SPiGA INTEGRATED DIGITAL SYSTEM FOR PROCESS SAFETY AND ASSET MANAGEMENT IN ECOPETROL S.A. Guillermo Eduardo Pinto Amaya ECOPETROL S.A.
SPiGAINTEGRATED DIGITAL SYSTEM
FOR PROCESS SAFETY AND ASSET MANAGEMENT IN ECOPETROL
S.A.
Guillermo Eduardo Pinto AmayaECOPETROL S.A.
SPiGA INTEGRATED DIGITAL SYSTEM FOR PROCESS SAFETY AND ASSET MANAGEMENT IN ECOPETROL
AgendaTopic Mins
Welcome, Greetings & Introduction 1
Background & Main needs and challenges in a separate Asset Management and Process Safety approach
2
Philosophy of SPIGA´s approach 3
The need of integration. Information, Amount of data, Digital Transformation. The 4th Industrial Revolution
3
SPiGA Evolution. Technological evolution 2
SPiGA’s IT architecture. ‘The Train’ 2
Closer view of some process’ implementations 3
SPiGA Short, Medium and Long term 2
Conclusions 2
PROCESS SAFETY MANAGEMENT
ASSET MANAGEMENT
MAINTENANCE HSE
Background & Main needs and challenges in aseparate Asset Management and Process Safetyapproach
• Integrate the information. Subprocesses of AM and PS need sharinginformation. Examples:
• MoC requires information from engineering, PSI or maintenance
• Engineering requires and generates risk information
• "As-Built" information is necessary for TA, MoC or for theelaboration of operational procedures
• Risk Management is based, among others, on the findings of theoperation (rounds) or maintenance (inspections)
• Inspections and improved maintenance can produce a MoC or anew project;
• Risk analysis (HAZOP, HAZID, LOPA, etc.) can derive in a MoC andat the same time require "As-Built" information for their properdevelopment,… and more
SPiGA INTEGRATED DIGITAL SYSTEM FOR PROCESS SAFETY AND ASSET MANAGEMENT IN ECOPETROL
PROCESS SAFETY MANAGEMENT
ASSET MANAGEMENT
MAINTENANCE HSE
Background & Main needs and challenges in aseparate Asset Management and Process Safetyapproach
• Decision-making based on risk. Absence, outdated, lack ofcompletion or lack of integration of the information make decisionsdifficult or can lead to erroneous decisions, generally causing costoverruns or incidents.
• Operational Analysis to improve decision making. Difficulty toperform operational analyses. The information from the differentsources is not integrated, updated or real-timed
• PSM and AM Management (Planning, Organize, Leading, Controlling).Redundant indicators (KPIs), more manpower for consolidation, moremeetings for managing two processes and then integrate them,redundant plans to manage risk, duplication of or inadequatepurchases; are some of the examples of the cost overruns
SPiGA INTEGRATED DIGITAL SYSTEM FOR PROCESS SAFETY AND ASSET MANAGEMENT IN ECOPETROL
PROCESS SAFETY MANAGEMENT
ASSET MANAGEMENT
MAINTENANCE HSE• Unification of Risk assessment. Ununified risk assessment andconsequently, of the actions to control it. Development of non priorityactivities or lack of action for activities that really need urgent action
• Updated information. Potential incidents due to outdated informationused in MoC or Projects
• Optimize processes and costs. Cost overruns, mainly due to:
• The need to consolidate / integrate information from both processes–PS and AM-, inaccessible by inter-related subprocesses which isrequired for their optimal operation
