0 PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT (PPR) PRELIMINARY PROJECT REPORT (PPR) NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT (NABARD) (NABARD) (NABARD) (NABARD) BLOCK: BLOCK: BLOCK: BLOCK: KISKO & LOHARDAGA KISKO & LOHARDAGA KISKO & LOHARDAGA KISKO & LOHARDAGA DISTRICT: LOHARDAGA DISTRICT: LOHARDAGA DISTRICT: LOHARDAGA DISTRICT: LOHARDAGA PIA PIA PIA PIA SAMRIDHI FOUNDATION SAMRIDHI FOUNDATION SAMRIDHI FOUNDATION SAMRIDHI FOUNDATION NAME OF THE PROJECT: NAME OF THE PROJECT: NAME OF THE PROJECT: NAME OF THE PROJECT: LOHARDAGA LOHARDAGA LOHARDAGA LOHARDAGA- - -NABARD NABARD NABARD NABARD- - -1 1 1/ / /201 201 201 2015 5 5- - -16 16 16 16 SUBMITTED TO SUBMITTED TO SUBMITTED TO SUBMITTED TO NATIONAL BANK FOR AGRI NATIONAL BANK FOR AGRI NATIONAL BANK FOR AGRI NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT CULTURE AND RURAL DEVELOPMENT CULTURE AND RURAL DEVELOPMENT CULTURE AND RURAL DEVELOPMENT RANCHI RANCHI RANCHI RANCHI STATE LEVEL NODAL AGENCY STATE LEVEL NODAL AGENCY STATE LEVEL NODAL AGENCY STATE LEVEL NODAL AGENCY- - - JHARKHAND STATE WATERSHED MISSION JHARKHAND STATE WATERSHED MISSION JHARKHAND STATE WATERSHED MISSION JHARKHAND STATE WATERSHED MISSION DEPARTMENT OF RURAL DEVELOPMENT DEPARTMENT OF RURAL DEVELOPMENT DEPARTMENT OF RURAL DEVELOPMENT DEPARTMENT OF RURAL DEVELOPMENT 4 4 4 TH TH TH TH FLOOR, FFP BUILDING, DHURWA, RANCHI FLOOR, FFP BUILDING, DHURWA, RANCHI FLOOR, FFP BUILDING, DHURWA, RANCHI FLOOR, FFP BUILDING, DHURWA, RANCHI- - - 834004 834004 834004 834004 TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 - - - 651 651 651 651- - -2446217 2446217 2446217 2446217, 2401974 , 2401974 , 2401974 , 2401974 E E E- - -MAIL : MAIL : MAIL : MAIL : [email protected], WEB SITE: WEB SITE: WEB SITE: WEB SITE: www.jswm.nic.in
30
Embed
PRELIMINARY PROJECT REPORT (PPR) - Welcome …jswm.nic.in/File/Top_Box/PPR/NABARD PPR 2015-16/LOHARDAGA...2 Format for Preliminary Project Report (PPR) I. Institutional Structures.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT
SAMRIDHI FOUNDATIONSAMRIDHI FOUNDATIONSAMRIDHI FOUNDATIONSAMRIDHI FOUNDATION
NAME OF THE PROJECT: NAME OF THE PROJECT: NAME OF THE PROJECT: NAME OF THE PROJECT: LOHARDAGALOHARDAGALOHARDAGALOHARDAGA----NABARDNABARDNABARDNABARD----1111////2012012012015555----16161616
SUBMITTED TOSUBMITTED TOSUBMITTED TOSUBMITTED TO
NATIONAL BANK FOR AGRINATIONAL BANK FOR AGRINATIONAL BANK FOR AGRINATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENTCULTURE AND RURAL DEVELOPMENTCULTURE AND RURAL DEVELOPMENTCULTURE AND RURAL DEVELOPMENT
RANCHIRANCHIRANCHIRANCHI
STATE LEVEL NODAL AGENCYSTATE LEVEL NODAL AGENCYSTATE LEVEL NODAL AGENCYSTATE LEVEL NODAL AGENCY---- JHARKHAND STATE WATERSHED MISSIONJHARKHAND STATE WATERSHED MISSIONJHARKHAND STATE WATERSHED MISSIONJHARKHAND STATE WATERSHED MISSION
DEPARTMENT OF RURAL DEVELOPMENTDEPARTMENT OF RURAL DEVELOPMENTDEPARTMENT OF RURAL DEVELOPMENTDEPARTMENT OF RURAL DEVELOPMENT
Note: 1. Total outlay per Month for 12 SLNA-JSWM staffs under IWMP is Rs. 4.40 Lakhs
R – Recurring; NR- Non-recurring
* From column no. 3, totals no. of persons, from column no. 7 to 9, totals, may be indicated for the State at the end of the table.
