Government of Maharashtra WELCOME PRADHAN MANTRI AWAS YOJANA – HFA BY - 2022 CSMC MEET 28.04.2016 1
1) Approval to State Level Technical Cell.
2) Approval to DPR proposals;
Proposals before CSMC for Approval
No. of DPR No. of EWS
Houses
GoI share
(Rs. In crore)
40%
1st Instalment
(Rs. In crore)
52 123362 1824.77 729.91
2
1) State Level Technical Cell is to be formed, which includes 10 professionals as per G. R. dt. 09.12.2015.
2) Experts to be appointed in SLTC as per State G.R. 1) Engineering Field Expert - 2 2) Construction Technology Expert - 1 3) Social Development Officer - 1 4) Urban Planner - 1 5) I.T. Expert - 2 6) Project Finance Analysis Expert - 1 7) For Administration Jt./Dy. Director - 2 Total - 10 3) Above posts were advertised in newspaper.
Proposal – 1 Approval requested for State Level Technical Cell.
3
4) Response received for 4 positions (Sr.no.1, 3, 6, 7).
5) 6 Experts for 4 positions selected through interview.
6) Selected 2 Engineering Experts started working since Jan.2016.
7) SLSMC has given approval in its 2nd meeting dt.16.03.2016.
8) CSMC approval is requested for SLTC and release of funds.
9) Remaining Experts are being appointed in due course.
Contd… Proposal – 1 Approval requested for State Level Technical Cell.
4
Abstracts for DPR for approval No. of
proposals
No. of
Houses GoI share GoM share I.A.
Vertical - I ( ISSR )
1 4685 46.85 46.85 Solapur M.C.
Vertical - III ( AHP )
1 792 11.88 7.92 PCNTDA
1 252 3.78 2.52 NIT Nagpur
1 860 12.90 8.60 Barshi M.C.
1 860 12.90 8.60 Amaravati M.C.
1 30000 450.00 300.00 Ray Nagar Fed.
44 78126 1171.89 781.26 MHADA
49 110890 1663.35 1108.90
Vertical - IV ( BLC )
I 6158 92.370 61.58 Amaravati M.C.
1 1629 22.204 14.804 Akola M.C.
2 7787 114.574 76.38
52 123362 1824.77 1242.13 ….
( Rs. in crore )
6
DPR Annexure 7A
1 Name of the State : Maharashtra
2 Name of the City : Solapur
3 Name of Slum : 9, 61 & 155 Yalleshwar Wadi S. no. 8735, Konapur Chawl S. No. 8370, Dhakata Rajwada S. No. 3726 to 3747, Chambhar Galli, 35, 36 & 89 Matoshri Ramabai Ambedkar Part – 1, T.P. 2/48, Dhondiba Wasti S.No. 413 (Part), Joshi Galli T.P. ¼, Sarda Plot S. No. 2175 A Part, Near Gullapalli Lharkhana T.P. 1/9, Harijan Wasti T.P. 1/37, Chamanshah Tekadi S. No. 6094 Part, Shiklgar Wasti T.P. 2/48 part, Gurumata Zop. T.P. 4/349, 326, Ward No. 28 Kabir Matha (19 Slums).
4 Project Name : Insitu Redevelopment of 19 slums coming in retrofitting area of smart city using land as resources.
5 Project Code* : 27000030031N0
6 State Level Nodal Agency : MHADA
7 Implementing Agency (Urban Local Body/ Development Authority / Housing Board / Urban Improvement Trust / Private Agency/ Developer)
: Solapur Municipal Corporation, Solapur
8
8 Date of approval by State Level Sanctioning and Monitoring committee (SLMC)
: 16.03.2016
9 Project Cost (Rs. In Lakhs) : Rs. 39805.73 Lakhs
10 Project Duration (In months) : 36 months (w.e.f. date of work order)
11 i. Status of slum (Please write : 1 if notified, 2 if recognized and 3 if identified)
: 17 : 1 2 : 2
ii. Total slum area (sq.mt.) : 209936.41 sq.m.
iii. Area under slum rehabilitation (sq.mt.)
: 113018.35 sq.m.
iv. Slum Population : 24000 approx.
12 No. of existing slum households : Gen SC ST OBC Total Minority 185 2417 92 1889 4583 616
13 No. of eligible slum households : 4009
14 No. of houses proposed (slum rehabilitation only) with carpet area
: 4685 Carpet Area 25.00 sq.mt. (3033 Households) 26.08 sq.mt. (1652 Households)
15 Whether beneficiary have been selected as per PMAY guidelines ? (Yes/No)
: Yes
DPR Annexure 7A
9
16 Whether private partner has been selected through open competitive bidding? If yes, date of bidding.
: No. Selection process will be started after approval of the project.
17 Incentive to Private Partner :
i Existing FSI in the area : 1
ii FSI provided in the project : 2.5
iii Other Incentives, if any : VGF 63.43 Crores or FSI 4
18 i) GoI grant required (Rs. 1.0 Lakhs per eligible slum dweller) Rs. In Lakhs)
: 4685
ii) State grant, if any (Rs. In Lakhs) : 4685
iii) ULB grant, if any (Rs. In Lakhs) : Rs. 24468.00 Lakhs through PPP with additional FSI
iv) Beneficiary Share (Rs. In Lakhs) : 5967.73
Total (Rs. In Lakhs) : 39805.73 Lakhs
19 Whether technical specification / design for housing have been ensured as per Indian Standard/NBC/ State
: Yes
DPR Annexure 7A
10
20 Type of temporary arrangement for beneficiaries during construction period in the project (Rent/ Transit Shelter)
: Beneficiaries to make their own arrangements.
21 Whether trunk infrastructure is existing or is being provided through AMRUT or any other scheme ? (Yes / No)
: No.
22 Whether the provision of Civil infrastructure has been made as per applicable State norms/ Central Public Health and Environment Engineering Organization (CPHEEO) norms / IS Code/ National Building Code (NBC)?
:
i) Water Supply (Yes / No) : Yes
ii) Sewerage (Yes / No) : Yes
iii) Road (Yes / No) : Yes
iv) Storm Water Drain (Yes / No) : Yes
v) External Electrification (Yes/No) : Yes
DPR Annexure 7A
11
vi) Solid Waste Management (Yes/No)
: Yes
vii) Any other, Specify : Social, Health Recreational & Religious Facilities
viii) In case, any infrastructure has not been proposed, reasons thereof.
: N.A.
23 Whether disaster (earthquake, flood, cyclone, land-side etc.) resistant features have been adopted in concept, design and implementation of the project?
: Yes
24 i) Whether Quality Assurance is part of the Project, ii) If no, how it is proposed to be ensured ? Give brief details. iii)
: Yes
25 i) Whether O & M is part of Project, ii) If yes, for how many years ?
: Yes 2 Years
26 Whether encumbrance free land is available for the project or not ?
: The land in question is occupied by Slum Dwellers
DPR Annexure 7A
12
27 Whether any innovative / cost effective / Green technology adopted in the project?
: Non-conventional energy system, Solar street Lights are proposed.
28 Comments of SLAC after techno economic appraisal of DPR
: Exemption is requested.
29 Project brief including any other information ULB / State would like to furnish
: 12 slums are in retrofitting area of smart City Remaining 7 slums are on SMC owned land
The proposed Retrofitting area being lying in heart of the City. Due to this, the project will be feasible through cross subsidisation of commercial exploitation.
DPR Annexure 7A
13
SOLAPUR MUNICIPAL CORPORATION, MAHARASHTRA
Hon. Chief Secretory & All Dignitaries
Govt. of India
Presentation By
V. N. Kalam I.A.S.
Municipal Commissioner,
Solapur Municipal Corporation, Maharashtra
14
Presentation of
Pradhan Mantri Awas Yojana (PMAY)
Housing For All (HFA) 2015-2022
In Situ Redevelopment of 19 Slums in Solapur Smart City Retrofitting Area (SMC, Govt., Private) & SMC’s Owned Land
28 April 2016
SLUM HISTORY
• MUNICIPAL AREA = 178.00 Sq. Km.
• POPULATION BY 2011 CENSUS = 9.53 Lacs
• POPULATION IN SLUM AREA = 2.85 Lacs
• % POPULATION OF SLUM = 28.90%
• AREA OCCUPIED BY SLUM = 1.89 Sq. Km.
• % AREA OCCUPIED = 1.07%
CLASSIFICATION OF SLUMS
Particulars
No. of slums
Area (Sq. Km)
Number of Households
On Govt. Land
On S.M.C Land
On Private Land
Notified Slum 159 1.7188 47339 42 26 91
Non- Notified Slum 61 0.1771 9823 8 2 51
Total 220 1.8959 57,162 50 28 142
• Tenable Slums - 196
• Non Tenable Slums - 24
• Total Slum Lands Taken In Pilot Project - 19
a) ULB Ownership - 11
b) Private - 07
c) Govt. - 01
*The SFCPoA is prepared under RAY scheme & submitted to Govt. Of Maharashtra. Which will be directly used for HFAPoA. The additional survey required to access housing demand out of slum is
initiated
15
16
Railway Station
ST Stand
Civil Hospital
Shri. Siddheshwar Tempple
Solapur Municipal Corporation
Govt. Rest House
Mahtma Gandhi Zoo
Outer Ring Road
Internal Ring Road
To Tu
ljapu
r
SATELLITE IMAGE SHOWING LAND MARKS OF
SOLAPUR CITY, SMART CITY (RETROFITTING AREA) & PROJECT
SLUM LAND
SATELITE IMAGE SHOWING SLUMS UNDER RETROFITTING
AREA (SMART CITY)
SMC Land
35 Matoshri Ramabai Ambedkar Nagar No. 1
36 Matoshri Ramabai Ambedkar Nagar No. 2
56 Joshi Galli
103 Gullapali Karkhana
105 Harijan Wasti Patharut Chowk
139 Shikalgar Vasti
140 Gurumata Nager
211 Kabbir Zopadpati
9 Yalleshwar wadi (Retrofitting Area)
61 Jay Bhim Zopadpati (Retrofitting Area)
155 Jay Bhim Zopadpati (Retrofitting Area)
Government Land
30 Dhakta Rajwada (Retrofitting Area)
Private Land
89 Masre Wasti
38 Dhondiba Wasti
12 Konapure Chaal (Retrofitting Area)
32 Chambar Gali (Retrofitting Area)
66 Sarda Plot (Retrofitting Area)
123 Chamansha Tekali (Retrofitting Area)
217 Rehematabai Zopadpatti (Retrofitting Area)
17
PROPOSED LAYOUT PLAN OF IN SITU REDEVELOPMENT OF
UID No. 009-Yalleshwar Wadi, UID No. 061-Jay Bhim Zopadpatti,
UID No. 155-Jay Bhim Zopadpatti Ext.
No. of HH
Str to be Retained
Required DUs
Proposed DUs
720 126 594 560
Bldg. Type
No. No.
