Social Monitoring Report Semestral Report April 2012 PRC: Anhui Integrated Transport Sector Improvement Project Prepared by Engineering Resettlement Research Institute of Anhui Communication Vocational &Technical College for Anhui Provincial Transport Department and the Asian Development Bank.
32
Embed
PRC: Anhui Integrated Transport Sector Improvement ProjectSocial Monitoring Report Semestral Report April 2012 PRC: Anhui Integrated Transport Sector Improvement Project Prepared by
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Social Monitoring Report
Semestral Report April 2012
PRC: Anhui Integrated Transport Sector
Improvement Project
Prepared by Engineering Resettlement Research Institute of Anhui Communication Vocational &Technical College for Anhui Provincial Transport Department and the Asian Development Bank.
This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
3
Asian Development Bank
Financed Anhui Highway Project
Xuzhou-Mingguang Highway
External Monitoring Report of the
Resettlement
(The Second Copy)
Engineering Resettlement Research Institute of
Anhui Communication Vocational &Technical College
April 2012
4
Contents
CONTENTS……………………………………………………………………………2
1 GENERAL
DESCRIPTION…………………………………………………………………………4
1.1 General Description of the Project………………………………………………4
1.2 Time of the Project’s Approval and Construction…………………………………4
1.3 Brief Description of the Resettlement plan………………………………………5
1.3.1 Effect of the Project……………………………………………………5
1.3.2 Compensation and Time of Implementation…………………………5
1.4 General Description of Monitoring
Evaluation……………………………………7
1.4.1 Basal Investigation……………………………………………………7
1.4.2 Main Content of Monitoring Evaluation………………………………7
1.4.3 Methods of Monitoring Evaluation……………………………………7
2 Monitoring and Evaluation in the Process of
Resettlement…………………………………9
2.1 Land Requisition…………………………………………………………………11
2.1.1 Quantity of Land Expropriation………………………………………11
2.1.2 Compensation Criterion of Land Requisition………………………12
2.1.3 Compensation and payment of Land Fee……………………………16
2.1.4 Restoration Measures and Compensation……………………………17
2.2 House Relocation………………………………………………………………17
2.2.1 Schedule and Quantity of Relocation…………………………………17
2.2.2 Compensation Criteria of Relocation…………………………………18
2.2.3 Condition of Resettlement……………………………………………20
2.2.4 Compensation for Removal and Interim Transitional Allowance……23
2.3 Compensation for the Relocation of the Electronic Telegraphic
Bungalow with Half Brick Half Tile(yuan per square meter)
530 530 530 530 440 440 450 450 450 450
Bungalow with Mud wall and Slate Roof(yuan per square meter)
430 430 430 430 350 350 450 450 450 450
Bungalow with Mud Wall and Grass Roof(yuan per square meter)
430 430 430 430 280 280 450 450 450 450
Simple Bungalow(yuan per
380 380 380 380 200 200 180 220 180 180
19
square meter) 160
2、Moving subsidies
3yuan per
square meter
3yuan per square meter
3yuan per
square meter
3yuan per
square meter
/ 500yuan
per person
/ 4yuan/square meter
500yuan per
person
500yuan per
person
3、Transition(According to Six
Months)
3yuan per
square meter·mo
nth
3yuan per square
meter·month
3yuan per
square meter·m
onth
3yuan per
square meter·m
onth
/ 400person per month
/
6yuan per
square meter·m
onth
/
20
2.2.3 Condition of Resettlement
By field investigation, the monitoring and evaluation team gets to know that
compensation criterion of houses and the appendages are formulated by each city, the
compensation criterion can basically meet the resettlement requirement, as follows:
A. The resettlement condition of Wuhe County:
There are two ways of resettlement in Wuhe County:cash compensation to single
affected agricultural household and developing unified resettlement places. Combining
New Rural Construction,the centralized resettlement place of Wuhe County has been
chosen unified planning, unified designing, and were chosen by the relocation
households themselves to resettle.The first step of compensation is the publicity of the
compensation criterion, then signs a compensation agreement with the affected families,
and villages and towns report the roster, and report to the County government
together,and the compensation has been in the affected families’ card.By the field
investigation, the monitoring and evaluation gets to know that the centralized
resettlement place of Toupu town Wuhe County is in construction.(see picture3,picture4).
