PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Sep 16, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating
Page 2: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

POTHOLING SERVICES FORMESA EXTENSION

RFP No. LRT-11-157-MPOT

POTHOLING SERVICES FORMESA EXTENSION

RFP No. LRT-11-157-MPOT

PRE-PROPOSAL CONFERENCEJULY 22, 2010

PRE-PROPOSAL CONFERENCEJULY 22, 2010

Page 3: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Meeting OverviewMeeting Overview

Sign-In Sheets: Be sure to sign in. Sign-In sheets will be available on the METRO website.http://www.valleymetro.org/metro_light_rail/contracts_and_purchasing/current_opportunities/potholing_services_for_mesa_extension/

Questions: Please defer all questions until the designated Question and Answer period.

Opportunity: This conference is the sole opportunity to ask questions on the Request for Proposal process and/or technical scope of work with METRO staff.

Post Pre-Proposal Questions must be submitted in writing per solicitation Section 16.

Page 4: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Pre-Proposal Conference Process

Pre-Proposal Conference Process

During the pre-proposal presentation, write your questions on the index cards provided.

After the pre-proposal presentation, questions will be collected and read aloud.

Where possible, verbal answers will be provided.

Responses to all questions will be issued to all Record Holders by written addendum.

Responses to questions that require further research will be included in a written addendum.

Page 5: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

AgendaAgendaIntroductions / Opening Remarks

Melody Baughman

Project Overview/ScopeRoy Alvarado

Request for Proposal OverviewMelody Baughman

DBE InformationReginald Ragland

Question and AnswersRoy Alvarado

Melody Baughman

Closing Remarks / AdjournMelody Baughman

Page 6: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

PROJECT OVERVIEWPROJECT OVERVIEW

Page 7: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Project OverviewProject Overview

The Central Mesa Light Rail Extension Project consists of approximately 3.1 miles of double track alignment extending from the Central Phoenix/East Valley (CP/EV) LRT Project’s eastern limits to an end of line station on Main Street between Lesueur and Hobson.

Page 8: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

PROJECT SCOPEPROJECT SCOPE

Page 9: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Project Scope/ LocationsProject Scope/ LocationsContractor will need to adhere to 1998 edition of the Uniform Standard Specification for Public Works Construction, published by the Maricopa Association of Governments as amended by the City of Mesa on February 2, 2010.Metro will perform all pothole field inspections.It shall be the responsibility of the Contractor to comply with the City of Mesa Traffic Barricade Manual (latest revision). Contractor shall supply Testhole Data Report and a Testhole Data Summary Report. Contractor shall comply with Safety Standards.

Page 10: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Project ScopeProject ScopeMETRO and/or Consultants will make requests for locating and potholing existing utilities.Locating will be conducted in up to four (4) stages (requiring the SUE contractor to mobilize four (4) times).Stage I will occur prior to the 30% submittal.Stage II will occur between the 30% and 60% design submittals. Stage III will occur prior to the 90 percent certain submittal.A fourth stage may be required, but shall not cause the total number of potholes to exceed the overall number of potholes estimated. Mesa Traffic Barricade Manual (latest revision).

Page 11: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

NOTICE TO PROPOSERSNOTICE TO PROPOSERS

Page 12: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Correspondence & Communications

Correspondence & Communications

All correspondence, communications, and/or contacts regarding this RFP shall be in writing and must be addressed to:

Manager, Procurement & Risk Management ServicesValley Metro Rail, Inc.101 N. 1st Avenue, Suite 1300Phoenix, AZ 85003FAX: 602-271-9361 Email: [email protected]

Page 13: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Notice to ProposersNotice to Proposers

Please refer to the FTA Website for all reporting requirements

http://www.fta.dot.gov/index_9440.html

Page 14: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Notice to ProposersNotice to Proposers

CONTRACTOR-PROVIDED INSURANCE

Workers Compensation statutory limits; employer’s liability $1 Million minimum policy limitCommercial General Liability, minimum $5 Million per occurrence; naming AGENCY as Additional InsuredAuto Liability, minimum $5 Million per occurrence; naming AGENCY as Additional Insured

Page 15: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Notice to Proposers Notice to Proposers

• CONTRACTOR-PROVIDED INSURANCE

Valley Metro Rail fully intends to adhere to the Insurance Requirements. Questions regarding insurance requirements should be submitted to [email protected] to Notice to Proceed, Contractor shall provide Certificate(s) of Insurance

Page 16: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

DISADVANTAGED BUSINESS ENTERPRISE (DBE) PROGRAM DISADVANTAGED BUSINESS

ENTERPRISE (DBE) PROGRAM

Page 17: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Disadvantaged Business Enterprise (DBE) Program Disadvantaged Business Enterprise (DBE) Program