Floor No. of
Flats/Floor Total No. of
Flats Proposed
DUs
CT-16 2 (S+7) 112 224
560 FS-28 3 (S+7) 56 168
FS-4 7 (S+7) 28 168
Slum Boundary
ESR & GSR
Open Space
Roads
Proposed Buildings
Existing Structures To be retained Water Supply Line
Solar Energy Street Lights
Dust Bin
Drainage Line
Total Area Under Slum
Area Under Dp
Reservation
Area For Slum
Development
Area Under Internal
Road
Area Under Children's
Play / Open Space
Area Under Plot
Plot Area Of Existing
Structure To Be Retained
Net Area Available
For Developmen
t
Net Area Available For Development
Allowable FSI
No of Proposed
Dus
B/U area Consumed for In situ
redevelopment
B/U area Consumed for Social Facilies
Total B/U area
consumed in proposed
development
B/U area available for commercial exploitation
Area Allotted For In-Situ Slum Redevelopm
ent
Area Made Available
For Commercial Exploitation
25688.50 875.40 24813.10 3259.20 4140.20 17413.70 10913.55 6500.15 6500.15 0.00 16250.38 560.00 16800.00 687.29 17487.29 -1236.92
Total Area Under Slum
No. Of Proposed Slum D/U
Estimated Cost of
proposed DUs 8.50 lacks per
DU
Benificiaries contribution 15% of Cost of per DU (in
lacs)
GOI contribution
@ RS 1lac per DU under
component 1
GOM contribution
@ RS 1lac per DU under
component 1
Remaining Through PPP
Plot Area Availaible For
Commercial Exploitation
Proposed Builtup Area available for Commercial Exploitation
Allowable Ground
coverage
Proposed B/U area
consumed in proposed
commercial exploitation
B/U area available for
T.D.R
estimated rate of gain
Rs… Per Sqm of
commercial explotation
estimated cross
subsidigation through
commercial exploitation
(In lacs)
Required VGF
25688.50 560 4668.08 700.21 560.00 560.00 2847.87 0.00 -1236.92 0.00 0.00 -1236.92 0.00 0.00 2847.87
22 Notification Status
Land Status
Notified SMC
PERSPECTIVE VIEW OF FS-28
(Flat System-2 Staircases, 2 Lifts, 8 Flats per floor)
Type of Building
FS-28
No. of Storey
Stilt+7
No. of Flats per floor
8 Flats
Total No. of Flats
56 Flats
Details of Single Flat
Bedroom=8’6” X 9’0” Hall=10’0” X 8’6” Kitchen=6’9” X 9’0 W.C.=3’0” X 4’0” Bathroom=4’0” X 5’2”
Carpet Area of Single Flat
269.63 Sq.ft. (25 Sq.m)
Built-up Area of Single Flat
312.00 Sq.ft. (29 Sq.m)
24
25 CT-16 (Chawl Type-2 Staircases, 2 Lifts, 16 Flats per floor)
Refuse Area at 5th Floor
Refuse Area at 5th Floor
PERSPECTIVE VIEW OF CT-16
(Chawl Type-2 Staircases, 2 Lifts, 16 Flats per floor)
Type of Building
CT-16
No. of Storey
Stilt+7
No. of Flats per floor
16 Flats
Total No. of Flats
112 Flats
Details of Single Flat
Bedroom=9’0” X 8’0” Hall=12’4” X 8’0” Kitchen=5’6” X 7’4 Toilet=4’0” X 7’4”
Carpet Area of Single Flat
282.34 Sq.ft. (26.23 Sq.m)
Built-up Area of Single Flat
322.39 Sq.ft. (30 Sq.m)
26
27
Approval Requested
Solapur is approved in first 10 Smart Cities declared by Govt. of India. Hence,
convergence of all schemes is expected in the Smart City Retrofitting area.
Hence, this project along with 2 Non notified & 7 slums on private land and 1
slum on Govt. land shall be approved to achieve the objectives of PMAY and
SMART CITY.
1) Estimated Cost of Slum Development 398.06 Crores
2) Beneficiary Contribution @ Rs 1.28 lac per DU 59.71 Crores
3) GoI contribution @ Rs 1 lac per DU 46.85 Crores
4) GoM contribution @ Rs 1 lac per DU 46.85 Crores
5) PPP Through commercial exploitation by using 2.5 FSI 181.25 Crores
6) Required Probable Deficit Amount 1-(2+3+4+5) 63.43 Crores
a) Smart City Fund Integration for Slum Infrastructure Facilities 58 Crores
b) SMC’s own contribution for year 2016-17 5.43 Crores
FUNDING PATTERN
28
Ref: Rahul Mahna US. Hudco RAY, New Delhi dtd; 13/04/2016 thr’ EE, MHADA, Mumbai email on 16/04/2016
Approval of proposal of Slum Redevelopment under
Pradhan Mantri Awas Yojana, Component-1.
Remarks Compliance
In addition to above, it also needs to be mentioned that in the In-Situ Redevelopment project (ISSR) at Solapur, 7 slums on private land have been covered. In this regard, Ministry would like to apprise the State authorities about the position that as per extant scheme guidelines slum rehabilitation grant of Rs. 1 lakh per house on an average provided otherwise under ISSR component is not admissible in the case of rehabilitation of slums on private land.
• We have submitted proposal of In Situ Redevelopment under Pradhan Mantri Awas Yojana, Component-1 in the retrofitting area of Smart City. Out of proposed 19 slums redevelopment (4685 DUs), 12 slums are situated on SMC & Government land (2356 DUs) & remaining 7 slums are situated on private land (2329 DUs).
• Redevelopment of slums on private land is necessary to achieve the objective of development of retrofitting area of Smart City. As well in the directives of Smart City, convergence of other schemes is expected. Therefore redevelopment of slums on private land in the retrofitting area of Smart City is proposed. As well the project will be feasible only with the grant of GoI & GoM to the slum DUs of private land. You are requested to recommend & process our proposal for approval please.
34
S.No. Condition Adherence
1. All proposed projects are on litigation free land? Out of 19 slums, 11 on SMC Land, 1 slum is on Govt. Land & 7 are on
Private Land, which are in Retrofitting Area of Smart City. Process
for getting govt land is initiated. Process for getting land from private
owners (As per Slum Act 1971, Section 14 or BPMC Act 1949, Section
48) is also initiated. The process will be completed on approval of
the project under PMAY. Out of 7 slums on private land, 1 slum
named Konapure Chawl is in litigation.
2. Status of Demand Survey, and timeline for completion, if not
completed yet
Socio Economic Survey under RAY is carried out & the data is
uploaded to CGG.
3. If Demand Survey is complete, has the state shared the list of CLSS
beneficiaries to the Ministry?
The Socio Economic Survey Data, Total Station Survey Data & Tax
Dept. Record is matched & Draft beneficiary list is prepared.
Unmatched beneficiary will be finalised by adopting transparent
procedure & the beneficiary list will be finalised.
4. In case of In-Situ and BLC projects, whether beneficiaries have been
identified and listed in the DPR along with their AHL-TIN from
SECC data?
Draft beneficiary list is prepared. Unmatched beneficiary will be
finalised by adopting transparent procedure & the beneficiary list
will be finalised & submitted to Ministry.
5. Timelines for Project Completion (Months) For all BLC Projects
timelines must be within 2 years of release of funds from
Government of India.
24 Months from release of funds
6. Status of Physical Infrastructure like drainage, road, street lighting,
solid waste management, etc? If not available, whether the
provision has been made in the project on this account?
Provision has been made in the project for physical Infrastructure
like drainage, road, street lighting, solid waste management, etc.
7. Whether the DPR mentions convergence with other centrally
assisted programmes for provision of Infrastructure?
Yes, for Infrastructural facilities convergence from Smart City
proposal, AMRUT, Swaccha Bharat Mission is proposed.
8. Whether connection to Electricity & Water Supply has been
planned under the project? The project shall not be considered
complete unless the Houses are provided with Electricity & Water
Supply
Yes
Table: Adherence to conditions Pradhan Mantri Awas Yojana-Component No.-1
Solapur Municipal Corporation, Maharashtra
35
S.No. Condition Adherence
9. Status of Social Infrastructure? Provision for Social Infrastructure are made like Livelihood Center,
Multipurpose Hall, Primary Health Center, Library, Gym etc.
10. Beneficiary details compiled as per Annexure 4A/ 4B? In process
11. Project Proposals submitted as per Annexure 7A/7B/7C? As per 7A
12. Whether the DPR contains the Financial details/Funding pattern of
the Project?
Yes
13. For BLC Projects:
Whether the Beneficiaries have right-ful ownership of land? NA
Ready-ness of the State for geo-tagging of BLC Houses? NA
Mechanism for Direct Benefit Transfer? (DBT) NA
14. For AHP Projects:
Whether un-encumbered land is available with the Implementation
Agency?
NA
Amount of Beneficiary Share per DU NA
15. In case of In-Situ Projects:
Whether unencumbered ownership of land is available? 11 slums are on SMC owned land, 1 slum is on govt. land & 7 slums
are on private land. Process is initiated to get this lands in the name
of SMC as mentioned (As per Slum Act 1971, Section 14 or BPMC Act
1949, Section 48)
Beneficiaries have been identified and listed in the DPR? Draft beneficiary list is submitted along with DPR
Undertaking for de-notification of slum after completion of project? Yes
16. Details of the proposed ownership of houses – in favour of
Women/Joint ownership
Women ownership, in exceptional cases Joint ownership
17. Any other innovative approach taken by the state in proposed
projects?
The project is included in Smart City Retrofitting Area
18. Whether the Project Proposals are consistent and adhere to
Guidelines in all aspects?
Yes
Table: Adherence to conditions Pradhan Mantri Awas Yojana-Component No.-1
Solapur Municipal Corporation, Maharashtra
36 Observation On The DPR Of Component-1
In-situ Redevelopment Of Slums In Retrofitting Area Of Smart City & Slums On SMC’s Owned Land
Remarks Compliance
i. The DPR has not been appraised by SLAC. SLAC is requested to accord appraisal to the proposal
ii. There are 220 slums in Solapur out of which 159 slums have been
notified. 175 slums are tenable, 33 semi tenable and 12 are non
tenable.
Yes
iii. Status of demand survey is not mentioned. a) SMC have carried out survey through the slums & prepared SFCPoA &
Demand of slum DUs is arrived at
b) The demand survey to estimate the LIG & EWS DUs, out of slums is initiated
iv. In-situ redevelopment of 19 tenable slums ( 17 notified and 2
recognised ) has been proposed. 12 slums are in the retrofitting
area of smart city out of which 7 slums are on private land.
Yes
v. Solapur Municipal Corporation is the Implementing Agency Yes
vi. Area under slum rehabilitation (113018.35 Sqm) is 53.83 % of Total
Slum area ( 209936.41 Sqm). The proposed land has been occupied
by the slum dwellers.
Yes
vii. 4685 houses (slum rehabilitation only) have been proposed in the
project though number of eligible beneficiary households are 4009.
It has been stated that 630 houses have been proposed for
beneficiaries to be relocated from 30 non tenable slums and 46
houses for accommodating additional eligible beneficiaries.
The Socio Economic Survey is carried out in the year 2012-13. Today after 4 years,
due to rapid urbanization, the no. of beneficiary is increased. The Socio Economic
Survey Data, Total Station Survey Data & Tax Dept. record is compared & the
names matching in these 3 data are taken in the draft beneficiary list. The names
which are not matching in either of these three data are listed separately & which
will be finalized by adopting transparent process. Hence, certain provision is made
to accommodate the probable increase in no. of beneficiaries.
viii. The Breakup of estimated cost for 4685 DU is as under:
GoI contribution @ Rs 1.00 Lakh per DU : 4685 Lakhs
GoM contribution @ Rs 1.00 Lakh per DU : 4685 Lakhs
Ben. contribution@ 15% of DU Cost ( Rs 8.50 Lakhs): 5971 Lakhs
Through PPP : 18125 Lakhs
Required VGF (or additional FSI) : 6343 Lakhs
Total : 39806 Lakhs
Solapur is approved in first 10 Smart Cities declared by Govt. of India. Hence,
convergence of all schemes is expected in the Smart City Retrofitting area. Hence,
this project along with 2 Non notified & 7 slums on private land and 1 slum on
Govt. land shall be approved to achieve the objectives of PMAY and SMART CITY.
