August 28, 2015 6083.01 Josh Henderson Core Projects VIA E-MAIL: [email protected]Dear Mr. Henderson: Re: 445 Kingsway TAMS Schedule Bunt & Associates were retained to provide a Transportation Assessment and Management Study (TAMS) for the proposed redevelopment of 445 Kingsway, Vancouver BC. The redevelopment would result in the addition of 104 residential condo units to a redeveloped auto dealership and vehicle service amenity. The City has asked that weekday traffic counts wait until the school season has started; hence those counts are now scheduled for September 15, 2015. We expect have a draft of our report ready for Core Projects by September 18, 2015. The study will follow the City of Vancouver’s 2008 Transportation Assessment and Management Study Guidelines for Consultants document. Bunt has confirmed the TAMS scope with City staff. Parameters of the TAMS document are described below: The study will include analysis of weekday PM peak hour and Saturday mid-day peak hour periods. Study area intersections to be examined with Synchro 8 software are (also illustrated in Exhibit 1): o Kingsway & St. George Street, o Kingsway & Site Access, o St. George Street & 12 th Avenue, and o St. George & Site Access. Two time period scenarios: Existing conditions, and Existing plus Development. The TAMS will review on-site vehicle and bicycle parking supplies. Transportation Demand Management (TDM) strategies for the development will be provided.
4
Embed
Prelim Letter Aug 28 445 Kingsway - Vancouver...445 Kingsway, Vancovuer BC – TAMS Schedule | August 28, 2015 3 S:\PROJECTS\JP\6083-01 445 Kingsway\5.0 Deliverables\Prelim Letter
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Bunt & Associates were retained to provide a Transportation Assessment and Management Study (TAMS)
for the proposed redevelopment of 445 Kingsway, Vancouver BC. The redevelopment would result in the
addition of 104 residential condo units to a redeveloped auto dealership and vehicle service amenity.
The City has asked that weekday traffic counts wait until the school season has started; hence those
counts are now scheduled for September 15, 2015. We expect have a draft of our report ready for Core
Projects by September 18, 2015.
The study will follow the City of Vancouver’s 2008 Transportation Assessment and Management Study
Guidelines for Consultants document. Bunt has confirmed the TAMS scope with City staff. Parameters of
the TAMS document are described below:
The study will include analysis of weekday PM peak hour and Saturday mid-day peak hour periods.
Study area intersections to be examined with Synchro 8 software are (also illustrated in Exhibit 1): o Kingsway & St. George Street, o Kingsway & Site Access, o St. George Street & 12th Avenue, and o St. George & Site Access.
Two time period scenarios: Existing conditions, and Existing plus Development.
The TAMS will review on-site vehicle and bicycle parking supplies.
Transportation Demand Management (TDM) strategies for the development will be provided.
use this to outline site etc
13th Avenue
ProposedSt. George Access
Guelp
hStreet
St. Geo
rge
Street
Prop
osed
King
sway
Acces
s
13th Avenue
Unsignalized
Pedestrian Signal
Traffic Signal
12th Avenue
&
Scale: NTS
N
Exhibit 1
Study Area and Preliminary Proposed Laning
445 Kingsway Auto & Residential TAMSAugust 28, 2015
445 Kingsway, Vancovuer BC – TAMS Schedule | August 28, 2015 3 S:\PROJECTS\JP\6083-01 445 Kingsway\5.0 Deliverables\Prelim Letter Aug 28 445 Kingsway.docx
We have calculated development site traffic as follows: