TRAZO Y
NIVELACIONCLAVECONCEPTO:UNIDADCLAVECONCEPTO:UNIDADP01-001TRAZO Y
NIVELACIN DEL TERRENO ESTABLECIENDO REFERENCIAS, POR MEDIOS
MANUALES INCLUYE: TRAZO CON CAL, HILOS ESTACAS,
MATERIALES,HERRAMIENTAS Y MANO DE OBRA. M2P01-001TRAZO Y NIVELACIN
DEL TERRENO ESTABLECIENDO REFERENCIAS, POR MEDIOS MANUALES INCLUYE:
TRAZO CON CAL, HILOS ESTACAS, MATERIALES,HERRAMIENTAS Y MANO DE
OBRA. M2
ELEMENTOCANTIDADFACTOR DE CONTACTOCANTIDADFACTOR DE
DESPERD.CANTIDADFACTOR DE USOSCANTIDADP.U.IMPORTECONCEPTO: TRAZO Y
NIVELACIONUNIDAD: M2P.T.P.T./m2P.T./m2P.T./m2/usoS/P.T.$/m2/uso1.-
YUGOS
0.880.300.261.20.3151/30.10512.5$1.31EJESTRAMOUNIDADLARGOCANTIDADPIEZATOTAL1pzas(2"x4"x0.40ml/
3.657)1 y 7A-HM321.0021.00242.003C'-DM32.102.1012.102.-
ESTACAS1.750.751.311.21.5751/30.9412.5$11.753E-E'M33.403.4013.402pzas(2"x4"x0.40/3.657)3F-GM32.502.5012.505B-CM36.006.0016.003.-
HILO------0.0675.50$4.53A, G y H1 A 7M311.0011.00333.004.- CLAVOS
DE 2 1/2"------0.1646.88$7.50B y C5 A 7M36.456.45212.90TOTAL$25.09D
y E1 A 5M35.305.30210.60II. MANO DE OBRAF1 A
2M33.603.6013.60CATEGORIAUNIDADCANTIDADSALARIOIMPORTETOTAL116.10CUADRILLA
N 6JOR0.6660$1,055.55$703.003 peonrendimiento= 1.50m3/
jorTOTAL$703.00III.
HERRAMIENTASHERRAMIENTASUNIDADKhMoHm=Kh(Mo)Herramienta de
mano%MO0.03$703.00$21.09TOTAL$21.09IV. EQUIPO DE SEGURIDADEQUIPO DE
SEGURIDADUNIDADKsMoEs=Ks(Mo)%Mo0.025$703.00$17.58TOTAL$17.58COSTO
DIRECTO$766.75COSTO INDIRECTO 18%138.02COSTO POR FINANCIAMIENTO
1%7.67COSTO POR UTILIDAD 9%69.01COSTO ADICIONAL 0.625%4.87PRECIO
UNITARIO$986.31CLAVECONCEPTO:UNIDADCANTIDADP.UIMPORTEP01-001TRAZO Y
NIVELACIN DEL TERRENO ESTABLECIENDO REFERENCIAS, POR MEDIOS
MANUALES INCLUYE: TRAZO CON CAL, HILOS ESTACAS,
MATERIALES,HERRAMIENTAS Y MANO DE OBRA.
M2116.1$986.31$114,510.59
EXCAVACIONCLAVECONCEPTO:UNIDADCLAVECONCEPTO:UNIDADP02-001EXCAVACION
EN MATERIAL TIPO "B" CON HERRAMIENTA MANUAL Y/O EQUIPO DE 0.00 A
1.0 MTS. DE PROFUNDIDAD, SECC. OBLIGADA, INCL. AFINE DE TALUD Y
ACARREO LIBRE SOBRE 20 MTSM3P02-001EXCAVACION EN MATERIAL TIPO "B"
CON HERRAMIENTA MANUAL Y/O EQUIPO DE 0.00 A 1.0 MTS. DE
PROFUNDIDAD, SECC. OBLIGADA, INCL. AFINE DE TALUD Y ACARREO LIBRE
SOBRE 20 MTSM3
MANO DE OBRANUMEROS
GENERADORESCATEGORIAUNIDADCANTIDADSALARIOIMPORTECONCEPTO:
ExcavacionUNIDAD: M3CUADRILLA N
6JOR0.0714$1,055.55$75.37EJESTRAMOUNIDADLARGOANCHOALTOCANTIDADPIEZASTOTAL3
peon1F-HM38.250.800.644.2214.22rendimiento= 14 M2/
jor1D-FM36.701.201.008.0418.04Mando
intermedio%MO8%$84.44$6.031A-DM310.250.800.645.2515.25TOTAL$81.402F-GM31.501.201.001.8011.80IV.
