Top Banner
1 PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY SOIL MINING PROJECT FOR ENVIRONMENTAL CLEARANCE At Village : Bhansali, Tehsil : Bharuch District : Bharuch State : Gujarat Lease area : 1.63.12 Hect Category of project : B2 Capacity : 1.41.914MT Name of project : Shree Indica Road Carrier Project in proponent : Gaffar Abubakar Meman Address : R/O-Keshrol , Taluka-Bharuch, Dist- Bharuch Gujrat- 392015 E-mail address : [email protected] Mobile no. : 9924071007 Project cost : 20 Lac
13

PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY ...environmentclearance.nic.in › writereaddata › District › ... · 1 PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY

Jun 25, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY ...environmentclearance.nic.in › writereaddata › District › ... · 1 PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY

1

PRE- FEASIBILITY REPORT

OF

INDICA ROAD CARRIER ORDINARY SOIL MINING PROJECT

FOR

ENVIRONMENTAL CLEARANCE

At

Village : Bhansali,

Tehsil : Bharuch

District : Bharuch

State : Gujarat

Lease area : 1.63.12 Hect

Category of project : B2

Capacity : 1.41.914MT

Name of project : Shree Indica Road Carrier

Project in proponent : Gaffar Abubakar Meman

Address : R/O-Keshrol ,

Taluka-Bharuch,

Dist- Bharuch Gujrat- 392015

E-mail address : [email protected]

Mobile no. : 9924071007

Project cost : 20 Lac

Page 2: PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY ...environmentclearance.nic.in › writereaddata › District › ... · 1 PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY

2

1.0 EXECUTIVE SUMMARY

1.1 Executive Summary

Proponent is presently proposing the Ordinary Soil mining project in of Shree Indica Road

Carrier. R / O - Keshrol,Taluka-Bharuch,Dist- Bharuch (Gujrat), for an extent Of 1.63.12 Hectare

. The proposed soil mining at Village – Bhansali, Tehsil- Bharuch, Dist.- Bharuch(Gujarat) has

been leased to Shree Indica Road Carrier. The lease area is 1.63.12 Hectares. Soil mining

activity in lease area will be carried out in most period of the year except the rainy season.

This mining project falls under Category “B2” or activity 1(a) as per EIA Notifications

2006 and amended thereof.

1.2 Salient features of the project

Project Name Shree Indica Road Carrier

Location of mine Village.Bhansali Tehsil-Bharuch,

District-Bharuch,

State - Gujarat

Latitude N21 43 50.5 to N21 43 40.9

Longitude E72 45 58.6 to E72 45 41.8

Survey No. 36-A Paiki

Minerals of mine Ordinary Soil

Life of Mine 3 Year

Proposed production of mine 1.41.914MT

Method of mining Opencast mining

No of working days 150 days

Water demand Total water requirement is about 4.7 KLD = 3.7 KLD

(Drinking & Domestic Uses) + 0.5 KLD (Plantation) + 0.5

KLD (Dust Suppression).

Sources of water Water will be supplied from nearby sources near the mine

Page 3: PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY ...environmentclearance.nic.in › writereaddata › District › ... · 1 PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY

3

site.

Man power 10

Nearest railway station Bharuch railway station (about 24 KM in E Direction)

Nearest State highway/national

highway

NH -228 (About 18.80 KM in E Direction)

SH -161 (About 15.85 Km in NE Direction)

Nearest airport Vadodara Airport-(About 81.10 Km in N Direction)

Seismic zone Zone III

1.3 Proposed Planning

Mining method - Opencast mining method

Project cost - Rs. 20 Lac

Production - 1.41.914MT

The land use pattern around Bhansali village is Govt. Land.

2.0 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION

2.1 Identification of Project and Project Proponent:

The proposed mine Village- Bhansali,,Tehsil- Bharuch, Dist.-Bharuch (Gujarat). The total mine

lease area is 1.63.12 Hectare has been leased . The total capacity has been anticipated to be

1.41.914MT of soil that will be extracted and transported to clients directly from the project site.

