Top Banner
Scale Checked by Drawn by Date Project number Precision Design 1 : 1 8/7/2012 5:17:04 PM Cover Page 001 Final Phase Final Project July2012 Gene Butterwick Checker A100 No. Description Date 1 : 1 1 final-ext_2 1 : 1 2 final_int_render Sustainable Construction Demonstration Building Table of Contents SP101-Site Plan A101-1st Floor Plan A102-Mezzanine Plan A103-North and South Elevations A104-East and West Elevations A105-Building Section A106-Wall and Stair Section A108-Details and Window schedule A109-Details and Door Schedule A110-1st Floor RCP A11-Mezzanine RCP
11

Precision Design - trantor.sheridanc.on.catrantor.sheridanc.on.ca/student/butterwe/Portfolio/sustainable-projec… · 1st Floor 0 Mezzanine Floor 3500 T.O.Steel 6800 T.O.Footing-3000

Jul 08, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Precision Design - trantor.sheridanc.on.catrantor.sheridanc.on.ca/student/butterwe/Portfolio/sustainable-projec… · 1st Floor 0 Mezzanine Floor 3500 T.O.Steel 6800 T.O.Footing-3000

Scale

Checked by

Drawn by

Date

Project number

Precision Design

1 : 1

8/7/

2012

5:1

7:04

PM

Cover Page001

Final Phase

Final Project

July2012

Gene Butterwick

Checker

A100

No. Description Date

1 : 11 final-ext_2

1 : 12 final_int_render

Sustainable Construction Demonstration Building

Table of Contents

SP101-Site PlanA101-1st Floor PlanA102-Mezzanine PlanA103-North and South ElevationsA104-East and West ElevationsA105-Building SectionA106-Wall and Stair SectionA108-Details and Window scheduleA109-Details and Door ScheduleA110-1st Floor RCPA11-Mezzanine RCP

Page 2: Precision Design - trantor.sheridanc.on.catrantor.sheridanc.on.ca/student/butterwe/Portfolio/sustainable-projec… · 1st Floor 0 Mezzanine Floor 3500 T.O.Steel 6800 T.O.Footing-3000

DN

TRUE

Scale

Checked by

Drawn by

Date

Project number

Precision Design

1 : 240

8/7/

2012

5:2

3:22

PM

Site Plan001

Final Phase

Final Project

July2012

Gene Butterwick

Checker

SP-101

No. Description Date

1 : 2401 Site_A2

Page 3: Precision Design - trantor.sheridanc.on.catrantor.sheridanc.on.ca/student/butterwe/Portfolio/sustainable-projec… · 1st Floor 0 Mezzanine Floor 3500 T.O.Steel 6800 T.O.Footing-3000

UPDN

REF.DW

Meeting Room2

3

4

5Office

15

Kitchenette16

8

9

Mens19

ProjectDisplayRoom

23

11

1

4

4

4

4

4

5

B

E

9

2

A103

2

A1041

A103

1

A1042

D

1

C

1A106

2A106

A

3

8

10

Bxx

Bx

Womens26

6

W200X15

4

7

1A105

TRUE

Exterior Stone on Metal Stud

-90 mm Masonry Stone-25 mm Air Space-Air Barrier-50 mm Rigid Insulation-190 mm Masonry Con.Block-150 mm Steel Stud-Batt Insulation-Vapor Barrier-12.5 mm G.W.B

W1

Interior GWB on Metal Stud

-12.5 Type X GWB-150 mm Metal Stud-Batt Insulation-12.5 Type X GWB

P1

Plumbing Wall

-6 mm Ceramic Tile-12.5 Type X GWB-89 mm Metal Stud-Batt Insulation-200 mm Air Space-89 mm Metal Stud-Batt Insulation-12.5 Type X GWB-6 mm Ceramic Tile

W2

W3

Foundation Wall

15MPa Concrete

Scale

Checked by

Drawn by

Date

Project number

Precision Design

As indicated

8/7/

2012

5:1

7:34

PM

C:\Users\Gene\Documents\6th Semester\Revit\Final Project\final submission\Finalproject_8-5-2012.rvt

1st Floor Plan001

Final Phase

Final Project

July2012

Gene Butterwick

Checker

A101

1 : 1001 1st Floor_A2

No. Description Date1 issue for design

development2012/07/17

1 : 20Wall Legend

Page 4: Precision Design - trantor.sheridanc.on.catrantor.sheridanc.on.ca/student/butterwe/Portfolio/sustainable-projec… · 1st Floor 0 Mezzanine Floor 3500 T.O.Steel 6800 T.O.Footing-3000

DN

Open to Below

12

5

B

E

9

2

A103

2

A1041

A103

1

A1042

D

1

C

1A106

2A106

A

3

8

10

Bxx

Bx

3500

6

4

7Open to Below1

A105

TRUE

Exterior Stone on Metal Stud

-90 mm Masonry Stone-25 mm Air Space-Air Barrier-50 mm Rigid Insulation-190 mm Masonry Con.Block-150 mm Steel Stud-Batt Insulation-Vapor Barrier-12.5 mm G.W.B

