Top Banner
Pre-Proposal Meeting: 26 Requirement Contracts for Architecture and Engineering
33

Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

Sep 04, 2018

Download

Documents

lydieu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

Pre-Proposal Meeting: 26 Requirement Contracts for Architecture and Engineering

Page 2: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

$17 billion

committed by 2018

$15 billion completed since

1996

451 active infrastructure

portfolio

481 active public buildings

portfolio

3924 projects completed

since 1996

1280 in-house workforce

1332 consultant workforce

4.4 million

job hours per year

Zerega Avenue EMS Station Smith-Miller Hawkinson Architects

Bronx

billion current portfolio

value

$10

as of August 20, 2015

200+ awards won

since inception

Page 3: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

3

INITIATION 2004-2008

INSPIRATION Inspired by GSA Federal Design Excellence Program

COLLABORATION Interagency collaboration with PDC, DOT, and City Planning

OVERARCHING CONCEPT Design Matters

PROCUREMENT Quality Based Selection

PROCESS Included Peer Review

Page 4: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

4

IMPLEMENTATION 2008-2013

DESIGN METRICS Design Quality Indicators

DESIGN LIAISONS New staff role

TECHNOLOGY Building Information Modeling (BIM)

PROCESS Constructability Review

GROWTH More projects and more consultants

Page 5: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

5

GROWTH

EQUITY

SUSTAINABILITY

RESILIENCY

HEALTHY LIVING

Page 6: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

6

Staten Island Brooklyn

Queens

Bronx

Manhattan

We are OneNYC

Page 7: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

7 Snøhetta

Times Square 1100 Architect

Children’s Library Discovery Center

Page 8: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

Senior Staff Introduction Margaret O’Donoghue Castillo, Chief Architect

Christine Flaherty, Associate Commissioner

Eric Boorstyn, Associate Commissioner

John Goddard, Agency Chief Contracting Officer

Page 9: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

Andrew Berman Architects 9 9

10/29/14 Slide 9

DDC Staff makes Design Excellence happen 9

Page 10: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

Design and Construction Excellence 2.0

Margaret O’Donoghue Castillo, AIA, LEED AP

Chief Architect

Page 11: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

Snøhetta

Westchester Square Library 11

Growth

Page 12: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

Equity

Marpillero Pollak Architects Elmhurst Branch Library

12

Page 13: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

Andrew Berman Architects 13 13

10/29/14 Slide 13

Manhattan Districts 1/2/5 Garage 13 Dattner Architects & WXY Architecture + Urban Design

Sustainability

Page 14: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

14 10/29/14 Slide 14

Ocean Breeze Field House 14 MKW + Associates

Resiliency

Page 15: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

Healthy Living

15 15 15 Caples Jefferson Architects, photo by Nic Lehoux Weeksville Heritage Center

Page 16: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

Public Buildings

Christine Flaherty, CCM

Associate Commissioner

Page 17: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

$10,642 $279,655 $134,808

$173,370 $807,303

$1,368,654 $130,998

$226,739

$1,352,360 $190,204

$25,257

$438,740

$412,389

$99,256.00 $2,430,539

$994,775

$2,712,849

$5,265,716

NEW YORK RESEARCH LIBRARY

NEW YORK PUBLIC LIBRARY

BROOKLYN PUBLIC LIBRARY

QUEENS BOROUGH PUB. LIB.