HERRAMIENTAS3C-GM39.001.201.0010.80110.80HERRAMIENTASUNIDADKhMoHm=Kh(Mo)5B-CM35.001.201.006.0016.00Herramienta
de mano%MO0.03$81.40$2.445 y
6G-HM31.251.201.001.5023.00TOTAL$2.447G-HM36.750.800.643.4613.46V.
EQUIPO DE SEGURIDAD7B-GM315.201.201.0018.24118.24EQUIPO DE
SEGURIDADUNIDADKsMoEs=Ks(Mo)7A-BM33.250.800.641.6611.66%Mo0.025$81.40$2.04H1
a 7M33.100.800.641.5923.17TOTAL$2.04G2 a
3M30.801.201.000.9610.96COSTO DIRECTO $85.87G3 a
7M34.651.201.005.5815.58COSTO INDIRECTO 18%:$15.46F, E y D1 a
3M31.901.201.002.2836.84COSTO POR FINANCIAMIENTO 1%:$0.86C3 a
7M35.851.201.007.0217.02COSTO POR UTILIDAD 9%:$7.73B5 a
7M33.851.201.004.6214.62COSTO ADICIONAL 0.625%:$0.54A1 a
7M38.600.800.644.4014.40PRECIO UNITARIO:$112.49TOTAL DE
EXCAVACION95.07
CLAVECONCEPTO:UNIDADCANTIDADP.UIMPORTEP02-001EXCAVACION EN
MATERIAL TIPO "B" CON HERRAMIENTA MANUAL Y/O EQUIPO DE 0.00 A 1.0
MTS. DE PROFUNDIDAD, SECC. OBLIGADA, INCL. AFINE DE TALUD Y ACARREO
LIBRE SOBRE 20 MTSM395.07$112.49$10,694.42
PLANTILLACLAVECONCEPTO:UNIDADCLAVECONCEPTO:UNIDADP02-002PLANTILLA
DE CONCRETO F'c= 250 KG/CM HECHO EN OBRA CON 10 CMS. DE ESPESOR
PROMEDIO.M2P02-002PLANTILLA DE CONCRETO F'c= 250 KG/CM HECHO EN
OBRA CON 10 CMS. DE ESPESOR PROMEDIO.M2
CLAVE CONCEPTOUNIDADCANT.P.UIMPORTECONCEPTO: Plantila de
concreto de 10 cm de espesorUNIDAD: M3CONCRETO FC 250 KG/CM2 ,
AGREGADOS 3/4". REVENIMIENTO DE 8 A 10
CMM22.5$2,458.66$6,146.65EJESTRAMOUNIDADLARGOANCHOALTOCANTIDADPIEZASTOTALIMPORTE
TOTAL (INCLUYENDO MANO DE
OBRA):$6,146.651F-HM38.250.800.100.6610.661D-FM36.701.200.100.8010.801A-DM310.250.800.100.8210.822F-GM31.501.200.100.1810.18CLAVECONCEPTO:UNIDADCANTIDADP.UIMPORTE3C-GM39.001.200.101.0811.08P02-002PLANTILLA
DE CONCRETO F'c= 250 KG/CM HECHO EN OBRA CON 10 CMS. DE ESPESOR
PROMEDIO.M210.75$6,146.65$66,076.495B-CM35.001.200.100.6010.605 y
6G-HM31.251.200.100.1520.307G-HM36.750.800.100.5410.547B-GM315.201.200.101.8211.827A-BM33.250.800.100.2610.26H1
a 5/6 a 7M33.100.800.100.2520.50G2 a 3M30.801.200.100.1010.10G3 a
7M34.651.200.100.5610.56F, E y D1 a 3M31.901.200.100.2330.68C3 a
7M35.851.200.100.7010.70B5 a 7M33.851.200.100.4610.46A1 a
7M38.600.800.100.6910.69TOTAL DE EXCAVACION10.75
ZAPATA
Z1,Z2,Z3CLAVECONCEPTO:UNIDADCLAVECONCEPTO:UNIDADP02-003ZAPATA
CORRIDA Z1 F'c= 250 KG/CM, ARMADA CON VARILLA DEL No.2 @ 25 CMS. EN
SENTIDO TRANSVERSAL Y VARILLA No. 4 @ 20 CM. EN SENTIDO
LONGITUDINAL DE 100 CMS. DE ANCHO Y 15 CMS. DE ESPESOR, INCL.
