www.utm.my innovative entrepreneurial global 1 Lecture 5 Pre-estimating Requirements Mat Naim Abdullah [email protected] C04-308
28

Preestimating requirements r1

May 06, 2015

Download

Documents

alanchong88

Another slide for cost and tendering.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 1

Lecture 5

Pre-estimating Requirements

● Mat Naim Abdullah● [email protected]● C04-308

Page 2: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 2

Pre-construction - Information

CONSTRUCTION STAGES

Tendering & Procurement

Construction

Operation & Maintenance

Designing & Tender Document Preparation

Inception

Page 3: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 3

THE BUILDING COMMUNICATION

1. Drawings 2. Specification3. Bills of Quantities (BQ)4. Tender Documents5. Contracts Documents6. Work Programmes7. Operation & Maintenance Manual

Page 4: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 4

2. The Drawings

Imagine!!!!!! How to

design and draw?

Page 5: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 5

2. The Drawings (Cont’d)

Types of Drawings 1. Conceptual Drawings2. Tender Drawings3. Contract Drawings4. Construction Drawings5. Shop Drawings6. As-built Drawings

Page 6: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 6

2. The Drawings (Cont’d)

Conceptual Drawings – What can you see?

Page 7: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 7

2. The Drawings (Cont’d)

Conceptual Drawings – What can you see?

Page 8: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 8

AERIAL PERSPECTIVE

2. The Drawings (Cont’d)

Page 9: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 9

CONSTRUCTION DRAWINGS CIQ COMPLEX - FRONT ELEVATION

2. The Drawings (Cont’d)

Page 10: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 10

CONSTRUCTION DRAWINGS CIQ COMPLEX - LEFT ELEVATION

2. The Drawings (Cont’d)

Page 11: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 11

CONSTRUCTION DRAWINGS CIQ COMPLEX - PARTIAL SECTION

BUS & COACHESLV

MOTORCYLES

HGV

2. The Drawings (Cont’d)

Page 12: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 12

To Malaysia

To Singapore

2. The Drawings (Cont’d)

CONSTRUCTION DRAWINGS - CIQ Layout Plan (Level 1)

Page 13: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 13

CONSTRUCTION DRAWINGS

Offices & Passengers’ Hall (Level 2)

To

Malaysia

To

Singapore

2. The Drawings (Cont’d)

Page 14: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 14

2. The Drawings (Cont’d)

Shop Drawings – What can you see?

Page 15: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 15

2. The Drawings (Cont’d)

As Built Drawings – What can you see?

Any difference from the construction drawings?

Page 16: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 16

2. The Drawings (Cont’d)

Page 17: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 17

2. The Drawings (Cont’d)

Page 18: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 18

Bills of Quantities (BQ)

The forms where the contractor fills in his price based on:

1. The description of works2. Quantities3. Unit – m, m2, m3, kg, Lump sum, Item, No.

Preparation of BQ is by Quantity Surveyor based on the Standard Method of Measurement (SMM)

Example of BQ

Page 19: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 19

Specification

Specification – Describe: 1. Materials2. Standard of materials 3. Construction processes & 4. workmanship.

Making Cake

Page 20: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 20

Tender Documents

Tender Documents 1. Instruction to tenderers

2. Form of tender

3. Conditions of contracts

4. Bills of Quantities

5. Tender Particulars

6. Tender Drawings

7. Specification

8. Proposed work programme

Page 21: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 21

Instruction to Tenderers & Form of Tender

Instruction to Tenderers contains:1. The content of the tender documents2. Selection of the tenderers3. Visiting the site4. Procedure for addendum5. Procedure for tender preparation &

submission6. Content of Bills of Quantities7. Opening & closing of tender8. Any significant matters related to the

project

Form of Tender is a declaration by the tenderer to abide to the instruction of tenderers

Page 22: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 22

Conditions of ContractThe Details of Agreement between the Employer and the Contractor. Usually consists of:1. Contractor’s liabilities2. Provision of preliminary works3. Variations4. Payments5. Commencement & completion6. Defects liability 7. Delay & extension of time8. Termination9. Mediation & Arbitration

Page 23: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 23

Contract Documents

Contract Documents 1. Letter of Award

2. Instruction to tenderers

3. Form of tender

4. Conditions of contracts

5. Agreed Bills of Quantities

6. Tender Particulars

7. Contract Drawings

8. Specification

9. Agreed work programme

Page 24: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 24

Work Programme

Indicate the time to complete each of the construction activities or

package of the project in the form of bar chart or Critical Path Method,

hence the total completion period for the whole project.

Page 25: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 25

Master Implementation Programme

ACTIVITY2002 2003 2004 2005 2007

Jun ‘07Mar ‘03

May ‘05

Aug ‘02 Jul ‘06CIQ Facilities

Operational (Dec ’06)

2006

Jul ‘05

Sep ‘02 May ‘06

Jun ‘03 Aug ‘06

Oct ‘02 Dec ‘05

CIQ Complex

JB Sentral Terminal

Interchange No. 1 & Other Infrastructure Works

Road Bridge (Suspended)

Rail Bridge (Suspended)

Causeway Removal/ Navigation Channel

JBS Short Term Access

LEGEND: Milestones

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4Q2 Q3 Q4 Q1 Q2 Q3Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1

Jan ‘03

Mar ‘04

Jan ‘06

Oct ‘02

Aug ‘03

Apr ‘03

Apr ‘07

Section 1 Section 2

Physical WorksCommencement

Stage Completion Works

Jul ‘07

Short Term Access Nov ‘04 Dec‘06

(Suspended)

Feb ‘06

Oct ‘05

CIQ BuildingVPA

Page 26: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 26

Work Programme

Exam

ple of

work

progra

mme

Page 27: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 27

The pre-estimating requirements

1. Drawings2. Specification3. Rate – Built-up rate, sub-

contractor’s price or schedule of rate

4. Work programme

Page 28: Preestimating requirements r1

www.utm.my innovative ● entrepreneurial ● global 28

Built-up Rate

1. Material’s cost2. Manpower’s cost3. Machinery’s cost4. Wastage5. Margin