6
Table PPR-3: Details of State Level Data Cell (SLDC) functionaries
1 2 3 4 5 6 7 8 9
S. No
Total no. of the
persons
working
in the
SLNA for
IWMP
Name & Designation Qualification Experience
Work allocation Monthly remuner
ation
(Rs.)
Total budget of SLDC
(Rs. In Lakh)
Funding expected from DoLR
(Rs. In Lakh)
R NR R NR
1 1 Shri. Vinod Kumar. V. H, Project Co-ordinator
M Tech (Water Resources)
6 years Creation and updation of Geodatabase under IWMP Project using satellite data
30,000.00
2 1 Shri. Anuj Shankar, MIS State Coordinator
MCA 4 years Updation of all the thematic layer using MIS Software development
15000.00
3 3 Shri. Abdul Saqoor, Field Supervisor
M Sc (IT) 5 years Updation of data using GIS & Remote Sensing software and collection of field level data under watershed project
10000.00
4 Vishal Kumar Field Supervisor
B Sc (Fisheries), MBA, Rural Management
5 years Updation of data using GIS & Remote Sensing software and collection of field level data under watershed project
10000.00
5 Ratnesh Kumar Sharma Field Supervisor
M Sc (Math), Advance Diploma in Computer Application
6 years Updation of data using GIS & Remote Sensing software and collection of field level data under watershed project
10000.00
Total 5 65,000.00
Note- 1. Payment of above experts / staffs is being paid by state budget of JSAC
2. SLDC has been established at JSAC. However it is planning to establish SLDC in the office of JSWM. R – Recurring; NR- Non-recurring
* From column no. 3, totals no. of persons, from column no. 7 to 9, totals, may be indicated for the State at the end of the table.
7
I. B. District Level Watershed Units Table-PPR 4: Details of functionaries in the DRDA Watershed Cell*
S. No.
Name of the
District
Name of the
executing Agency#
Status of Chairman
@
Date of signing of MoU
with SLNA
Total no. of persons
working for Watershed programme
Names & Designation
Qualification Experience Work allocation
24
IWMP Districts
WCDC D.C NA 3 ( in each
district)
1. Technical Expert
Bachelor degree in the fields of agriculture/ horticulture/hydrology/soil engineering and animal husbandry with goog academic records
The candidate should have at least 5 years field / research experience in the fields of soil and water conservation/ forestry/ dry land agriculture/horticulture/ watershed management or related fields like assessment, management and mitigation of drought climatic and other associated risks, crop husbandry, crop specific technology, horticultural practices, livelihoods, animal husbandry etc
Remarks: 1. The committee will advice the district data cell for monitoring and evaluation. 2. The committee will facilitate for preparing of prospective plan 3. The committee will identify voluntary organization
2. Accountant
A serving govt. officer on deputation or a retd. Govt. officer from a finance/ accounts service
5 years experience in related work at reputed firm/organization
3. Data Entry Operator
BSc Hons (Computer Science) or BCA or PGDCA or MCA will be preferred.
2 years experience in field of MIS
(contd.)
11 12
Monthly remuneration/year in each district (in Rs.)
Total Annual budget of Watershed Cell in each district (Rs. In Lakh)
*From column no. 2, no. of districts; from column no. 3, no. of executive agencies; from column no. 6, no. of persons working in the executive agencies of watershed programme; from column no.7, total no. of personnel engaged in the watershed cells, from column no. 11 to 13, totals for the State may be indicated at the end of the table. WCDC/ DRDA/Zilla Parishad (ZP)/ State Department (please specify)/ Any other (Please specify) @collector/CEO ZP/ CDO/ DDO/ PD/ Any other (please specify)
8
II. SELECTION OF WATERSHED PROJECTS Table-PPR 5: Status of District-wise area covered under the watershed programme* (MIS Table-M(SP)2)
S. no.
Names of Districts
Total micro-watersheds in the
District
Micro-watersheds covered so far
Net watersheds to be covered
Dept. of Land Resources
Other Ministries/ Depts.
Total watersheds covered
Pre-IWMP projects (DPAP + DDP +
IWDP)
Any other watershed project
No. Area (ha.) No. Area (ha.) No. Area (ha.) No. Area (ha.) No. Area (ha.)
Grand Total 6183.1673 1679.1825 0.0000 1679.1825 3716.3169 3353.3745 362.9424 24.4099 373.9695 389.2885 5430.9364 1086.1873
Source of data: JSAC, Department of IT, Govt. of Jharkhand.
17
IV. AGRO – CLIMATIC CONDITION Briefly describe the agro- climatic condition of project area including the Agro-climatic zone of project area, soil types, rainfall, major crops, etc.