POLICE DEPARTMENT

FIRE DEPARTMENT

ADMIN FOR CHILDREN'S SERVICES

DEPARTMENT OF HOMELESS SERVICES

DEPARTMENT OF CORRECTION

HUMAN RESOURCES ADMINISTRATION

DEPARTMENT FOR THE AGING

DEPARTMENT OF CULTURAL INSTITUTIONS

DEPARTMENT OF HEALTH AND MENTAL HYGIENE

DEPARTMENT OF ENVIRONMENTAL PROTECTION

DEPARTMENT OF SANITATION

DEPARTMENT OF TRANSPORTATION

DEPARTMENT OF PARKS AND RECREATION

DEPARTMENT OF ADMINISTRATIVE SERVICES

CITYWIDE 10 YEAR PLAN FOR DDC CLIENT AGENCIES

TOTAL: $17.05 B *billions of dollars

Page 18: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

$25,000

$267,563

$137,689

$113,210

$229,780

$644,905

$57,432 $81,096

Executive Projects

Libraries/Pass Through

HumanServices/DCAS/OneNYC

Culturals/Parks

Sanitation/Transportation

Corrections/Courts/Health

Fire/Police

Build it Back

CONTRACTS PRE-DESIGN AND DESIGN

1

177

29

38

17

16

19 3 Executive Projects

Libraries/Pass Through

HumanServices/DCAS/OneNYC

Culturals/Parks

Sanitation/Transportation

Corrections/Courts/Health

Fire/Police

Build it Back *millions of dollars

18

Page 19: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

Public Buildings

Eric Boorstyn, AIA

Associate Commissioner

Page 20: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

Consultant Category Firm Size

# of Consultant Contracts

# of Professional

Staff

Minimum Value of

Construction

Maximum Value of

Construction

Micro 10 1 - 5 - $5,000,000

Small 10 6 - 20 $2,000,001 $15,000,000

Medium 3 21 - 50 $10,000,001 $35,000,000

Large 3 51 & above $25,000,001 $50.000.000

20

Page 21: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

$50M

$35M

$25M

$15M

$10M

$5M

$2M

$0M

MICRO

FIRMS

SMALL

FIRMS

MEDIUM

FIRMS

LARGE

FIRMS

ES

TIM

AT

ED

PR

OJ

EC

T

CO

NS

TR

UC

TIO

N B

UD

GE

T

21

Page 22: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

DESIGN SERVICE CONTACTS

Three Part Agreement:

Contract

Design Consultant Guide

Task Order

22

Page 23: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

PROJECT AWARD PROCESS

1. Client transfers project to DDC

2. “Mini” RFP issued to consultants

3. Consultant submits proposal

Design approach

Experience

4. Selection by committee

Includes client

23

Page 24: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

$0

$5

$10

$15

$20

$25

$30

$35

$40

$45

$50

5.00% 7.00% 9.00% 11.00% 13.00% 15.00% 17.00% 19.00%

ES

TIM

AT

ED

CO

NS

TR

UC

TIO

N C

OS

T

Mill

ion

s

ESTIMATED DESIGN FEE AS PERCENT OF CONSTRUCTION COST

DESIGN FEES

24

Complexity Factors:

Renovation

Historic Preservation

Landscape Design

Specialty Consultants

Page 25: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

KEY ISSUES AND CHALLENGES

Design to Budget

Construction Procurement

Bid documents must be:

• Clear

• Coordinated

• Specifications in compliance with DDC requirements

25

Page 26: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

Contracts and MWBE

John Goddard

Agency Chief Contracting Officer

Page 27: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

SUBMISSIONS

Deadline

Thursday, September 17, 2015 by 4:00pm

(DDC Entrance is on 30th Place, not Thomson Avenue)

Inquiries

Must be requested in writing or by e-mail no later than one week

prior to the submission date. Last day to submit questions is

September 10, 2015.

Acknowledgement of Addenda

All addenda shall become part of the requirements of the RFP.

Please sign and return Attachment 5 with your proposal.

27

Page 28: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

PROPOSAL PACKAGE CONTENTS (RFP-22)

Three separate packages will be required for submission:

Technical Proposal:

One original and one copy, and also one copy saved as a PDF on a compact disc (CD) or USB Flash Drive that is clearly identified and labeled with the proposer’s name.

Schedule B:

M/WBE Participation Requirements (Attachment 7)

Doing Business Data

Labelling of the Packages (RFP-22):

Clearly label the package as “Technical Proposal” and state if the submission is for the Micro, Small, Medium or Large firms.

28

Page 29: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

Proposal Evaluation Criteria (RFP-23):

Quantity and Quality of Successful Relevant Experience – 50%

Proposed Approach – 30%

Organizational Capability – 20%

General Information (RFP-25, Section VI):

Proposers are advised to read the entire section.

29

Page 30: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

Subcontractor Reporting (RFP 39):

As of March 2013, the City has implemented a new web-based subcontractor reporting system through the City’s Payee Information Portal (PIP), available at www.nyc.gov/pip, See RFP 39, Attachment 10.

M/WBE Requirement for this RFP:

Local Law 1 of 2013 – Applicable

M/WBE Utilization (Schedule B):

Master Service Agreement Schedule B, Attachment 7, required for submission.

Goal percentage will be established on individual task order.

30

Page 31: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

Meeting M/WBE Goals:

NYC Department of Small Business certified M/WBE firm Qualified Joint

Venture with an M/WBE firm, M/WBE sub-consultants and/or sub-contractors.

Find M/WBE Firms at www.nyc.gov/buycertified

Minutes of the Pre-proposal Conference and Attendance Sheet will be

posted on the DDC website.

31

Page 32: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be:

Questions and Answers

Page 33: Pre-Proposal Meeting · Quality Based Selection PROCESS ... Marpillero Pollak Architects Elmhurst Branch Library 12 . ... Bid documents must be: