PRE - FEASIBILITY REPORT For EXPANSION OF EXISTING MANUFACTURING UNIT at Plot No: 51 A, C, D, E, F, G & H, IDA Kondapally, Ibrahimpatnam Mandal, Krishna District, Andhra Pradesh. by ORCH LABORATORIES INDIA PVT. LTD Plot No: 44, Palampally Villas, Opp. Karur Vysya Bank Nizampet Road, Kukatpally Telangana State.
17
Embed
PRE - FEASIBILITY REPORT - …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/20_Jun... · PRE - FEASIBILITY REPORT For ... Eswar Bio Briquette India Pvt Ltd. ... the production
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PRE - FEASIBILITY REPORT
For
EXPANSION OF
EXISTING MANUFACTURING UNIT
at
Plot No: 51 A, C, D, E, F, G & H, IDA Kondapally, Ibrahimpatnam Mandal, Krishna District, Andhra Pradesh.
by
ORCH LABORATORIES INDIA PVT. LTD
Plot No: 44, Palampally Villas, Opp. Karur Vysya Bank
Nizampet Road, Kukatpally Telangana State.
Contents
S. No. Description Page no.
1.0 Executive Summary 1
2.0 Introduction of The Proposed Project 2
2.1 Project Proponent 2
2.2 Brief description of nature of the project. 2
2.3 Need for the project and its importance to the country and or
region 2 - 3
2.4 Demand-Supply Gap. 3
2.5 Employment Generation(Direct and Indirect) due to the project 3
3.0 Project description 4
3.1 Existing Products, Proposed Products and By- Products and Production Capacity
7-8
3.2 Raw materials required and Quantities 8
3.3 Manufacturing Process 9
3.4 Resource – Utilize and Recycling 9
3.4.1 Water 9
3.4.2 Power Requirement 10
3.4.3 Fuel Requirement 10
3.5 Quantity of wastes to be generated 10
3.5.1 Waste Water Generation and utilization 10
3.5.2 Hazardous Waste, Solid waste generation and Disposal 10
3.6 Schematic representations of the feasibility drawing which give information of EIA purpose.
11
4.0 Site Analysis 12
4.1 Connectivity 12
4.2 Land Form, Land use and Land ownership. 12
4.3 Existing Infrastructure 12
4.4 Soil classification 12
4.5 Climatic data from secondary sources. 12
4.6 Social Infrastructure available. 12
5.0 Planning brief 12
6.0 Proposed infrastructure 12
6.1 Industrial Area 12
6.2 Residential Area 12
6.3 Green Belt: 13
6.4 Social Infrastructure 13
6.5 Water management 13
6.6 Sewerage System 13
6.7 Industrial Waste Management 13
S. No. Description Page no.
7.0 Rehabilitation and Resettlement (R&R) Plan 13
8.0 Project Schedule and Cost estimates 14
9.0 Analysis of project 14
LIST OF TABLES
Table No Description Page no. 2.1 Proposed Employment for expansion 4 3.1 List of Existing Products 7 3.2 Proposed Products and Quantities 7 - 8 3.3 By-Product and Quantities 8 3.4 Water Requirement Details 10 3.5 Wastewater generation and Treatment Method 10 3.6 Hazardous / Solid Waste Details generation and Disposal 10-11
LIST OF FIGURES
Figure No Description Page no.
1.1 Location Map 5 1.2 Google Earth Map Showing Orch Laboratories India Pvt. Ltd 6
LIST OF FLOW CHART
Flow Chart No Description Page no. 3.1 Generalized Flow Chart for Bulk Drug Manufacturing 9
Pre-Feasibility Report Orch Laboratories India Pvt. Ltd
Prepared By Rightsource Industrial Solutions Pvt. Ltd Page 1
1.0 EXECUTIVE SUMMARY
Orch Laboratories India Pvt. Ltd was incorporated as Private sector under
companies Act, 1956 (No.1 of 1956) situated at IDA Kondapally, Vijayawada in the
state of Andhra Pradesh, India during the year 2011-2012. The company is engaged
in the manufacturing of intermediates for supply to the domestic as well as overseas
market.
Orch Laboratories India Pvt. Ltd got Environmental Clearance for manufacturing of
Bulk Drug and Drug Intermediates vide EC letter no SEIAA/AP/SKM - /2011 - 1992
dated: 04.03.2015 and obtained certified compliance report on existing EC Vide F.
Pre-Feasibility Report Orch Laboratories India Pvt. Ltd
Prepared By Rightsource Industrial Solutions Pvt. Ltd Page 11
3.5.2 Hazardous Waste, Solid waste generation and Disposal
The types of Solid and Hazardous wastes generated from the project, method of
disposal is shown in below table 3.6.
Table 3.6: Solid & Hazardous Waste generation and Disposal
S. No. Description Quantity In Kg/Day
Method Of Disposal
1 Organic Solid Waste 312 Sent to Cement Industries 2 Inorganic Solid Waste 1313 Sent to TSDF 3 Spent Carbon 59 Sent to Cement Industries 4 ETP Sludge 50 Sent to TSDF 5 Fly ash from Boiler 3500 Sent to Brick Manufacturers
6 Solvent Distillation Residue
574 Sent to Cement Industries
7 Waste Oils & Grease 300
Ltrs/Annum SPPCB Authorized Agencies for Reprocessing/Recycling
8 Container liners 500
No’s/Month After Detoxification sent to outside agencies.