Table – PPR 10: Details of Agro – climatic condition*
1 2 3 4 5 6 7 8 9
S. No.
Name of the Project
Name of the Agro-climatic zone
covers project area Area in ha
Names of the villages
Major soil types
Topography
Average rainfall in
mm (preceding 5
years average)
Major crops
a) Type b) Area in
ha a) Name
b) Area in ha
1. NABARD CENTRAL AND NORTH ESTERN
PLETAU
6183.1673 Detailed enclosed in Table PPR-7
Sandy loam 6183.1673 Undulating
with moderate
slop
1240 mm
Paddy 3200
Rabi 850
Vegetable 350
Others 250
TOTAL 4650
18
Table – PPR 11: Details of flood and drought in the project area*
1 2 3 4 5
Sl. No. Particulars Villages
Periodicity
Not affected Annual
Any other (please specify)
1 Flood No. of villages ---- ----- ----------
Name(s) of villages ----- ----- ---------
2 Drought
No. of villages All 30 Villages --------- --------------
Name(s) of villages Detailed enclosed in Table PPR-7
------- Affected
Table – PPR 12: Details of soil erosion in the project area
1 2 3 4 5
Cause Type of erosion Area affected (ha) Run off (mm/year) Average soil loss
(Tonnes/ ha/ year)
Water erosion
a Sheet 980
992 mm/year 48.15 b Rill 280
c Gully 55
Sub - Total 1315
Wind erosion N.A NA
Total
Note: Consider 62% of Rain fall is under Run off though Project Area Run off is around 1250 mm as per Isohytal map.
19
V. DEMOGRAPHY AND LAND DISTRIBUTION Growth in population during the last three census’, per capita availability of land, sex ratio, population age group in the project area, literacy level, migration, workforce available in different sectors of the economy, demography of SC, ST, BPL and landless families in the project area in the last ten years, etc.
Demography and Land Distribution
Population
Sl. No.
Name of Village No. of HH
Total Male Female SC ST Others Sex Ratio Total Male Female Total Male Female
GRAND TOTAL 5820 31280 15968 15312 1068 553 515 19131 9796 9335 11081 958
Sources of Data: Census 2001
20
VI. LIVELIHOODS Briefly describe the existing livelihoods, raw material available, possible livelihood interventions, scope for capacity building etc. in the project area
Table – PPR 13: Summary of livelihoods
1 2 3 4 5 6
S. No.
Names of the villages
Existing livelihood activities
Possible livelihood interventions under the project
Current status of migration (No. of
people)
Main reasons for migration
1. Detailed enclosed in Table PPR-7
Cultivation, collection
of fire wood, Making
Pattal, Poultry,
Employment from
NREGA, P.N.G.S.Y &
other Govt.
development activities.
Scientific agricultural practices will
improved the land yield, Cash crop will be
grown, Production of fruit & vegetables
will increase, Fodder stock will be
available for bovines, Dairy farms will be
opened, Training programmes will make
villagers skilldful, Agro-farm forestry will
make villagers self dependent in food
grains, fuel & small timber requirement.
M.F.P. will also increase & will increase
the earning of the villagers
1450
Unemployment, Erratic monsoon, Rainfed farming, non avaibility of competitive market, low agriculturea yield etc.
21
VII. EXPECTED PROJECT OUTCOMES
VII. (i). Expected employment related outcomes:
Table – PPR 14: Employment generation
1 2 3 4
SI. NO
Wage Employment Self Employment
Man days No of beneficiaries No of Beneficiaries
Name of Village SC ST Others Women Total SC ST Others Women Total SC ST Others Women Total
Table – PPR 15: Details of migration from project area
1 2 3 4 5 6
Sl. No.
Names of villages No. of persons migrating No. of days per year of
migration Major reason(s) for
migrating Expected reduction in no. Of
persons migrating
1 Detailed enclosed in
Table PPR- 9 1450
60 days – 120 days
Unemployment, Erratic monsoon,
Rainfed farming, Non availability of
competitive market, Less dignity of labor
1050
24
VII. (ii). Water related outcomes:
Table – PPR 16: Details of average ground water table depth in the project areas (in meters)
1 2 3 4 5 6
Sl. No. Names of villages
Sources Pre – Project level Expected post – project level Remarks
Detailed
enclosed in
Table PPR-7
Open wells 6.35 M 2.65 M
Bore wells 30 M- 65 M 20.M – 45 M
Others (specify)
Table – PPR 17: Status of Drinking water
1 2 3 4 5
S. No.
Names of the Villages
Availability of drinking water (No. of months in a year) Quality of drinking water Comments
Pre- project Expected Post - Project Pre- project Expected Post - Project
1 Detailed enclosed in Table PPR-7
6-9 10 to 12 Insanities Safe drinking water -----
25
VII. (i). Expected employment related outcomes:
Table – PPR 18: Major crops grown and their productivity in the project area
1 2 3 4
S. No. Name of the
Crop
Current status Expected post project status
Area in ha Productivity (Quintal/
ha.) Area (ha.)
