PROJECT TITLE: 122 Balaam Street Client: Jon Freedman Preliminaries Item Description Supplier Price Qty Material Cost Labour Cost TOTAL General Site Preperations Scaffolding and Tin Hat Waste Removal Deliveries and Parking Temporary Water Supply Temporary Electricity Supply Perm Water Supply Perm Electricity Supply Perm Gas Supply Site Cleaning Pavement Cleaning Site Telephone Health and Safety Signage Hoarding Craneage Site Office Lighting Plant Miscelaneous
17
Embed
Preliminaries - Drawing and Planning · ELECTRICAL CONNECTION N. GRID 4 ... J2 116 215 J3 116 215 J4 116 215 J5 116 215 ... Preliminaries Service Connections General Demolition Steel
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PROJECT TITLE: 122 Balaam StreetClient: Jon Freedman
PreliminariesItem Description Supplier Price Qty Material Cost Labour Cost TOTAL
General Site PreperationsScaffolding and Tin HatWaste RemovalDeliveries and ParkingTemporary Water SupplyTemporary Electricity SupplyPerm Water SupplyPerm Electricity SupplyPerm Gas SupplySite CleaningPavement CleaningSite TelephoneHealth and Safety SignageHoardingCraneageSite OfficeLightingPlantMiscelaneous
PROJECT TITLE: 122 Balaam StreetClient: Jon Freedman
Service ConnectionsItem Description Supplier Price Qty Sub -
Contracted Material Cost LabourCost TOTAL
WATER CONNECTION THAMES 4
- NEW WATER MAIN THAMES 4
- Connection to existing Main THAMES
WATER meters THAMES 4
GAS CONNECTION TRANSCO 4
- NEW GAS MAIN TRANSCO
- Connection to existing Main TRANSCO 4
GAS meters British GAS 4
ELECTRICAL CONNECTION N. GRID 4
- NEW ELECTRICAL MAIN N. GRID
- Connection to existing Main N. GRID 4
ELECTRICAL meters British GAS 4
PROJECT TITLE: 122 Balaam StreetClient: Jon Freedman
General ItemsFloor Item Description Supplier Price Qty Material Cost Labour Cost TOTAL
GROUND
Cycle parkingTidy up parking spaces
New staircase added onto exisiting 25 new steps Re-bar for increasing both staircases by 1 levellandscaping
ELEVATIONS
Tidy Up Cableing and remove unnessessary CablesFront Cladding Subbed out to Sub Contractor eg £50k
THIRD/FOURTH
Sound Insulation between levels - Build to robust detailsInternal access to flat roof above new loft
PROJECT TITLE: 122 Balaam StreetClient: Jon Freedman
DemolitionItem Description Supplier QTY Material Cost Labour Cost TOTAL
Removal of existing Roofing tiles Labour for safe removalRemoval of existing Roofing timbers Labour for safe removalRemoval of existing Roofing insulation Labour for safe removal
PROJECT TITLE: 122 Balaam StreetClient: Jon Freedman
SteelItem Description Supplier Length (cm) Material Cost Labour Cost TOTAL
B1 305x165x54.UB - S355 Creighton and Sons 701B1 305x165x54.UB - S356 Creighton and Sons 698B2 305x165x54.UB - S357 Creighton and Sons 216B3 254x146x37.UB - S355 Creighton and Sons 710B3 254x146x37.UB - S356 Creighton and Sons 710B4 254x146x37.UB - S357 Creighton and Sons 778B4 254x146x37.UB - S358 Creighton and Sons 778B5 254x146x37.UB - S359 Creighton and Sons 877B5 254x146x37.UB - S360 Creighton and Sons 877B6 254x146x37.UB - S361 Creighton and Sons 818
£3400+VAT
Re-bar for increasing both st
QUOTATIONAVAILABLE ON
REQUEST
PROJECT TITLE: 122 Balaam StreetClient: Jon Freedman
TimberItem Description Supplier AVG - Price Length Qty Material Cost Labour Cost TOTAL
1" x 1" Sawn and untreated Builders Depot £2.89 2.4m2" x 1" Sawn and untreated Builders Depot £3.69 3m2" x 2" Sawn and untreated Builders Depot £4.44 3.6m3" x 2" Sawn and untreated Builders Depot £6.20 3.6m4" x 2" Sawn and untreated Builders Depot £8.26 4.2m5" x 2" Sawn and untreated Builders Depot £12.96 4.2m6" x 2" Sawn and untreated Builders Depot £14.42 4.2m7" x 2" Sawn and untreated Builders Depot £12.58 2.4m8" x 2" Sawn and untreated Builders Depot £15.19 3.6m
Kitchen Tap Chef pull out Screwfix £39.49 4 £157.96
Kitchen Drawers Units 20 £0.00
Kitchen Wall Units 32 £0.00
Splashback Tiling £8 m2 £0.00
Kitchen Unit Doors White Gloss Panels 32 £0.00
Kitchen Base Units 32 £0.00
KickBoard and Architrave Skirting £0.00
Kitchen Work Top black Granite / marble £400m2 £0.00£3,357.92
PROJECT TITLE: 122 Balaam StreetClient: Jon Freedman
ElectricalItem Description Supplier Price Qty Material Cost Labour Cost TOTAL
LED spotlights in communal hallway Improve stairway lighting 20smoke detectors Hallway and L/Room in each flat linked to heat detectorLED spotlights throughout 4 new flats Locations to be decided by Site Owner 80Heat Detector In Kitchens linked to internal smoke alarmsShaver sockets shaver sockets 4twin socket outlet MK White 60emergency lighting On Stairwellstime operated switch On Stairwells
Extension to Intercom Please allow for addition of 4 units to existing systemWylex Consumer Unit- RCD 8 Breaker Conumser Unit1g 1 way lighting plate MK white 202g 2way lighting plate MK white3 core 3 way lighting plate MK whiteTelephone point Cable of being used as a routerSatelites Installation of 4 sky satelites and cabling, twin LNB for Sky HD 4
PROJECT TITLE: 122 Balaam StreetClient: Jon Freedman
PlumbingItem Description Supplier Price Qty Material Cost Labour Cost TOTAL
22mm Copper Tube £0.0015mm Copper Tube £0.00
Poly Tube £0.0022mm Copper Gas Supply £0.00
Mains Supply Tube (25mm) £0.00Soil and Waste Pipe 4 £0.00
Waste Fitting 4 £0.00Soldering Fittings £0.00
Poly Fittings ONLY CRIMP FITTINGS - NO PUSH FIT FITTINGS £0.00Compression Fittings £0.00