CITY OF PHOENIXNegotiated (Professional Services) Contracts

Prepared by:City of Phoenix, Public Transit DepartmentPrograms Oversight [email protected]

Page 18: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

DBE Goal AssessmentDBE Goal Assessment

DBE participation shall represent not less than 7.54% of the total Negotiated Price

Page 19: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

DBE Forms Submittal Requirements

DBE Forms Submittal Requirements

Proposed DBE Participation (Attachment A)Summary of proposed DBE(s) participationMust meet or exceed the required 7.54% DBE GoalNo dollars should be recorded on this form, show percentages only

Providing dollar amounts may result in your proposal being deemed non-responsive

Must be signed and dated by authorized representative of Submitter

Subcontractor Contact/Bidder List (Attachment B)Must list all subcontractors contacted by submitter for bids/quotesMust be signed and dated by authorized representative of Submitter

Page 20: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating
Page 21: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating
Page 22: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Qualifying DBE FirmsQualifying DBE Firms

To be counted toward the DBE Goal, DBE firms:

Must be certified through the Arizona Unified Certification Program (AzUCP)

website www.azdbe.org

Must be certified in the trade for which they are included in the Proposal

Must provide a Commercially Useful FunctionDBEs must perform or exercise responsibility for at least 30% of total cost of its contract with its own work force (49 CFR Part 26.55(c)(3))

Page 23: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

DBE Forms Proposal SubmittalDBE Forms Proposal Submittal

DBE forms A & B must be submitted with proposal

Proposals submitted without the required forms will NOT be considered

DBE Primes using their own resources to achieve the DBE Goal must include their DBE information on the “Proposed DBE Participation”form (Attachment A)

Page 24: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

DBE Questions DBE Questions

Valley Metro Rail fully intends to adhere to the DBE Program Plan Requirements. Questions regarding DBE compliance should be addressed to:

[email protected]

Page 25: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

LABOR COMPLIANCE REGULATIONS

LABOR COMPLIANCE REGULATIONS

Page 26: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

City of Phoenix Labor Compliance Office

City of Phoenix Labor Compliance Office

Monitors and enforces the federal labor standards on federally-funded Capital Improvement Construction

Applies to all federally-funded contracts in excess of $2,000 with few exceptions

All contractors and subcontractors, including lower-tiers, working on the project are subject to Davis-Bacon wages

Page 27: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

DBRA (Davis-Bacon & Related Acts)

DBRA (Davis-Bacon & Related Acts)

Davis Bacon Act (DBA)

Copeland Anti-Kickback Act

Contract Work Hours and Safety Standards Act (CWHSSA)

Page 28: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Federal RegulationsFederal Regulations

Code of Federal Regulations, Title 29 Part 3 and Part 5

Applicable Federal Language

Wage Decision

Page 29: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Enforcement ActivitiesEnforcement Activities

Labor Compliance Pre-Construction Conference

Confidential Employee Interviews

Requests for Additional Classifications

Payment Withholding

Page 30: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Technical AssistanceTechnical Assistance

Contact the City of Phoenix Labor Compliance Office at (602) 261-8287

Online Resourceshttp://www.hud.gov/offices/olr/olrnew.cfm(HUD funding)http://www.dol.gov/dol/esa/programs/dbra/ (Non-HUD funding)

Page 31: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

VALLEY METRO RAIL

REQUEST FOR PROPOSAL (RFP)PROCESS

VALLEY METRO RAIL

REQUEST FOR PROPOSAL (RFP)PROCESS

Page 32: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Proposal ProcessProposal Process

Request for Proposal Documents are available by Request via e-mail to [email protected]

Post Pre-Con: All questions regarding this Solicitation must be submitted in writing to:Manager, Procurement & Risk Management Services

by e-mail to [email protected]

by fax to 602.271.9361

Page 33: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Schedule of EventsSchedule of Events

Request for Proposals (RFP) Schedule of Events

The solicitation, receipt, evaluation and selection of the Offeror awarded will conform to the following anticipated schedule:

RFP Release July 12th

Pre-Proposal Conference July 22nd

Last Date for Questions July 30th

Final Addendum August 6th

Proposals Due August 19th

Notice of Intent to Award August 30th

Board Approval & Notice to Proceed TBD

Page 34: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

RFP Addendum ProcessRFP Addendum Process

Clarifications or modifications to RFP DocumentsResult of issues requiring changes which were received at Pre-Proposal Conference or identified by the AgencyProjected date for final Addendum is August 6thAddenda issued only to “Document Holders of Record” who obtained the RFP documents from METRO

Page 35: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Proposal Delivery, Due Date and Time Proposal Delivery, Due Date and Time

Timely receipt of the Proposal will be determined by the date and time the Proposal is received. Proposals received after the Submittal Date shall be returned to Offeror(s) unopened and without further consideration by the Agency.