CONCRETO PREMEZCLADO, VERTIDO Y ELEVACION HASTA EL LUGAR DE SU
UTILIZACION BOMBEO EN SU CASO VIBRADO, CURADO, ELABORACION, EQUIPO
DE SEGURIDAD INC. ADITIVOS PARA CONCRETO, DEPRECIACION Y DEMAS
CARGOS DERIVADOS DEL USO DE EQUIPO Y HERRAMIENTA EN CUALQUIER
NIVELMLP02-003ZAPATA CORRIDA Z1 F'c= 250 KG/CM, ARMADA CON VARILLA
DEL No.2 @ 25 CMS. EN SENTIDO TRANSVERSAL Y VARILLA No. 4 @ 20 CM.
EN SENTIDO LONGITUDINAL DE 100 CMS. DE ANCHO Y 15 CMS. DE ESPESOR,
INCL. CONCRETO PREMEZCLADO, VERTIDO Y ELEVACION HASTA EL LUGAR DE
SU UTILIZACION BOMBEO EN SU CASO VIBRADO, CURADO, ELABORACION,
EQUIPO DE SEGURIDAD INC. ADITIVOS PARA CONCRETO, DEPRECIACION Y
DEMAS CARGOS DERIVADOS DEL USO DE EQUIPO Y HERRAMIENTA EN CUALQUIER
NIVELML
CLAVE CONCEPTOUNIDADCANT.P.UIMPORTECONCEPTO: Cimentacion de
Zapatas Z1, Z2 y Z3UNIDAD: M3CONCRETO FC 250 KG/CM2 , AGREGADOS
3/4". REVENIMIENTO DE 8 A 10 CMM32.5$3,395.43$8,488.58ACERO No.2 @
25CMSTON0.000753$30,302.20$22.82EJESTRAMOUNIDADLARGOANCHOALTOCANTIDADPIEZASTOTALACERO
No.4 @
20CMSTON0.002230$24,972.59$55.691F-HM38.250.302.4812.48IMPORTE
TOTAL (INCLUYENDO
M.O):$8,567.081D-FM36.700.684.5614.561A-DM310.250.303.0813.082F-GM31.500.681.0211.02CLAVECONCEPTO:UNIDADCANTIDADP.UIMPORTE3C-GM39.000.686.1216.12P02-003ZAPATA
CORRIDA Z1 F'c= 250 KG/CM, ARMADA CON VARILLA DEL No.2 @ 25 CMS. EN
SENTIDO TRANSVERSAL Y VARILLA No. 4 @ 20 CM. EN SENTIDO
LONGITUDINAL DE 100 CMS. DE ANCHO Y 15 CMS. DE ESPESOR, INCL.
CONCRETO PREMEZCLADO, VERTIDO Y ELEVACION HASTA EL LUGAR DE SU
UTILIZACION BOMBEO EN SU CASO VIBRADO, CURADO, ELABORACION, EQUIPO
DE SEGURIDAD INC. ADITIVOS PARA CONCRETO, DEPRECIACION Y DEMAS
CARGOS DERIVADOS DEL USO DE EQUIPO Y HERRAMIENTA EN CUALQUIER
NIVELML4.00$8,567.08$34,268.325B-CM35.000.683.4013.405 y
6G-HM31.250.680.8521.707G-HM36.750.302.0312.037B-GM315.200.6810.34110.34CLAVECONCEPTO:UNIDAD7A-BM33.250.300.9810.98P02-004ZAPATAS
AISLADA Z2 DE 1.00 x 0.85 x 0.30 MTS. DE SECCION CON CONCRETO
PREMEZCLADO CON UNA RESISTENCIA F'c=250 KG/CM CON UN AGREGADO
MAXIMO DE " ,ARMADA CON ACERO DE REFUERZO F'Y = 4200 KG/CM CON
VARILLA No.4 @ 20 CMS. EN AMBOS SENTIDOS, INCLUYE HABILITADO,
ARMADO, TRASLAPES, DESPERDICIOS, COLADO, ELEVACION HASTA EL LUGAR
DE SU UTILIZACION,CURADO, PRUEBAS DE LABORATORIO, MATERIAL, MANO DE
OBRA, EQUIPO Y HERRAMIENTA P.U.O.T.PZAH1 a 5/6 a
7M33.100.300.9321.86G2 a 3M30.800.680.5410.54G3 a
7M34.650.683.1613.16CLAVE CONCEPTOUNIDADCANT.P.UIMPORTEF1 a
3M31.900.681.2911.29CONCRETO FC 250 KG/CM2 , AGREGADOS 3/4".