• The need to review/correct the information needed to developProjects or MoCs
• The need to operate, update/maintain multiple informationplatforms
SPiGA INTEGRATED DIGITAL SYSTEM FOR PROCESS SAFETY AND ASSET MANAGEMENT IN ECOPETROL
Background & Main needs and challenges in aseparate Asset Management and Process Safetyapproach
PROCESS SAFETY MANAGEMENT
ASSET MANAGEMENT
MI
RISK INTEGRATED AND DYNAMIC MANAGEMENTAudits, MoC, Operator Rounds,Inspections, Employes changes,Financial, BEC
ENGINEERING AND DESIGN
Projects, MoC & T/A
MoC
PSI
MAINTENANCET/A,Inspections,Planning, Programming
OPERATIONSOperating procedures,Operator Inspections
PSSR
Philosophy of SPIGA´s approach
SPiGA INTEGRATED DIGITAL SYSTEM FOR PROCESS SAFETY AND ASSET MANAGEMENT IN ECOPETROL
MOC
ENGIENEERING, DESIGN AND REVERSE
ENGINEERING
ProJects, MoC and T/A
T/A
PSI AND TECHNICAL
INFORMATION
OPERATIONS(OPERATIONALANALYSIS, PTW)
TRAINING
(Virtual reality and Augmented reality)
MAINTENANCE (INSPECTIONS) AND CMMS AND RTDB
LINKS
The need of integration. Information
INTEGRATED AND
DYNAMICAL MANAGEMENT
OF RISK
SPiGA INTEGRATED DIGITAL SYSTEM FOR PROCESS SAFETY AND ASSET MANAGEMENT IN ECOPETROL
https://www.forbes.com/sites/nvidia/2018/06/21/how-ai-is-providing-digital-twins-for-predictive-maintenance-in-oil-and-gas/#68d62eca4780
Amount of data
SPiGA INTEGRATED DIGITAL SYSTEM FOR PROCESS SAFETY AND ASSET MANAGEMENT IN ECOPETROL
SPiGA INTEGRATED DIGITAL SYSTEM FOR PROCESS SAFETY AND ASSET MANAGEMENT IN ECOPETROL
Time1800 1900 2000
First IndustrialRevolution
SecondIndustrialRevolution
Third IndustrialRevolution
ForthIndustrialRevolution
Degree of Complexity
Mechanization Electrification Automation Digitalization
Digital Transformation. The 4th Industrial Revolution
Figure based on Marcellus drilling news. June 20, 2017.
The digital flood
SPiGA INTEGRATED DIGITAL SYSTEM FOR PROCESS SAFETY AND ASSET MANAGEMENT IN ECOPETROL
MoCDocumental
2019-2020
2018-2019
SPiGA Evolution
SPiGA INTEGRATED DIGITAL SYSTEM FOR PROCESS SAFETY AND ASSET
MANAGEMENT IN ECOPETROL
MoC, the search for its digital solution. SITREC, MoC, PSI, T/A workflow
2004-2005. Initiate the new formal MoC process2010. First digital implementation for MoC2013. Diagnosis of MoC Solution2013-2016. Attemps to change digital solution for MoC2015. Cartagena’s refinery SITREC as document management. Implementation of MoC in SP. 2017. Refinements of MoC in Cartagena, PSI, T/A workflow
2005-2017
SPiGA, GDR, Barrancabermeja refinery, Engineering support by Contractors, Integration, PTW
2018. Dynamic and Integrated Risk Management 2018. It was born SPIGA concept and it is extended to Barrancabermeja refinery2018. Engineering and Reverse Engineering for Projects supported by contractors2018. SPIGA’s approve to VDP and VIP2019. Integration with CMMS and RTDB2019. Permit to Work Barrancabermeja refinery
PSIT/A workflow
GDR
EngineeringReverse Engineering
Permit to work
2020-20…
MOC
ENGIENEERING, DESIGN AND REVERSE
ENGINEERING
ProJects, MoC and T/A
T/A
PSI AND TECHNICAL
INFORMATION
OPERATIONS(OPERATIONALANALYSIS, PTW)
TRAINING
(Virtual reality and Augmented reality)
MAINTENANCE (INSPECTIONS) AND CMMS AND RTDB
