Top Banner
16

Presentación de PowerPoint · BTR INFLUENCE. SUBWAY LINE. SUBWAY STOPS. BRT ROUTES. BRT STOPS. BRT STATIONS “Plan Bicentenario”: Developing a new centrality connected to the

Feb 07, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Presentación de PowerPoint · BTR INFLUENCE. SUBWAY LINE. SUBWAY STOPS. BRT ROUTES. BRT STOPS. BRT STATIONS “Plan Bicentenario”: Developing a new centrality connected to the
Page 2: Presentación de PowerPoint · BTR INFLUENCE. SUBWAY LINE. SUBWAY STOPS. BRT ROUTES. BRT STOPS. BRT STATIONS “Plan Bicentenario”: Developing a new centrality connected to the
Page 3: Presentación de PowerPoint · BTR INFLUENCE. SUBWAY LINE. SUBWAY STOPS. BRT ROUTES. BRT STOPS. BRT STATIONS “Plan Bicentenario”: Developing a new centrality connected to the
Page 4: Presentación de PowerPoint · BTR INFLUENCE. SUBWAY LINE. SUBWAY STOPS. BRT ROUTES. BRT STOPS. BRT STATIONS “Plan Bicentenario”: Developing a new centrality connected to the

Territorial and urban description

Central plateauPlateau altitude 2850 m.a.s.lValleys altitude 2300 m.a.s.l

Page 5: Presentación de PowerPoint · BTR INFLUENCE. SUBWAY LINE. SUBWAY STOPS. BRT ROUTES. BRT STOPS. BRT STATIONS “Plan Bicentenario”: Developing a new centrality connected to the

Equa

tor

0°0’

0”

Territorial and urban description

District area = 423.073,30 Ha 4,7% is urban area

Population (2020) = 2’633,748 inh.71,9% urban population

Page 6: Presentación de PowerPoint · BTR INFLUENCE. SUBWAY LINE. SUBWAY STOPS. BRT ROUTES. BRT STOPS. BRT STATIONS “Plan Bicentenario”: Developing a new centrality connected to the

Trips to the business dictrict

73% of the motorized trips in the city are by public transportation

BUSINESS DICTRICT

Page 7: Presentación de PowerPoint · BTR INFLUENCE. SUBWAY LINE. SUBWAY STOPS. BRT ROUTES. BRT STOPS. BRT STATIONS “Plan Bicentenario”: Developing a new centrality connected to the

Poverty gap distribution

POVERTY GAP INDEX

Page 8: Presentación de PowerPoint · BTR INFLUENCE. SUBWAY LINE. SUBWAY STOPS. BRT ROUTES. BRT STOPS. BRT STATIONS “Plan Bicentenario”: Developing a new centrality connected to the

Quito’s Public Transportation System (PTS)

BRT ROUTE

BRT STOPS

FEEDER ROUTE

BRT system has been operating for 21 yearsCurrent demand = 1.1 million daily passengersThe demand is surpassing the service capacity

Page 9: Presentación de PowerPoint · BTR INFLUENCE. SUBWAY LINE. SUBWAY STOPS. BRT ROUTES. BRT STOPS. BRT STATIONS “Plan Bicentenario”: Developing a new centrality connected to the

Towards an Integrated PTS

BRT ROUTE

BRT STOPS

FEEDER ROUTE

SUBWAY ROUTE

SUBWAY STATIONS

CABLE CAR LINES

CABLE CAR STOPSFirst subway line and cable car line are under construction

Page 10: Presentación de PowerPoint · BTR INFLUENCE. SUBWAY LINE. SUBWAY STOPS. BRT ROUTES. BRT STOPS. BRT STATIONS “Plan Bicentenario”: Developing a new centrality connected to the

How accessibility is going to change with different infrastructure projects

Source: Arturo Ardila-Gomez - Global Lead Urban MobilityTransport and ICT Global Practice, 2016

Page 11: Presentación de PowerPoint · BTR INFLUENCE. SUBWAY LINE. SUBWAY STOPS. BRT ROUTES. BRT STOPS. BRT STATIONS “Plan Bicentenario”: Developing a new centrality connected to the

Ongoing efforts: Eco-Eficiency for high density and mixed land use• Increased density around the

PTS (400 meters accesibility)• Charge for building rights

(Value capture)• More eficiency = more floors

SUBWAY INFLUENCE

BTR INFLUENCE

SUBWAY LINE

SUBWAY STOPS

BRT ROUTES

BRT STOPS

BRT STATIONS

Page 12: Presentación de PowerPoint · BTR INFLUENCE. SUBWAY LINE. SUBWAY STOPS. BRT ROUTES. BRT STOPS. BRT STATIONS “Plan Bicentenario”: Developing a new centrality connected to the

“Plan Bicentenario”: Developing a new centrality connected to the Metro

NEW DEVELOPMENT

RE-DEVELOPMENT

RENOVATION

FACILITY - PARK

URBAN TREATMENTS

Metro Terminal Station

Convention Center

Source: Winning Project – Arq. Ernesto Bilbao

• Charges VS. Benefits• Land integration (mínimum plot size required)

• Public space (metropolitan park) 121,5 ha• Private plots around the park 191,34 ha• Allowed floors above ground 6 to 30 floors

Page 13: Presentación de PowerPoint · BTR INFLUENCE. SUBWAY LINE. SUBWAY STOPS. BRT ROUTES. BRT STOPS. BRT STATIONS “Plan Bicentenario”: Developing a new centrality connected to the

Expected benefits of TODURBAN BENEFITS

SOCIAL BENEFITS

• Proximity and accesibility to jobs, services,facilities and affordable housing

• Reductioning in commuting times and OneFare Card for All Transit

• Safety improvements through bettertransportation and public spaces

• Densification around PTS• Mixed land use• Land management and market regulation

Page 14: Presentación de PowerPoint · BTR INFLUENCE. SUBWAY LINE. SUBWAY STOPS. BRT ROUTES. BRT STOPS. BRT STATIONS “Plan Bicentenario”: Developing a new centrality connected to the

Expected benefits of TOD

ECONOMIC BENEFITS

ENVIRONMENTAL BENEFITS

• Carbon footprint reduction• Public space improvement• Urban Green Network

implementation

• Land-based financing forpublic space, services andinfrastructure

• Real estate reactivation• Business and

entrepreneurial location

Page 15: Presentación de PowerPoint · BTR INFLUENCE. SUBWAY LINE. SUBWAY STOPS. BRT ROUTES. BRT STOPS. BRT STATIONS “Plan Bicentenario”: Developing a new centrality connected to the
Page 16: Presentación de PowerPoint · BTR INFLUENCE. SUBWAY LINE. SUBWAY STOPS. BRT ROUTES. BRT STOPS. BRT STATIONS “Plan Bicentenario”: Developing a new centrality connected to the

Arq. Jacobo HerdoízaSecretary of Territory, Habitat y Housing

Arq. Carla ArellanoMayor’s office