This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Certification in Construction Safety Workshop and Electrical Safety.
Certification in Planning and Scheduling with P3 for Windows (P3 501).
Certification in Auto Cad R12 Basic Skills and Drawing Production.
Certified for Basic Training Course on Radiation Safety and the use of Nuclear Gauges.
Certificate of active participation of the International Conference on Multi-purpose High-Rise
Towers and Building Conference from The International Federation of High Rise Structures (IFHS).
Certification from Officers & Board of Trustees (Member of the National Geographic Society)
Certification for the training program on Variation Orders, Delays and Acceleration in Construc-
tion from United Construction & Trading Co. (SBG Group).
Certification of completion of ARC Specialist / Applicator Training at the ATI from Chesterton.
Certification to operate & analyze Pile Dynamic Analysis utilizing stale of the art computer soft-
ware.
Certification in CI (Member of the Construction Institute - American Society of Civil Engineers)
Certification in ACI (American Concrete Institute) Concrete Field Test. Technician Grade I
Certification of completion course on Fiberglass Reinforced Thermosetting Resin (RTR) Pipe Sys-
tem, Handling and Assembly from Amiantit, Bondstrand Ltd., Saudi Arabia.
Certified Welding Inspector (CWI) to qualify welding procedures, qualify welders, inspect all field
or shop welding to any code & conduct Non-Destruction Testing.
Certification in Practices & Procedures in Asbestos Control from the University of California, Berke-
ley.
Certification in Technical & Field Supervision of Hazardous Waste Operations and Emergency re-
sponse.
Kuwait Society of Professional Engineers, Membership No. 6547.
Skills: : Proficient in IBM PC systems including DOS, Windows XP, MS Office, Primavera,
MS Project, ACAD, Micro-station
Hobbies : Scuba Diving, Snow / water Skiing, Squash, Light Weight Lifting, Bicycling and
Hiking
Nationality : American (United States of America)
Languages : English & Arabic
References and
Transcripts : All references are available upon request.
Management background
LIST OF ONGOING PROJECTS
05
LIST OF ONGOING PROJECTS
S # Project Name & Client Brief Description of Work Location
Main
Contractor
Project-Value
1
King Abdullah Financial Dis-trict Riyadh, Saudi Arabia—Area 5 J01 & Area 2, CP04 (A&B).
Completion works, testing commissioning and hand-over for; King Abdullah Financial District cluster Area 5 J01 & Area 2, CP04 (A&B). Parcel 4.05, Parcel 5.03, Parcel 5.04, Parcel 5.05 & Parcel 5.06. Cluster Area CP 04 Parcel 2.05, Parcel 2.08, Parcel 2.09, Parcel 2.10, Parcel 2.11, Parcel 2.12 & Parcel 2.13
Riyadh, KSA 1.6
Billion
2 NEOM BAY AIRPORT UP-GRADE’ *00369* TABOUK, KINGDOM OF SAUDI ARABIA
Neom Bay Airport, which will serve Saudi Arabia’s $500bn (SAR1.9tn) cross-border futuristic Neom city in Tabuk Prov-ince. Architect: Design & Built
Neom, KSA 10,000,000
3 Harbor Buildings Rectification Project
Design, Demolish, supply & install all kind of facilities including structural repair, architectural works and MEP works for total of 65 buildings rectification, No of Buildings: 65 Buildings, Buildup Area: 67,586.64 M2 Floor Area: 267,902.23 M2
Thuwal, King-dom of Saudi Arabia
1.5 Billion
4
KAUST General Construction Services, Saudi Arabian Oil Company ("SAUDI ARAMCO") Town Center & Campus Up-grade (Pckg 2)
King Abdullah University of Science and Technology General Construction Services. Work Demolish, design, supply & install all kind of facilities including structural repair, architectural works and MEP works for total of 4 buildings rectification, No of Buildings: 4 Buildings, Buildup Area: 3,645.90 M2, Floor Area: 15,840.82 M2
Thuwal, King-dom of Saudi Arabia
166,000.00 Million
5
Jabal Omar Development Project-Makkah (Phase Ii – Zones S3 & S4) Client: JABAL OMAR DEVEL-OPMENT COMPANY (JODC) M/S Hill International (Middle East) Ltd.