LINKS
Concept
INTEGRATED AND
DYNAMICAL MANAGEMENT
OF RISK
SPiGA INTEGRATED DIGITAL SYSTEM FOR PROCESS SAFETY AND ASSET MANAGEMENT IN ECOPETROL
CADCAD+Base de Datos
DataCentric
Ad
de
d V
alu
e
• Database
• Object Relations
• BOM
• Static drawing
• Isolated information, lack of integration
• Integral Asset lifecycle Management
• Unique Database
• Automatic Design deliverables
• Consistency check
• Owner Operator oriented
• Integration (SAP, PI, Meridium)
Time
SPiGA INTEGRATED DIGITAL SYSTEM FOR PROCESS SAFETY AND ASSET MANAGEMENT IN ECOPETROL
Technology evolution
ASSET MANAGEMENT LIFECYCLE
PROCESS SAFETY MANAGEMENT
DisposeOperation and Maintenance
Construction, Commissioning
and Start-UpProcurement
Basic and Detailed
EngineeringConceptual Phase
Foundation & Portal
Mó
du
los
MA
TER
IALS
REF
EREN
CE
DAT
A
P&
ID
INST
RU
MEN
TATI
ON
ELEC
TRIC
AL
SMA
RT
3D
INTE
RO
P P
UB
LISH
ER
REV
IEW
PR
OC
ESS
ENG
INEE
RIN
G
MoCIntegration / Consistency
PSI & TecnicalInformation
Contractors / Providers Clients Other Stakeholders
Risk Integrated and Dynamical
ManagementInteroperability
Fusion
CO
NST
RU
CTI
ON
CO
MP
LETI
ON
S
OW
NER
OP
ERA
TOR
MO
BIL
E
3D
PA
CT
T/A Training
SPiGA INTEGRATED DIGITAL SYSTEM FOR PROCESS SAFETY AND ASSET MANAGEMENT IN ECOPETROL
SPiGA’s IT architecture. ‘The Train’
R A C IMOC. FLUJO GENERAL(1) DEL PROCESO
Convención de colores:
Facilitador
Dueño de Activo /
Nivel Superior
Dueño de Activo
Requiere Construcción?
Líder de
Ingeniería
Líder de
Construcción/
Ejecución.
Áreas:Paradas
de Planta,
Ingeniería o
Mantenimiento
Líder Alistamiento
Mecánico
NO
Autoridad
Técnica
SI
Autoridad
Técnica
Autoridad
Técnica
Autoridad Técnica
Facilitador Dueño de Activo
Dueño de Activo
Dueño de Activo
Dueño de Activo
Guardián
Información
Tecnología de
Proceso
Equipo
Integrado2
Líder Análisis
Técnico y
Desarrolladores
Análisis Técnico
Autoridad Técnica
Lider Análisis
Técnico y
Desarrolladores
Análisis Técnico
Dueño de Activo
Realizar Análisis de Factibilidad e
Inscribir la iniciativa en
Habilitador Tecnológico
Aprobar la iniciativa y Asignar
Autoridad Técnica
Asignar Líder de Análisis Técnico
Desarrollar Análisis Técnico y
Análisis de Riesgos
Asignar Líder de Ingeniería
Desarrollar Ingeniería y cargarla
en Habilitador Tecnológico
Aprobar el cambio
Implementar el Cambio
Generar información 'As-Built'
Alistamiento Mecánico
Verificar la actualización de la
información afectada por el
cambio en los habilitadores
tecnológicos correspondientes
Cerrar el Cambio
Área Técnica Área Operativa
Divulgar el cambio Facilitador Dueño de Activo
RSPA o
metodología
similar
Registro de
divulgación
Comité corporativo MoC
rev a 2018-11-02
NOTAS: 1) Para detalles, ver directamente en habilitador tecnológico definido en el área/negocio
2) Equipo humano que apoya técnicamente el área o unidad
Facilitador
Facilitador
Dueño de Activo
Facilitador
Líder de
Ingeniería
Ings.
desarrolladores
de Ingeniería
Facilitador
Facilitador
Facilitador
Facilitador
Facilitador
Facilitador
Facilitador
Dueño de Activo /
Nivel Superior
Dueño de Activo
Líder de
Análisis Técnico
Equipo
Integrado2
Autoridad Técnica
Equipo
Integrado2
Líder de
Entrenamiento del
área
Líder de
Construcción/
Ejecución.