Site is situated in in Village- Bhansali, Tehsil- Bharuch, Dist.- Bharuch (Gujarat) .

2.2 Brief Information about the Project

The project has been proposed for mining of 1.41.914 MT of Ordinary Soil by Opencast mining

method. The LEASE area is 1.63.12 Hect. Water requirement for the proposed project for

drinking use, dust suppression and other use will be 4.7 KLD, which will be taken from nearby

source.

2.3 Need for the Project and Its Importance to the Country or Region:

The mining project falls in the Bharuch District of Gujarat the area is devoid of industrial

growth. The earning sources of the region are limited. Most of the people are dependent upon

agriculture only. Mineral wealth of the state Gujarat provides the employment opportunity to the

Page 4: PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY ...environmentclearance.nic.in › writereaddata › District › ... · 1 PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY

4

people of the state as well as region also. Mining is one of the major core sector industries which

play a crucial role in the process of country economic development. The mineral Ordinary Soil

finds extensive use in the construction works.

2.4 Demands-Supply Gap

There is a demand of Ordinary Soil for filling.

2.5 Imports vs. Indigenous Production

Ordinary soil involves indigenous production hence the import and export activity is not

involved.

2.6 Export Possibility

There is no export possibility.

2.7 Domestic/ Export Markets

Products are marketed mainly in local areas. There is only domestic market of ordinary soil.

2.8 Employment Generation

It generates major employment of unskilled manpower from rural areas. It is seasonal in nature

and generally operational between 150 day in a year.

3.0 PROJECT DESCRIPTION

3.1 Type of Project Including Interlinked and Interdependent Projects, If Any.

It is an opencast manual method project over an area of 1.63.12 Hect, with a proposed

production is

1.41.914MT of Ordinary Soil. This is an independent mining project and there are no

interlinked projects involved.

3.2 Location

The location of the proposed mining area is detailed below:

Village and Tehsil District and State Area Ownership category

Bhansali,&

Bharuch

Bharuch

&

Gujarat

1.63.12 Hect Govt.Land

Latitude : N21 43 50.5 to N21 43 40.9 Longitude: E72 45 58.6 to E72 45 41.8

Page 5: PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY ...environmentclearance.nic.in › writereaddata › District › ... · 1 PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY

5

Map showing Location & Approach of the project site

Project Site

Page 6: PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY ...environmentclearance.nic.in › writereaddata › District › ... · 1 PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY

6

3.3 Details of Alternate Sites

Mining is site specific so no alternative site is proposed.

3.4 Size or magnitude of operation

The lease area has been granted over an area of 1.63.12 Hect. The average number of working

days in the year would be 150.

3.7 Project description with process details

3.7.1 Proposed Method of Mining

For the filling, natural soil as raw material has been identified, Opencast method of mining will

be adapted on single shift basis to excavate the overburden as well as crude Soil hence manual

open cast mining procedures shall be followed to full-fill raw material through excavating the

soil up-to permissible depth i.e. 0.86 meter from the land. It is proposed to use manual

excavation not exceeded 0.86meter depth of the land.

Production details

Year wise production is shown below:

Year Excavation of Soil in MT

First year 1,37,999

3.8 Raw Material Required Along With Estimated Quantity, Likely Source, Marketing

Area of Final Product/s, Mode of Transport of Raw Material and Finished Product

No raw material will be required for production of proposed minerals.The mine mineral shall be

collected and dispatch to various industries through trucks.

3.9 Resource Optimization/ Recycling and Reuse

Resource optimization has been exercised but there is no scope of recycling and reuse in the

project. Only top soil shall be used in regeneration of soil quality after completion of excavation

work.