37
Remarks Compliance
ix. Financial (VGF 63.43 Crores) or non-financial (FSI-4) incentives
have been integrated in the project for the feasibility of the
project.
In case of non availability of VGF and or FSI-4, conversion & integration
through smart city initiative and AMRUT is proposed
x. Beneficiaries have not been identified. A draft beneficiary list
(2013-14) is enclosed in the DPR without SECC data and AHL-TIN
number. It has been stated that a process shall be adopted for
selection of final beneficiaries after sanctioning of DPR.
Transparent Process will be adopted for selection of final beneficiaries
after sanctioning of DPR.
xi. Temporary arrangement for beneficiaries during construction
period has not been proposed. Beneficiaries will have to make
their own arrangements as per Annexure 7A.
Beneficiaries will have to make their own arrangements for
construction period. The bidder will pay the reasonable rent to the
slum dweller for the construction period. Condition to such effect will
be incorporated in the bid documents.
xii. The DPR does not delineate whether:
a. Sale of ‘free sale component’ has been linked with the
completion and transfer of ‘slum rehabilitation
component’ slum redevelopment
Condition to such effect will be incorporated in the bid documents.
b. Transparent process has been formulated for the
allotment of slum rehabilitated (components) houses to
eligible slum dwellers
Yes
c. Allotment mode (ownership right or renewable, mortgage
able, inheritable leasehold right).
Ownership right allotment in Female head, in exceptional cases Joint
ownership
d. Priority to families with physical handicapped persons and
senior citizens for allotment on ground floor or lower
floors
Yes
e. Title to the house has been proposed to be given in the
name of the Female head
Ownership right allotment in Female head, in exceptional cases Joint
ownership
f. The proposed slums will be de-notified after slum
redevelopment
Yes
Observation On The DPR Of Component-1 In-situ Redevelopment Of Slums In Retrofitting Area Of Smart City & Slums On SMC’s Owned Land
38
Remarks Compliance
xiii. Layout and Building plans are yet to be approved by the
Competent authority.
Layout and Building plans of slums redevelopment on SMC owned land
are approved by the Competent authority. Copy of the same is
submitted with the proposal. Building permission of slums on private
land will be sought on approval of the proposal
xiv. Non conventional energy system ( Solar Street Lights) have been
proposed as Innovative /Green technology proposed in the
project
Yes
xv. Structural drawings have not been enclosed with the DPR. Structural designs of the proposed construction will be vetted from the
Competent Authority before in release execution
xvi. Annexure 7 A is enclosed in the DPR but the certificate has been
revised, mentioning the beneficiary will be checked as per
guidelines.
Transparent Process will be adopted for selection of final beneficiaries
after sanctioning of DPR.
xvii. DPR does not delineate whether
a. Technical specification/ design for housing have been
ensured as per Indian Standards/NBC/ State norms
Technical specification/ design for housing will be ensured as per
Indian Standards/NBC/ State norms
a. Disaster (earthquake, flood, cyclone, landslide etc.)
resistant features have been adopted.
In the proposed redevelopment of 19 Slums, question of flood, cyclone,
landslide will not arise. The structure will be designed as earthquake
resistant structures.
a. Quality assurance aspects have been considered. Yes
a. O&M is part of project and its mechanism thereof. Provision for O&M of 5 Years after completion of construction is made
in the proposal
Observation On The DPR Of Component-1 In-situ Redevelopment Of Slums In Retrofitting Area Of Smart City & Slums On SMC’s Owned Land
Ref: Chief Engineer, PMAY, MHADA email received on 21/04/2016
39
Table: Clarifications required on the projects proposed under PMAY
Pradhan Mantri Awas Yojana-Component No.-1
S.No. Condition Clarification
1 For all the projects where the land is not within the
boundary of approved statutory town, the Notifications of
the respective town should be submitted which can
establish the fact that the projects proposed are within the
jurisdiction or within the planning area of the cities
approved under PMAY
The Proposed projects are within the city limit of Solapur Municipal
Corporation.
2 The language of the certification under Annexure 7A/7B/7C
submitted has been changed. the Annexure 7A, 7B & 7C
mentions that the beneficiaries ‘will be checked’ while as
per guidelines, certificate should have been that the
beneficiaries ‘have been checked’
Socio Economic Survey under RAY is carried out & the data is uploaded
to CGG & The SFCPoA is prepared.
The Socio Economic Survey Data, Total Station Survey Data & Tax Dept.
Record is matched & Draft beneficiary list is prepared & submitted in
the DPR of PMAY. Unmatched beneficiary will be finalised by adopting
transparent procedure & the beneficiary list will be finalised.
3 In case of Solapur ISSR project
i. 7 out of 19 slums proposed under ISSR are on private
land. The DPR mentions that the consent of the land
owner against benefit as a stakeholder is obtained.
Kindly send a copy of any of the consent form
Consents are obtained; copy of consent of private land owner of Sarda
Plot is attached herewith.
ii. Kindly inform whether the consent of the beneficiaries
proposed to be relocated has been taken?
Copy of consent of beneficiary of Sarda Plot is attached herewith.
iii. Kindly let us know that slum-wise, how many
number of EWS houses are proposed on private
land
UID
No.
Name of slum Total DU's
Proposed
12 Konapure chwal S.No.8370 708
32 Chambhar Galli 124
89 Masare Wasti 105
38 Dhondiba Wasti S.No.413(Part) 868
66 Sarda Plot S.No 2175A part 146
123 Chamanshah Tekadi S.No.6094 Part 126
217 Rahimtbi Zopdaptti 252
Total 2329
40
Table: Clarifications required on the projects proposed under PMAY
Pradhan Mantri Awas Yojana-Component No.-1
Condition Clarification
iv. The DPR mentions that VGF of Rs. 63.43 Crore is proposed to be
provided to the selected bidder. Kindly indicate which scheme
provides VGF for In-Situ real estate projects?
The estimated cost of proposed Infrastructural, Social & Health facilities
will be integrated through Smart City Initiative & other schemes like
AMRUT, we have proposed integration of Rs. 58.00 Crores. The
proposed expected rate of gain may increase & rate of construction may
get reduced while actual transparent tendering process. Also Solapur
Municipal Corporation have made budgetary provision of Rs. 25 Crores.
v. The DPR is silent about temporary arrangement for beneficiaries
during construction period.
Beneficiaries will have to make their own arrangements for
construction period. Bidder will pay rent to the beneficiary for the
period of completion of construction. While floating the tender for
execution, specific condition will be incorporated wherein the bidder
shall pay reasonable rent to the beneficiary for getting shifted during
the course of execution of three years.
vi. Whether the sale of ‘free sale component’ has been linked with the
completion and transfer of ‘slum rehabilitation component’?
Yes,
The sale of ‘free sale component’ has been linked with the completion
and transfer of ‘slum rehabilitation component. Condition to such effect
will be incorporated in the bid documents.
vii. Whether transparent process has been formulated for the
allotment of slum rehabilitated (components) houses to eligible
slum dwellers?
Yes,
Transparent process has been formulated for the allotment of slum
rehabilitated (components) houses to eligible slum dwellers
viii. What would be the allotment mode for In-Situ redevelopment
project? (ownership right or renewable, mortgage able,
inheritable leasehold right)
For In-Situ redevelopment project, allotment would be on ownership
right basis.
ix. Whether the title to the house has been proposed to be given in
the name of the Female head?
The title to the house has been proposed to be given in the name of the
Female head in exceptional cases Joint ownership
x. Whether the proposed slums will be de-notified after slum
redevelopment?
Yes,
On completion of In-Situ redevelopment, the slum will be denotified
PROJECT UNDER BENEFICIARY LED CONSTRUCTION
1 Name of the State : Maharashtra
2 Name of the ULB/City : Amravati
3 Project Name means Locality : EWS of all five zones within Amravati city limits.
4 Project Code* : To be filled by State.
5 State Level Nodal Agency : MHADA
6 Name of Implementing Agency
(Urban Local Body/ Development
Authority/ Housing Board/ Urban
Improvement Trust/ Private
Agency/ Developer)
: Amravati Municipal Corporation, Amravati
7 Date of approval by State Level
Sanctioning and Monitoring
Committee (SLMC)
: 16/03/2016
42
8 Project Cost (Rs. In Lakhs)
a) Mention Name &Year of Schedule
of Rate 2015 -16
b) Rate of Construction per sq.mt. of
Carpet Area& Built up area.
c) Attach detail estimate of building,
infrastructure and other.
: Current Schedule Rate of Amravati Region, Amravati
District for 2015 -16
Name Carpet Area (Rs.) Built-up Area
(Rs.)
EWS of all five
zones within
Amravati city
limits.
13667 per Sqm 10380 per Sqm
Detail Estimate Attached
Housing Infrastructure Other Total
25247.80
lakhs
00
lakhs
2524.78
lakhs
27772.58
lakhs
43
9 No. of Beneficiaries covered in the
project.
: New
House
1) Zone - 1 - 1382
2) Zone - 2 - 0617
3) Zone - 3 - 1832
4) Zone - 4 - 0972
5) Zone - 5 - 1355
Total - 6158
10 i) No. of Beneficiaries (New
Construction)
: Gen SC ST OBC Minority Total
2966 713 32 2417 872 6158
ii) No. of Beneficiaries (Enhancement) : -
44
11 Whether selected Beneficiaries have
rightful ownership of land.
If yes, give details.
: Yes,
All 6158 Beneficiaries submitted on line applications along
with title of ownership such as city survey records, revenue
records, 6/2 records, property tax records etc.
12 (i) Whether building plan for all houses
have been approved.
(ii) If yes, attach approved copy of
building plans for all houses.
(iii) If no, suggest solution.
(iv) Whether layout plan for
project have been approved. If yes,
attach copy.
(v) If no, suggest solution.
(vi) Whether Project requires
environmental clearance.
If yes, whether clearance is obtained.
If no, whether it will be obtained before
commencement of work.
If yes, attach approved copy of layout.
If no, suggest solution.
: (i) No,
(ii) -
(i) -
(i) Yes, All beneficiaries possess land in residential zone so
building plans will be approved after sanctioning of
project by SLSMC.
(i) –
(ii) No
13 i) GoI grant required @ Rs. 1.50 Lakhs
per eligible beneficiaries= New Houses
(6158 DUs x 1.50) (Rs. In Lakhs)
: 9237.00 lakhs
45
ii) State grant @ Rs.1.00 lakhs =
New Houses (6158 DUs x 1.00) (Rs. In
Lakhs)
: 6158.00 lakhs
iii) ULB share, If any @ Rs….. / Home, Total
Rs…../- (Rs. In Lakhs) For Infrastructure
: 00.00 lakhs
iv) Beneficiary Share @ Rs….. /
Home,
Total Rs…../- New
Houses (6158 DUs x 2.01)
: 12377.58 lakhs
vi) Total (Rs. In Lakhs)
( ‘i' to ‘iv’ above)
: 27772.58 lakhs
14 Whether technical specification/ design for
housing have been ensured as per Indian
Standards/ NBC/ State norms?
: Yes
15 Whether disaster (earthquake, flood,
cyclone, land-slide etc.) resistant features
have been adopted in concept, design and
implementation?
: Yes
46
16 Whether Quality Assurance is part of the
Project, if not, how it is proposed to be
ensured?