REVENIMIENTO DE 8 A 10 CMM32.5$3,395.43$8,488.58E1 a
3M31.900.681.2911.29ACERO No.4 @ 20CMSTON0.002230$24,972.59$55.69D1
a 3M31.900.681.2911.29IMPORTE TOTAL (INCLUYENDO M.O):$8,544.26C3 a
7M35.850.683.9813.98B5 a 7M35.050.683.4313.43A1 a
7M38.600.302.5812.58TOTAL55.12CLAVECONCEPTO:UNIDADCANTIDADP.UIMPORTEP02-004ZAPATAS
AISLADA Z2 DE 1.00 x 0.85 x 0.30 MTS. DE SECCION CON CONCRETO
PREMEZCLADO CON UNA RESISTENCIA F'c=250 KG/CM CON UN AGREGADO
MAXIMO DE " ,ARMADA CON ACERO DE REFUERZO F'Y = 4200 KG/CM CON
VARILLA No.4 @ 20 CMS. EN AMBOS SENTIDOS, INCLUYE HABILITADO,
ARMADO, TRASLAPES, DESPERDICIOS, COLADO, ELEVACION HASTA EL LUGAR
DE SU UTILIZACION,CURADO, PRUEBAS DE LABORATORIO, MATERIAL, MANO DE
OBRA, EQUIPO Y HERRAMIENTA P.U.O.T.PZA9.00$8,544.26$76,898.34
CLAVECONCEPTO:UNIDADP02-005ZAPATAS AISLADA Z2 DE 1.00 x 0.85 x
0.30 MTS. DE SECCION CON CONCRETO PREMEZCLADO CON UNA RESISTENCIA
F'c=250 KG/CM CON UN AGREGADO MAXIMO DE " ,ARMADA CON ACERO DE
REFUERZO F'Y = 4200 KG/CM CON VARILLA No.4 @ 20 CMS. EN AMBOS
SENTIDOS, INCLUYE HABILITADO, ARMADO, TRASLAPES, DESPERDICIOS,
COLADO, ELEVACION HASTA EL LUGAR DE SU UTILIZACION,CURADO, PRUEBAS
DE LABORATORIO, MATERIAL, MANO DE OBRA, EQUIPO Y HERRAMIENTA
P.U.O.T.PZA
CLAVE CONCEPTOUNIDADCANT.P.UIMPORTECONCRETO FC 250 KG/CM2 ,
AGREGADOS 3/4". REVENIMIENTO DE 8 A 10
CMM32.5$3,395.43$8,488.58ACERO No.4 @
20CMSTON0.002230$24,972.59$55.69IMPORTE TOTAL (INCLUYENDO
M.O):$8,544.26CLAVECONCEPTO:UNIDADCANTIDADP.UIMPORTEP02-005ZAPATAS
AISLADA Z2 DE 1.00 x 0.85 x 0.30 MTS. DE SECCION CON CONCRETO
PREMEZCLADO CON UNA RESISTENCIA F'c=250 KG/CM CON UN AGREGADO
MAXIMO DE " ,ARMADA CON ACERO DE REFUERZO F'Y = 4200 KG/CM CON
VARILLA No.4 @ 20 CMS. EN AMBOS SENTIDOS, INCLUYE HABILITADO,
ARMADO, TRASLAPES, DESPERDICIOS, COLADO, ELEVACION HASTA EL LUGAR
DE SU UTILIZACION,CURADO, PRUEBAS DE LABORATORIO, MATERIAL, MANO DE
OBRA, EQUIPO Y HERRAMIENTA P.U.O.T.PZA7.00$8,544.26$59,809.82
CIMBRACLAVECONCEPTO:UNIDADCLAVECONCEPTO:UNIDADP02-007CIMBRA EN
CIMENTACION CON MADERA DE PINO ACABADO COMUN, INC. CIMBRA COMUN,
DESCIMBRA, (ZAPATAS, DADOS Y CONTRATRABES), HERRAMIENTA Y MANO DE
OBRAM2P02-007CIMBRA EN CIMENTACION CON MADERA DE PINO ACABADO
COMUN, INC. CIMBRA COMUN, DESCIMBRA, (ZAPATAS, DADOS Y
CONTRATRABES), HERRAMIENTA Y MANO DE OBRAM2
ELEMENTOCANTIDADFACTOR DE CONTACTOCANTIDADFACTOR DE
DESPERD.CANTIDADFACTOR DE USOSCANTIDADP.UIMPORTECONCEPTO:
Cimentacion de Zapatas Z1, Z2 y Z3UNIDAD:
M3P.TP.T/M2P.T/M2P.T/M2/USOS/P.T$/M2/USO1.- DUELA (EN ZAPATA) 3PZAS
