Top Banner
Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS
30

Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Mar 28, 2015

Download

Documents

Tristin Campton
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Preparing for a F&A Proposal Base Year

2011 NCURA Region VI & VII ConferencePresented By: Adrienne Clifton and Ginger Baker, MAXIMUS

Page 2: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Agenda

• Overview of F&A Calculation• Preparing for a Base Year• Negotiations

Page 3: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Overview of F&A

Page 4: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Facilities and Administrative Costs

• Costs that are incurred for common or joint objectives and therefore cannot be identified readily and specifically with a particular sponsored project, instructional activity or any other institutional activity. (OMB Circular A-21, Section B.4)

Page 5: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Facilities & Administrative Costs

• Administrative components– General Administration and General Expenses

– Departmental Administration

– Sponsored Projects Administration

– Student Administration and Services

• Administrative components are capped at 26% of modified total direct costs (OMB Circular A-21 G.8)

Page 6: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Facilities & Administrative Costs

• Facilities components– Building Depreciation

– Equipment Depreciation

– Interest

– Operations and Maintenance

– Library

Page 7: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Facilities & Administrative Costs

• Order of allocation– Building Depreciation

– Equipment Depreciation

– Interest

– Operations and Maintenance

– General Administration

Page 8: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Facilities & Administrative Costs

• Order of allocation (continued)– Departmental Administration

– Sponsored Projects Administration

– Student Administration and Services

– Library

Page 9: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Facilities & Administrative Costs

• Bases represent an institution’s direct cost activities:– Instruction and Departmental Research

• Sponsored instruction and training• Departmental research

– Organized Research• Sponsored research• University research

– Other Sponsored Activities– Other Institutional Activities

Page 10: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Preparing for a F&A Proposal Base Year

Page 11: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

This is my base year, what do I do?

• Define your objectives• Review past problems• Identify resources• Plan• Get resources commitment• Start early

Page 12: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Major Problems

• Base / Space Relation• Space Survey / Space Inventory• Reclassifications of Financial Statement

functions to F&A functions• Rates are decreasing, lower Administrative

components also• Time constraints• Compliance with Disclosure Statement (DS-2)

Page 13: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Major Opportunities

• Special studies• Interest• New construction since last proposal

– Should be occupied• Equipment by room• Quality space survey

Page 14: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Where To Start• Is the F&A Proposal due date realistic?• Resources

– Internal resources • Staffing• Financial systems

– External• Auditors• Consultants

• Goals – Expectations for the rate– Rate increase, maintain rate or minimize staff

effort

Page 15: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Define Base• Define the base

– Financial Statement reconciliation issues– Financial Statement reclassifications out of

Organized Research– Financial Statement reclassifications that

are large amounts (i.e. into Operations and Maintenance)

– Cost sharing

Page 16: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Need For Special Studies

• Library Study– Requires full year of data

• Componentization Study– The components of a building have different

useful lives and this results in accelerating the recognition of depreciation.

– Requires change on Financial Statements for building depreciation.

Page 17: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Interest

• Get it in the State Wide Cost Allocation Plan (SWCAP)

• Get it by building• Get it by department• Get it by the total amount for interest

associated with Campus Wide Improvements

Page 18: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

New Construction/Projection• What new research intensive buildings are

coming on line?• When will the building be completed?• What departments are moving into that

space? What is happening to the space they vacate?

• Will this building support new or existing research?

Page 19: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Equipment

• Ideally, want to match 90% of equipment to a valid building and room.

• Accurate inventory• Well documented• Split funded equipment• Service Center equipment

Page 20: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Space Survey

• Best if done in the final months of the base year (spring) or some schools are conducting the survey after the base year ends

• Identify source and quality of base inventory• Identify departments to survey• Identify survey tools• Identify resources

Page 21: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Space Survey

• Develop Survey Plan• Develop Survey Materials• Train Surveyors• Conduct Survey• Quality Assurance• Review Results

Page 22: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Anticipate Results

• Conduct a practice year• Use partial year data to model results• Make adjustments in the accounting

system before year end• Review physical plant accounting

Page 23: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Results

• The more you can do before year end, the better

• No surprises during the rate calculation• Maximize rate calculation• With cleaner data, you can spend more time

focusing on data analysis, instead of data clean up

Page 24: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Review

• Are there significant percent changes in the individual components of the rate when compared with your last base year?

• What is the value of a point?– How many Administrative dollars are required to

increase the Administrative component by one point?– How many Facilities dollars are required to increase the

facilities rate by one point?– How much Organized Research space is needed to

increase the rate?

Page 25: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Review

• What departments have large Direct Charge Equivalent (DCE) ratios, why?

• Does your system coding facilitate the proper identification of other expenses?

• Does the campus have a clearly defined definition for Organized Research? Other Sponsored Activities? OIA?

• Do you have a common consistent understanding of University data?

Page 26: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Review

• What three things are you most comfortable with?

• What three things do you have the most concern about?

• Where are there possibilities for an increase in the rate?

• If you were the government, where would you look to decrease the rate?

Page 27: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Negotiations

• What is the submitted rate?• What is the minimum rate the University

will accept?• What rate can the University live with?• What is the ideal rate the University would

like?• What is the actual rate of recovery?

Page 28: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Negotiations• How many years should you negotiate for?• Do you have new research intensive buildings

coming on line? It is ideal to have a full year of costs in your proposal.

• Do you need to change your off-campus definition?

• Are you considering an equipment capitalization change?

Page 29: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Post Analysis

• What did you do right?• What can you do better next time?• Would a practice year benefit you?• Document, document, document• Fix it before you start the next one!

Page 30: Preparing for a F&A Proposal Base Year 2011 NCURA Region VI & VII Conference Presented By: Adrienne Clifton and Ginger Baker, MAXIMUS.

Questions/Comments

• Adrienne Clifton– 773-575-2599 (Mountain Time Zone)– [email protected]

• Ginger Baker– 702-994-2999 (Pacific Time Zone)– [email protected]