Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1
32

Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

Jan 04, 2016

Download

Documents

Sherilyn Newton
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

Prepared by: Ayah Yasin

SUPERVISOR Dr. HAFEZ SHAHEEN

PROJECT 2 : FALL 2012-2013

Wastewater Collection system for Anin

1

Page 2: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

OBJECTIVES

In my project the following objectives have been achieved:

1. Contribute to solving the environmental problems in Anin village that is due to un-safe disposal of wastewater.

2. Design of a Wastewater collection system.

2

Page 3: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

METHODOLOGY

Identify the problem. Determine the objective. Collect data and drawings for study area. Collect data by report, questionnaires. Data analysis and processing using excel and

AutoCAD programs. Model selection. Building the model. Sewer design(pipe diameter and length,

nodes elevation and location) .3

Page 4: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

METHODOLOGY

4

Page 5: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

Project 1:

In the first part of the project I have collected the data that have been applied in the project, this data include:

Water consumption : 100L/c/d. Average number of capita per family is 5.6

(PCBS). Current population is 4150. The disposal of wastewater in Anin is done by

cesspits.

5

Page 6: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

PROJECT 1:

In this part, also, I have calculated the following data:

Population growth rate:2.89. Future population:9450capita. Peak factor:3.04. the peak flow:3335 m3 /d

6

Page 7: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

PROJECT 1:

I have determined the design determinants, this determinants are:

design period :28 years (2012-2040). Wastewater production factor: 0.85. Formula have been used : Manning formula

(V=(1/n)*R2/3*S1/2 ). The velocity in the range of 0.6-3 m/s. minimum pipe diameter :8 in (200mm). Infiltration rate :5% of peak flow. Manholes spacing between the range 30-100 m. 7

Page 8: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

PROJECT 2:

In the second part of the project I have designed the sewer network using SewerCAD program.

The design steps are : calculating the load for each manhole

using excel sheet, based on :1. The population of the area which is equal the

area multiplied by the village population density.

2. Find the population for the designed year using the following equation:

Pn= P(1+ r)^n8

Page 9: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

PROJECT 2:

Using the hourly peak factor 2, and daily peak factor 1.5.

Determining the manholes location according to:

Every change in the pipe size, grade, or alignment. The distance between manholes in my project do not exceed 50m.

9

Page 10: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

INPUT DATA TO SEWERCAD:

Minimum and maximum velocity:

10

Page 11: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

INPUT DATA TO SEWERCAD:

Minimum and maximum cover:

11

Page 12: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

INPUT DATA TO SEWERCAD:

Minimum and maximum slope:

12

Page 13: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

OUTPUT RESULTS

13

Making analysis for the output results and modify the non-logical results for: manholes, velocities, slopes and diameters.

Printing the out put results1-TablesI. 1-pipes

II. 2-manholes

2- profiles

Page 14: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

14

THANK YOU

Page 15: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

15

Page 16: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

16

Page 17: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

17

Page 18: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

18

Page 19: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

19

Page 20: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

20

Page 21: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

21

Page 22: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

22

Page 23: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

23

Page 24: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

24

Page 25: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

25

Page 26: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

26

Page 27: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

27

Page 28: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

28

Page 29: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

29

Page 30: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

30

Page 31: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

31

Page 32: Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL 2012-2013 Wastewater Collection system for Anin 1.

THANK YOU

32