Asset Portfolio Key figures and location DECEMBER, 2018
32

Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Sep 12, 2019

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Asset PortfolioKey figures and location

DECEMBER, 2018

Page 2: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Index1. ALEATICA

Footprint 03

2. CHILE 04Toll Roads | Ports 06

3. COLOMBIA 09Toll Roads | 10

4. SPAIN 11Toll Roads | Ports | Railways 12

5. MEXICO 18Toll Roads | Airports 19

6. PERU 29Toll Roads | 30

Office Locations 31

2

Page 3: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Toll Roads

1,088 km

Ports

71 ha

Railways

22 km

Airports

1

ALEATICA | Footprint

3

Concessions: 19 assets

4,611.7 Mn €*

* Excluding consolidated companies under the equity method. Total managed investment as of December 31, 2018.

Total managed investment

Page 4: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Chile | Concessions

* Total managed investment as of December, 31 2018.

Ports

Infrastructure Ha Stake % Managed Investment* Status

Port of Valparaiso 18.9 100 54 Mn € Operation │Construction

4

Toll Roads

Infrastructure Km Stake % Managed Investment* Status

Eastern Vespucio Toll Road 9.3 50 911 Mn € Construction

Industrial Bridge 6.5 100 160 Mn € Construction

Canopsa 43 100 198 Mn € Operation │Construction

Page 5: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Stake

50 %

Client

Ministry of Public Works

Length

9.3 km

Investment

911 Mn €

AADT

N.A.

Chile | Toll Roads

5

Sociedad Concesionaria Vespucio Oriente, S.A.

Concession term: 45 years. Contract term: March 2014 – March 2059

Eastern Vespucio Toll Road

Page 6: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Stake

100 %

Client

Ministry of Public Works

Length

6.5 km

Investment

160 Mn €

AADT

N.A.

Chile | Toll Roads

6

Sociedad Concesionaria Puente Industrial, S.A.

Concession term: 40 years. Contract term: December 2014 – December 2054

Industrial Bridge

Page 7: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Stake

100 %

Client

Ministry of Public Works

Length

43 km

Investment

198 Mn €

AADT

5,483 (equivalent vehicles)

Chile | Toll Roads

7

Nuevo Camino Nogales – Puchuncaví, S.A.

Concession term: 38 years or until ITE fulfillment. Contract term: August 2016 – August 2054

Canopsa

Page 8: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Stake

100 %

Client

Port of Valparaiso Authority

Surface area

19 ha of esplanade 1,410 m of berthing line

Investment

481 Mn €

Capacity

1,150,000 TEU (potential)1,250,000 t

Machinery

5 Super Post Panamax Cranes12 Rtg’s10 Reach Stackers41 Tractors and Platforms 2 Gottwald Mobile Cranes

Chile | Ports

8

Terminal Cerros de Valparaíso, S.A.

Concession term: 30 years. Contract term: July 2013 – December 2043

TCVAL. Port of Valparaiso

Page 9: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Colombia | Concessions

9

Toll Roads

Infrastructure Km Stake % Managed Investment* Status

Río Magdalena Toll Road 155 100 626 Mn € Pre-Operation │Construction

* Total managed investment as of December, 31 2018.

Page 10: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Stake

100 %

Client

National Infrastructure Agency

Length

155 km

Investment

606 Mn €

AADT

2,047 (equivalent vehicles)

Colombia | Toll Roads

10

Autopista Río Magdalena, S.A.S. Río Magdalena Toll Road

Concession term: 25 years. Contract term: December 2014 – March 2040

Page 11: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Railways

Infrastructure Km Stake % Managed Investment* Status

West Light Rail Lines 22.4 23 597 Mn € Operation

Spain | Concessions

11

Toll Roads

Infrastructure Km Stake % Managed Investment* Status

A-2 Highway Section 1 56.0 20 205 Mn € Operation

M-45 Highway Section 3 8.3 100 96 Mn € Operation

Ports

Infrastructure Ha Stake % Managed Investment* Status

Port of Alicante 36.5 100 117 Mn € Operation

Port of Tenerife 15.3 100 62 Mn € Operation

* Total managed investment as of December, 31 2018.