Picture 3 The Resettlement Residents in Construction Picture 4 The Resettlement residents in
Construction At T
At Toupu Town,Wuhe Village -oupu Town,Wuhe Village
By investigation,the external monitoring evaluation team gets to know that one of the
affected agricultural households in Toupu Town ,Wuhe County Sun Haidong lives in
makeshift shelter with his family, and the affected families reflect that the relocation
compensation and transition fee have received, the renting deadline has come,but the
price of the pre-fabricated house has not been decided, the government reported to the
affected families as 760square meters before,but now the pre-fabricated house belongs
to the government investment, and is underwritten by government on the whole, so the
price of the pre-fabricated house has not been decided.
21
Picture 5 Sun Haiping Who is Living in the Pre-fabricated House with His Family
B. The resettlement condition of Si County
By field investigation,the monitoring and evaluation team gets to know that there are
two ways of resettlement in Si County:cash compensation to single affected agricultural
households and developing unified resettlement places. There are many affected
families that get cash compensation,because of the shortage of homestead, some
affected families choose to build house and have self-restoration at their own’s
farmland.51 affected families in Mawang Village ,Changgou Town waiting for the
resettlement,among them.After getting the compensation according to the compensation
criterion of resettlement,4 of the residents buy homestead themselves nearby,and adopt
advanced technology of engineering construction, translate the formal house out of the
range of highway’s land requisition,this save the relocation cost greatly.By the field
investigation, the monitoring and evaluation team gets to know that the affected
household Yao Jun, with a family of six people,the area of land requisition is about
0.42mu, the area of relocation house is about 368.12 square meters,the affected people
is a mason in the regions south of the Yangtze River, the income is about 150 to 160yuan
per day, the pure profit of the couple is around 50 to 60 thousand per year,they have two
children, and they are both middle school students, the economic condition is well.The
cost of resettlement compensation adds up to 3 million yuan,and through the translation
of houses, about 1.5 million yuan is needed to restore to the formal condition, and about
1.5 million yuan is saved.Through the discussion, the householder has no complaints
about the compensation.(see picture 7)
Picture 6 The Affected Household Yao Jun’s House at Wang Picture 7 Monitoring and Evaluation
team’s Field
Village Changgou Town After Translation Investigation to the Affected person Yao Jun
22
C. The resettlement condition in Lingbi County is mainly cash compensation to single
affected agricultural households,and now the affected families have received the
compensation. There are 97 resettlement households,and the homestead region has
been delimited, they are in the process of resettlement,the affected agriculture
households have no complaints.
D. The resettlement condition of Mingguang City:
The external monitoring and evaluation team gets to know that the relocation of
Mingguang City began on December 2009, and the whole work of relocation is finished
till the Spring Festival of 2010. The resettlement way is adopting developing and setting
residents uniformly, the homestead is divided by the village and resettled intensively, and
the affected families have received the compensation.Now the pre-fabricated housed
have been built(see picture8,picture9).Among them, the relocation households of
Jingwang Village in Qiaotou Town have resettled 37 households in total, among them, we
have known from Yu Ying resettlement setting that 16 affected households were resettled
uniformly, water and electricity are prepared well in the pre-fabricated houses, all of these
cost is contributed by the government,and the greening in front of the houses have been
improved, the road has been leveled by the investment of the government.Among
them,the affected household Yu plants farmland, and mainly cultivates farmland for
others,there are about 20 mu land in his family, he is satisfied with the resettlement and
have no complaint.(see picture10).
Picture 8 Yuying Resettlement Site at Jingwang Picture 9 The Road Leveling of Yuying
Resettlement Site
Village,Qiaotou Town Mingguang City. At Jingwang Village,Qiaotou Town Mingguang City
Picture 10 Door Interview of the Affected Households at Yuying Site
Jingwang Village
2.2.4 Compensation for Removal and Interim Transitional Allowance
23
By the field investigation, the monitoring and evaluation team gets to know that during
the relocation and transition of each county, each county has paid the relocation
compensation and transition fee according to the requirement.
