Top Banner
Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD
39

Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

Dec 22, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

Preliminary Design Review

Presented By:Ken StaffordNick GalottiChris Werner

WPI / Mass Academy

FIRST Team 190: Gompei and the HERD

Page 2: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

What is FIRST?

• Organization to make science and technology fun for students

• Brings engineers and students together to work on a common problem

• Almost 1000 teams across the world

• NOT an academic project per se

Page 3: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Our Team• Competing since 1992• WPI students are the Mentors

to Mass Academy students• 40+ demos a year• Called “the highlight of their

WPI engineering education” by past alums

• WPI’s “#1 women and minority outreach program”

Page 4: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Team Organization

AdvisorKen Stafford

Team President

Paul Dovydaitis Director of Support

Nick GalottiDirector of Operations

Chris Werner

Administrative Assistant

Chief of Marketing

Chief of Awards

Manufacturing Coordinator

Chief of Mechanical Operations

Chief of Controls Engineering

Chief of Tactics

Co-AdvisorBrad Miller

Page 5: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

Support

• Administration

• Marketing

• Awards

Page 6: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Administration

• Website– http://users.wpi.edu/~first/– News and Events

Page 7: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Marketing

• T-shirt design

• Donated Food

• Decorates Robot

Page 8: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Awards

• Chairman’s Award– Most prestigious

award– 4 page paper about

our team and how we exemplify the meaning of FIRST

– Journal

• Animation• Inventor

Page 9: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

Operations

• 2004 Game • Brainstorming• Autonomous Timeline• Mechanical• Controls

Page 10: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

The Game

Page 11: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Brainstorming

• General ideas about the game

Page 12: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Brainstorming

• Broke into small groups• Developed list for robot capabilities

• Maneuver around the field• Manipulate Small Balls• Manipulate Big Balls• Hang on the bar• Knock off bonus balls• Manipulate Goals

• Discussed ball containment vs ball pickup

Page 13: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Brainstorming

• Met in different groups to develop initial robot designs

• After two days, groups convened to present ideas

• 3 of 4 groups designed primarily small ball manipulators

• One designed a primarily hanging and big ball manipulator

Page 14: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Brainstorming• Developed a

weighted matrix to analyze small ball manipulation vs. hanging

Page 15: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Brainstorming

• Students met over the next two days to develop the designs further

• Three ideas were presented • Small Ball Containment• Small Ball Pick-up• Hanging

• Team members voted and decided to create the hanging robot

Page 16: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Final Design

Page 17: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Autonomous Timeline

Start of match

Page 18: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Autonomous Timeline

Approaching the stairs

Page 19: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Autonomous Timeline

5.5 Seconds

Page 20: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Autonomous Timeline

Autonomous Completed (15 Seconds)

Page 21: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Mechanical – Driveline/Chassis

• Driven by 2 Bosch Drill Motors

• Lightweight Aluminum Chassis

• 8 - 8” Pneumatic Wheels• Facilitates Stair Climbing• Only 4 wheels in contact at any time• Inside wheels allow the robot to traverse the

narrow passage without falling off platform

Page 22: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Mechanical – Driveline/Chassis

• EDL: Electronic Differential Lock• To allow the robot to drive perfectly straight by

locking left and right drivelines together

• KSD: Kamen Straddling Device• Allows the robot to start in an optimal position

and meet the rules on robot starting position

• LAD: Laser Aiming Device• Mounted on robot to ensure it is lined up exactly

in place every match

Page 23: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Mechanical – Arm Design

• Designed to allow big ball manipulation while hanging on the bar

• Includes:• Turret• Extension• Wrist• Gripper• Shoulder

Page 24: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Mechanical - Turret

• Driven by a seat motor with screw drive

• 3” OD x 1/16” wall x 36” torque tube

• 20 degree rotation to the left or right

• Takes 7 seconds to rotate 40 degrees

• Facilitates big ball grabbing and placement in the event that the robot is off-center on the bar

Page 25: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Mechanical - Turret

Page 26: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Mechanical – Arm Extension

