Pre- Feasibility Report
Environment Clearance of Proposed Brick Earth Mining project for
M/S
SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-
Gauriganj,District-Amethi,Uttar Pradesh
Page 1 of 12
1. EXECUTIVE SUMMARY
Application of mining for soil used in Brick Kiln M/S SHANKAR
BRICK FIELD from
Khasra/Gata Nos–55,325,332, Area-2.41 Hectare at
Village-Atrauli,Gaurajamon,Tehsil-
Gauriganj,District-Amethi,Uttar Pradesh.The project has been
proposed for an annual production
of 7424 cubic meter soil by open cast manual mining from
allotted Khasra/Gata Nos 55,325,332,
Area-2.41 Hectare at
Village-Atrauli,Gaurajamon,Tehsil-Gauriganj,District-Amethi,Uttar
Pradesh.
The order of Hon‟ble Supreme Court dated the 27th
February, 2012 in I.A. No.1213 of 2011 in
Special Leave Petition (C) No.19628-19629 of 2009, in the matter
of Deepak Kumar etc. Vs.
State of Haryana and Others etc., prior environmental clearance
has now become mandatory for
mining of minor minerals irrespective of the area of mining
lease. And whereas, the Hon‟ble
National Green Tribunal, vide its order dated the 13th
January, 2015 in the matter regarding sand
mining has directed for making a policy on environmental
clearance for mining leases in cluster
for minor minerals.
As per Environment (Protection) Rules, 1986, MoEF & CC
making certain amendments in EIA
Notification, 2006 vide number S.O. 2588(E), dated 15th
Jan, 2016, the applicant is seeking prior
environmental clearance for mining of minor minerals under
category „B2‟ for less than and
equal to five hectare from DEIAA of concerning District.
Table1: Salient Feature of Project
Items Details
Project name M/S SHANKAR BRICK FIELD of Sri Ashok Kumar Singh
S/o
Ram Sankar Singh,Village-Harkhpur,Nemuwa,Tehsil-Gauriganj,
District-Amethi,Uttar Pradesh.
Location of mine Khasra/Gata Nos 55,325,332
Land Use Uncultivated Land
Land Ownership Private Land
Life of mine 5.0 Years
-
Pre- Feasibility Report
Environment Clearance of Proposed Brick Earth Mining project for
M/S
SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-
Gauriganj,District-Amethi,Uttar Pradesh
Page 2 of 12
Proposed production
of mine
Lease period : 5.0 Years
Proposed Capacity: 7424 cum/Annum (8909TPA)
Table: Available Minable Reserve
Latitude
&Longitude
Gata No
&
Area
(ha)
Area
(sqm)
Ben
ch
Area
excluding
bund wall
(sqm)
Dep
th (
m) Top
soil
(cum)
Minable
Reserve
(cum)
26°19'36.46"
N 55
(0.0380) 380
I 361 1.00 55 306
81°43'34.93"E
II 353 1.00 - 353
26°19'31.86"
N 325
(2.0280) 20280
I 19266 1.00 2936 16330
81°43'37.05"E
II 18860 1.00 - 18860
26°19'32.07"
N 332
(0.3440) 3440
I 3268 1.00 498 2770
81°43'31.88"E
II 3199 1.00 - 3199
Total 2.4100 24100.0 3489 41819
As per brick kiln capacity (17 Paya), yearly production of
bricks are
24.5 Lac/season for that the required volume of brick clay will
be
7424 cum/ annum @330 bricks in one cubic meter .The total
mineable
reserves of soil of area is 41819 m3 or 50182 ton with proposed
rate of
production 7424 m3 the expected life of mine 5 years.