(1"X4"X1.00ML/3.657)3.283.3310.941.213.121/52.6212.50$32.81EJESTRAMOUNIDADLARGOANCHOALTOCANTIDADPIEZASTOTAL1F-HM38.250.302.4812.481D-FM36.700.684.5614.562.-YUGOS
4PZAS(2"X$"X0.35ML/3.657)3.063.3310.201.212.241/52.4512.50$30.601A-DM310.250.303.0813.082F-GM31.500.681.0211.023C-GM39.000.686.1216.123.-
DUELA (EN CONTRATRABE) 4
PZAS(1"X4"X1ML/3.6574.380.632.741.23.291/50.6612.50$8.215B-CM35.000.683.4013.405
y 6G-HM31.250.680.8521.707G-HM36.750.302.0312.034.- YUGO 2
PZAS(2"X4"X0.95ML/3.6574.160.632.601.23.121/50.6212.50$7.807B-GM315.200.6810.34110.347A-BM33.250.300.9810.98H1
a 5/6 a 7M33.100.300.9321.865.- SEPARADORES 2
PZAS(2"X4"X0.55ML/3.6572.40.631.501.21.801/30.6012.50$7.50G2 a
3M30.800.680.5410.54G3 a 7M34.650.683.1613.16F1 a
3M31.900.681.2911.296.- MADRINAS 4
PZAS(2"X4"X1ML/3.657)8.750.635.471.26.560.100.6612.50$8.20E1 a
3M31.900.681.2911.29D1 a 3M31.900.681.2911.29C3 a
7M35.850.683.9813.987.- PIE DERECHOS
8PZAS(4"X4"X0.30ML/3.657)10.50.636.561.27.880.100.7911.30$8.90B5 a
7M35.050.683.4313.43A1 a 7M38.600.302.5812.58TOTAL DE
PLANTILLA55.128.- ARRASTROS 4
PZAS(1"X4"X0.90ML/3.657)3.940.632.461.22.961/30.9912.50$12.31
9.- DISEL------0.2414.20$3.4110. CLAVOS DE 2
1/2"------0.1646.88$7.50TOTAL$127.24II. MANO DE
OBRACATEGORIAUNIDADCANTIDADSALARIOIMPORTECUADRILLA N
6JOR0.6660$1,055.55$703.003 peonrendimiento= 1.50m3/ jor
TOTAL$703.00III.
HERRAMIENTASHERRAMIENTASUNIDADKhMoHm=Kh(Mo)Herramienta de
mano%MO0.03$703.00$21.09TOTAL$21.09IV. EQUIPO DE SEGURIDADEQUIPO DE
SEGURIDADUNIDADKsMoEs=Ks(Mo)%Mo0.025$703.00$17.58TOTAL$17.58COSTO
DIRECTO$868.90COSTO INDIRECTO 18%156.40COSTO POR FINANCIAMIENTO
1%8.69COSTO POR UTILIDAD 9%78.20COSTO ADICIONAL 0.625%5.52PRECIO
UNITARIO$1,117.72CLAVECONCEPTO:UNIDADCANTIDADP.UIMPORTEP02-007CIMBRA
EN CIMENTACION CON MADERA DE PINO ACABADO COMUN, INC. CIMBRA COMUN,
DESCIMBRA, (ZAPATAS, DADOS Y CONTRATRABES), HERRAMIENTA Y MANO DE
OBRAM255.12$1,117.52$61,597.70
CADENACLAVECONCEPTO:UNIDADCLAVECONCEPTO:UNIDADP02-008CADENA DE
DESPLANTE DE CONCRETO F'c= 200 KG/CM SECCION 15 x 20 CMS. ARMADO
CON 4 VARILLAS DEL No.3 (3/8") Y ESTRIBOS DEL No.2 (") @ 15 CMS,
INCL. CIMBRA COMUN, DESCIMBRA, HERRAMIENTA Y MANO DE
OBRA.MLP02-008CADENA DE DESPLANTE DE CONCRETO F'c= 200 KG/CM
SECCION 15 x 20 CMS. ARMADO CON 4 VARILLAS DEL No.3 (3/8") Y
ESTRIBOS DEL No.2 (") @ 15 CMS, INCL. CIMBRA COMUN, DESCIMBRA,
HERRAMIENTA Y MANO DE OBRA.MLCLAVE
CONCEPTOUNIDADCANT.P.UIMPORTECONCEPTO: UNIDAD: M3CIMBRA EN
CADENAML2.5$1,087.48$2,718.70CADENA DE DESPLANTECONCRETO FC 200
KG/CM2 , AGREGADOS 3/4". REVENIMIENTO DE 8 A 10
CMM30.03$3,185.80$95.57EJESTRAMOPIEZASLARGOANCHOALTOCANTIDADUNIDADTOTALACERO