: Yes
17 Project Completion Period (in months) : 22 Months.
18 Whether O& M is part of Project,
If yes, for how many years?
: Yes, AMC will maintain the services.
19 Table showing details of Land under
project be given in the Table.
Please attach 7/12 extract and D.P. Plan.
If land is not owned by proponent the
document of authority with proponent
be attached.
: Yes All 6158 Beneficiaries submitted on line
applications along with title of ownership such
as city survey records, revenue records, 6/2
records, property tax records etc.
47
20 Details of inspection carried out by a Competent
Officer of ULB.
:
1) Name of Officer : Er. Sanjay N. Pawar
2) Designation : Executive Engineer, Municipal
Corporation, Amravati.
3) Date of Inspection : 25/02/2016 to 14/03/2016
4) Whether land as proposed, is located : Yes, All Beneficiaries possess land within
city limits and within residential zones
5) Status of land : Land is owned &n possessed by 6158
beneficiaries in Residential Zones.
(i) Whether free from encroachment
If no, suggest solution.
: Yes
(ii) Whether free from flood area
If no, suggest solution.
: Yes
(iii) Whether land is fit for building construction
If no, suggest solution.
: Yes
(iv) Whether High Tension Power Line passing through
project land affecting the project.
If yes, suggest solution.
: No
(v) Is any possibility of water stagnation
If yes, suggest solution.
: No
(vi) Whether land is abutting to burial, cremation ground,
cliff having chances of land slide or chemical hazardous
factories.
If yes, suggest solution.
: No
48
21 Availability of off-site
infrastructure for project site
: Available
1. Approach Road with width : Available
2. Water Supply details : Available
3. Power details : Available
4. Drainage details : Sewerage System - being executed by AMC
Strom Water Drain - Available
5. Solid waste management By the Municipal Corporation
22 Whether adequate social infrastructure
facilities covered in the project;
If no, availability of Social Infrastructure.
:
1. Name of nearest Primary School &
distance from site.
: Primary & Secondary schools are available within 2 to 3 kms in
AMC city limits.
2. Details of Dispensary & distance from
site.
: Civil hospital, Woman’s hospital are available within 5 to 10 kms
in AMC city limits.
3. Market name & details & distance
from site.
: Market area is present within 5 to 10 km in AMC city limits
4. Nearest Public Bus Stop & distance
from site.
: Amravati Bus stand, Centrally located & City Buses available
within vicinity of 1 km.
5. Nearest Railway Station & distance
from site.
: Amravati, New Amravati & Badnera Railway stations, are within
2 to 10 km distance. 49
23 Name of beneficiaries organization/ society who
proposed the project with details address.
Whether applicant organization has registered Co-
operative Housing Society.
If yes, Give name & registered name.
: All 6158 beneficiaries submitted online
applications & are going to execute on land
possessed by them.
Not applicable
24 Whether Project is included in Housing For All Plan of
Action (HFAPoA).
If no, whether it will be included in next year plan.
: No, HFAPoA preparation is in process and
HFAPoA will be got ready by August 2016
Yes
25 Whether Annual Implementation Plan (AIP) for HFAPoA
has been proposed
If yes, whether the Project under consideration is
included in AIP.
If no, whether this project will be included in AIP of next
year.
: No,
Yes, This project will be included in AIP.
26 Eligibility :
(i) Whether eligibility of beneficiaries in terms of EWS
and Homelessness is verified and certified by the
Chief Officer or CEO or Commissioner or MD of ULB
(as the case may be).
(ii) If yes, please attach list of eligible beneficiaries
separately in prescribed format duly signed by the
Chief Officer or CEO or Commissioner or MD of ULB
(as the case may be).
(iii) If no, propose solution.
:
Yes
List is Attached
50
27 Please attach google map of
entire city.
: Yes, city google map attached
28 Please state any innovative
technologies or green
building concept proposed.
: Construction in AAC block & Fly ash bricks will be
promoted along with water harvesting & Solar
power.
29 Any other information in brief
ULB would like to furnish.
: Amravati city included in first 100 “SMART CITIES”
& also covered under Solar City programme of GoI.
51
PROJECT INFORMATION : Construction of 6158 EWS houses under (BLC) scheme number 4 in 5 zones of Amravati City.
• Total No. Of Tenements-6158
• No. of Houses– 6158
• Project Duration-22 Months
• Ameneties
Beneficiary Led Construction Scheme
1. Approach Road with width : Available
2. Water Supply details : Available
3. Power details : Available
4. Drainage details : Sewerage System - being executed by AMC
Strom Water Drain - Available
5. Solid waste management By the Municipal Corporation
52
PROJECT COST (IN LAKHS) Housing Infrastructure Other Total
25247.80 lakhs 00 lakhs 2524.78 lakhs 27772.58 lakhs
NO. OF EWS BENEFICIARIES COVERED OR PROPOSED IN THE
PROJECT Gen SC ST OBC Min Total
EWS 2966 713 32 2417 872 6158
AS PER GOVT GR NO PCM/2009/160/P.K.94/UD-22 DATED 4/09/2011
Installment Income Group
CARPET AREA (SQM)
SUBSIDY FROM GOI
SUBSIDY FROM GOM
BENIFICIARY CONTRIBUTION
Total(IN LAKHS)
1st (40 %)
EWS 30 sq. mtr
0.6 0.4 0.804 1.804
2nd (40 %) 0.6 0.4 0.804 1.804
3rd (20 %) 0.3 0.2 0.402 0.902
Total (Lakhs) 1.5 1.0 2.01 4.51
BENEFICIARY CONTRIBUTION
Construction of 6158 EWS houses under (BLC) in 5 zones of Amravati City.
53
IMG-20160224-WA0013
Amravati is a Municipal Corporation area .
All 6158 Beneficiaries have submitted on line applications along with
title of ownership such as city survey records, revenue records, 6/2
records, property tax records etc.
Status of Land : Land is owned & possessed by 6158 beneficiaries in
Residential Zones.
All beneficiaries will have different building plan depending on the size
of their plot, financial capabilities , family requirements and feasibility.
Some of the Floor Plans are given in next slides
55
Pradhan Mantri Awas Yojana (PMAY)
RAY Nagar - Urban Community Development Solapur, Maharashtra
Maharashtra Housing & Development Authority
74
DPR format 7B
AHP 30,000 Houses for RAY Nagar Federation, Solapur
1. Name of the State : MAHARASHTRA
2. Name of the ULB / City : Kumbhari, Solapur, Fringe area of Solapur Municipal
Corporation.
3. Project Name- (Locality of Project
with Address) :
Construction of 30,000 Houses for RAY Nagar Federation (
Worlds Largest Affordable Housing Project)
4. Project Code* (To be filled by State) : 27000030013N0
5. State Level Nodal Agency : MHADA
6.
Name of implementing Agency
(Urban Local Body / Development
Authority/Developer
: RAY Nagar Housing Co-operative Society’s Federation Ltd.
South Solapur
75
Contd….
7.
Date of approval by State level
Sanctionary and Monitorial
committee (SLMC)(To be filled by
state)
:
8. Project Cost (Rs . in lakhs)
Housing Infra Other Total
150000 31133.58 -- 181133.58
Lakhs Lakhs Lakhs
9. No. of EWS beneficiaries covered
or proposed in the project 30,000 DU
10. Project Completion period(in
months) :
48 Months (We propose to handover 20000 Houses by
Hon’le PM on of before Dec. 2018 i.e. before next General
Elections Code of Conduct)
11. Whether sale price is approved by
states (To be filled by State) : To be filled by State
76
12. Sale price of per EWS unit
(Rs in Lakhs) : Rs. 6,03,778/- (Excluding land cost)
13. No. of houses proposed in the project
No of EWS units &% : 30,000 T/N EWS (100 %)
14.
Whether open and transparent
procedure has been envisages to select
private partner, if private partner has
been considered?Give in brief how the
partner is selected.
: Society will execute the Project
15. No. of EWS houses eligible for Central
Assistances : 30,000 Houses
16.
I) GoI grant required for eligible EWS
beneficiries,
a) Rs. 1.5 Lakhs for House (Under PMAY)
b) Rs. 0.5189 Lakhs for Infra (Under
AMRUT)
Rs. 1.5 Lakhs X 30,000= 45,000 Lakhs
Rs. 0.5189 Lakhs X 30,000= 15566.83 Lakhs
Contd….
77
16.
II) State grant (GoM) for eligible EWS beneficiaries a) Rs. 1.0 Lakhs for House (Under PMAY)
b) Rs. 0.2595 Lakhs for Infra (Under AMRUT)
:
Rs. 1 Lakhs X 30,000= 30,000 Lakhs
Rs. 0.2595 Lakhs X 30,000= 7783.41 Lakhs
III) Implementing Agency share (Rs in
lakhs per house &total) : Beneficiary is Implementing Agency
IV) Beneficiary share
a) Self Contribution (0.5 Lakh)
b) Housing Loan including
Infrastructure share (Rs 2.2595 Lakh)
:
a) Rs 0.5 Lakh X 30,000 = Rs.15000 Lakhs
b) Rs 2.2595 Lakh X 30,000 = Rs.67,783.41 Lakhs*
-------------------------
TOTAL = Rs. 82783.41 Lakhs
*Letter From Union Bank of India, Tata Capital, Gruh Finance
(Subsidiary of HDFC Bank), expressing willingness to give housing loan
Total of I) to IV) ( Rs in lakhs) : 181133.6 Lakhs
Contd….
78
17.
Whether technical specification
/design for housing have been ensured
as per Indian Standard/NBC/State
norms?
: Yes
18.
Whether the provision of civil
infrastructure has been made as per
applicable state norms/central public
health and Environment engineering
Organisation (CPHEEO) norms/ IS
Code/ National Building Code (NBC)?
: Yes
19.
(i) Whether adequate, social
infrastructure facilities covered in the
project)
(ii) If yes, give details.
(iii) If no, whether the same are
available in vicinity ? Give details in
brief
:
Yes,
Amenities have been considered in the planning.
Required land space is allocated. However, cost of
amenities is not considered in DPR as it will be claimed
in future under various Gov. Schemes such as NUHM,
NULM, SSA, SBM etc..
Anganwadi – 60 Nos
Primary School – 30 Nos
Secondary School – 12 Nos
Community Hall – 10 Nos
ShopingCentres – 30 Nos
Contd….
79
20.
Whether disaster like earthquake ,
flood, cyclone, land-slide etc.
resident feature have been adopted
in concept design and
implementation of the project
: Yes. All Indian standard codes applied while designing
project.
21.
(i) Whether Quality Assurance is
part of the project,
(ii) If no, how it is proposed to be
ensured? give brief details
:
Yes
NA
22. Whether O&M is part of project,
If yes for how many years :
No. It is not included in Project Cost. Society will bear the
cost by contribution of beneficiary.
23.
Whether project is included in
Housing for all plan of Action
(HFAPoA)
If no, whether it will be included in
next year plan
: No. It will be included in next years plan.
24. Eligibility of beneficiaries :
List to be verified at time of handing over by competent
authority. Sample form filled by Beneficiary is attached for
perusal
Contd….
80
25.
Details of various permission
i) Whether the layout plan of land
under project is approved
ii) Details of building plan
approved by competent
Authority.
:
Layout plan, Building Plan is submitted for approval to Subdivision officer (Prant), Collector Office, Solapur. .
iii) Whether project requires
environment clearance.
:
Following Layouts a) 722 & 723, b) 845, c) 874/3 and d)
1053 (part I) do not need Environmental clearance . For
other layouts which need Environmental clearance,
commencement will happen only after obtaining
environmental clearance
26.
