PRELIMINARY DAMAGE ASSESSMENTREPORT FOR GROUP HOUSING PROJECT “SPAZE PRIVY AT4” At Sector-84, Gurgaon, Haryana Being Developed By: - M/s Spaze Towers Pvt. Limited. Spazedge Commercial Complex Sector-47, Gurgaon Sohna Road Gurgaon- 122002, Haryana BY Environmental Consultant M/s Perfact Enviro Solutions Pvt. Ltd. (NABET Registered wide list of accredited consultants organizations/ Rev 51/March 2017 at S. No-114) 502-507, NN Mall, Sector-3, Rohini, New-Delhi-85 Phone: 011-49281360
15
Embed
PRELIMINARY DAMAGE ASSESSMENTREPORTenvironmentclearance.nic.in/writereaddata/... · 42540.72m2.The proposed residential complex “Spaze Privy AT4” at Village Sihi, Sector 84, Gurgaon,
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PRELIMINARY DAMAGE ASSESSMENTREPORT
FOR
GROUP HOUSING PROJECT
“SPAZE PRIVY AT4”
At
Sector-84, Gurgaon, Haryana
Being Developed By: -
M/s Spaze Towers Pvt. Limited.
Spazedge Commercial Complex
Sector-47, Gurgaon Sohna Road
Gurgaon- 122002, Haryana
BY
Environmental Consultant
M/s Perfact Enviro Solutions Pvt. Ltd.
(NABET Registered wide list of accredited consultants organizations/ Rev
51/March 2017 at S. No-114)
502-507, NN Mall, Sector-3, Rohini, New-Delhi-85
Phone: 011-49281360
CONTENT
1. Introduction
2. Environmental Legislation Applicable
3. Project Details
4. Environmental Damage Assessment
5. Remediation Plan and Natural & Community Augmentation Plan
6. Cost of Remediation Plan
7. Suggestions
INTRODUCTION
M/s Spaze Towers Pvt. Ltd. has made a collaboration agreement with land owners of land area
42540.72 sqm. On 23.10.2010 located at Khasra No. Survey No.5912 village Sihi, Gurgaon. The
land owners have obtained the license from DTCP (Directorate of Town & Country Planning),
Haryana on 23.03.2011.
M/S Spaze Towers Pvt. Ltd. has conceptualised the residential Group Housing on above area
and obtained approval of building plan in 1403.2012.
The application for Environmental Clearance was filled at SEIAA, Haryana on 18.06.2012.
The Environmental appraisal was done on 11.12.2012 in which committee has deferred the
case due to non-matching of sign of land owners. The documents were submitted and again
case was appraised by SEAC on 29.04.2013.
SEAC appraised the case on 17.06.213, 27.11.2013, 16.04.2014 and finally asked for site
inspection by sub-committee.
PP started the construction work and submitted documents to SEAC on 12.01.2015.The
Environmental Clearance was pending at SEAC due to violation proceedings.
Now, as per gazette notification dated 14.03.2017 we are submitting the details for EC as per
the said notification as violation case.
ENVIRONMENTAL LEGISLATION APPLICABLE:
Following legislations are applicable to the project. Therefore, it is the responsibility of the
developer to comply with these legislations.
➢ THE WATER (PREVENTION AND CONTROL OF POLLUTION) ACT 1974
Under Section 25. Restrictions on New Outlets and New Discharges
– Applicable due to discharge of waste water from the group housing colony.
– Under the above-mentioned act, we shall take consent “consent to establish” &
“consent to operate” of the State Pollution Control Board.
➢ THE AIR (PREVENTION AND CONTROL OF POLLUTION) ACT, 1981
Under section 21. Restrictions on use of certain industrial plants.
– Applicable due to provision of DG Sets which will be source of air emission to
atmosphere. Stack shall be installed.
– Under the above mentioned act, we shall take consent “consent to establish” &
“consent to operate” from the State Pollution Control Board.
➢ THE WATER (PREVENTION AND CONTROL OF POLLUTION) CESS ACT, 1977
Under Section 3: Levy and Collection of Cess
– There shall be levied and collected a cess for the purpose of the Water (Prevention and
Control of Pollution) Act, 1974 (6 of 1974) and utilization there under.
– The cess under sub-section (1) shall be payable by—
– Every person extracting water from ground.
– Everyone using supply water.
➢ S.O.908 (E), [25/9/2000] - THE MUNICIPAL SOLID WASTES (MANAGEMENT AND HANDLING)
RULES, 2000 and as amended
As per this rule solid waste is to be segregated and disposed as per defined procedure at
MSW approved site or within its own colony by using different solid waste disposed