No.2 @
15CMSTON0.000753$30,302.20$22.821A-H80.150.150.400.01M30.07ACERO
No.3 @
15CMSTON0.002230$26,004.06$57.991A-H10.150.2250.400.01M30.01IMPORTE
TOTAL (INCLUYENDO
M.O):$2,895.082F-H20.150.150.400.01M30.022F-H10.150.150.400.01M30.01CLAVECONCEPTO:UNIDADCANTIDADP.UIMPORTE3D-G50.150.150.400.01M30.05P02-008CADENA
DE DESPLANTE DE CONCRETO F'c= 200 KG/CM SECCION 15 x 20 CMS. ARMADO
CON 4 VARILLAS DEL No.3 (3/8") Y ESTRIBOS DEL No.2 (") @ 15 CMS,
INCL. CIMBRA COMUN, DESCIMBRA, HERRAMIENTA Y MANO DE
OBRA.ML0.33$2,895.08$955.385B-G40.150.150.400.01M30.045H10.150.230.400.01M30.015
a
6A-D20.150.150.400.01M30.026G10.150.150.400.01M30.016H10.150.230.400.01M30.016
a 7B -
G30.150.150.400.01M30.037A-G50.150.150.400.01M30.057H10.150.230.400.01M30.01TOTAL0.33
CASTILLOCLAVECONCEPTO:UNIDADCLAVECONCEPTO:UNIDADP02-009CASTILLO
EN CIMENTACIN DE CONCRETO F'c= 200 KG/CM DE 15 x 15 CMS. DE SECCION
ARMADO CON 4 VARILLAS DEL No.3 (3/8") Y ESTRIBOS DEL No.2 (") @ 20
CMS. INCL. CIMBRA Y DESCIMBRA.MLP02-008CASTILLO EN CIMENTACIN DE
CONCRETO F'c= 200 KG/CM DE 15 x 15 CMS. DE SECCION ARMADO CON 4
VARILLAS DEL No.3 (3/8") Y ESTRIBOS DEL No.2 (") @ 20 CMS. INCL.
CIMBRA Y DESCIMBRA.MLCLAVE CONCEPTOUNIDADCANT.P.UIMPORTECONCEPTO:
UNIDAD: M3CIMBRA EN CASTILLOSML2.5$954.04$2,385.10ANCLAJE DE
CASTILLOCONCRETO FC 200 KG/CM2 , AGREGADOS 3/4". REVENIMIENTO DE 8
A 10
CMM30.03$3,185.80$95.57EJESTRAMOPIEZASLARGOANCHOALTOCANTIDADUNIDADTOTALACERO
No.2 @
15CMSTON0.000753$30,302.20$22.821A-H80.150.150.400.01M30.07ACERO
No.3 @
15CMSTON0.002230$26,004.06$57.991A-H10.150.2250.400.01M30.01IMPORTE
TOTAL (INCLUYENDO
M.O):$2,561.482F-H20.150.150.400.01M30.022F-H10.150.150.400.01M30.01CLAVECONCEPTO:UNIDADCANTIDADP.UIMPORTE3D-G50.150.150.400.01M30.05P02-009CASTILLO
EN CIMENTACIN DE CONCRETO F'c= 200 KG/CM DE 15 x 15 CMS. DE SECCION
ARMADO CON 4 VARILLAS DEL No.3 (3/8") Y ESTRIBOS DEL No.2 (") @ 20
CMS. INCL. CIMBRA Y
DESCIMBRA.ML0.33$2,561.48$845.295B-G40.150.150.400.01M30.045H10.150.230.400.01M30.015
a
6A-D20.150.150.400.01M30.026G10.150.150.400.01M30.016H10.150.230.400.01M30.016
a 7B -
G30.150.150.400.01M30.037A-G50.150.150.400.01M30.057H10.150.230.400.01M30.01TOTAL0.33
IMPERMEABILIZANTECLAVECONCEPTO:UNIDADCLAVECONCEPTO:UNIDADP02-010IMPERMEABILIZACION
DE CIMENTACION CON UNA CAPA DE CARTN ,ASFALTICO FM-1, DOS CAPAS DE
ASFALTO SOPLADO #12 MLP02-010IMPERMEABILIZACION DE CIMENTACION CON
UNA CAPA DE CARTN ,ASFALTICO FM-1, DOS CAPAS DE ASFALTO SOPLADO #12
MLCLAVE CONCEPTOUNIDADCANT.P.UIMPORTECONCEPTO: UNIDAD: M3CARTON