A. Wuhe
All things are carried out according to the criterion in the provincial government
[2007]No.17 file, and transition fee and housing allowance are paid to the relocation
immigrants, it is paid according to the criteria of 400 person per month, the transition
period is about six month.The relocation compensation is paid according to the criteria of
500yuan per person.
B. Si County
(1) Relocation grants: It is calculated according to the area of the relocating buildings
3yuan per square meter.
(2) Transition fee: It is calculated according to the area of the relocation buildings
3yuan per square meter·month; the transition period is calculated according to six
months.
(3) The compensation for the shut down and close down of the non-residential
houses which carry out property exchanges: The commercial buildings are calculated
according to the area of the relocation house 10-20yuan per square meter·month; The
industrial and storage buildings are calculated according to the area of the relocation
house 8yuan per square meter·month.
C. Lingbi
(1) The relocation grants: It is calculated according to the area of the relocation
building 3yuan per square meter.
(2) The transition fee:It is calculated according to the area of the relocation building
3yuan per square meter·month; The transition period is calculated according to six
month.
D. Mingguang City
The Criterion of the Compensation of the Temporary Resettlement and the Relocation
Name Unit Sum Remarks
The Temporary Resettlement’s
compensation of the Residential
House
Square
meter
per
month
Six Yuan
1.Based on the Property Exchange Area of the Agreement 2. Paid in advance monthly
The Relocation Fee of the Residential
House
Yuan per
Square meter
Four Yuan(Thos
e under 400yuan are calculated
3. Temporary resettlement compensation, pay nonrecurring relocation grants, those who have taken the property exchange transitional resettlement are paid
24
as 400yuan)
secondary relocation grants, four months’ transition fee is paid after the resettlement
2.3 Compensation for the Moving of the Electronic and Telegraphic Lines
By the field investigation,the monitoring and evaluation team got to know that the
telegraph lines are in moving.
A. Wuhe County:Those who involved electronic,communication and broadcast lines
is coordinated by county headquarter, and each property right organization take charge
of the moving,the range of relocation is carried out according to the design file provided
by the design organization, the moving plan and the budget is audited by the highway
construction project proprietor, and the specific moving fee is decided by the highway
construction proprietor and the relevant property right unit.At present,the work of
organization’s line relocation is in operation.
B. Si County: By field investigation, the monitoring and evaluation team gets to know
that moving of the work of organization’s line is in operation. Compensation is given to
the transformer according to the relevant regulation of the power division and the
industrial standard, electronic,communication facilities,and those which are still in use are
compensated according to the cost of moving, and the abandoned ones are not
compensated.
C. Lingbi: Moving electronic,telegraphic lines 543, lines 88645meters, the electronic
and telegraphic lines are moving by the lines’ property owners., Material cost is given by
the project owners.
D. Mingguang: Those which have signed relocation compensation agreement are
moved by each property right organization. At present,the moving of the electronic and
telegraphic lines has finished.
2.4 Affected Enterprises and individually-owned business
By the field investigation,the monitoring and evaluation team found that there are 3
affected enterprises and institutions along the route of the project..
A.Wuhe County: One glove factory and one supermarket are involved. Among them,
the glove factory is state-owned land, it occupies 7mu, and is purchased and contracted
personally, only the framework does not open formally,and now through consultation,
compensation agreement is signed and compensates according to the compensation
25
criterion, the owner does not intend to resume production, and has complaint about the
compensation.The supermarket has been emptied, it is two-floored high,and plans to be
placed nearby.After the relocation,it can operate normally, the owner has received the
compensation, and he has no objection(see picture11)
Picture 11 The Affected Supermarket(Left)and Glove Factory at Wuhe County
B. Lingbi County: The supermarket located in Gaozhai Village does not involve in the
relocation, the actual area is about 800 square meters, its distance towards Xu-Ming
Highway is about 60 meters,the householder Sun Guanghui thinks it would bring about
transportation inconvenience and noise etc, and he put forward the claim, now this event
is resolved through consultation.