The Jabal Omar Development Project is a unique urban re-generation scheme purposing to provide hotel accommoda-tions, commercial/retail spaces, car parking, public spaces and public amenities to support religious, social and commercial activities to Hajj and Umrah pilgrims all year round. (Land area is approximately 230.000 sq.m. - Built up floor area is approxi-mately 2 million sq.m.). Building design & construction works: A. Buildings within zone S2/S4 which is part of the South
Zone under comprise a Podium and 4 Hotel Towers. B. The Podium contains commercial/retail spaces, car park,
hotel lobbies and technical areas. C. The 4 hotel towers are 5 star hotels operated by interna-
tional hotel operators. D. SBG (Saudi Binladin Group) has progressed with part of
the design works including architectural, structural and MEP
E. SBG had progressed and completed part of the rock exca-vation and foundation works comprising piles and pile caps. The works were supervised by DIWI International GmbH.
Plant III Extension of Building B—KMI Design Phase
Design, Procure, Construct and Hand over a new 2500 square meter of structural steel building inclusive of all Civil, Electrical and mechanical disciplines. Project will provide the owner with significant increase of fabrication, handling among addi-tional administrative, recreational spaces.
2nd Industrial city Dammam
20,000,000
7 Mixed Use Development Plant/Sariya HQ-offices, KMI Design Phase
LSTK Project, Design, Procure, Construct and Hand over of a mixed use development composed of Sariya HQ 2-3 story offices and a 2500 square meter expansion to the existing Plant II
1st Industrial city Dammam
6,250,000
8 Master plan development of Warehouses complex—KMI Design Phase
LSTK Project, Design, Procure, Construct and Hand over of a complex of warehouse's grouped under one secure facility serving to expand the KMI warehouse capabilities
1st Industrial city Dammam
5,000,000
On Going Project: KING ABDULLAH FINANCIAL DISTRICT RIYADH, OF SAUDI ARABIA
On Going Project: NEOM BAY AIRPORT UPGRADE’ *00369* TABOUK, KINGDOM OF SAUDI ARABIA
On Going Project: NEOM BAY AIRPORT UPGRADE’ *00369* TABOUK, KINGDOM OF SAUDI ARABIA
On Going Project: KAUST General Construction Services, Saudi Arabian Oil Company ("SAUDI ARAMCO")
Harbor Buildings Rectification Project
On Going Project: Jabal Omar Development Project-Makkah (Phase Ii – Zones S3 & S4)
On Going Project: Jabal Omar Development Project-Makkah (Phase Ii – Zones S3 & S4)
On Going Project: Jabal Omar Development Project-Makkah (Phase Ii – Zones S3 & S4)
On Going Project: Jabal Omar Development Project-Makkah (Phase Ii – Zones S3 & S4)
LIST OF COMPLETED PROJECTS
06
S.# Project Name & Client Brief Description of Work Location Value / Year
1
Water Injection Pump Stations (WIPS) Facilities, Saudi Arabia, Subcontract : 084255-000-SC5900-002 A1, Saudi Arabian Oil Company
Construction of civil, structural, architectural, electrical, instrumentation, communication, HVAC and plumbing works related to the WIPS equipment foundation work, substations, control building, UPS building, battery rooms, structural steel equipment supply and pipe racks, evaporation pad, underground RTR piping, demo-lition work, paving & roadwork's.
Aindar & Hawiyah
275,000,000 2008
2 Bin Jumah Movenpick Hotel Mansour Binjuma Trading
This project consists of a 14 storey Five Star Hotel Build-ing, largest Banquette Hall building in the eastern prov-ince, Seven storey Employees building and six number two storey Guest Villas. The major works consist of: Civil, Architectural, Electro-Mechanical and Interior De-sign Works including all furniture's and equipment
Al Khobar 174,000,000
2007
3
Saudi Kayan Petrochemical Complex , Civil Works at Shipping Gates Contract No. 700-K-060-IK
CIVIL, ELECTRO-MECHANICAL AND SECURITY works at KAYAN Main Gate and Shipping Gate including all indus-trial civil works related to Hydraulic Barriers, Turnstiles, Security Building, X-Ray Building and SSD-1 Fence, earth-works, duct banks, culverts, asphalt works etc. Modifi-cation of Royal Commission Tareeg 184 inclusive of all deceleration and acceleration lanes.