Page 7: PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY ...environmentclearance.nic.in › writereaddata › District › ... · 1 PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY

7

3.10 Availability of Water its Source, Energy/ Power Requirement and Source

Water Requirement

One diesel engine pump set shall be provided for drinking and process water. Source of water

shall be groundwater. A water storage tank of capacity 1 KLD shall be provided for domestic use

in emergency cases. Water shall not be either utilized in mining activity. No power (electricity)

is required for mining activities.

Total water requirement is about 4.7 KLD = 3.7KLD (Drinking & Domestic Uses) + 0.5 KLD

(Plantation) + 0.5KLD (Dust Suppression).

3.11 Quantity of wastes to be generated (Liquid and solid) and Scheme for their

Management/Disposal

There shall not be generation of either liquid or solid waste during the project activities.

However, due care shall be taken in these aspects.

4.0 SITE ANALYSIS

4.1 Connectivity

The mining lease area is situated about 1.23 M SW of near village – Bhansali, Tehsil –

Bharuch, District – Bharuch(Raj.).

4.2 Landform, Land use and Land ownership:

Proposed land form is a flat or nearly flat land. There is no terrain, mountains, hills, plateaus etc.

Area is barren /sown once in a year land and it is not used for cultivation of vegetables and fruits

as in case of prime agriculture land due to unfavourable soil quality

Land Use Pattern Near Village Pvt. Land Total

govt. Land Bhansali 1.63.12Hect 1.63.12Hect

.

4.3 Topography

The study area represents a more plain topography where as the 0.5 km buffer zone is highly

adulating with plains. The Spot RL height in area is 84 mRL above MSL.

4.4 Existing land Use Pattern

Agriculture land converted into commercial usage. There is no River/ Canal/Port in the applied

area. There is no village or human settlement in the lease area. There is no public road passing

through the area.

Page 8: PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY ...environmentclearance.nic.in › writereaddata › District › ... · 1 PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY

8

4.5 Existing Infrastructure

No existing infrastructure with in mining

area.

4.6 Soil Classification

Average 0.2 m cover has been considered as soil.

4.7 Climate data from Secondary Sources:

The climate of the area is dry with extreme temperature variation i. e. in summer as high as 44 0

C, whereas in winter it lowers to 60C or even less. Most of the rain falls during the period of July

to September. Maximum and minimum rain fall varies (500mm- 200mm).

4.8 Social Infrastructure available:

1) The area is not facilitated with power line.

2) Post Office and Medical facilities are available at

Bharuch.

3) The ground water table is 15-35 from the surface.

4) The nearest police station applicable is atBharuch.

5) Mobile Phone connectivity is available at the Lease

site.

6) Medical facility is available at village Muler

7) No National Park/sanctuary falls within 10 km of the Lease

area.

5.0 PLANNING BRIEF Planning Concept (type of industries, facilities, transportation etc) Town and Country

Planning/Development Authority Classification

(i)Ordinary Soil mining with brick making in the region is a rural industry/business which is

categorized as tiny scale unit. It is classified as labour oriented and traditional brick making also.

The area is not covered under any town planning or development authority. N o need of any such

planning by the proponent also.

(ii)Population Projection Due to proposed mining activities there will not be influx of people from outside as only local

people will be engaged.

Page 9: PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY ...environmentclearance.nic.in › writereaddata › District › ... · 1 PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY

9

5.2 Land use Planning

Land Use Pattern Near Village Agricultural Land Total

Govt. Land

(commercial usage)

Bhansali 1.63.12Hect 1.63.12Hect

5.3 Assessment of Infrastructure demand (Physical & Social)

On the basis of the preliminary site visit, the infrastructure demand in the village was assessed on

the basis of need and priority.

The health infrastructure of the study area requires improvement. The lack of medical facilities

needs improvement. Medical facilities will be provided by mine owner during mining.