2.5 Infrastructure Construction
(1) The affected infrastructure, The governments at all levels and the resettlement
office regulate relevant restoration measure according to the compensation criterion and
compensation procedure in allusion to the specific circumstance of the county.
(2) The villages and towns pay a lot attention to the construction of the resettlement
place ,residential construction is combined with the New Rural Construction.The measure
of resettling unified are taken for the affected households which are resettled collectively.
2.6 Affected Vulnerable Groups
In the process of resettlement,the monitoring and evaluation team finds that the
affected vulnerable group along the route are as following in table 2-19.
Table 2-19 The Schedule of the Condition of Vulnerable Group in Each City
The Affected Countie
s
vulnerable Group
Affected Situation
Resettlement Situation and Take good measures
Lingbi County
718person
The disabled,The
Five
Appropriate Arrangement and Care are taken to those old,weak
person,orphans, widows and the
26
Guarantees,The
Impoverished,Widow
disabled who is lack of or lose labor , or whose life are unfunded ,ensure
their food,clothing,birth,old and death.
Wuhe County
470person
The disabled,The
Five Guarantees,T
he Impoverished,
Widow
Appropriate Arrangement and Care are taken to those old,weak
person,orphans, widows and the disabled who is lack of or lose labor , or whose life are unfunded ,ensure
their food,clothing,birth,old and death.
Si County
818person
The disabled,The
Five Guarantees,T
he Impoverished,
Widow
Appropriate Arrangement and Care are taken to those old,weak
person,orphans, widows and the disabled who is lack of or lose labor , or whose life are unfunded ,ensure
their food,clothing,birth,old and death.
Mingguang City
173person
The disabled,The
Five Guarantees,T
he Impoverished,
Widow
Appropriate Arrangement and Care are taken to those old,weak
person,orphans, widows and the disabled who is lack of or lose labor , or whose life are unfunded ,ensure
their food,clothing,birth,old and death.
Concerting with the counties’ and cities’ relevant department such as Minister of Labor
and Social Security ,the Cities will give technological training to the labor of the affected
households, and establish a special fund to support the vulnerable groups.
By field investigation at Mingguang City, the external monitoring and evaluation team
gets to know that the vulnerable groups have two kind of subsidies, they are directional
subsidies and minimum living standard.Among them,the directional subsidies are
subsidized by the Bureau of Civil Affairs, and the different categories have different
compensation criterion according to the producing area and the age.Type A is
orphan,with no sons or daughters,the criteria of those who should be guaranteed but not
guaranteed is 1440yuan per year. Type B is single parent family, the criteria of the
children with serious illness below 18 years old is 1000yuan per year, Type C is the
Poorest household,and the criteria is 600yuan per person.
The agency of Mingxi Street Mingguang City involves one household enjoying five
guarantees, this affected household’s health is in good condition, and have the ability to
work, 2300yuan per year is given to them, and Young Crop Fee is given to the affected
person according to the price of 1000yuan per mu.The affected household have farmland
and house, and is satisfied with the compensation, and have no complaints.
3.Mechanism of Monitoring and Evaluation
3.1 Internal Monitoring Inspection
The resettlement organization has been established,Anhui provincial government
authorizes Anhui Province Transportation and investment Group LTD to reserve all rights
for the carrying-out and relevant resettlement of the project via Anhui provincial
Transportation Bureau, the regional government of each project is responsible for the
carrying-out and relevant resettlement of the project in the area, carrying out the internal
monitoring work at the same time and finishing The Internal Monitoring Report.The
27
regional government of each project establishes the resettlement leading group, and 3
levels of County,Town,Village resettlement office, the staff and equipment has been in
place.