Details of inspection carries out by a
competent officer of
ULB/implementing Agency
:
MHADA Chief office – Ashok Kakde, Exe. Engg.- VivekPatil, Dy. Engg. – Ramtirth&Deysle, Estate Manager- ShriTakur, Dy. Engg. MilindAtkale (Solapur)
Contd….
81
27.
Status of Land
(i) Whether free from
encroachment. If no suggest solution
(ii) Whether free from flood area If
no, suggest solution
(iii) Whether land is fit for building
construction. If no suggest solution
(iv) Is any possibility of water
stagnation if yes suggest solution
(v) Whether land is abutting to
burial cremation ground, cliff having
chance of land slide or chemical
hazardous factories If yes suggest
solution
(vi) Whether High Tension Power
line passing through project If yes
suggest solution
:
i) Free from encroachment
ii) Free from flood area
iii) Fit for building construction
iv) No
v) No
vi) HT line is passing through only 2 out of 21 Layouts of
the project. Required distance is maintained while
planning the buildings as per norms.
Contd….
82
28.
Availability of off-site infrastructural
for project site
(i) Approach Road with width
(ii) Water supply details in brief
(iii) Power details
(iv) Drainage details in
:
(i) Road Widths available at site - 18, 24, 30 and 60
meter D.P road
(ii) Letter of MJP is attached Annexure-11
(iii) Letter of MahaVitaran Annexure-12
(iv) Self Sustaining with provision of STP
29.
Please State any Innovative
technologies or green building
concept
:
Innovative Technology Precast (Wall and Slab) technology proposed in project Green Technology i) Use of recycle water from sewerage treatment plant for FLUSHING AND GARDENING and
ii) Rainwater harvesting iii) Wind direction and sunpath analysis considered for all layouts
Contd….
83
Brief History
• Society formed in 2009
• Collection of Beneficiary contribution for Land purchase since 2011
• Pilot Project of 4100 houses Submitted under “Pilot Project under Rajeev Awas Yojna” in May 2013
• Pilot Project recommended and forwarded by state to Center for consideration
• Project considered in CSMC held on 31 May 2013
• Clarification on State Contribution was sought
• No clarification was given by Previous Government
• Post Election , Hon’le CM Devendra Fadanvis ji reinitiated the proposal and sent it Centre for consideration
• As new policy was being devised, Centre replied by asking to resubmit the Proposal under “ Housing for All”
• 26th June 2015 New scheme was launched
• Hon’le CM conducted meeting for on 7 August to understand our bottlenecks for obtaining clearance under the new scheme
• Crucial bottlenecks such as allowing houses in green zone and allowing projects in Fringe areas are already solved
• Project for entire 30000 houses Submitted to Pune MHADA on 4th March for final approval
84
Housing Federation
Organisation into Slum Federation – RAY Nagar Housing cooperative societies Federation Ltd. is formed by 5 Cooperative Housing Societies have come together to form the Federation. Federation and all societies are registered under Cooperative Act of Maharashtra. Hutama Kurbaan Hussain Alpasankhyank Mahila Kamgar Sahakari Grihnirman Sanstha Maryadit, Kumbhari
Com. Meenakshi Sane Mahila Bidi Kamgar Sahakari Grihnirman Sanstha Maryadit, Kumbhari
Hutatma Readymade & Shilai Kamgar Sahakari Grihnirman Sanstha Maryadit, Kumbhari
Com. M.K. Pandhe Yantramag Kamgar Sahakari Grihnirman Sanstha Maryadit, Kumbhari
Jammuni Mochi Samaj Magas Vargiya Sahakari Grihnirman Sanstha Maryadit, Kumbhari
86
Broad Outline of Project
30,000 Houses with Infrastructure
– Worlds Largest Affordable Housing Project on PPP basis
Submitted under “Verticle 3” of PMAY
- Affordable housing in partnership
Land for 30,000 Houses already Acquired by RAY Federation
Society comprising of unorganised urban workers, self employed, etc…
These slum dwellers have been contributing the funds for purchase of land since 2011.
Construction with time line of 42 months with Precast Technology
Proposed to hand over 20000 houses by Dec 2018 by Hon’le PM Narendra Modi ji ( before next General Election)
87
Broad Outline of Project
Cost per DU – Rs 5,00,000/- with 27.94 sq mt carpet area comprising of living, kitchen, bed, individual toilet and WC facility with water supply connection
Cost of Infrastrcuture per DU – Rs. 1,03,770/-
Infrastrucutre – Rain water harvseting , CC Road, Storm water drains, Water supply, WTP, ESR/GSR, Sewerage, STP, external electrification, street lights , solid waste bins etc..
Green Technology
• Use of recycle water from sewerage treatment plant for FLUSHING AND GARDENING
• Rainwater harvesting
• Wind direction and Sunpath analysis considered for all layouts
• Zero use of Natural Sand and
• Minimum use of Water
• Solar Street Light
88
Financial Institutes
Many Banks expressing willingness to give housing loan for
RAY Nagar Federation Project
Following are Financial Institutes -
1) Tata Capital
2) Union Bank of India
3) Gruh Finance ( subsidiary of HDFC Bank)
4. Micro Housing Finance Institution
89
Presentation Outlay
Google Map of Location
Sample Layout
Site Photographs
Floor Plan and Single dwelling unit plan
Master Planning
Precast Technology
Environmental Analysis
Checklist
90
Google Map of all Proposed Sites (Gats)
Existing Roads
Solapur City Border
Distances from Kumbhari, S. Solapur
N
91
DU Plan
Total Carpet Area: 27.94 sq. mt.,
Living Room = 2.5m x 3.6m Bedroom = 2.5m x 2.975m,
Bath = 1.2m x 1.75m, Kitchen = 2.5m x 2.1m
Balcony = 2.5m x 0.925m WC = 1.2m x 0.9m
98
Precast Technology for the Project Precast is smart way to build any type of buildings, Safely,
Speedily and affordably.
PLANT – Precast Walls and Slabs
o Precast elements are manufactured in casting beds, 800 ft or more length. Structural elements are commonly reinforced with tightly stretched pre-tensioning steel strands, which provide increased structural efficiency.
o All the structural slabs, walls and beams are manufactured under controlled conditions and with all quality procedures.
o Latest Machineries like Battery Mould Walls, tilting tables, crawler cranes, RMC plants and highly skilled labours considered.
Manufacturing of Walls and Slabs
Hollow Core Slabs Tilting Table (Hydraulic Jack)
99
Precast Technology for the Project
Erection Method - Rebar and Grout method used typically with walls , slabs, reinforcing bars spliced into slabs and grouted in place
Up to plinth Level Conventional Method
Ground Floor Wall
Panel Erection
Ground Floor Slab
Panel Erection
Ground Floor Slab
Panel Erection
First Floor Wall Panel
Erection
Two Floor Completed
1 2 3
4 5 6
7 8 9
100
Environmental Management Plan
For Proposed Project Sr. No. Description Remarks
01 Water Supply
Feasibility
1. Water to be pumped from 'EkrukTalav' with dedicated supply arrangement of Jack
Well, Rising mains, ESR s etc.
2. Qty required - Daily : 24.75 MLD
Annually : 0.314 TMC
1. Permission obtained from MJP
2. Additional Supply arrangement: Through Gr. Water Abstraction including
appropriate & adequate Rainwater Harvesting, Recharge and aquifer augmentation.
02 Domestic
Wastewater
(Sewage)
Management
1. Dedicated sewerage system comprising of primary, secondary and trunk sewers.
2. Centralized collection of the domestic wastewater
3. Treatment in dedicated STP to be provided on site.
4. Reuse of treated sewage for flushing of toilets and gardening in the premises.
03 Municipal Solid
Waste (MSW)
Management
1. Dedicated MSW collection system (separate for Wet and Dry wastes) – House to
house
2. Adequate and proper centralized MSW Community Facility for Collection, Handling,
Storage, Segregation, Treatment and Disposal
3. For wet and organic wastes treatment & disposal through organic waste converter
(OWC), onsite surface aerobic bio-composting, vermiculture followed by sale and
reuse of the manure.
4. For dry wastes : Proper segregation followed by recycling and reuse, sanitary
landfilling. 102
Environmental Management Plan
For Proposed Project Sr. No. Description Remarks
04 Rainwater Harvesting 1. Properly contemplated & designed Roof Top as well as Land Rainwater
Harvesting Plan comprising of Collection, Storage and Gr. Water Recharge
measures.
2. Dedicated storm water management infrastructure.
3. Installation of Pizometers for monitoring of Gr. Water Table and Aquifer
storage conditions.
05 Green Belt Development
omestic Wastewater
(Sewage) Management
1. Properly planned and designed Green Belt implementation as per MoEF &
CPCB guidelines from view point of management of noise and dust / air
pollution as well as enhancing aesthetics of the project area.
06 Permissions and Approvals 1. Necessary Consent to Establish and Operate from MPCB shall be procured.
Also, Environmental Clearance as per applicability criteria according EIA
Notification No. 1533 (E) dated 14.09.2006 shall be procured.
103
Format of DPR for Scheme No.3 Affordable Housing in
Partnership (AHP).
Shirdhon -Kalyan
1. Name of the State Maharashtra
2. Name of the City Shirdhon –Kalyan, Within MMR
3. Project Name Construction of 22862 EWS, 8644
LIG and 3512 MIG Tenements at S
No 86, 95, 133 at Shirdhon, Tal.
Kalyan, Dist Thane.
4. Project Code* 27000021073NO
5. State Level Nodal Agency MHADA
6. Implementing Agency
(Urban Local Body/
Development Authority/
Housing Board/ Urban
Improvement Trust/
Private Agency/ Developer)
MHADA
106
7. Date of approval by State
Level Sanctioning and
Monitoring Committee
(SLSMC)
16-Mar-2016
Project Cost (Rs. in lac)
Housing Infra. Other Total
EWS Type-A 113412.22 14250.48 56521.30 184184.00
Type-B 57333.32 8164.41 27702.64 93200.38
EWS TOTAL (A) 170745.54 22414.89 84223.94 277384.38
LIG Type-A 81070.93 6135.70 44852.77 132059.40
Type-B 44503.40 726.44 27252.42 72482.26
LIG TOTAL (B) 125574.33 6862.14 72105.19 204541.66
MIG Type-A 38109.76 3035.68 21422.56 62568
Type-B 30219.01 2290.08 17150.11 49659.20
MIG TOTAL (C) 68328.77 5325.76 38572.67 112227.2
TOTAL PROJET COST
FOR (A TO C) 364648.64 34602.79 194901.80 594153.24
107
9. No. of EWS beneficiaries
covered in the project
Gen SC ST OBC OTHER TOTAL
11431 2515 2515 - 7544 22862
10. Whether Beneficiary have
been selected as per PMAY
Guidelines (Yes/No)
The Beneficiaries will be selected as per
PMAY Guidelines and MHADA Procedure by
adopting transparent procedure.
11. Construction /cost of EWS
Unit (Rs. In Lacs)
For Type A – Rs. 8.28 (LAC)
For Type B – Rs. 8.77/- (LAC)
12. Project Duration (in
months)
36 Months
13. Whether Sale Price is
approved by State/UT?
The SLSMC in the 2nd meeting
dtd.16.03.2016 has principally approved the
pricing policy of sale price as per the
procedure laid down and being adopted by
MHADA. The MHADA is Govt. agency and
engaged in housing activities since 1976 and
have policy to determine the price which
shall be adopted for the present scheme also.