ASFALTICO No.5 +5% DESP.M20.263$2.60$0.68ASFALTO
FM-1KG0.38$6.98$2.65COMBUSTIBLE PETROLEO
DIAFANOLTS0.25$5.50$1.38ANCLAJE DE CASTILLOCOSTO UNITARIO DEL
TRABAJOM31.0032.57$32.57EJESTRAMOPIEZASLARGOANCHOALTOCANTIDADUNIDADTOTALIMPORTE
TOTAL (INCLUYENDO
M.O):$33.952F-H20.150.150.400.01M30.022F-H10.150.150.400.01M30.01CLAVECONCEPTO:UNIDADCANTIDADP.UIMPORTE3D-G50.150.150.400.01M30.05P02-010IMPERMEABILIZACION
DE CIMENTACION CON UNA CAPA DE CARTN ,ASFALTICO PEMEX #5, DOS CAPAS
DE ASFALTO SOPLADO #12 Y RIEGO DE
ARENAML0.33$33.95$11.205B-G40.150.150.400.01M30.045H10.150.230.400.01M30.015
a
6A-D20.150.150.400.01M30.026G10.150.150.400.01M30.016H10.150.230.400.01M30.016
a 7B -
G30.150.150.400.01M30.037A-G50.150.150.400.01M30.057H10.150.230.400.01M30.01TOTAL0.25
RELLENOCLAVECONCEPTO:UNIDADCLAVECONCEPTO:UNIDADP02-011RELLENO Y
COMPACTACION DE MATERIAL PRODUCTO DE EXCAVACION CON EQUIPO
VIBRATORIO TIPO "BAILARINA", INCL. ACARREO DE MATERIAL DENTRO DE LA
OBRA Y AGUA, MEDIDO COMPACTO.M3P02-011RELLENO Y COMPACTACION DE
MATERIAL PRODUCTO DE EXCAVACION CON EQUIPO VIBRATORIO TIPO
"BAILARINA", INCL. ACARREO DE MATERIAL DENTRO DE LA OBRA Y AGUA,
MEDIDO COMPACTO.M3CLAVE CONCEPTOUNIDADCANT.P.UIMPORTENUMEROS
GENERADORESDEPRECIACION DE PALAM31.00$3.28$3.28CONCEPTO:
ExcavacionUNIDAD: M3DEPRECIACION DE
CARRETILLAM30.500$0.75$0.38EJESTRAMOUNIDADLARGOANCHOALTOCANTIDADPIEZASTOTALPASARELASPT0.120$4.00$0.481F-HM38.250.800.644.2214.22PISON
DE MADERAPT0.107$12.50$1.341D-FM36.701.201.008.0418.04AGUA PARA
COMPACTACION INC.
DESP.M30.300$20.00$6.001A-DM310.250.800.645.2515.25COSTO UNITARIO
DEL TRABAJOM31.00$32.57$32.572F-GM31.501.201.001.8011.80IMPORTE
TOTAL (INCLUYENDO
M.O):$40.393C-GM39.001.201.0010.80110.805B-CM35.001.201.006.0016.00CLAVECONCEPTO:UNIDADCANTIDADP.UIMPORTE5
y 6G-HM31.251.201.001.5023.00P02-011RELLENO Y COMPACTACION DE
MATERIAL PRODUCTO DE EXCAVACION CON EQUIPO VIBRATORIO TIPO
"BAILARINA", INCL. ACARREO DE MATERIAL DENTRO DE LA OBRA Y AGUA,
MEDIDO
COMPACTO.M395.07$40.39$3,839.887G-HM36.750.800.643.4613.467B-GM315.201.201.0018.24118.247A-BM33.250.800.641.6611.66H1
a 7M33.100.800.641.5923.17G2 a 3M30.801.201.000.9610.96G3 a
7M34.651.201.005.5815.58F, E y D1 a 3M31.901.201.002.2836.84C3 a
7M35.851.201.007.0217.02B5 a 7M33.851.201.004.6214.62A1 a
7M38.600.800.644.4014.40TOTAL DE EXCAVACION95.07
PRESUPUESTO
CLAVECONCEPTOUNIDADCANTIDADPUTOTALOBRA EN REA DE
EDIFICIOSP01PRELIMINARES 129736.37P01-001TRAZO Y NIVELACIN DEL
TERRENO ESTABLECIENDO REFERENCIAS, POR MEDIOS MANUALES INCLUYE:
TRAZO CON CAL, HILOS ESTACAS, MATERIALES,HERRAMIENTAS Y MANO DE
OBRA.