In the process of carrying out the plan,the local office of the villages and towns will
report the resettlement information which are based on person,family and unit to the
county resettlement office,the county resettlement office will report the information to the
Xu-Ming Highway Resettlement Office,Xu-Ming Highway Resettlement Office report the
information to the Foreign Investment Administration Office of Anhui provincial
Transportation Bureau ,Foreign Investment Administration Office of Anhui provincial
Transportation Bureau check the resettlement of the organization at all levels
periodically,and inspect the reported materials and the work progress.Thus,the
resettlement organization at all levels are brought into the supervisory mechanism.
3.2 Communal Participation
In the implementation phase,the government at all levels,the affected enterprises and
personal representatives along the route take part in the following activities in the
resettlement work:
(1) The division of the compensation range and the confirmation of the compensation
criterion.
(2) The confirmation of the compensation agreement.
(3) The choose of the immigrants’ new residential places
(4) The redistribution of land.
(5) The resettlement of the affected enterprises and the staff.
(6) The investigation and consultation of the appeal.
(7) The monitoring and evaluation of the resettlement.
In the investigation of the resettlement work,the monitoring and evaluation team gets to
know that the public participated activities include:
Aim Method Time Unit Participat
or Topic
The Notice of Land
Resettlement
Compensation’s Plan
Symposium,on-the-spot Guidance and Publicity
March 2011
The Relevant
Village and Town
Government in Wuhe County
All Affected Person
The Compensation,Payment Method and Policy.
The Pre-work of Land
Requisition and
Relocation
Symposium
July 2011
The Relevant
Village and Town
Government in Lingbi County
All Affected Person
The County and Village Headquarters have been established, Hold Land Requisition and Relocation Rally about Lingbi Section Xu-Ming Highway,Formulate
28
working Plan and Relocation Notice Elaborately.
The Pre-work of Land
Requisition and
Relocation
Symposium,on-the-spot Guidance and Publicity
December 2009
Construction Headquarter of Si County
Section
All Affected Person
Establishing the Office Staff,and Printing Land Requisition and Relocation files,organizing and implementing
The Notice of Land
Resettlement
Compensation’s Plan
Symposium,on-the-spot Guidance and Publicity
April~May 2011
The Relevant
Village and Town
Government in Fengyang
County
All Affected Person
The Compensation,Payment Method and Policy.
The Notice of Land
Resettlement
Compensation’s Plan
Symposium,on-the-spot Guidance and Publicity
April~May 2011
The Relevant
County,Village and Town
Government in
Mingguang City
All Affected Person
The Compensation,Payment Method and Policy.
3.3 Complaint and Claim
When the affected person feel unsatisfied about the resettlement,they can appeal to
the county resettlement office;if not satisfied about the reply,they could appeal to the local
county and city Justice Department.
The monitoring and evaluation team found that some county and town resettlement
office received some complaints and problems, by careful investigation and field
handling,now all things are implemented.
Sun Ping Administrative Village in Toupu Town Wuhe County has over 40 relocation
resettlement households,now the new resettlement residents are in construction.By
investigation,the external monitoring evaluation team gets to know that one of the
affected agricultural households in Toupu Town ,Wuhe County Sun Haidong with his
family live in makeshift shelter, and the affected families reflect that the relocation
compensation and transition fee have received, the renting deadline has come,but the
price of the pre-fabricated house has not been decided, the government reports to the
affected families as 760square meters before,but now the pre-fabricated house belongs
to the government investment, and is underwritten by government on the whole, so the
price of the pre-fabricated house has not been decided.
A. The 16 relocation households in Yuying resettlement sites Mingguang City involve
2 vulnerable groups,among them, One of the householder called Xu Chuande is about 60
years old, disable, has a daughter who has get married,the area of the relocation house
is about 40 square meters,tile-roofed,and now has no financial capacity to build a new
29
house to live with his brother, has no ability to work. The other householder called Yu
Baosheng has no minimum living standard, widowed, two houses have been relocated,
because of his children,he does not go to the home for the aged, no any policy
compensation or comfort measure are taken except the relocation compensation.