W1

Interior GWB on Metal Stud

-12.5 Type X GWB-150 mm Metal Stud-Batt Insulation-12.5 Type X GWB

P1

Plumbing Wall

-6 mm Ceramic Tile-12.5 Type X GWB-89 mm Metal Stud-Batt Insulation-200 mm Air Space-89 mm Metal Stud-Batt Insulation-12.5 Type X GWB-6 mm Ceramic Tile

W2

W3

Foundation Wall

15MPa Concrete

Scale

Checked by

Drawn by

Date

Project number

Precision Design

As indicated

8/7/

2012

5:1

8:03

PM

C:\Users\Gene\Documents\6th Semester\Revit\Final Project\final submission\Finalproject_8-5-2012.rvt

Mezzanine Plan001

Final Phase

Final Project

July2012

Gene Butterwick

Checker

A102

1 : 1001 Mezzanine Floor_A2

No. Description Date

1 : 20Copy of Wall Legend

Page 5: Precision Design - trantor.sheridanc.on.catrantor.sheridanc.on.ca/student/butterwe/Portfolio/sustainable-projec… · 1st Floor 0 Mezzanine Floor 3500 T.O.Steel 6800 T.O.Footing-3000

1st Floor0

Mezzanine Floor3500

T.O.Steel6800

T.O.Footing-3000

5 921

2A106

Roof Peak9700

3 8 1064 7

1st Floor0

Mezzanine Floor3500

T.O.Steel6800

T.O.Footing-3000

59 2 12

A106 Roof Peak9700

3810 6 47

Scale

Checked by

Drawn by

Date

Project number

Precision Design

1 : 100

8/7/

2012

5:1

8:32

PM

C:\Users\Gene\Documents\6th Semester\Revit\Final Project\final submission\Finalproject_8-5-2012.rvt

North_South Elevations001

Final Phase

Final Project

July2012

Gene Butterwick

Checker

A103

No. Description Date

1 : 1001 North

1 : 1002 South

Page 6: Precision Design - trantor.sheridanc.on.catrantor.sheridanc.on.ca/student/butterwe/Portfolio/sustainable-projec… · 1st Floor 0 Mezzanine Floor 3500 T.O.Steel 6800 T.O.Footing-3000

1st Floor0

Mezzanine Floor3500

T.O.Steel6800

T.O.Footing-3000

BE D C1

A106 ARoof Peak

9700

1A105

1st Floor0

Mezzanine Floor3500

T.O.Steel6800

T.O.Footing-3000

B EDC1

A106ARoof Peak

9700

1A105

Scale

Checked by

Drawn by

Date

Project number

Precision Design

1 : 100

8/7/

2012

5:1

9:08

PM

C:\Users\Gene\Documents\6th Semester\Revit\Final Project\final submission\Finalproject_8-5-2012.rvt

East_West Elevations001

Final Phase

Final Project

July2012

Gene Butterwick

Checker

A104

No. Description Date

1 : 1001 East

1 : 1002 West

Page 7: Precision Design - trantor.sheridanc.on.catrantor.sheridanc.on.ca/student/butterwe/Portfolio/sustainable-projec… · 1st Floor 0 Mezzanine Floor 3500 T.O.Steel 6800 T.O.Footing-3000

1st Floor0

Mezzanine Floor3500

T.O.Steel6800

T.O.Footing-3000

5 921 2A106

Roof Peak9700

3 8 1064 7

Meeting Room2

Product ShowcaseRoom

18

Mens19

Product FinishesRoom

17

Product Library21

Scale

Checked by

Drawn by

Date

Project number

Precision Design

1 : 100

8/7/

2012

5:1

9:36

PM

builing section001

Final Phase

Final Project

July2012

Gene Butterwick

Checker

A105

No. Description Date

1 : 1001 Building Section

Page 8: Precision Design - trantor.sheridanc.on.catrantor.sheridanc.on.ca/student/butterwe/Portfolio/sustainable-projec… · 1st Floor 0 Mezzanine Floor 3500 T.O.Steel 6800 T.O.Footing-3000

1st Floor0

Mezzanine Floor3500

T.O.Steel6800

T.O.Footing-3000

1

A1091

A1092

A1083

Roof Peak9700

1st Floor0

Mezzanine Floor3500

T.O.Steel6800

T.O.Footing-3000

B C

A1082

A1081

Roof Peak9700

A1084

1A105

Scale

Checked by

Drawn by

Date

Project number

Precision Design

1 : 50

8/7/

2012

5:2

0:00

PM

Wall and Stair Sections001

Final Phase

Final Project

July2012

Gene Butterwick

Checker

A106

No. Description Date

1 : 501 Wall Section 1 : 502 Stair Section

Page 9: Precision Design - trantor.sheridanc.on.catrantor.sheridanc.on.ca/student/butterwe/Portfolio/sustainable-projec… · 1st Floor 0 Mezzanine Floor 3500 T.O.Steel 6800 T.O.Footing-3000