108
14. If yes, Sale price of EWS unit
(Rs. in lac)
EWS – A Type - Rs. 11.96 lac
(Approximate)
EWS – B Type - Rs. 12.49 lac
(Approximate)
15. Carpet area of EWS Unit in
SQ. Mt.
For Type A – 29.10 SQMT
For Type B – 29.80 SQMT
16. Total No. of houses proposed
in the Project
TYPE A TYPE B TOTAL
i) No. of EWS units 15400 7462 22862
i) No. of LIG units 5610 3034 8644
i) No. of MIG units 2200 1312 3512
i) No. of HIG units 0 0 0
TOTAL 23210 11808 35018
17. Whether open and
transparent procedure has
been envisaged to select
private partner, if private
partner has been considered?
Not Applicable
109
18. No. of EWS houses eligible for
Central Assistance
22862 units
TYPE A TYPE B TOTAL
19. i) GoI grant required (Rs. 1.50 lac
per eligible EWS house) (Rs. in
lac)
23100 11193 34293
ii) State grant (Rs. in lac) 15400 7462 22862
a.Land Cost (Rs. in lac) 0 0 0
b. Cash Grant (Rs. in lac) 0 0 0
iii) Implementing Agency share (Rs.
in lac)
0 0 0
iv) Beneficiary Share (Rs. in lacs) 145684 74545.38 220229.38
v) Total (Rs. in lac) 184184 93200.38 277384.38
20. Whether technical specification/
design for housing have been
ensured as per Indian Standards/
NBC/ State norms?
Yes
110
21. Whether Trunk Infrastructure is existing or is
being provided through AMRUT or any other
scheme?
•No
22. Whether the provisions of Civic infrastructure
has been made as per applicable State norms/
CPHEEO norms/ IS code / NBC?
--
i) Water Supply (Yes / No) Yes
ii) Sewerage (Yes / No) Yes
iii) Road (Yes / No) Yes
iv) Storm water drain (Yes / No) Yes
v) External Electrification (Yes / No) Yes
vi) Solid waste management (Yes / No) By Organic Waste Convertor
vii) Any other, Specify) Rain Water Harvesting is proposed viii) In case, any infrastructure has not been
proposed, reason thereof N.A.
111
23. Whether adequate social infrastructure
facilities covered in the project?
If no, whether the same are available in
vicinity.
Amenity Plots have been proposed
in this Layout
(Total Area of all Amenity Plots
21632.17 Sq. M. -reserved for
School/ Anaganwadi, Dispensary,
Post Office, etc)
24. Whether disaster (earthquake, flood, cyclone,
landslide etc.) resistant features have been
adopted in concept, design and
implementation of the project?
Yes
25. Whether Quality Assurance is part of the
Project, if not, how it is proposed to be
ensured?
Yes. Third Party Quality
Management (TPQM) will be
appointed for the Project to ensure
Quality of the Structure.
26. Whether O&M is part of Project, if yes, for
how many years?
1. O & M is not part of Project
cost.
2. Implementing agency has
proposed to hand over the
services to Residence welfare
Association( RWA).
112
27 Whether encumbrance free land is
available for the project or not?
Yes. Available.
28 Whether any innovative/ cost
effective / green technology adopted
in the project?
Yes.
The solar system for
common passage &
parking is provided. The
rain water harvesting is
provided
113
Construction of 22862 EWS, 8644 LIG, 3512 MIG Tenements at S.
No. 86, 95, 133 village- Shirdhon, Taluka- Kalyan& Dist- Thane
114
The proposed site is approximately 5.0 kms from Kalyan Dombivli
Municipal Limit.
The area of proposed site plot is 53.49 Hectares ((Non Agricultural).
115
Type A - Carpet Area 29.10 Sqm
BED ROOM 3.05X3.0
ALCOVE 2.25X2.5
Wc 1.20 x 0.90
LIVING 3.20X3.00
BATH 1.40 x 1.05
124
1 Name of the State :
2 Name of the ULB/ City :
3 Project Name – Means locality
of Project with address
:
4 Project Code* :
5 State Level Nodal Agency :
6 Name of Implementing Agency
(Urban Local Body/
Development Authority/
Housing Board/ Urban
Improvement Trust/ Private
Agency/ Developer)
:
7 Date of approval by State Level
Sanctioning and Monitoring
Committee (SLMC)
:
Amravati Housing &bArea
development Board ,Gruhanirman
Bhavan,Tope Nagar, Amravati 444604
16.03.2016
Maharashtra
Shivni Akola
Affordable Housing Scheme, (Only
EWS) at Shivni, Ta. Dist. Akola on, on
Survey No. 93/3, 93/3B, 94 (Part) &
100
27000005023N0
MHADA
Format of DPR for Scheme No. 3 Affordable Housing in Partnership (AHP)
127
Project Cost (Rs. In Lakhs) Housin
g
Infrastr
ucture Other Total
329.24
SC ST OTH.
-11% -6% -32%
128 28 15 84 255
10 Whether benefiaciary have been
selected as per PMAY
guidelines (yes/no)
:
11 Construction cost of EWS
Units(Rs in Lakhs)
:
12 Project Duration(in Months)
13 Whether Sale Price is approved
by State/UT
:
14 IF yes,Sale price of EWS unit
(Rsin Lakhs)
15 Carpet area of EWS Unit in Sqm
Adverisement will be given for
selection of beneficiaries.
Rs.6.69
24
Sale price shall be as per pricing policy
of MHADA
Rs8.99
30.00
1702.8 260.37 2292.5
Gen(50
%)
Total
8 :
9 No. of EWS beneficiaries
covered or proposed in the
project
:
Attach detail estimate of
building, infrastructure and
other.
Format of DPR for Scheme No. 3 Affordable Housing in Partnership (AHP)
128
16 No. of houses proposed in the Project :
i) No. of EWS units :
ii) No. of LIG units :
iii) No. of MIG units :
iv) No. of HIG units :
Total :
v) No. of Commercial units, if any &
%
:
ii) State grant (Rs. One Lakhs per
house, total)
:
iii) Implementing Agency share (Rs. In
Lakhs per house & total)
:
v) Total of ‘i' to ‘iv’ (Rs. In Lakhs) :
Format of DPR for Scheme No. 3 Affordable Housing in Partnership (AHP)
Rs 2292.95
Implementing Agency share will be
recover by the beneficiary .
iv) Beneficiary Share (Rs. In Lakhs
per house & total)
: Rs 6.49/house = 255x6.49=Rs
1654.95
19 i) GoI grant required (Rs. 1.50 Lakhs
per eligible EWS house, Rs. In Lakhs)
: 1.50x255=Rs383
1.00x255=Rs.255
Whether open and transparent
procedure has been envisaged to select
private partner, if private partner has
been considered?
: NA
18 No. of EWS houses eligible for Central
Assistance
: 255
----
255
----
----
255
----
17
129
21 Whether trunk infrastructure is
existing or is being provided AMRUT
or any other shceme ?( Yes/No)
22 Whether the provision of civil
infrastructure has been made as per
applicable state norms /CPHEEO
norm/IS code NBC?
:
i)Water supply (yes/No)
ii)sewerage (yes/No)
i)Road (yes/No)
iv) storm wter drain (yes/No)
v) External Electrication (yes/No)
vi)solid waste management (yes/No)
vii)any other specify (yes/No)
viii)In case any infrastructure has not
been proposed ,reasons there of
yes
20 Whether technical specification /
design for housing have been ensured
as per Indian Standard/NBC/ State
: Yes
Yes
Yes
Yes
Yes
Yes
Yes
yes
Rainwater harvesting.
NA
Format of DPR for Scheme No. 3 Affordable Housing in Partnership (AHP)
130
(i) Whether adequate social
infrastructure facilities covered in the
project;
(ii) If yes, give details.
(iii) If no, whether the same are
available in vicinity? Give details in
Whether Quality Assurance is part of
the Project,
If not, how it is proposed to be
ensured ? Give brief details.
(i) Whether O& M is part of
Project,
(ii) If yes, for how many years ?
27 Wheether encumbrance free land is
available for the project or not ?
Format of DPR for Scheme No. 3 Affordable Housing in Partnership (AHP)
26 Yes/ No
One year
Land free from encumbrance.
24 Whether disaster like earthquake,
flood, cyclone, land-slide etc. resistant
feature have been adopted in concept,
design and implementation of the
: Yes
25 : Yes
NA
23 : No
131
28 Whether any innovative /cost
effective green technology adopted in
the project ?
29 Comments of SLAC afther techno
economic appraisal or DPR?
30 30Project Brief including any other
information UlB/state would like to
furnish.
Format of DPR for Scheme No. 3 Affordable Housing in Partnership (AHP)
-----
No
132
DETAILS OF LAND IDENTIFIED FOR AFFORDABLE
HOUSING
• Amravati Housing & Area Development Board, Amravati is having 4.53 Hectares of land near Akola Khamgaon Bye Pass of which 3556.86 Sqm. of land is acquired by Highway Authority to widen the highway wider to make it four lanes, In the western part of a land affordable housing is proposed.
• Board has identified total 4.53 Hactare Land in Mouje- Shivni Tq- Akola,
• Dist- Akola out of which 0.738 Hactares land shall be utilized for,
• EWS Type .
• DPR of land at village Shivni, Tal – Akola, Dist- Akola has been prepared as sample DPR.
• Total Area = 4.53 hectare
• Plotted Area = 41,743.14 Sqm.
• Commercial Area = 6769.20 Sqm.
• Open space Area = 4176 Sqm.
• Public utility Area = 4233.0 Sqm.
• Road Area = 14,031.70 Sqm.
• Salable Area = 19302.44 Sqm.
133
Shivni Land is located within Gram Panchayat Shivni Comprising 255 EWS 2.5 FSI available for MHADA( Gramin Area)
The proposed site is adjoining to Akola – Khamgaon Bye Pass and approximately 4.00 km from Main Bus Stand - Akola The area of proposed site plot is 4.53Hactare and provisionally Sanctioned by Town Planning Akola. Out of which the area utilized for affordable housing is 7384.19 Sqm.
AMRAVATI HOUSING & AREA DEVELOPMENT BOARD (A unit of MHADA)
Construction of 255 EWS Type TENAMENTS at Village -Shivni, Taluka- Akola, Dist- Akola
134
CONSTRUCTION OF 255 EWS TENAMENTS AT, MOUJA SHIVNI, TA.DIST. AKOLA.
DESCRIPTION REVISED(RS.)
TOTAL
PROJECT
COST
In Lac
CENTRAL
SUBSIDY
(Rs. 1.5 Lac
Per EWS T/S )
STATE
SUBSIDY (Rs.
1.0 Lac Per
EWS T/S )
Implementing
Agency Share
In Lacs.
Beneficiary
Share
Total
(Housing + Infra+
Land +
Overheads)
2292.55 382.50 255.00 1655.05
Implementing
Agency’s Share
will be
Recovered from
the
beneficiaries
141
SPECIFICATIONS
Ceramic tiles Flooring with Skirting in Tenements.
Ceramic Flooring & Dado in W.C. & Bath up to 1.5 M. ht.
Kota Pattern flooring in entrance lobby.
Kota treads & risers up to total height.
Kota flooring in passage.
Mild Steel sliding windows.
Mild steel grill for windows.
Marble top kitchen platform.
Stainless steel sink.
142
Concealed Plumbing.
Fully Water proof cement externally.
Oil bound distemper internally.
No lift.
Emergency power generator for common area.
Wash basin.
