Top Banner
Willetts Creek/Dzus Fastener Present status and Future Plans
26

Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

Aug 18, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

1

Willetts Creek/Dzus FastenerPresent status and Future Plans

Page 2: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

2

Dzus Fastener

Background

Page 3: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

3

On Site (Dzus) Past Cleanup Completed- 1997

Page 4: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

4

Creek Sampling priorto remediation

Page 5: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

5

Off Site (Willetts Creek and Lake Capri)Past Cleanup work- 1999

Page 6: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

6

Remedial Process

Long Term monitoring

*****

2000-present

Remedial Action

Remedial Design

Record of Decision

Proposed Remedial

Action Plan

Remedial Investigation

Page 7: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

7

Long Term Monitoring Groundwater Surface Water Sediment Biota

Page 8: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

8

GroundwaterCurrent Conditions

Page 9: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

9

Surface Water

Page 10: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

10

Biota

Page 11: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

11

SedimentSediment has been tested for Over 10 years

Post remediation levels of cadmium near or below ( ppm cleanup criteria

Levels increased in 2012

Led to more robust sampling creek and lake

Page 12: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

12

Recent Sediment Sampling- Upper Creek

Page 13: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

13

Recent Sediment Sampling – Mid Creek

Page 14: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

14

Recent Sediment Sampling –lower Creek and Lake

Page 15: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

15

Cove Sampling

Page 16: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

16

Athletic Fields

Page 17: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

17

Remedial Process

Long Term monitoring

Remedial ActionRemedial DesignRecord of Decision

Proposed Remedial Action

Plan

Remedial Investigation

****

Current step

Willetts

Page 18: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

18

Next Steps - Schedule Expanded Creek sampling

-this spring/early summerResidential Sampling

- this spring/early summerAthletic Field Sampling –

- this spring/early summer

Page 19: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

19

Next Steps - Schedule Proposed Remedial Action Plan

– later 2016Public Comment Period

– later 2016Record of Decision (ROD)

- fall 2016Design and Creek Cleanup to follow ROD

Page 20: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

20

Contact InformationPayson Long, P.E.

625 Broadway DER, 12th Floor

Albany, NY 12233

Phone: (518) 402-9813

Email Address: [email protected]

Page 21: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

21

New York State Department of HealthBrad Wenskoski

Public Health SpecialistBureau of Environmental Exposure InvestigationEmpire State Plaza, Corning Tower, Room 1787

Albany, NY 12237Phone: (518) 402-7860

Fax: (518) 402-7859Email: [email protected]

Page 22: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

22

Role of the NYS DOH• Work with NYSDEC to collect information needed to evaluate

potential exposure to environmental contamination

• Evaluate data and make recommendations to address any potential exposure and evaluate the need for additional information

• Ensure that remedy selected is protective of public health

Page 23: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

23

Exposure• Physical contact with a chemical or substance

Inhalation (breathing) Direct contact (touching) Ingestion (eating/drinking)

• One or more of these physical contacts must occur before a chemical has the potential to cause a health problem

• Exposure does not necessarily mean that health effect will occur

Page 24: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

24

Potential Exposure Pathways

Soil/Sediment

• Potentially complete exposure pathways include direct contact with and subsequent ingestion of sediment and soil in and around Willetts Creek.

Ground/Surface Water

• Public water is supplied to the surrounding area from a source not affected by this contamination

• Potentially complete exposure pathways exist with surface waters of Willetts Creek.

Page 25: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

25

Fishing

Follow fish advisories for Lake Capri

Men Over 15 & Women Over 50

American eel, CarpUp to 1 meal/month

All other fishUp to 4 meals/month

Women Under 50 & Children Under 15

American eel, CarpDON’T EAT

All other fishDON’T EAT

Page 26: Present Status and Future Plans - Presentation - …...Willetts Creek/Dzus Fastener - Present Status and Future Plans - Presentation Keywords Willetts Creek,Dzus Fastener,Present Status,Future

26

Gardening

Garden• Chemicals may be there naturally or

from past and present land use, consider growing in raised beds

• Wear gloves when working in the garden and avoid bringing soil inside

• Wash hands with soap and water after gardening

Food Preparation• Always wash or rinse fruits and

vegetables before eating them

• Peel below-ground vegetables and those grown in close contact with soil

• Remove outside leaves of leafy head vegetables