Page 12: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Stake

20 %

Client

Ministry of Public Works

Length

56 km

Investment

205 Mn €

AADT

113,935 (average daily intensity)

Spain | Toll Roads

12

Autovía de Aragón Tramo 1, S.A. A-2 Highway, Section 1

Concession term: 19 years. Contract term: December 2007 – December 2026

Page 13: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Stake

100 %

Client

Community of Madrid

Length

8.3 km

Investment

96 Mn €

AADT

95,592 (average daily intensity)

13

Euroglosa 45, C.C.A. de Madrid, S.A. M-45 Highway, Section 3

Concession term: 29 years. Contract term: October 1998 – December 2027

Spain | Toll Roads

Page 14: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Stake

100 %

Client

Alicante Port Authority

Surface area

36.5 ha of esplanade 1,670 m of berthing line

Investment

117 Mn €

MOV

95,557

Machinery

2 Post Panamax Cranes3 Transtainers Kone7 Reach Stackers Kone16 Mafis / Tractors11 Platforms4 Forklift

Spain | Ports

14

Terminales Marítimas del Sureste, S.A. TMS. Port of Alicante

Concession term: 42 years. Contract term: June 2003 – July 20147

Page 15: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Stake

100 %

Client

Santa Cruz de Tenerife Port Authority

Surface area

15.3 ha of esplanade 700 m of berthing line

Investment

62 Mn €

MOV

238,118

Machinery

6 Over Post Panamax Cranes8 RTG3 Reach Stackers12 Maffis12 Platforms

15

Terminal de Contenedores de Tenerife, S.A. TCTenerife. Port of Tenerife

Spain | Ports

Concession term: 42 years. Contract term: May 2012 – May 2054

Page 16: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Stake

23 %

Client

Community of Madrid

Length

22,4 km

Investment

597 Mn €

Passengers

18,725 (average daily passengers)

Spain | Railways

16

Metro Ligero Oeste, S.A. West Light Rail Lines ML2 & ML3

Concession term: 30 years. Contract term: September 2006 – September 2036

Page 17: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Spain| Other map resources

17

Spain| Toll Roads Spain | Metropolitan Area & Henares Corridor

Page 18: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Airports

Infrastructure Services Stake % Managed Investment* Status

Toluca Int. AirportAirport

Supplementary Commercial

28 193 Mn € Operation

Mexico | Concessions

18

Toll Roads

Infrastructure Km Stake % Managed Investment* Status

Mexiquense Beltway 155 29 1,132 Mn € Operation

Atizapán - Atlacomulco 74 57 532 Mn € Construction

Bicentennial Viaduct 32 57 495 Mn € Operation

Northern Urban Toll Road 9 57 522 Mn € Operation

Poetas Expressway 7 28 337 Mn € Operation

Gana 123 39 136 Mn € Operation

Puebla Elevated Bypass 13.3 29 444 Mn € Operation

* Total managed investment as of December, 31 2018.

Page 19: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Stake

29 %

Client

State of Mexico Government

Length

155 km (110 km in operation)

Investment

1.132 Mn €

AADT

355,559 (equivalent vehicles)

Mexico | Toll Roads

19

Concesionaria Mexiquense, S.A. de C.V. Mexiquense Beltway

Concession term: 46 years. Contract term: February 2003 – December 2051

Page 20: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Stake

57 %

Client

Secretariat of Communications and Transport

Length

74 km

Investment

532 Mn €

AADT

N.A.

Mexico | Toll Roads

20

Concesionaria AT-AT, S.A. de C.V.

Concession term: 30 years. Contract term: April 2014 – April 2044

Atizapán – Atlacomulco Toll Road

Page 21: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Stake

57 %

Client

State of Mexico Government

Length

32 km (22 km in operation)

Investment

495 Mn €

AADT

33.373 (average daily intensity)

Mexico | Toll Roads

21

Viaducto Bicentenario, S.A. de C.V.

Concession term: 30 years. Contract term: May 2008 – May 2038

Bicentennial Viaduct

Page 22: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Stake

57 %

Client

Mexico City Government

Length

9 km

Investment

523 Mn €

AADT

58,316 (average daily intensity)

Mexico | Toll Roads

22

Autopista Urbana Norte, S.A. de C.V.