Table: Year wise production
Year Soil Reserve
(cum/yr)
Soil Reserve
(Ton/yr)
Brick
prepared
(lakh/yr)
Ist 7424 8909 24.5
IInd 7424 8909 24.5
IIIrd 7424 8909 24.5
IVth 7424 8909 24.5
Vth 7424 8909 24.5
Total 37120 44544 122.5
-
Pre- Feasibility Report
Environment Clearance of Proposed Brick Earth Mining project for
M/S
SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-
Gauriganj,District-Amethi,Uttar Pradesh
Page 3 of 12
Method of mining Open-cast Manual mining
River •River :13 (N)
Topography Undeveloped flat with gentle slope
Minerals of mine Brick Earth
Estimated cost Rs. 22.0 Lac
Water demand 5.0 KLD
Sources of water Drinking water supply will be met by nearby
dugwell/ borewells or
private tankers.
Ultimate depth of
Mining
2 m
Man power Not More than 20 Labors
Nearest
railway station Gauriganj R.St :14 Km (SW)
Nearest highway NH 56 : 8 Km (N)
SH 34 : 13 Km (S)
Nearest Airport Lucknow Airport :100 Km (W)
Nearest Town /city Gauriganj
Seismic zone Zone-III (As per 1893:2002)
* Approximate aerial distances
2. INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION
2.1 Identification of Project and Project Proponent
Application of mining for soil used in Brick kiln of Brick Earth
Mining project M/S SHANKAR
BRICK FIELD from Khasra/Gata Nos–55,325,332, Area-2.41 Hectare
at Village-
Atrauli,Gaurajamon,Tehsil-Gauriganj,District-Amethi,Uttar
Pradesh of Sri Ashok Kumar
Singh S/o Ram Sankar
SinghVillage-Harkhpur,Nemuwa,Tehsil-Gauriganj,
District-Amethi,Uttar
Pradesh.
2.2 Brief description of the nature of the project
-
Pre- Feasibility Report
Environment Clearance of Proposed Brick Earth Mining project for
M/S
SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-
Gauriganj,District-Amethi,Uttar Pradesh
Page 4 of 12
Brick kiln are seasonal unit are either in small sector or in
cottage sector. Clay brick industry in
India uses soil as raw material and slack (small size) coal as
fuel. Estimate of total mineable
reserve quantity comes to be 41819 m3 or 50182 ton up to
permissible depth of 2 m. As per
Brick Kiln capacity yearly production of bricks are 24.5 Lac
bricks/ season for that the required
volume of brick clay will be 7424 cum/Annum. .
2.3 Need for the project and its importance to the country and
region
The production of Brick Earth will benefit to the state in the
form of royalty. Apart from this
project operation will provide employment directly and
indirectly to the people residing in
vicinity, thus improving the Socio-economic status of the
area.
2.4 Demands-Supply Gap
Bricks are produced in India in small or cottage scale brick
kilns and Clamps, operates
seasonally. The raw materials in the brick kilns include soil,
coal, paddy husk, wood & locally
available agro wastes to some extent. There are large variations
in quality of soils available in
different parts of the country and also in brick manufacturing
process.
Brick are good building material for construction activities but
quality of brick differs place to
place. There are large variations in quality of soil available
in different part of the country and
also brick manufacturing process. Brick kiln are seasonal unit
are either in small sector or in
cottage sector. Clay brick industry in India uses soil as raw
material and slack (small size) coal as
fuel.
2.5 Import vs. Indigenous:
Import does not apply in the present case as Brick is
indigenously available at number of mines
under operation in Uttar Pradesh.
2.6 Export Possibility:
Export possibility is neither plausible nor there is any such
demand.
2.7 Domestic/ Export Markets
-
Pre- Feasibility Report
Environment Clearance of Proposed Brick Earth Mining project for
M/S
SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-
Gauriganj,District-Amethi,Uttar Pradesh
Page 5 of 12
Due to the increased industrial and infrastructural growth of
the rural and urban areas demand of
Brick is very high. Construction companies and local vendors in
the nearby town and cities are
the potential market for the brick made up of brick clay.
2.8 Employment Generation
About 20 local labors shall be engaged through project proponent
for extraction of soil, molding
and loading of brick and handling of mineral in mining area,
besides, watch and ward and
plantation activity with proper maintenance.