• Modeled after our 2001 robot arm• Uses globe motor and window tape drive• Extends ~7” per second• Allows for 85” of extension• Uses 1” x 3” and 1” x 2” aluminum

channel

• Allows us to reach both stationary goals with a ball while hanging

Page 27: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Mechanical - Wrist

• Driven by globe motor

• 250 degrees of rotation

• Pivot offset 1.5” to allow for proper storing when in our starting configuration

• Allows us to optimize ball pickup and delivery based on our position

Page 28: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Mechanical - Gripper

• Pneumatically powered using a 1” bore, 3” stroke cylinder

• 6” ‘sweet spot’ on either side

• 4 sets of prongs to grab ball extend 7.5” above and below the centerline

• Ability to grab ball from around the poles

Page 29: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Mechanical - Shoulder

• Driven by a Van Door motor to dual capstones

• Cross shaft for capstones located low enough to make room for hanging device

• Can rotate 180 degrees in 3 seconds

• Allows for quick exchange of the big ball from their goal to ours in the final seconds of the match

Page 30: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Mechanical - SODs

• SODs: Shields of Doom• Shaped like Pi• Deploy once hanging and cover the

entire bar• Individually controlled

• Allow us to block opponents from hanging on the bar and lift to allow our alliance partner on if desired

Page 31: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Mechanical - Probe

• Winched cable, driven by a CIM motor

• Designed to pull robot up in 4 seconds

• The final 3” of motion activate 2 locking latches, 15” apart, applying positive engagement with the bar

• Latches are spring-loaded, over-center mechanisms; they can be released by servo

Page 32: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Controls

• Controls challenge:– Navigate autonomously to bar– Grab large ball– Lift up to hanging position– Place ball on opponents goal

• Additionally provide many operator automated operations

• Controls functions have already been prototyped on EDU Robots

Page 33: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Autonomous Requirements

• To complete the autonomous move we need to:– Hit the stairs at a position within a few inches– Navigate around the fixed goal– Arrive within 6” of the big ball

• Requirements include precise position knowledge – distance and heading– Hoping for augmented dead reckoning– Have additional sensors available to help determine

position

Page 34: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Controls – Optical Encoder

• Left and right wheels will be equipped with optical encoders– Provides precise

distance measurement

– Additionally gives us a software EDL (Electronic Differential Lock)

Page 35: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Controls - Gyros

• Two sets of solid state gyros for navigation– Same technology from Gompei 2k3

• Turning gyro (in turning axis)– Provides more precise heading information

• Pitch gyro– Allows us to determine exactly when the

robot has cleared the stairs

Page 36: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Controls – Operator Interface

• Tank steering for drive

• Additional operator station to operate the probe and arm

• Many directly accessible automated functions, e.g.– Moving ball from one goal to another– Set arm for taking ball from medium goals

Page 37: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Timeline Milestones

• Jan. 10th – Kickoff• Jan. 11th – Strategy decision• Jan. 17th – Overall configuration• Jan. 29th – Chassis built• Jan. 30th – Preliminary Design Review• Feb. 7th – Mechanical subsystems built• Feb. 8th – Driver try-outs• Feb. 14th – System integration• Feb. 20th – Critical Design Review• Feb. 20th – Chairman’s Award due• Feb. 24th – Ship robot

Page 38: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

http://users.wpi.edu/~first/Team 190: Gompei and the HERD http://users.wpi.edu/~first/Team 190: Gompei and the HERD

Competition Schedule

• UTC Scrimmage (Suffield, CT)– 2/21/04

• Granite State Regional (Manchester, NH)– 3/4/04 – 3/6/04

• Arizona Regional (Phoenix, AZ)– 3/11/04 – 3/13/04

• Championship Event (Atlanta, GA)– 4/15/04 – 4/17/04

• BattleCry@WPI 5 (Worcester, MA)– 6/19/04

Page 39: Preliminary Design Review Presented By: Ken Stafford Nick Galotti Chris Werner WPI / Mass Academy FIRST Team 190: Gompei and the HERD.

Questions?

• For more information visit our website at http://www.wpi.edu/~first/

•Anyone is welcome to visit us in the lab weekdays after 1600, Saturdays after 0900, and Sundays after 1200.