M2116.1$986.31$114,510.59SUBTOTAL$114,510.59P02CIMENTACION129736.37P02-001EXCAVACION
EN MATERIAL TIPO "B" CON HERRAMIENTA MANUAL Y/O EQUIPO DE 0.00 A
1.0 MTS. DE PROFUNDIDAD, SECC. OBLIGADA, INCL. AFINE DE TALUD Y
ACARREO LIBRE SOBRE 20 MTSM395.07$112.49$10,694.42P02-002PLANTILLA
DE CONCRETO F'c= 250 KG/CM HECHO EN OBRA CON 5 CMS. DE ESPESOR
PROMEDIO.M210.75$6,146.65$66,076.49P02-003ZAPATA CORRIDA Z1 F'c=
250 KG/CM, ARMADA CON VARILLA DEL No.2 @ 25 CMS. EN SENTIDO
TRANSVERSAL Y VARILLA No. 4 @ 20 CM. EN SENTIDO LONGITUDINAL DE 100
CMS. DE ANCHO Y 15 CMS. DE ESPESOR, INCL. CONCRETO PREMEZCLADO,
VERTIDO Y ELEVACION HASTA EL LUGAR DE SU UTILIZACION BOMBEO EN SU
CASO VIBRADO, CURADO, ELABORACION, EQUIPO DE SEGURIDAD INC.
ADITIVOS PARA CONCRETO, DEPRECIACION Y DEMAS CARGOS DERIVADOS DEL
USO DE EQUIPO Y HERRAMIENTA EN CUALQUIER
NIVELML4.00$8,567.08$34,268.32P02-004ZAPATAS AISLADA Z2 DE 1.00 x
0.85 x 0.30 MTS. DE SECCION CON CONCRETO PREMEZCLADO CON UNA
RESISTENCIA F'c=250 KG/CM CON UN AGREGADO MAXIMO DE " ,ARMADA CON
ACERO DE REFUERZO F'Y = 4200 KG/CM CON VARILLA No.4 @ 20 CMS. EN
AMBOS SENTIDOS, INCLUYE HABILITADO, ARMADO, TRASLAPES,
DESPERDICIOS, COLADO, ELEVACION HASTA EL LUGAR DE SU
UTILIZACION,CURADO, PRUEBAS DE LABORATORIO, MATERIAL, MANO DE OBRA,
EQUIPO Y HERRAMIENTA
P.U.O.T.PZA9.00$8,544.26$76,898.34P02-005ZAPATA CORRIDA Z3 F'c= 250
KG/CM, ARMADA CON VARILLA DEL No.4 @ 20 CMS. EN SENTIDO TRANSVERSAL
Y VARILLA No. 4 @ 20 CM. EN SENTIDO LONGITUDINAL DE 60 CMS. DE
ANCHO Y 15 CMS. DE ESPESOR, INCL. CONCRETO PREMEZCLADO, VERTIDO Y
ELEVACION HASTA EL LUGAR DE SU UTILIZACION BOMBEO EN SU CASO
VIBRADO, CURADO, ELABORACION, EQUIPO DE SEGURIDAD INC. ADITIVOS
PARA CONCRETO, DEPRECIACION Y DEMAS CARGOS DERIVADOS DEL USO DE
EQUIPO Y HERRAMIENTA EN CUALQUIER
NIVELPZA7.00$8,544.26$59,809.82P02-007CIMBRA EN CIMENTACION CON
MADERA DE PINO ACABADO COMUN, INC. CIMBRA COMUN, DESCIMBRA,
(ZAPATAS, DADOS Y CONTRATRABES), HERRAMIENTA Y MANO DE
OBRAM255.12$1,117.52$61,597.70P02-008CADENA DE DESPLANTE DE
CONCRETO F'c= 200 KG/CM SECCION 15 x 20 CMS. ARMADO CON 4 VARILLAS
DEL No.3 (3/8") Y ESTRIBOS DEL No.2 (") @ 15 CMS, INCL. CIMBRA
COMUN, DESCIMBRA, HERRAMIENTA Y MANO DE
OBRA.ML0.33$2,895.08$955.38P02-009CASTILLO EN CIMENTACIN DE
CONCRETO F'c= 200 KG/CM DE 15 x 15 CMS. DE SECCION ARMADO CON 4
VARILLAS DEL No.3 (3/8") Y ESTRIBOS DEL No.2 (") @ 20 CMS. INCL.
CIMBRA Y DESCIMBRA.ML0.33$2,561.48$845.29P02-010IMPERMEABILIZACION
DE CIMENTACION CON UNA CAPA DE CARTN ,ASFALTICO PEMEX #5, DOS CAPAS
DE ASFALTO SOPLADO #12 Y RIEGO DE
ARENAML0.33$33.95$11.20P02-011RELLENO Y COMPACTACION DE MATERIAL
PRODUCTO DE EXCAVACION CON EQUIPO VIBRATORIO TIPO "BAILARINA",
INCL. ACARREO DE MATERIAL DENTRO DE LA OBRA Y AGUA, MEDIDO
COMPACTO.M395.07$40.39$3,839.88SUBTOTAL$314,996.84