3. PROJECT DESCRIPTION
3.1 Type of project including, interlinked and interdependent
projects, if any
This is a mining project for Brick Earth Excavation and the
project shall not involve any
interlinked and interdependent projects.
3.2 Location (map showing general location and project boundary
and project site) with
coordinates.
Soil miming area is located at Village
Atrauli,Gaurajamon,Tehsil-Gauriganj,District-
Amethi,Uttar Pradesh which is connected NH 56 at a distance
approx: : 8 Km in North.
Nearest Railway Station – Gauriganj R.St :14 Km (SW) from the
Area and nearest
Airport is Lucknow Airport :100 Km (W).
Table: Site Co-ordinates
Khasra/
Gata
No.
Latitude Longitude
55 26°19'36.46"N 81°43'34.93"E
325 26°19'31.86"N 81°43'37.05"E
332 26°19'32.07"N 81°43'31.88"E
-
Pre- Feasibility Report
Environment Clearance of Proposed Brick Earth Mining project for
M/S
SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-
Gauriganj,District-Amethi,Uttar Pradesh
Page 6 of 12
Figure: - District Map
3.3 Details of alternate sites considered
Besides this any other alternative other than Brick Earth mining
like mining of rock in-situ
quarry shall result in exorbitant cost, result in comparatively
higher land degradation and cause
more environmental impacts.
3.4 Size or magnitude of operation
The proposed mine has lease agreement over an Area - 2.4100
hectare. The project has
been proposed for an annual production of 7424 cum soil by open
cast manual mining
from the Khasra/Gata Nos – 55,325,332, Area-2.41 Hectare at
Village-
Atrauli,Gaurajamon,Tehsil-Gauriganj,District-Amethi,Uttar
Pradesh.
3.5 Project description with process details (a schematic
diagram/ flow chart showing the
project layout, component of project etc. should be given)
The proposed project is to mine Brick Clay from plot (s) under
agreement sustainably and
scientifically. Mining will be opencast and manual using hand
tools only in the allotted plots
keeping the nearby plot (s) unaffected. Following geo-scientific
methods are proposed to carry
-
Pre- Feasibility Report
Environment Clearance of Proposed Brick Earth Mining project for
M/S
SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-
Gauriganj,District-Amethi,Uttar Pradesh
Page 7 of 12
out the activity. Mining will be confined to extraction of Brick
Clay in its existing form from the
allotted plot(s) only. Mining of Brick Clay from the allotted
plot(s) will be restricted to a
maximum depth of 2 m from the surface in proper bench form as
per MCR-1960 and MMR
1961. The width and height of bench will be 1 m x 1 m. Top soil
up to 6” depth will be preserved
to spread it after mining activity is completed to restore the
fertility of land
3.6 Raw material required along with estimated quantity:-
Table: Available Mineable Reserve:-
Latitude
&Longitude
Gata
No &
Area
(ha)
Area
(sqm)
Ben
ch
Area
excluding
bund
wall
(sqm) Dep
th (
m) Top
soil
(cum)
Minable
Reserve
(cum)
26°19'36.46"N 55
(0.0380) 380
I 361 1.00 55 306
81°43'34.93"E II 353 1.00 - 353
26°19'31.86"N 325
(2.0280) 20280
I 19266 1.00 2936 16330
81°43'37.05"E II 18860 1.00 - 18860
26°19'32.07"N 332
(0.3440) 3440
I 3268 1.00 498 2770
81°43'31.88"E II 3199 1.00 - 3199
Total 2.4100 24100.0 3489 41819
Proposed method of mining:
Mining shall be carried out from top to downward through the
formation of benches. The
height & width of benches shall be kept 1 m x 1 m with face
slope 450.It shall be opencast
manual mine involves scooping the mineral through use of hand
implements like spade, pick
axe, shovel and crowbar etc. In future top soil shall be
scrapped by means manually and shall
be used for the purpose of plantation and rehabilitation.