Fire fighting system
Rain water harvesting system.
143
Sr.
No.
Item Details
1)
Name of Scheme AHP constructing 792 EWS
houses at Akurdi, PCMC.
2) Name of I.A. PCNTDA
3) Area of Land 3.82 Ha.
4) Ownership of Land PCNTDA
5) Reservation on Land Residential
6) Project Cost 142.00 Cr.
7) No. of Beneficiaries 792
PCNTDA Scheme at Pune
145
Sr.
No.
Item Details
9) Sale Price Per Tenement EWS1 : Rs.13.92 Lakhs
EWS2 : Rs.18.86 Lakhs
10) Grants GoI : 11.88 Cr.
GoM : 07.92 Cr.
11) Infrastructure
1) Water Supply Available
2) Approach Road Available
3) Power Supply Available
4) Sewage facility Available
PCNTDA Scheme at Pune Contd….
146
Sr.
No.
Item Details
1)
Name of Scheme AHP constructing 1096 EWS
houses at Mahalunge, PCMC.
2) Name of I.A. MHADA
3) Area of Land 11.25 Ha.
4) Ownership of Land MHADA
5) Reservation on Land Residential
6) Project Cost 176.69 Cr.
7) No. of Beneficiaries 1096
Mahalunge, PMRDA, PCMC
148
Sr.
No.
Item Details
9) Sale Price Per Tenement Phase I : Rs.15.86 Lakhs
Phase II : Rs.16.30 Lakhs
10) Grants GoI : 16.44 Cr.
GoM : 10.96 Cr.
11) Infrastructure
1) Water Supply Available
2) Approach Road Available
3) Power Supply Available
4) Sewage facility Available
Mahalunge, PMRDA, PCMC Contd….
149
Sr.
No.
Item Details
1)
Name of Scheme AHP constructing 860 EWS
houses at Barshi, Solapur.
2) Name of I.A. R. S. Mirgane Engg. & Devp.
3) Area of Land 02.05 Ha.
4) Ownership of Land R. S. Mirgane Engg. & Devp.
5) Reservation on Land Residential
6) Project Cost 59.36 Cr.
7) No. of Beneficiaries 860
Barshi, Dist. Solapur, AHP scheme
151
Sr.
No.
Item Details
9) Sale Price Per Tenement Rs.06.85 to 07.03 Lakhs
10) Grants GoI : 12.90 Cr.
GoM : 08.60 Cr.
11) Infrastructure
1) Water Supply Available
2) Approach Road Available
3) Power Supply Available
4) Sewage facility Available
Barshi, Dist. Solapur, AHP scheme Contd….
152
Sr.
No.
Item Details
1)
Name of Scheme AHP constructing 860 EWS
houses in Amaravati.
2) Name of I.A. Amaravati Municipal Corporation
3) Area of Land 02.52 Ha.
4) Ownership of Land Amaravati Municipal Corporation
5) Reservation on Land Residential
6) Project Cost 61.49 Cr.
7) No. of Beneficiaries 860
Amaravati Municipal Corporation
154
Sr.
No.
Item Details
9) Sale Price Per Tenement Rs.07.11 Lakhs
10) Grants GoI : 12.90 Cr.
GoM : 08.60 Cr.
11) Infrastructure
1) Water Supply Available
2) Approach Road Available
3) Power Supply Available
4) Sewage facility Available
Amaravati Municipal Corporation Contd….
155
Sr.
No.
Item Details
1)
Name of Scheme BLC constructing New 1241
Houses and Enhancement 388
EWS houses in Akola.
2) Name of I.A. Akola Municipal Corporation
3) Area of Land --
4) Ownership of Land State Govt.
5) Reservation on Land Residential
6) Project Cost 62.65 Cr.
7) No. of Beneficiaries 1629
Akola Municipal Corporation
157
Sr.
No.
Item Details
9) Sale Price Per Tenement Rs.04.12 to 04.59 Lakhs
10) Grants GoI : 22.20 Cr.
GoM : 14.80 Cr.
11) Infrastructure
1) Water Supply Available
2) Approach Road Available
3) Power Supply Available
4) Sewage facility Available
Akola Municipal Corporation Contd….
158
Sr.
No.
Item Details
1)
Name of Scheme AHP constructing 252 EWS
houses in Nagpur.
2) Name of I.A. Nagpur Improvement Trust
3) Area of Land 0.48 Ha.
4) Ownership of Land NIT
5) Reservation on Land Residential
6) Project Cost 26.27 Cr.
7) No. of Beneficiaries 252
Nagpur Improvement Trust, Nagpur
160
Sr.
No.
Item Details
9) Sale Price Per Tenement Rs.10.42 Lakhs
10) Grants GoI : 03.78 Cr.
GoM : 02.52 Cr.
11) Infrastructure
1) Water Supply Available
2) Approach Road Available
3) Power Supply Available
4) Sewage facility Available
Nagpur Improvement Trust, Nagpur Contd….
161
Rs. In Lakhs
Housing Infra Others
EWS 3969 26138.3 3118.0 12735.8
LIG 988 10576.1 1280.5 2266.9
MIG 985 15559.3 1901 5891.1
HIG 0 0 0 0
Total 5942 52273.6 6299.5 20894
Area of Land:
Ownership of Land:
Land Reservation:
Gen SC ST OBC Other Total
1985 437 238 0 1309 3969
25.00
PROJECT INFORMATION
14.41 Ha
GoM
R-Zone & other various Reservation
Vasai
Virar
/
MHADA
i) Water Supply (Yes / No)
Benefi
ciary
Share
3969.05953.510.58
Tentati
ve Sale
Price
Per
Unit
GoM
Share
GoI
Share
32069.5
No. of EWS beneficiaries
covered in the project:
Carpet
Area
sq.mt.
Of
EWS
No. Of Dus
Name
of City
/
Impl.
Agency
Name of Scheme
AHP (Scheme No.3)
to DPR of
construction of
3969 EWS houses (
Total project EWS
3969 + LIG 988 +
MIG 985 = 5942
Houses ) on Survey
No.392/A1 at
Bolinj, Virar.
Project Cost
Rain water harvesting, STP is proposed
N.A.
Whether the provisions of Civic infrastructure has been made as per applicable
State norms/ CPHEEO norms/ IS code / NBC?
Yes
Yes
Yes
vii) Any other, Specify)viii) In case, any infrastructure has
not been proposed, reason thereof
iv) Storm water drain (Yes / v) External Electrification (Yes vi) Solid waste management
Yes
Yes
From Vasai-Virar City M.C
iii) Road (Yes / No)
ii) Sewerage (Yes / No)
Rs. In Lakhs
Housing Infra Others
EWS 1012 6700.8 642.2 3394.4
LIG 412 4374.63 425.17 2068.3
MIG 219 3459.76 339.47 1671.9
HIG 0
Total 1643 14535.1 1406.9 7134.6
Area of Land:
Ownership of
Land:
Land Reservation:
Gen SC ST OBC Other Total
506 111 61 0 334 1012
viii) In case, any infrastructure
has not been proposed, reason N.A.
PROJECT INFORMATION
v) External Electrification Yes
vi) Solid waste management From Vasai-Virar City M.C
vii) Any other, Specify) Rain water harvesting, STP is proposed
ii) Sewerage (Yes / No) Yes
iii) Road (Yes / No) Yes
iv) Storm water drain (Yes / Yes
4.66 Ha
GoM
Special R-Zone & other various Reservation
No. of EWS beneficiaries
covered in the project:
Whether the provisions of Civic infrastructure has been made as per applicable
State norms/ CPHEEO norms/ IS code / NBC?
i) Water Supply (Yes / No) Yes
GoI
Share
GoM
Share
Benefi
ciary
Share
AHP (Scheme
No.3) to DPR of
construction of
1012 EWS houses (
Total project EWS
1012 + LIG 412 +
MIG 219 = 1643
Houses ) on Survey
No.411/1A at
Bolinj, Virar.
Vasai
Virar
/
MHADA
10.61 1518.0 1012.0 8207.3
Name of Scheme
Name
of City
/
Impl.
Agency
No. Of Dus
Project Cost Carpet
Area
sq.mt.
Of EWS
Tentati
ve Sale
Price
Per
Unit
25.00
Rs. In Lakhs
Housing Infra Others
EWS 1804 12561.0 1373.7 6576.8
LIG 492 5840.13 649.07 3070.36
MIG 305 6469.9 723.88 3487.23
HIG 0 0 0 0
Total 2601 24871.0 2746.6 13134.4
Area of Land:
Ownership of
Land:
Land Reservation:
Gen SC ST OBC Other Total
902 198 108 0 596 1804
ii) Sewerage (Yes / No) Yes
iii) Road (Yes / No) Yes
iv) Storm water drain (Yes / Yes
viii) In case, any infrastructure
has not been proposed, reason
thereof
N.A.
vi) Solid waste management Facility is available with Thane M.C
vii) Any other, Specify) Rain water harvesting, STP is proposed
PROJECT INFORMATION
Name of Scheme
Name
of City
/
Impl.
Agency
No. Of Dus
Project CostCarpet
Area
sq.mt.
Of
EWS
Tentati
ve Sale
Price
Per
Unit
GoI
Share
GoM
Share
Benefi
ciary
Share
v) External Electrification Yes
1804.0 16001.5
5.20 Ha
GoM
U-2 Zone & G-1. D.P. preparation in process
AHP (Scheme
No.3) to DPR of
construction of
1804 EWS houses (
Total project EWS
1804 + LIG 492 +
MIG 305 = 2601
Houses ) on Survey
No.13 at Bhandarli,
Thane, MMR.
MMR
/
MHADA
25.02 11.37 2706.0
No. of EWS beneficiaries
covered in the project:
Whether the provisions of Civic infrastructure has been made as per applicable
State norms/ CPHEEO norms/ IS code / NBC?
i) Water Supply (Yes / No) Yes
Rs. In Lakhs
Housing Infra Others
EWS 3822 28009.2 2579.9 14602.3
LIG 1044 14924.2 1403.1 7777.1
MIG 220 3786.28 356.02 2019.8
HIG 0 1 2 3
Total 5086 46720.7 4341.0 24402
Area of Land:
Ownership of Land:
Land Reservation:Gen SC ST OBC Other Total1911 420 229 0 1262 3822
i) Water Supply (Yes / No) Yes
GoI
Share
GoM
Share
9.64 Ha
GoM
U-2 Zone. D.P. preparation in processNo. of EWS beneficiaries
covered in the project:Whether the provisions of Civic infrastructure has been made as per applicable
State norms/ CPHEEO norms/ IS code / NBC?
Benefi
ciary
Share
AHP (Scheme No.3)
to DPR of
construction of
3822 EWS houses (
Total project EWS
3822 + LIG 1044 +
MIG 220 = 5086
Houses ) on Survey
No.157/1 at
Gotheghar, Thane,
MMR.
MMR
/
MHADA
11.80
12.31
5733.0 3822.0 35491.4
Name of Scheme
Name
of City
/
Impl.
Agency
No. Of Dus
Project CostCarpet
Area
sq.mt.
Of
EWS
Tentati
ve Sale
Price
Per
Unit24.57
24.89
PROJECT INFORMATION
v) External Electrification (Yes Yes
vi) Solid waste management Facility is available with thane m.c.
vii) Any other, Specify) Rain water harvesting, STP is proposed
ii) Sewerage (Yes / No) Yes
iii) Road (Yes / No) Yes
iv) Storm water drain (Yes / Yes
Rs. In Lakhs
Housing Infra Others
EWS 1148 7683.4 721.8 4004.7
LIG 820 9243.7 893.25 4836.3
MIG 605 9606.57 939.28 5155.6
HIG 0 0 0 0
Total 2573 26533.7 2554.3 13997
Area of Land:
Ownership of Land:
Land Reservation:
Gen SC ST OBC Other Total574 126 57 0 391 1148
viii) In case, any
infrastructure has not been N.A.