5

B

E

9

2

A103

2

A1041

A103

1

A1042

D

1

C

1A106

2A106

A

3

8

10

Bxx

Bx

6

4

7

1A105

TRUE

Scale

Checked by

Drawn by

Date

Project number

Precision Design

1 : 100

8/7/

2012

5:2

2:09

PM

C:\Users\Gene\Documents\6th Semester\Revit\Final Project\final submission\Finalproject_8-5-2012.rvt

1st Floor RCP001

Final Phase

Final Project

July2012

Gene Butterwick

Checker

A110

No. Description Date

1 : 1001 1st Floor

Page 10: Precision Design - trantor.sheridanc.on.catrantor.sheridanc.on.ca/student/butterwe/Portfolio/sustainable-projec… · 1st Floor 0 Mezzanine Floor 3500 T.O.Steel 6800 T.O.Footing-3000

Mezzanine Floor3500

1

3 mm Carpet75 mm concrete on steel deckOWSJSuspended Ceiling

Lintel

Insulate90 mm masonary stone25 mm air spaceAir/moisture barrier50 mm rigid insulation150 mm masonary concrete block90 mm Metal studBatt InsulationVapor barrier16 mm type X G.W.B

Fire stop gasket

WeeperFlashing with air barrier lapped

T.O.Steel6800

1

90 mm masonary stone25 mm air spaceAir/moisture barrier50 mm rigid insulation150 mm masonary concrete block90 mm Metal studBatt InsulationVapor barrier16 mm type X G.W.B

Steel Painted roof90 mm rigid insulationSteel truss system

AluminumFasia,soffitand eaves

Curtainwall head and mullion

34 x 84Flush Mount

36 x 84Flush Mount

1830 x 2134 Double Glass

1730 x 2134Double Glass

Scale

Checked by

Drawn by

Date

Project number

Precision Design

As indicated

8/7/

2012

5:2

1:46

PM

Details001

Final Phase

Final Project

July2012

Gene Butterwick

Checker

A109

No. Description Date 1 : 101 Wall at Mezzanine

1 : 102 Wall at Roof

1 : 50Door Legend

Door Type Schedule

Type Mark Width Height Thickness FinishFrame

MaterialFrameType Fire Rating

Construction Type kick plate Cost

1st FloorM_Curtain Wall DblGlass

1737 2218

36" x 84" 3 914 2134 5136" x 84" 4 914 2134 511830 x 2134mm 5 1830 2134 5134" x 84" 8 864 2134 5134" x 84" 9 864 2134 511730 x 2134mm 11 1730 2134 51Mezzanine Floor1730 x 2134mm 12 1730 2134 51

Page 11: Precision Design - trantor.sheridanc.on.catrantor.sheridanc.on.ca/student/butterwe/Portfolio/sustainable-projec… · 1st Floor 0 Mezzanine Floor 3500 T.O.Steel 6800 T.O.Footing-3000

1st Floor0

25175

305

C-ChanelAnchor Stringer to floor

Anti-slip ceramic tile12 gauge metal pan filled withconcreteSteel StringerGrind smooth all weldsPaint finish on steelProvide 150 mm kick plate atlandings (typical)

Mezzanine Floor3500

305

175

396

Ceramic Tile Flooring75mm ConcreteSteel Floor DeckingStructural Steel Framing - OWSJWide Flange BeamSuspended Ceiling

Anti-slip ceramic tile12 guage metal panfilled with concreteSteel stringerGrind smooth all weldsPaint steel finish

C-Chanel welded to Wide flangebeams

1A105

1st Floor0

1

90 mm masonary stone25 mm air spaceAir/moisture barrier50 mm rigid insulation150 mm masonary concrete block90 mm Metal studBatt InsulationVapor barrier16 mm type X G.W.B

Aluminum flashingAluminum flashing InsulationBacker rod andsealantRubber gasket

Mezzanine Floor3500

305

396

Ceramic Tile Flooring75mm ConcreteSteel Floor DeckingStructural Steel Framing - OWSJWide Flange BeamSuspended Ceiling

Anti-slip ceramic tile12 guage metal panfilled with concreteSteel stringerGrind smooth all weldsPaint steel finish

C-Chanel welded to Wide flangebeams

914

1067

152

83

1A105

Fixed 400 x 600 Fixed 900 x 1200

Scale

Checked by

Drawn by

Date

Project number

Precision Design

As indicated

8/7/

2012

5:2

1:24

PM

C:\Users\Gene\Documents\6th Semester\Revit\Final Project\final submission\Finalproject_8-5-2012.rvt

Details001

Final Phase

Final Project

July2012

Gene Butterwick

Checker

A108

No. Description Date

1 : 101 Stair at 1st Floor 1 : 102 Stair at Mezzanine

1 : 103 Wall at Foundation

1 : 104 Stair rail and gaurd at Mezzanine

1 : 20window legend

Window ScheduleLevel Height Width Mark Cost Type Count Operation

1st Floor 1219 914 1 36" x 48" 11st Floor 610 406 2 16" x 24" 11st Floor 610 406 3 16" x 24" 11st Floor 610 406 4 16" x 24" 11st Floor 610 406 5 16" x 24" 11st Floor 610 406 6 16" x 24" 1