4. Typical Investigation and Evaluation
From March 2011 to May 2011,the monitoring and evaluation team takes the method
of random sampling to the affected households of land requisition and relocation
immigrants individually, 402 sample households in total,among them, there are 325
affected households of land requisition,77 affected households of the relocation.Base
investigation has been done for the above sample households,and archives have been
established for them in case of the follow-up survey in the future.In the April 2012’s
investigation,the resettlement monitoring and evaluation team got to know that most of
the village residences has been going out for non-farming jobs, and seldom labors stay at
home, person stayed at home know fewer about the families’income condition .In view of
this condition,the monitoring and evaluation team chooses part of the typical affected
houses to get brief understanding about their income,table 4-1is the comparison of the
affected households’ income before and after the relocation,among them,income before
the relocation mainly refers to the income of 2010, income after the relocation mainly
refers to the income of 2011 or the income expectation of 2012 according to the first 4
months’ income of 2011 in the process of investigation.As Xu-Ming Highway is in
construction,and the affected households is also in relocation,the income in the table can
be understood as the general specific condition,the recovery rate of the actual income
should carry out recovery condition evaluation after the completion of the project.
Table4-1 The Condition of the Income recovery Unit:Yuan
County Town Village Name
Income before
the relocation
Income after the
relocation Remarks
Mingguang City
Qiaotou Town
Jingwang
Zheng Kechi
15680 14260 Land
Requisiition Households
Mingguang City
Qiaotou Town
Jingwang
Zheng Kefeng
17220 15020 Land
Requisiition Households
Mingguang City
Qiaotou Town
Jingwang
Lu BIngren 15340 14886 Land
Requisiition Households
Mingguang City
Qiaotou Town
Jingwang
Zhao Yuhe 16587 16878 Land
Requisiition Households
Mingguang City
Qiaotou Town
Jingwang
Zhao Zecheng
17895 17258 Land
Requisiition Households
Mingguang City
Qiaotou Town
Xinjian Yu
Chuanyong
12036 12243 Land
Requisiition Households
Minggua Qiaotou Xinjian Shen 14236 13680 Land
30
ng City Town Guofu Requisiition Households
Mingguang City
Qiaotou Town
Xinjian Zhou
Guochao 18697 18245
Land Requisiition Households
Mingguang City
Qiaotou Town
Xinjian Yu
Baosheng 17568 17026
Land Requisiition Households
Wuhe County
Toupu Town
Chentai
Zhao Hongjia
23059 20243 Land
Requisiition Households
Wuhe County
Toupu Town
Chentai
Wang Ruting
24015 21567 Land
Requisiition Households
Wuhe County
Toupu Town
Chentai
Wang Ruliang
23504 22354 Land
Requisiition Households
Wuhe County
Toupu Town
Fangtai
Guo Chuanson
g 25658 23567
Land Requisiition Households
Wuhe County
Toupu Town
Fangtai
Zhang Maosheng
24857 24231 Land
Requisiition Households
Wuhe County
Toupu Town
Fangtai
Chen Xianzhi
27894 25897 Land
Requisiition Households
Wuhe County
Toupu Town
Hua Muwa
ng
Shen Sirang
25648 24365 Land
Requisiition Households
Wuhe County
Toupu Town
Hua Muwa
ng
Zhang Daijun
26575 23532 Land
Requisiition Households
Wuhe County
Toupu Town
Hua Muwa
ng
Liu Qingyan
23025 21025 Land
Requisiition Households
Wuhe County
Toupu Town
Hua Muwa
ng
Sun Hailong
24035 25678 Land
Requisiition Households
Wuhe County
Toupu Town
Hua Muwa
ng
Sun Jingpeng
23687 24898 Land
Requisiition Households
Wuhe County
Toupu Town
Hua Muwa
ng Du Jiliang 24568 23589
Land Requisiition Households
Si County
Dayang Town
Gaoji Wang
Jinrong 26787 24021
Land Requisiition Households
Wuhe County
Dayang Town
Gaoji Xie
Weiqiang 25467 20023
Land Requisiition Households
Wuhe County
Dayang Town
Gaoji Wu Shikai 24568 21231 Land
Requisiition Households
Wuhe County
Dayang Town
Gaoji Wu Xueshi 26988 25987 Land
Requisiition Households
31
Wuhe County
Dayang Town
Gaoji Wu
Xingwang 25769 25696
Land Requisiition Households
Wuhe County
Changgou
Town
Zhupeng
Zhang Baoshi
20157 15568 Land
Requisiition Households
Wuhe County
Changgou
Town
Zhupeng