Áreas:Paradas
de Planta,
Ingeniería o
Mantenimiento
Guardián
Información
Tecnología de
Proceso
SPiGA INTEGRATED DIGITAL SYSTEM FOR PROCESS SAFETY AND ASSET MANAGEMENT IN ECOPETROL
MoC
Engineering,
Maintenance,
Operations,
Risk Management
Team,
EPC Contractors
BOW-TIEs(xls)
(xls)
(xls)
SPiGA INTEGRATED DIGITAL SYSTEM FOR PROCESS SAFETY AND ASSET MANAGEMENT IN ECOPETROL
GDR. Implementation
Industry4.0
SPiGA INTEGRATED DIGITAL SYSTEM FOR PROCESS SAFETY AND ASSET MANAGEMENT IN ECOPETROL
GDR. Bow-tiesThreat Preventive Barriers Limit event Mitigation Barriers
• Operators, Engineers, Technicians identify process events, conditions, threats, barriers vulnerabilities which can cause the lack of contention of dangerous products
• Impact ranking, risk analysis and actions to reduce risk (using known methodologies) and decision making
SPiGA INTEGRATED DIGITAL SYSTEM FOR PROCESS SAFETY AND ASSET MANAGEMENT IN ECOPETROL
GDR. Workflow
• Escalation an validation of risk assessment and actions
• Systematic revision of risk, mitigation plans and their responsible people, schedules.
• High level review and decision making
MoCDocumental
Corporative PTW, Engineering ‘in house’, VR Training, Full Integration, Mobility, Digital twin2019. SPiGA full B/meja refinery2010-SPiGA in VDP2019. Permit to work for the whole corporation2019. Engineering and reverse engineering ‘in house’2020. Training using VR and/or Augmented Reality2020. Full integration of MoC, PSI, T/A, GDR, Engineering, Permit to work, Training2020. First Digital Twin
2019-2020
2018-2019
SPiGA Short, Medium and Long term
SPiGA INTEGRATED DIGITAL SYSTEM FOR PROCESS SAFETY AND ASSET
MANAGEMENT IN ECOPETROL
MoC, the search for its digital solution. SITREC, MoC, PSI, T/A workflow 2005. Initiate MoC Process2010. First digital implementation for MoC2013. Diagnosis of MoC Solution2013-2016. Attempts to change digital solution for MoC2015. Cartagena’s refinery implements MoC in SP. SITREC2017. Refinements of MoC in Cartagena, PSI, T/A workflow
2005-2017
SPiGA, GDR, Barrancabermeja refinery, Engineering support by Contractors, Integration, PTW2018. Dynamic and Integrated Risk Management 2018. It was born SPIGA concept and it is extended to Barrancabermeja refinery2018. Engineering and Reverse Engineering for Projects supported by contractors2018. SPIGA’s approval to VDP and VIP2019. Integration with CMMS and RTDB2019. Permit to Work Barrancabermeja refinery
PSIT/A workflow GDR
EngineeringReverse Engineering
Permit to workEngineering. ‘In house’
VR Training
2020-20…
Real time Risk based decision making
*Early alerts from risk scenarios based in real time indicators and analytics*Decision making based on different risk perspectives HSE, Operational, Projects, Maintenance, Procurement* Massive use of digital twins* SPiGA in ECOPETROL group
Digital twins
SPiGA INTEGRATED DIGITAL SYSTEM FOR PROCESS SAFETY AND ASSET MANAGEMENT IN ECOPETROL
✓ Communion (Integration) between PS and AM is the key to: a) avoid cost
overruns, b) An adequate Management for PS and AM
✓ Assure the communications in the project with all the actors, barriers never
are technical
✓ Be constant, the integration between processes and the IT construction is
evolutionary to a point. Then it will be a quantum leap
Conclusions