Jubail SABIC
28,415,000
4 Bin Khaldoon Plaza – Dammam Olayan Real Estate Co.
Construction of New Shopping Mall with Ground and Mezzanine floor (area 21,600m²) including Azizia Panda Market and 13 shops, central block, food court (3,675m²), arcade (3,121m²) 2000m² of storage area, loading docks, water tank, including steel space frame and aluminum skylights. External works includes 32,622m² parking area including landscaping, hardscap-ing and roads.
Dammam 28,375,677
2001
5 Khursaniyah Permanent Communica-tions, Civil and Facilities Project, Saudi ARAMCO /ABB
This project consists of Civil, electro-mechanical and security access system Construction for Khursaniyah Gas Plant/ Process Facilities (KGP/KPF)
Khursaniya 24,955,663
2007
6 Bin Khaldoon Plaza – Phase II - Dammam—Olayan Real Estate Co.
The project Phase II as Zone 4 to New Bin Khaldoun Plaza with an area of 17,700m2 comprise of two storied building, including shops, arcade (1000m²) with alumi-num skylights and food court, composed of precast ele-ments on super structure and cast-in-place on sub-structure. The project includes 4 escalators and 2 pas-senger elevator External works includes parking area, landscaping, hardscaping, and compound wall and as-phalt roads.
Dammam 24,214,427
2002
7 “Ansari Compound” Al-Khobar Mr. Abdulrazak M. Al Ansari
The project "Al Ansari Compound" consists of 52 Villas, 16 Apartment building, Community Center, Staff Accom-modation and Guard House, Parking area, landscaping, hardscaping and roads
Al Khobar 23,000,000
2004
Continue on next page...
LIST OF COMPLETED PROJECTS
S.# Project Name & Client Brief Description of Work Location Value / Year
8 Commissary Building Munirah Camp Reconfiguration Contract# 6600009967 Saudi ARAMCO
Demolition of the security gate to Al Munirah Camp, commissary building # 142 and other incidental build-ings and recreational facilities, construction of commis-sary building, construction of a commissary building, security gate house and underpass tunnel beneath Dhahran boulevard, electrical and non-electrical utili-ties, tennis & basketball courts & associated site works.
Dhahran 18,965,031
2005
9 BGP Administration Building Berri Con-tract Requisition No. 3000026286 Saudi Arabian Oil Company
Construction of BGP Administration Building in Jubail, covering enclosed area of 3500 m2 (First and Second floor), including construction of helipad. The project scope will be Hardscape and Landscape Works, Concrete and Precast Works, Steel Structural Framing and deck-ing, gypsum board partition, Furniture's, Audio Visual Equipments, and Electro-Mechanical Works.
Jubail 17,488,882
2004
10 Al Gosaibi Housing Compound Mr. Salah Khalifa Al Gosaibi K.A. ALGOSAIBI CONTRACTING
The project "Al Gosaibi Compound" having a total area of 58,000m2 includes 100 Bachelor units (5,550m²),66 Family units (9,075m²), Club House & Recreation area (3,175 m²) and Parking area, landscaping, hard-scaping and roads (40,000m2) The Recreation Area is comprised of a Swimming Pool with an area of 185m², tennis court with an area of 731m², Children Playground, Kiosk and Shower Change Room
Al Khobar 15,852,113
2002
11
Midal Cables Plant, 2nd Industrial City, Dammam, Kingdom of Saudi Arabia
Midal Bahrain has awarded their new project to set up an Aluminum & Aluminum Alloy wire & conductor facto-ry – Midal Cables Saudi Arabia LLC located at Modon Industrial park, Dammam, Saudi Arabia with the capaci-ty of over 15,000 MT. to Sariya Contracting Company. The construction for the plant has commenced at site. The facility is expected to be operational early May 2014. This facility is being set up using the latest equip-ment and technology available in this business. Midal Saudi Arabia caters to the local and regional markets meeting their specific requirements. Project compo-nent: An industrial facility composed of a Production area of 7300 sqm, administration area of 800sqm, Guard rooms, SCECO and miscellaneous site facilities.