Indicate quantum of development &
tonnage & production expected in table below:
-
Pre- Feasibility Report
Environment Clearance of Proposed Brick Earth Mining project for
M/S
SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-
Gauriganj,District-Amethi,Uttar Pradesh
Page 8 of 12
Table: Year wise production
Year
Soil
Reserve
(cum/yr)
Soil
Reserve
(Ton/yr)
Brick
prepared
(lakh/yr)
Ist 7424 8909 24.5
IInd 7424 8909 24.5
IIIrd 7424 8909 24.5
IVth 7424 8909 24.5
Vth 7424 8909 24.5
Total 37120 44544 122.5
3.7 Resource optimization/recycling and reuse envisaged in the
project, if any, should be
briefly described.
Not applicable
3.8 Availability of water its source, energy/ power requirement
and source
Water Requirement: Water requirement for human consumption,
plantation and dust
suppression is 3.0 KLD, which shall be met from ground water
resource from the nearby
village.
Power: No electrical power shall be required for operations.
3.9 Quantity of wastes to be generated (liquid and solid) and
scheme for their management/
disposal.
Solid waste generation & its disposal: No solid waste other
than negligible quantity of silt/silty
clay, which gets deposited as crust material on the bed profile,
shall be scrapped and deposited
into the mine pits or in the upper terraces earmarked for
plantation
Liquid Effluent: There will be no waste water generation from
mining activities.
4. SITE ANALYSIS
4.1 Connectivity: Soil miming area is located at Village-
Atrauli,Gaurajamon,Tehsil-
Gauriganj,District-Amethi,Uttar Pradesh which is connected NH 56
at a distance approx: :
8 Km in North. Nearest Railway Station – Gauriganj R.St :14 Km
(SW) from the Area
and nearest Airport is Lucknow Airport :100 Km (W) direction
from the area.
-
Pre- Feasibility Report
Environment Clearance of Proposed Brick Earth Mining project for
M/S
SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-
Gauriganj,District-Amethi,Uttar Pradesh
Page 9 of 12
4.2 Land form, land use and land ownership: The mine agreement
area is agricultural private
land.
4.3 Topography (along with map): Agricultural plain
4.5 Existing infrastructure: The existing land use of mine lease
area belongs to landuse
category “Uncultivated land” and shall continue to be so even
after the current mining project is
over.
4.6 Geology: The geology of the district exposes nothing beyond
Ordinary River borne alluvium
which is not old. The mineral products are few and unimportant.
The minerals of commercial
value are the nodular limestone conglomerate known as kankar,
brick and saltpetre. The soil in
the district is light sandy or dense clay of yellowish brown
colour. The sand found in the rivers is
medium to coarse grained, greyish white to brownish in colour
and is suitable for construction
purposes.
4.7 Geographical Structure
Location and Boundaries
District Amethi lies at the latitude 26°9‟ north and longitude
81°49‟ east at an average
elevation of 101 metres(331 feet) from mean sea level. The total
geographic area of the
districts is about 3063 km2. The surface is generally level,
being broken only by ravines in
the neighbourhood of the rivers. The principal river is Gomti,
which passes through the
centre of the district. North side of this district is bounded
by Faizabad District; South side
is bounded by Pratapgarh District. West side is bounded by
Bara-Banki District and Rai
Bareilly District and the East side is bounded by Amethi
District.
The land of Amethi district is generally plane except some
regions around the Gomti River
which drains almost the whole district. It may be called an
agrarian area as agriculture is
the main occupation of the people. Amethi district has a wet and
dry cl imate with average
temperatures ranging between 23 °C to 28 °C. Amethi experiences
three distinct seasons:
summer, monsoon and a mild autumn.
4.8 Climatic conditions:
-
Pre- Feasibility Report
Environment Clearance of Proposed Brick Earth Mining project for
M/S
SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-
Gauriganj,District-Amethi,Uttar Pradesh
Page 10 of 12
The district has four rain-gauge stations with record of three
of them extending back to about 100
years.. The south-west monsoon usually arrives over the district
by about the middle of June and
withdraws by the end of September. The average rainfall of the
district is 1393.1 mm. About 87
percent of the annual rainfall is recorded during the period
June to September, July being the
rainiest. The monsoon in the district generally advances from
the south-west to the north-east.