Concession term: 30 years. Contract term: July 2010 – December 2042

Northern Urban Toll Road

Page 23: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Stake

28 %

Client

Mexico City Government

Length

7 km

Investment

337 Mn €

AADT

81,770 (equivalent vehicles)

Mexico | Toll Roads

23

Controladora Vía Rápida Poetas, S.A.P.I. de C.V.

Concession term: 30 years. Contract term: April 2010 – June 2043

Poetas Expressway

Page 24: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Stake

29 %

Client

State of Puebla Government

Length

13.3 km

Investment

444 Mn €

AADT

31,915 (equivalent vehicles)

Mexico | Toll Roads

24

Libramiento Elevado de Puebla, S.A. de C.V.

Concession term: 30 years. Contract term: August 2014 – October 2046

Puebla Elevated Bypass

Page 25: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Stake

39 %

Client

Secretariat of Communications and Transport

Length

123 km

Investment

136 Mn €

AADT

43,769 (equivalent vehicles)

Mexico | Toll Roads

25

Grupo Autopistas Nacionales, S.A.

Concession term: 60 years. Contract term: November 2003 – November 2063

Gana

Page 26: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Stake

28 %

Client

Airports and Auxiliary Services (ASA)

Services

Airport, supplementary and commercial

Investment

193 Mn €

Passengers

566,968 (passengers per year)

Mexico | Airports

26

AMAIT, S.A. de C.V.

Concession term: 50 years. Contract term: September 2005 – September 2055

Toluca International Airport

Page 27: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Mexico | Regions (I)

27

Mexico | Mexico City Greater Metropolitan Area

Page 28: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Mexico | Regions (II)

28

Mexico | Altiplano Corridor

Page 29: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Peru | Concessions

29

Toll Roads

Infrastructure Km Stake % Managed Investment* Status

Northern Toll Road 396 100 483 Mn € Operation

* Total managed investment as of December, 31 2018.

Page 30: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Stake

100 %

Client

Ministry of Transport and Communications

Length

396 km

Investment

483 Mn €

AADT

55,402 (equivalent vehicles)

Peru | Toll Roads

30

Autopista del Norte, S.A.C.

Concession term: 33 years*. Contract term: February 2009 – February 2042

Northern Toll Road

* The modification of the contract related to the Chimbote Bypass provides for an extension of the concession period subject to traffic performance. This extension is estimated to be between 7 and 8 additional years.

Page 31: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

Office Locations

ALEATICASPAINPaseo de la Castellana, 259 D Torre Cristal

28046 Madrid – ESPAÑATelephone: +34 91 348 41 [email protected]

ALEATICA LabsPaseo de la Castellana, 259 D Torre Cristal

28046 Madrid – ESPAÑA

Telephone: +34 91 348 78 38

[email protected]

BRAZILAvenida Angélica 2491 – 19º Andar, 01227-200 – ConsolaçãoSão Paulo – BRASILTelephone: +55 11 31 51 49 98

CHILEEdificios Alto el Plomo, Torre Norte Cerro, El Plomo # 5855,

Piso 16 Oficinas 1607 – 1608

756160 – Las Condes, Santiago de Chile – CHILE

Telephone: +56 22 871 85 00

COLOMBIACalle 17 N° 93 – 09 Edificio Ecotower 93, Oficinas 703 - 704Bogotá – COLOMBIATelephone: +57 15 18 87 00

PERUAv. 28 de Julio, 150, Piso 4Miraflores, Lima 18 – PERÚTelephone: +51 16 25 45 00

MEXICOAvenida Paseo de la Reforma No. 222, piso 25

06600 Ciudad de México – MÉXICO

Telephone: +52 55 52 55 52 50

ALEATICA LabsRío Lerma 196 Bis Torre A Piso 7

06500 Ciudad de México – MÉXICO

Telephone: +52 55 78 26 71 71

Page 32: Presentación de PowerPoint - aleatica.com · * Excluding consolidated companies under the equity method.Total managed investment as of December 31, 2018.

aleatica.com