Zhang Jinlun
23547 16536 Land
Requisiition Households
Wuhe County
Changgou
Town
Zhupeng
Zhang Hong
25641 24749 Land
Requisiition Households
Wuhe County
Changgou
Town
Zhupeng
Xu Bangxiu
24325 23686 Land
Requisiition Households
Lingbi County
Zhaoyang
Town Jingqu Zhao Yi 15687 11724
Land Requisiition Households
Wuhe County
Zhaoyang
Town Jingqu
Zhuo Xiangbin
14522 10284 Land
Requisiition Households
Wuhe County
Zhaoyang
Town Jingqu Cao Jiawei 13254 14260
Land Requisiition Households
Wuhe County
Zhaoyang
Town Jingqu
Li Hongshen
g 12235 13254
Land Requisiition Households
Wuhe County
Yugou Town
Liangji Wang Keyin
13257 10227 Land
Requisiition Households
Wuhe County
Yugou Town
Liangji Wang
Chuheng 14001 12961
Land Requisiition Households
Wuhe County
Yugou Town
Liangji Li
Guangling 12025 12841
Land Requisiition Households
Wuhe County
Yugou Town
Liangji Zhang Qifa 13620 12463 Land
Requisiition Households
From the result of the monitoring and evaluation, we get to know that the construction
of Xu-Ming have brought influence to the income of the local residents,especially for the
affected households.The reason is as following:
The construction of Xu-Ming Highway has bad influence on the income of the
relocation household.After the residents receive the relevant resettlement compensation,
they pay more attention to the resettlement and construction of the houses,and the
chance of going out for non-farming jobs is lower,and the families’ annual income is
lower.
The construction of the project does not influence much to the affected households of
land requisition. In the present economic construction condition,the income of the
residents does not rely on land too much, even part of the farmland is uncultivated.The
residents can still work on the formal occupation after receiving the project’s
compensation, so the influence of the land requisition to the income of the residents is
finitude.
32
For the residents along the route whose land are not requisitioned or houses are not
relocated,they received certain employment opportunities in the project construction, as
the migrant workers,the canteens for the constructors along the route.This part of
residents have certain chance to make a profit in the project construction.
5. Basic Evaluation and Suggestion
5.1 Basic Evaluation
In the process of resettlement, the resettlement office at all levels finish the work of
relocation and resettlement according to The Resettlement Plan.Permanent requisitioned
land and house relocation is finished as plan, the resettlement work is in progress, the
basic evaluation is as following:
(1) The schedule of house relocation and land requisition has been finished as
required.
(2) The compensation criteria is no less than the criteria of The Immigrants’ Plan.
(3) The house relocation compensation is in place totally.
(4) The moving of the electronic and telegraphic lines has been finished,the
construction units have entered, and the construction proceeds normally.
5.2 Suggestions
In allusion to the problems mentioned above, the individual monitoring and evaluation
units put forward several following suggestions for the following step of resettlement:
(1)The deep of the borrow pit is about 5 to 6 meters,and cannot be made use for the
agriculture production.because for the borrow pit,the possibility of recovering to the
original shape after the carrying out of the project is small, and it’s easy to cause
accidents in the future duration, such as child drownings,out control of one’s vehicle, the
around land collapse etc.The monitoring and evaluation team suggests the relevant
departments establish specialized safeguarding and caution signs,minimum the risk of
accidents.
(2) They suggest to give proper policy care for the vulnerable groups,taking the
methods of the rural poorest salvation and rural minimum living standard security, and all
kinds of employment information and guide are provided,add employment opportunities,
solve basic living problem, and take relevant supporting measure during the future work.
(3)Restoring and reconstructing the irrigation and water conservancy projects