Dammam, Saudi Ara-
bia 13,500,000.00
12 Civil and Building Works for Production Line No. 3—Qassim Cement Company
This project consists of Civil, electro-mechanical works for Civil & Building works for Production Line #3
Qassim 12,550,000.00
13 Sheikh Babtain Villa Sh. Abdul Wahab S. Al-Babtain
5000m² Private Residential Villa Al Khobar 11,344,937
2000
14 Saudi Aramco Integrated Security Up-grade Program (SAISUP)
Installation of pre-cast concrete foundation including all required earthworks and sundry work, construction of cast In Situ concrete foundation including installation of other pre-cast elements, trenching, cable laying, wire pulling, conduiting, dust banks and related earth/site work, electrical termination, plumbing installation and testing and commissioning and installation of perimeter Saudi Aramco SSD-1 fence.
Uthmani-yah
Shedgum Hawiyah
10,744,305
Continue on next page...
LIST OF COMPLETED PROJECTS
S.# Project Name & Client Brief Description of Work Location Value / Year
15
RasTanura Integrated Project (RTIP) – Data Center for Sadara (AD-07) Project No. 1-14-3980/4099
One Story Reinforced Concrete Building size 40.00 m. x 47.00 m. (floor Area = 1,880 m2) to be constructed to House and Support Data, Telecommunications, Generator Building 12x9 in size 108m2 and Computing Services and Facilities at the Ras Tanura Integrated Project (RTIP) located at Jubail in Saudi Arabia.
Jubail , Saudi Ara-
bia. 9,050,000.00
16 Sheraton Dammam Health Club SPA, Dammam, Saudi Arabia
Sheraton dammam hotel & Towers, Renovation of SPA works : Civil, interior and electro mechanical works * Prelimi-naries, earth excavation, concrete works, block wall and brick wall works, water proofing and insulation work, glazing works, swimming pool works landscaping, electrical work, plumbing work, HVAC work, Supply and fixings of sanitary fixtures and accessories, fixing of light fixtures (supply of any light fixtures by DHCL, wall surface preparation and painting, ceiling preparation and painting, installation of gypsum false ceiling, installation of MDF false ceiling, installation of gypsum partitions, Marble & flooring and carpet flooring.
Dammam Saudi Ara-
bia. 8,500,000.00
17
PERIMETER STREET LIGHTING: American Consulate Regional Procurement and Support Office Joa-chim -Becher-Str. 19—Perimeter & Interior Lighting
Construction of New Perimeter & Interior Lighting to the American Consulate Inclusive of Total up Grade of Security System to Meet New FBO Standards.
Dhahran 573,910.
Year: 2000
18
New Banquet Hall Ex-tension, External Civil & Landscaping Works at Sheraton Hotels
Project includes demolition of existing asphalt and parking shades, construction of New Banquet Hall Extension and External Civil and Landscaping , hard-scaping and asphalt works.
Dammam 7,505,375
19 Zahid La-Promenade Zahid Real Estate Co., Ltd.
Construction of New Commercial Complex "La Promenade" and an annex building for Zahid Trading & Real Estate Co. Ltd. at Dhahran street. Structure of the building composed of both cast-in-place and precast elements
Al Khobar 7,524,669 Year: 2000
20
Khursaniyah Gas Plant/ Process Facilities (KGP/KPF) Khursaniyah Civil Construction Works KGP/17.205/CW-00
Complete execution of construction works for civil including supply of required materials, labor and supervision to site CCC will supply concrete & rebars hence quote for labor only, but as an option quote for supply and install.
This project consists of Design-build delivery of Physical Security Upgrade to the existing U. S. Embassy Compound in Manama, Bahrain.
Bahrain 6,725,063
22
New A/C Warehouse, Utmaniyah Store Yard Req. No. 3000051183, Contract # 6600009862 Saudi ARAMCO
Construction of the new Pre-engineered Steel air-conditioned warehouse bldg. & associated utilities in Uthmaniyah store yard. 1. Structural steel frame with fully insulated cladding. 2. Electrical system & lighting 3. HVAC, Plumbing & Fire protec-tion/ Detection System. 4. Pallet Racking & Shelving 5. Associ-ated Electrical & Non-Electrical Utilities. 6. Site Development Works.