4.9 Social Infrastructure
The social infrastructure like educational facilities (primary
and higher secondary schools,
degree college), drinking water supply, post and telegraph,
public transportation and hospitals
are by and large are available in the study area.
5. PLANNING BRIEF
5.1 Planning Concept
The proposed project is to mine brick clay from plot(s)
sustainably and scientifically. The minor
mineral (clay) will be excavated from the plot(s) as per mining
rules and casting of raw bricks
will be done which will be transported to the kiln through horse
cart, trolleys etc. through village
chak roads. Mining will be opencast Manual keeping nearby
plot(s) unaffected. Maximum depth
of mining will be only up to 2 m as per agreement.
5.2 Population Projection
There is no projection of population as the mining activity will
be carried out during day time
only.
5.3 Assessment of Infrastructure Demand (Physical &
Social)
Adequate infrastructure facilities are available in the vicinity
of mine lease area and due to the
mining activities; no extra infrastructure over and above the
existing infrastructure is required.
5.4 Amenities/Facilities
Rest Shelter: Rest shelter along with first-aid station
complying with all the provisions
of Mines Rules shall be provided by project proponent outside
lease area
Water Supply: Water will be supplied for human consumption, dust
suppression and for
plantation.
-
Pre- Feasibility Report
Environment Clearance of Proposed Brick Earth Mining project for
M/S
SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-
Gauriganj,District-Amethi,Uttar Pradesh
Page 11 of 12
Transport of Man and Material: The material from the mine will
be transported by
trucks / tippers / tractor trolleys.
Security Arrangements: Appropriate security arrangement shall be
made.
6.0 PROPOSED INFRASTRUCTURE:-
6.1 Industrial area (Processing Area): Temporary arrangements
like site office, rest shelters &
approach roads etc shall be provided. No permanent
infrastructure is proposed.
6.2 Residential Area (Non Processing Area): As the local person
shall be employed, no
residential building / housing are proposed.
6.3 Green Belt: Plantation of soil binding grasses like Agave
nector, Saccharum officinarum
(Munja), Cassia tora (Charata), Opuntia ficus indica, Aloe vera
(Gheekwar), Euphorbia hirta
across the benches.
6.4 Connectivity: The lease area is connected to which are
connected to rail and road
6.5 Social Infrastructure: In-line with the Social
Responsibility Activities at other operational
sites, relevant developmental assistance shall be rendered
depending on the local needs identified
through studies.
6.6 Drinking Water Management: Water requirement for drinking
and operations will be 5.0
KLD, which will be met from underground water resource.
6.7 Sewerage System: No sewerage system is required as there is
no domestic waste water will
be disposed.
6.8 Industrial Waste Management: Not applicable, as the mining
activity will not be
generating any overburden or waste materials.
6.9 Solid Waste management: No solid waste generation is
expected from the mining
operation.
6.10 Power Requirement & Supply/ Source: No electrical power
requirement for mining
activities.
-
Pre- Feasibility Report
Environment Clearance of Proposed Brick Earth Mining project for
M/S
SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-
Gauriganj,District-Amethi,Uttar Pradesh
Page 12 of 12
Rehabilitation and Resettlement (R&R) Plan
The existing mine lease area is designated as private land and
has no human settlements and
hence, no R & R is envisaged.
COST ESTIMATES
The capital cost of proposed project is estimated as Rs. 22.0
Lac.
CSR Cost- 3% of the project cost.: .66 Lac
ANALYSIS OF PROPOSAL (FINAL RECOMMENDATION)
The proposed project is expected to provide employment to local
people in different activities
such as Mining, sizing (sieving), transportation and plantation
activities. The project activity will
not have any major impact on the environment.
***********