Offerors are encouraged to hand deliver their Proposals. No facsimile or electronic submissions will be accepted.

Page 36: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Proposal FormatProposal Format

Offerors shall submit one (1) clearly marked original, five (5) bound copies, for a total of six (6) printed copies.

Page 37: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Proposal Format (Section 11 of RFP)

Proposal Format (Section 11 of RFP)

Section I – Introduction (maximum 2 pages)Introductory Letter

Section II - Evaluation Criteria (maximum 18 pages)1. Project Manager’s Qualifications & Experience2. Personnel Qualifications & Experience3. Firm Qualifications & Experience4. Understanding/Approach to the Scope of Work

Section III – Additional Supportive Information (maximum 5 pages)1. Resumes, additional project descriptions, additional

references, graphs, charts, etc.

Section IV – Required Inclusions (not included in page limits)

Page 38: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Required Documents & Acknowledgements

Required Documents & Acknowledgements

Attachment H Proposed Subcontractors

Attachment J Certification Regarding Lobbying

Attachment K Certification of Offeror regarding Debarment, Suspension, and Other Responsibility Matters

Attachment L Buy America Certificate

Attachment M Responsibility Questionnaire

Page 39: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Proposal Format (Section 11 of RFP)

Proposal Format (Section 11 of RFP)

Proposals shall be submitted in a sealed package, clearly marked in the lower left hand corner as follows:

RFP No. LRT-11-157-MPOT (Name of Submitting Firm)Due: August 19, 2010 (Phoenix local time) 3:00 P.M.

Proposals must be addressed to:Manager, Procurement & Risk Management Services Valley Metro Rail, Inc.101 North 1st Avenue, Suite 1300Phoenix, Arizona 85003

Page 40: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Contract AwardContract Award

NOTICE OF INTENT TO AWARDEach Offeror shall be notified in writing of the Agency’s Intent to Award a Contract at least five (5) working days prior to award of the Contract.

Page 41: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Protest ProceduresProtest Procedures

Protest ProceduresInterested parties have a right to seek resolution of any concerns, issues, or perceived wrongs associated with this procurement. Upon receipt of a written protest(s), issues of concern will be researched and a written final determination to the protesting party will be issued by the Chief Executive Officer of the Agency. In responding to this RFQ, the Offeroragrees that any legal action in any state or federal court relating to this procurement may not be commenced until the administrative Protest Procedures promulgated by the Agency have been exhausted.

Protests must be made in accordance with the Agency’s written protest procedures, which are available from the Manager, Contracts & Procurement, Valley Metro Rail, Inc. 101 North 1st Avenue, Suite 1300, Phoenix, Arizona 85003.

Page 42: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Public DisclosurePublic Disclosure

Proposals will not be publicly opened.

Proposals received are public records.

Subject to public inspection and copying after the procurement.

Offerors will specifically mark and clearly label “CONFIDENTIAL” any materials which are deemed to contain trade secrets or other proprietary information and which are exempt from public inspection and copying.

Page 43: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

EvaluationEvaluationThe following criterion shall be applied in the evaluation of the Proposals.

Project Manager’s Qualifications & Experience (Maximum 100 Points)

Personnel Qualifications & Experience (Maximum 100 Points)

Firm Qualifications & Experience (Maximum 200 Points)

Understanding/Approach to the Scope of Work (Maximum 400 Points)

Offeror’s Pricing (Maximum 200 Points)

Page 44: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Pre-Award DebriefingPre-Award DebriefingMETRO will limit the information disclosed to that offeror’sproposal and not disclose any information about the other offerors. To reveal information about other offerors would compromise the integrity of the procurement. Information revealed to an offeror prior to award must be limited to the following:

The agency’s evaluation of the significant strengths and weaknesses of the offeror’s proposal in accordance with the evaluation criteria;A summary of the reasons for eliminating the offerorfrom the competition;Reasonable responses to relevant questions about whether the evaluation procedures contained in the solicitation and other regulations were followed in eliminating the offeror from the competition.

Page 45: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

Pre-Award DebriefingPre-Award Debriefing

Pre-award debriefings will not disclose the following:

The number of offerors;The identity of other offerors;The content or evaluation of other offerors’proposals;The ranking of other offerors;Confidential business information of other offerors.

Page 46: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating

QUESTIONS & ANSWERSQUESTIONS & ANSWERS

Page 47: PRE-PROPOSAL CONFERENCE JULY 22, 2010 POTHOLING … · 2020. 1. 15. · Project Scope METRO and/or Consultants will make requests for locating and potholing existing utilities. Locating