrikPabrik Baturaja Baturaja UntukUntuk MemproduksiMemproduksi OPCOPC--I, Limestone I, Limestone Set Point 8% Set Point 8% ProporsiProporsi FeederFeeder
4949PKM VISIPKM VISI “Valuable Is SMART Improvement” LIMESTONE DOSING EQUIPEMNTLIMESTONE DOSING EQUIPEMNT
LANGKAH VILANGKAH VIEVALUASI HASILEVALUASI HASIL PERBAIKANPERBAIKAN
-----10,2910,4710,4711,1710,5010,4610,5410,4710,4710,35C4AF-----12,6711,311,3810,8610,739,908,879,509,827,18C3A-----25,6626,2826,0625,6218,027,438,2018,9215,5211,39C2S-----45,8743,8344,3545,2154,1368,3865,1253,0756,0961,60C3S-----1,481,681,451,32-1,080,994,203,813,24Free CaO
Max 3.0-2,131,331,661,280,790,680,630,62IRMax 5.0-2,992,432,583,423,281,745,273,630,340,330,30LOIMax 3.5Max 4.01,991,891,71,92,32,232,032,072,292,382,392,542,76SO3
Max 0.6-----------2,472,241,90K2O/ AlkaliMax 6,0-0,800,640,971,061,091,101,141,040,961,910,821,231,23MgO
5050PKM VISIPKM VISI “Valuable Is SMART Improvement” LIMESTONE DOSING EQUIPEMNTLIMESTONE DOSING EQUIPEMNT
LANGKAH VILANGKAH VIEVALUASI HASILEVALUASI HASIL PERBAIKANPERBAIKAN
ANALISA EKONOMIANALISA EKONOMI
Adapun Pemakaian Limestone Tanggal 17 Adapun Pemakaian Limestone Tanggal 17 -- 31 Januari 2010 Di Cement Mill Pabrik Baturaja, 31 Januari 2010 Di Cement Mill Pabrik Baturaja,
Yaitu: Yaitu:
PemakaianPemakaian Limestone Limestone BulanBulan JanuariJanuari 20102010 == 1135.75 ton 1135.75 ton
HargaHarga Limestone (Base Limestone (Base DesemberDesember 2009)2009) == RpRp 19.868 Per ton19.868 Per ton
HargaHarga Clinker (Base Clinker (Base DesemberDesember 2009)2009) == RpRp 281.033 Per ton281.033 Per ton
SelisihSelisih HargaHarga Limestone Limestone TerhadapTerhadap ClinkerClinker == RpRp 261.166 Per ton261.166 Per ton
KeuntunganKeuntungan PemakaianPemakaian LimestoneLimestone == RpRp 261.166 Per ton . 1135.75 ton 261.166 Per ton . 1135.75 ton
== RpRp 296.618.649 296.618.649
5151PKM VISIPKM VISI “Valuable Is SMART Improvement” LIMESTONE DOSING EQUIPEMNTLIMESTONE DOSING EQUIPEMNT
LANGKAH VILANGKAH VIEVALUASI HASILEVALUASI HASIL PERBAIKANPERBAIKAN
AdapunAdapun BeberapaBeberapa UsulanUsulan StandarisasiStandarisasi Yang Yang TelahTelah DilakukanDilakukan, , YaituYaitu::
1.1. SosialisasiSosialisasi ProsedurProsedur PengisianPengisian Gypsum Dan Limestone Gypsum Dan Limestone
2.2. RevisiRevisi Form Form RekamanRekaman HarianHarian Performance Performance OperasiOperasi Cement Mill Cement Mill PabrikPabrik BaturajaBaturaja
3.3. PenambahanPenambahan FrekuensiFrekuensi AnalisaAnalisa Residue 45 Residue 45 m Dari 1 x m Dari 1 x PershiftPershift MenjadiMenjadi 2 x 2 x PershiftPershift
((KoordinasiKoordinasi Unit Unit KerjaKerja DalmutDalmut Dan Dan ProduksiProduksi))
4.4. PenetapanPenetapan KehalusanKehalusan Semen (Blaine) Semen (Blaine) UntukUntuk SetiapSetiap PersenPersen PenambahanPenambahan Limestone Dan Limestone Dan
TindakTindak LanjutLanjut BilaBila TidakTidak TercapaiTercapai ((KoordinasiKoordinasi Unit Unit KerjaKerja DalmutDalmut Dan Dan ProduksiProduksi))