5.4 Amenities/Facilities

All available amenities & facilities shall be provided to its workers like - domestic fuel,

medicines, temporary shelters, safe drinking water, security etc as per their requirements

5.4.1Budget for facilities provided to Labours

Sl. No. Scheme Cost (in Rs)

1 Drinking water facility 5,000/-

2 Shelter and sanitation facility 5,000/-

3 Health facility 5,000/-

4 Fuel for cooking 5,000/-

Total 20,000/-

6.1 Industrial Area (Processing Area)

Proposed Ordinary Soil mining is not like a traditional manufacturing unit, No infrastructure is

proposed.

6.2 Residential Area (Non Processing Area)

As local workers from nearby areas will be engaged for the mining activity, no residential area/

housing are proposed.

Page 10: PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY ...environmentclearance.nic.in › writereaddata › District › ... · 1 PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY

10

6.3 Green Belt

Total area of green belt would be 20% of LEASE and surrounding area. As the mine lease area

is

1.63.12Hect so plantation would be around 0.60 Ha.

It is proposed to plant 20 plants per year in mining area and surrounding area.

6.4 Social Infrastructure

The Applicant shall spend 2.0% of profit for the development of the area i.e. treatment of poor,

schools, and other social work.

6.4.1. Budget for Corporate Social Responsibility (CSR)

S. No. Activity CSR

1 Provide drinking water facility in surrounding villages and

schools by Hand pump/dug well/water tank or funds for

Ambulance

10,000/-

2 Educational support poor students specially girls 10,000/-

4 Ladies toilet 20,000/-

TOTAL 40,000/-

6.5 Sewerage System

There will be no generation of sewerage due to the project, hence no need of sewerage system.

6.6 Industrial Waste Management

Not applicable

6.7 Solid Waste management

Nature of Waste:-

The waste generated during mining shall be backfilled in the excavated area within lease

.6.8 Generation of Top Soil:

No top soil will be generated.

6.9Power Requirement & Supply/Source

Electric power supply does not exist at mine site. No need of power for the purpose of soil

mining.

Page 11: PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY ...environmentclearance.nic.in › writereaddata › District › ... · 1 PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY

11

6.10 Environmental Management Plan

The environmental management plan consists of the set of mitigation, management,

monitoring and institutional measures to be taken during the implementation and operation

of the project, to eliminate adverse environmental impacts or reduce them to acceptable

levels. The present environmental management plan addresses the components of

environment, which are likely to be affected by the different operations in the mine area

Budget Allotted for the EMP

SI. No. Measures Cost (in Rs.)

1 Pollution Control

i) Dust Suppression

10,000/-

2

Pollution Monitoring

i) Air pollution

ii) Water pollution

iii) Noise pollution

10,000/-

3 Green Belt 20,000/-

Total 40,000 /-

7.0 REHABILITATION AND RESETTLEMENT (R&R) PLAN

The proposed soil mining plot is a vacant and open land, therefore no need of rehabilitation

or resettlement plan.

8.0 PROJECT SCHEDULE & COST ESTIMATES

8.1 Likely Date of Start of Construction and Likely Date of Completion

No construction activities are proposed. The mining activity will commence only after

receiving environmental clearance and other statutory clearance.

Page 12: PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY ...environmentclearance.nic.in › writereaddata › District › ... · 1 PRE- FEASIBILITY REPORT OF INDICA ROAD CARRIER ORDINARY

12

8.2 Estimated Project Cost along with analysis in Terms of Economic Viability of the

Project

Estimated project cost is Rs. 20 Lac. The applicant has all the mining equipments used for the

scientific mining. The mine is Eco-Friendly. Economically the ore is mineable as compared

to overburden thickne

9.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)

The proposed mine will bring economical benefits to the state by the way of Royalty for

mineral and to the local people by way of direct and secondary employment opportunities.

Proposed minerals are used for a variety of structural and decorative purposes. The material is

in high demand at the local market for real estate industry.

The project will bring about socio-economic improvement of the area and will prove

beneficial to the area.

****************