9 Used Lead Acid Batteries 2 No’s/Annum Send back to suppliers for buyback of New Batteries
3.6 Schematic representations of the feasibility drawing which give
information of EIA purpose.
The applicability of the S.O 1533 for the proposed project was explored by
considering different possibilities & provision made in the said notification.
Considering the products & project location of the proposed project it is noticed that
the proposed project falls under Category 5 (f) “B” of the Schedule-I of EIA
Notification SO 1533.
As per the provision of the SO 1533, it is necessary to get Environmental Clearance
by applying to MoEF along with the Environmental Impacts Assessment Study
Report for the proposed project prior to commissioning of the project activities.
Therefore the EIA is required to conduct to comply with provisions of SO 1533 made
for Category 5(f) “B” of schedule –I of the notification.
Pre-Feasibility Report Orch Laboratories India Pvt. Ltd
Prepared By Rightsource Industrial Solutions Pvt. Ltd Page 12
4.0Site Analysis
4.1 Connectivity
Orch Laboratories India Pvt. Ltd is having well developed road and Rail way line
Connections for transportation of raw materials and finished products.
• The nearest habitation from the site is Kattubadipalem at a distance of 0.85 Km -
NE.
• The nearest railway station is Kondapalli Railway station at a distance of 2.85
KMs – SSW from the site.
• The nearest airport is Vijayawada Airport at a distance of 28.60 KMs - SE at
Gannavaram.
• The Nearest road ways National Highway No.30 (Vijayawada - Mylavaram Road)
– 0.85 KMs - E
4.2 Land Form, Land use and Land ownership
The proposed expansion is in existing area only and located in Notified Industrial
Area. There would be no any change in Land Use, Land Cover or Topography of
plot.
4.3 Existing Infrastructure
Proposed project is an expansion within existing facility and the basic infrastructure
is already there.
4.4 Soil classification
The district is mainly covered by three types of Red loamy soils, Sandy soils, Black
soils.
4.5 Climatic data from secondary sources
Annual Temperature Maximum : 38o C
Minimum : 20o C
Normal annual rainfall 1011 mm
4.6 Social Infrastructure available
Well developed social infrastructure facilities are available at nearby Habitations.
5.0 Planning Brief
Proposed plant expansion activities will be started after getting statutory clearance
form related authorities. The project will be completed within two years.
Pre-Feasibility Report Orch Laboratories India Pvt. Ltd
Prepared By Rightsource Industrial Solutions Pvt. Ltd Page 13
Further proposed project activities will take care of all the rules and regulation of
statutory authority and provide the control measure and devices to achieve the
standard norms.
6.0 Proposed Infrastructure
6.1 Industrial Area
Basic infrastructure developed already and the required plant and machineries will
be installed after getting statutory clearance.
6.2 Residential Area
No residential area is involved in the proposed project. The employs are
accommodated in nearby Residential areas
6.3 Green Belt:
Area of 313.59 SQM (6 %) green area developed within the plant site, In addition to
the above Orch Laboratories Pvt Ltd got permission from Kondapalli Notified Gram
Panchayath Industrial Area Service Society to develop Green belt in an area of 4487
Sq.mts in the industrial Development Park.
6.4 Social Infrastructure:
Facilities like road and communication are good. Banks; ATM's and medical facilities
are also adequate.
Amenities:
Education- schools including middle, secondary and higher secondary schools,
social welfare hostels.
Medical and Health- Community Health Centre, & Primary Health center Are
available near villages
Power and water- All the villages are electrified and drinking water facilities are
extended to all villages.
Rail and Road- The plant site is very well connected by road through National
Highway No. 30, Kondapalli railway station.
6.5 Water management
Water requirement will be fulfilled through Industrial Development Authority.
Pre-Feasibility Report Orch Laboratories India Pvt. Ltd
Prepared By Rightsource Industrial Solutions Pvt. Ltd Page 14
6.6 Effluent Treatment System
An industrial effluent of 38.76 KL/ day is generated and will be sent to Kondapalli
CETP. Domestic waste water will be sent to septic tank followed by soak pit .
6.7 Industrial Waste Management:
Due to proposed expansion, the effluent from cooling and Plant/Equipment washing
will be sent to CETP Kondapalli.
7.0 Rehabilitation and Resettlement (R & R) Plan
Rehabilitation & Resettlement (R&R) plan is not applicable to proposed project.
8.0 Project Schedule & Cost Estimates
Proposed Expansion activities will be started after getting statutory clearance form
related authorities. The cost of the proposed expansion will be approximately 4.80
Crores the project will be completed within two years.
9.0 Analysis of proposal (Final Recommendations)
Proposed expansion activity will provide benefits to the local people in terms of
financial and social welfare.
� Local people will get direct financial benefit by way of employment.
� Local people will get some contracts of supply and services to get indirect
income.
� Company will contribute in improving education and health facilities in nearby