Productivity (Quintal/ ha.)
1 Kharif, Cereal, Pulses
3200 18.50 3800 22.50
2 Rabi Wheat Pulses and oilseed
850 10.25 1050 12.50
3 Zaid/ Other season vegetable
350 7.75 500 11.25
III. MANDATt.*
NAME OF OFFICER (IN CAPITAL LETTERS)
DESIGNATION
*Letter of Authority from Secretary of the concerned Department, authorizing the concerned officer to sign the above undertaking, should be enclosed
with PPR.
26
VIII. MANDATORY CERTIFICATION
“It is certified that the State Government of will abide by the following mandatory conditions laid down by DoLR
1 The area of the proposed projects are not covered under assured irrigation
2 The area of the proposed project is not covered or overlapping with any other watershed projects sanctioned by the cnetal govt./ state govt./ autonomous bodies & others
3 The State must sign all the mandatory MoUs before implementing the project
4 The timeframes and milestones of the projects will be followed
5 The Budget requested for must follows the criteria laid down in the Common Guidelines, 2008
6 The State must release matching State Share within 15 days from release of each installment of central funds.
7 Purchase of vehicles and other equipments are not permitted and nor is construction of buildings allowed. Only purchase of computers and related software is permitted
8 Savings, If any, in each component of the project cost can be utilized only for activities in the Watershed works
9 The WCDC will have one Member exclusively responsible for monitoring
10 All work will be evaluated after each phase of completion. Fund release will depend on favourable reports received from evaluators
11 Evaluators must include only institutions and agencies and not individuals.
12 The State and DRDA cell will furnish monitoring reports and periodical reports as desired by DoLR
13 Composition of the WDT must be clearly spelt out and the team members must be fully in place at the time of signing of the MoU of contract between the PIA and DRDA Cell
14 That DRDA shall release the funds to the PIAs and the watershed committees within 15 days of receipt of the funds
15 The Watershed Committee must be a registered society under the Societies Registration Act, 1860
16 At least one of the WDT Members must be a Woman
17 The Gram Sabhas of the proposed project areas have passed resolutions for people’s contribution towards WDF
18 Resource-use agreement on the principles of equity and sustainability must be worked out among the User
27
Groups prior to the concerned work being undertaken
19 The DPR must give detailed justification for the proposed project duration
20 No PIA will start project work within three months of the receipt of first installment by DWDU/ agency or else it can come under the purview of foreclosure
21 The State will not undertake unnecessary foreclosure of the projects. In the event of foreclosure, the State will refund the amount and furnish all necessary defalcation, misappropriation, mis- utilization, deliberate negligence and laxity which has caused foreclosure of the project.
Date:
Signature of officer authorized by State Govt.*
NAME OF OFFICER (IN CAPITAL LETTERS)
DESIGNATION
* Letter of Authority from Secretary of the concerned Department, authorizing the concerned officer to sign the above undertaking, should be enclosed with
PPR.
28
X. STATUS OF ON-GOING PROJECTS (DPAP / DDP/ IWDP)
Table – PPR 19: Details of pending UCs : State wise*
1 2 3 4 5 6 7 8 9 10 11
S. no.
District Project Installment No.
Financial year of
release of fund
Amount released (Rs. In Lakhs)
Amount utilized (Rs. In Lakhs)
Submission of UC Date of submission
of UC Reasons for not submitting/delayed submission of
UC
Pending UC
Due date
Amount (Rs, in Lakhs)
Date Amount (Rs, in Lakhs)
Period Amount (Rs, in Lakhs
1 Lohardaga DPAP ----- ----- ----- ----- N.A.
Table -PPR 20: Details of Unspent balance as on 31.03.2012
S.No. DISTRICT Name of the
Project
Total Cost (Rs. In
Lakh)
Total funds Released (Rs. In Lakh) Unspent Balance
(Rs. In Lakhs) DoLR State
1 Lohardaga DPAP ------- ------- ------- ------
29
X. ABSTRACT OF PROJECTS PROPOSED FOR SANCTION DURING FINANCIAL YEAR 2015-16
1 Number of districts to be covered under the present proposal
1
2 No. of Watersheds projects proposed to be taken up under NABARD
Hilly / desert Others
01
3 Total Area to be covered (ha) 6183.1673
Total area to be covered under proposed projects ( ha.) (a) Hilly & Desert areas#
b). Others 5430.9364
4 Total cost of the proposed Watershed projects (Rs. In lakhs)
(a) Hilly & Desert areas#
(b) Others Total
1086.1873 Lakh
5 First installment required from central funds for the proposed watershed projects.