Uthamani-ah
4,646,387 Year: 2005
LIST OF COMPLETED PROJECTS
S # Project Name & Client Brief Description of Work Location Value
23
FAHAD ALI REZA MOSQUE AND SCHOOL PROJECT HADDA, Al Khobar
This project consists of Structural, Architectural, electro-mechanical works for the mosque and two story school.
Al Khobar 4,500,000.00
24
COMPOUND ACCESS CONTROL American Consulate General Regional Procurement and Sup-port Office Joachim -Becher-Str. 19 Compound Access Control
Construction of New Access to the American Consulate in Dhahran Inclusive of Total up Grade of Security Sys-tem to Meet New FBO Standards
Dhahran 3,432,500
2001
25
FAÇADE EXTERIOR HARD LINE American Consulate General Regional Procurement and Sup-port Office Joachim -Becher-Str. 19 Façade Exterior Hard-line
Construction of New Façade Exterior Hard-line to the American Consulate Inclusive of Total up Grade of Secu-rity System to Meet New FBO Standards
Dhahran 355,164
2000
26 AL KUHAIMI VILLA PROJECT Dismantle and relocate the entire pre-engineered struc-tural steel building including all architectural, electro mechanical and external works.
Al Khobar 3,200,000.00
27 Mahmoud Al Kuhaimi Villa, Rak-kah
Construction of new villa including all architectural, structural and electro-mechanical and external works
Al Khobar 2,000,000.00
28
US Embassy Riyadh Physical Security Upgrade Contract # SSA700-11-C-0001 Riyadh
This project consists of Physical Security Upgrade to the existing U. S. Embassy in Riyadh, including installation of THREE(3) DELTA BARRIER SYSTEM inclusive of all Civil, electro-mechanical and security works
Nov-2010 To
Mar-2011 1,200,000
29
Construction of Forklift Re-Charging Facility, Dhahran Store-house, Contract # 660010320 Saudi ARAMCO
New forklift Building will be constructed with a pre engi-neered steel structure with insulated aluminum roof and side cladding the foundation is isolated footing with slab on grade. Electrical and non electrical utilities with site restoration / development work.
Dhahran 1,347,094
2005
LIST OF COMPLETED PROJECTS
BIN JUMAH MOVENPICK HOTEL
AL KHOBAR
Pictures of Projects Executed by
the Executive Managing Director
Pedestrian Access—1
Completed Project: Project: SAUDI KAYAN PETROCHEMICAL COMPLEX—PLANT GATE 1
(Sliding Gate, Arm Barrier, Signal etc.) Location: Al Jubail
Completed Project: SAUDI KAYAN PETROCHEMICAL COMPLEX
Completed Project: SAUDI KAYAN PETROCHEMICAL COMPLEX
SAUDI ARAMCO BERRI GAS PLANT ADMINISTATION BUILDING,
Creates technologies that protect computer users from ever-increasing cyber threats.
McAfee, Inc, the leader in intrusion prevention and security risk manage-ment, proactively secures systems, and networks, worldwide.
Create your own high performance communication network over any wire using Corinex’s AV200 technology.
Connecting voice and data over IP networks. Global manufacturer of award-winning telephony, Internet, remote access, and device networking products.
The leader in storage and computing innovations worldwide
Internet Security System for Complete Unified Threat Management. Cyberoam appliances offer powerful security against a range of Internet threats, including viruses, worms, Trojans, spyware, phishing, pharming and more.
Cyclades gives companies with centralized and distributed networks the ability to locally and remotely access, monitor and manage IT infrastruc-ture across multiple sites via an alternate path to network nodes.
EqualLogic is the leading provider of iSCSI-based, all-inclusive storage area network (SAN) solutions that enable businesses - from Fortune 500 to small and mid-size organizations - to realize the economic benefits of consolidated, self-managing storage.
Aastra is a leading global provider of IP-based technologies based on open standards. Whether connecting to colleagues around the country or around the world, Aastra offers a variety of best-in-class technologies to improve your communications.
Master Group manufactures high quality 19" cabinets and LCD Mounting products. Our product lines include 19" standard Server/Network Cabi-nets, LCD Arms for Single & Multiple panels, and 19" Rackmount LCD KVM Console.