PROJECT INFORMATION
v) External Electrification (Yes Yes
vi) Solid waste management Facility is available with Kalyan Dombivali M.C
vii) Any other, Specify) Rain water harvesting, STP is proposed
ii) Sewerage (Yes / No) Yes
iii) Road (Yes / No) Yes
iv) Storm water drain (Yes / Yes
5.96 Ha
GoM
Other various Reservation
No. of EWS beneficiaries
covered in the project:
Whether the provisions of Civic infrastructure has been made as per applicable
State norms/ CPHEEO norms/ IS code / NBC?
i) Water Supply (Yes / No) Yes
GoI
Share
GoM
Share
Benefi
ciary
Share
AHP (Scheme No.3)
to DPR of
construction of
1148 EWS houses (
Total project EWS
1148 + LIG 820 +
MIG 605 = 2573
Houses ) on Survey
No.27 at Barave,
Kalyan, MMR.
MMR
/
MHADA
25.02 10.81 1722.0 1148.0 40999.3
Name of Scheme
Name
of City
/
Impl.
Agency
No. Of Dus
Project CostCarpet
Area
sq.mt.
Of
EWS
Tentati
ve Sale
Price
Per
Unit
Rs. In Lakhs
Housing Infra Others
EWS 6368 47221.5 4102.0 24420.0
LIG 3460 50768.79 4502.8 26351.2
MIG 630 10919.64 967.94 5625.39
HIG 0 0 0 0
Total 10458 108909.9 9572.7 56396.6
Area of Land:
Ownership of
Land:Land Reservation:
Gen SC ST OBC Other Total
3184 701 383 0 2100 6368
iii) Road (Yes / No) Yes
iv) Storm water drain (Yes / Yes
v) External Electrification Yes
No. of EWS beneficiaries
covered in the project:
Whether the provisions of Civic infrastructure has been made as per applicable
State norms/ CPHEEO norms/ IS code / NBC?
i) Water Supply (Yes / No) Yes
ii) Sewerage (Yes / No) Yes
6368.0 59823.5
17.10 Ha
GoM
U-2 Zone
AHP (Scheme
No.3) to DPR of
construction of
6368 EWS houses (
Total project EWS
6368 + LIG 3460 +
MIG 630= 10458
Houses ) on Survey
No.162 at Khoni,
Kalyan, MMR.
MMR
/
MHADA
25.57
24.88
11.74
12.24
9552.0
PROJECT INFORMATION
Name of Scheme
Name
of City
/
Impl.
Agency
No. Of Dus
Project CostCarpet
Area
sq.mt.
Of
EWS
Tentati
ve Sale
Price
Per
Unit
GoI
Share
GoM
Share
Benefi
ciary
Share
viii) In case, any
infrastructure has not been N.A.
vi) Solid waste management Yes
vii) Any other, Specify) Rain water harvesting, STP is proposed
Rs. In Lakhs
Housing Infra Others
EWS 1536 11200.0 2564.4 6123.5
LIG 576 8139.2 1783.7 4586.41
MIG 220 3702.7 677.36 2267.98
HIG 0 0 0 0
Total 2332 23041.9 5025.5 12977.9
Area of Land:
Ownership of
Land:
Land Reservation:
Gen SC ST OBC Other Total
768 169 92 0 507 1536
PROJECT INFORMATION
Name of Scheme
Name
of City
/
Impl.
Agency
No. Of Dus
Project CostCarpet
Area
sq.mt.
Of
EWS
Tentati
ve Sale
Price
Per
Unit
GoI
Share
GoM
Share
Benefi
ciary
Share
Whether the provisions of Civic infrastructure has been made as per applicable
State norms/ CPHEEO norms/ IS code / NBC?
AHP (Scheme
No.3) to DPR of
construction of
1536 EWS houses (
Total project EWS
1536 + LIG 576 +
MIG 220 = 2332
Houses ) on Survey
No.5 at Wave,
MMR.
MMR
/
MHADA
24.89
25.57
12.71
13.27
16158.9
4.07 Ha
GoM
U-2 Zone
No. of EWS beneficiaries
covered in the project:
2304.0 1536.0
i) Water Supply (Yes / No) Yes
ii) Sewerage (Yes / No) Yes
iii) Road (Yes / No) Yes
vii) Any other, Specify) Rain water harvesting, STP is proposed
viii) In case, any
infrastructure has not been N.A.
iv) Storm water drain (Yes / Yes
v) External Electrification Yes
vi) Solid waste management Yes
Rs. In Lakhs
Housing Infra Others
EWS 3630 35837.1 2751.9 16659.6
LIG 1148 12800.34 988.81 5956.45
MIG 1485 23268.52 1822.14 11097.87
HIG 0 0 0 0
Total 6263 71906.0 5562.9 33713.9
Area of Land:
Ownership:
Land Reservation:
Gen SC ST OBC Other Total1815 399 218 0 1198 3630
PROJECT INFORMATION
Name of Scheme
Name
of City
/
Impl.
Agency
No. Of Dus
Project Cost Carpet
Area
sq.mt.
Of EWS
Tentati
ve Sale
Price
Per
Unit
GoI
Share
GoM
Share
Benefici
ary
Share
Whether the provisions of Civic infrastructure has been made as per applicable
State norms/ CPHEEO norms/ IS code / NBC?
AHP (Scheme
No.3) to DPR of
construction of
3630 EWS houses
( Total project
EWS 3630 + LIG
1148 + MIG 1485
= 6263 Houses )
on Survey No.209
at Juchandra,
Palghar, MMR.
MMR
/
MHADA
30.00 15.22 45055.7
49.70 Ha
GoM
Burial ground , Market, Dumping ground, Play ground, Road
No. of EWS beneficiaries
covered in the project:
5445.0 3630.0
i) Water Supply (Yes / No) Yes
ii) Sewerage (Yes / No) Yes
iii) Road (Yes / No) Yes
vii) Any other, Specify) Rain water harvesting, STP is proposed
viii) In case, any
infrastructure has not been N.A.
iv) Storm water drain (Yes / Yes
v) External Electrification Yes
vi) Solid waste From Vasai-Virar City M.C
Rs. In Lakhs
Housing Infra Others
EWS 6380 66420.9 6887.9 24305.1
LIG 2624 19026.74 1910.44 24825.38
MIG 1760 19772.71 2018.5 22857.88
HIG 0 0 0 0
Total 10764 105220.4 10816.9 71988.4
Area of Land:
Ownership of
Land:
Land Reservation:
Gen SC ST OBC Other Total
3190 702 383 0 2105 6380
vii) Any other, Specify) Rain water harvesting, STP is proposed
viii) In case, any
infrastructure has not been N.A.
iv) Storm water drain (Yes / Yes
v) External Electrification Yes
vi) Solid waste Facility available with Thane M.C
i) Water Supply (Yes / No) Yes
ii) Sewerage (Yes / No) Yes
iii) Road (Yes / No) Yes
93356.9
1.38 Ha
GoM
U-2 Zone. D.P. preparation in process
No. of EWS beneficiaries
covered in the project:
9570.0 6380.0
Whether the provisions of Civic infrastructure has been made as per applicable
State norms/ CPHEEO norms/ IS code / NBC?
AHP (Scheme
No.3) to DPR of
construction of
6380 EWS houses
( Total project
EWS 6380 + LIG
2624 + MIG 1760
= 10764 Houses )
on Survey No.80,
81 at Bhandarli,
Thane, MMR.
MMR
/
MHADA
30.00 15.30
PROJECT INFORMATION
Name of Scheme
Name
of City
/
Impl.
Agency
No. Of Dus
Project CostCarpet
Area
sq.mt.
Of EWS
Tentati
ve Sale
Price
Per
Unit
GoI
Share
GoM
Share
Benefici
ary
Share
Rs. In Lakhs
Housing Infra Others
EWS 1100 11408.2 1096.4 5951.9
LIG 492 5817.92 556.97 3034.02
MIG 330 5524.4 532.43 2935.59
HIG 0 0 0 0
Total 1922 22750.5 2185.8 11921.5
Area of Land:
Ownership of
Land:
Land Reservation:
Gen SC ST OBC Other Total550 121 66 0 363 1100
vii) Any other, Specify) Rain water harvesting, STP is proposed
viii) In case, any
infrastructure has not N.A.
iv) Storm water drain (Yes Yes
v) External Electrification Yes
vi) Solid waste Yes
i) Water Supply (Yes / No) Yes
ii) Sewerage (Yes / No) Yes
iii) Road (Yes / No) Yes
15706.5
3.75 Ha
GoM
R-Zone , D.P.Road & College
No. of EWS beneficiaries
covered in the project:
1650.0 1100.0
Whether the provisions of Civic infrastructure has been made as per applicable
State norms/ CPHEEO norms/ IS code / NBC?
AHP (Scheme
No.3) to DPR of
construction of
1100 EWS houses
( Total project
EWS 1100 + LIG
492 + MIG 330 =
1922 Houses ) on
Survey No.217-
1A1 at Ramwadi,
Pen, MMR.
MMR
/
MHADA
30.00 11.37
PROJECT INFORMATION
Name of Scheme
Name
of City
/
Impl.
Agency
No. Of Dus
Project CostCarpet
Area
sq.mt.
Of EWS
Tentati
ve Sale
Price
Per
Unit
GoI
Share
GoM
Share
Benefici
ary
Share
Rs. In Lakhs
Housing Infra Others
EWS 1872 21037.6 1932.3 10942.5
LIG 864 10984.48 1005.05 5710.75
MIG 408 7396.88 681.18 3820.01
HIG 0 0 0 0
Total 3144 39419.0 3618.6 20473.2
Area of Land:
Ownership of
Land:
Land Reservation:
Gen SC ST OBC Other Total936 206 112 0 618 1872
PROJECT INFORMATION
Name of Scheme
Name
of City
/
Impl.
Agency
No. Of Dus
Project CostCarpet
Area
sq.mt.
Of EWS
Tentati
ve Sale
Price
Per
Unit
GoI
Share
GoM
Share
Benefici
ary
Share
Whether the provisions of Civic infrastructure has been made as per applicable
State norms/ CPHEEO norms/ IS code / NBC?
AHP (Scheme
No.3) to DPR of
construction of
1872 EWS houses
( Total project
EWS 1872 + LIG
864 + MIG 408 =
3144 Houses ) on
Survey No.261 A
at Khardi, MMR.
Outside
MMR
/
MHADA
30.00 18.12 29232.4
15.27 Ha
GoM
Included in ecologically sensitive area
No. of EWS beneficiaries
covered in the project:
2808.0 1872.0
i) Water Supply (Yes / No) Yes
ii) Sewerage (Yes / No) Yes
iii) Road (Yes / No) Yes
vii) Any other, Specify) Rain water harvesting, STP is proposed
viii) In case, any
infrastructure has not been N.A.
iv) Storm water drain (Yes / Yes
v) External Electrification Yes
vi) Solid waste Yes
Rs. In Lakhs
Housing Infra Others
EWS 4970 38800.8 3827.8 20236.3
LIG 1454 20638.3 2030.27 10785.44
MIG 1069 18438.93 1823.7 10594.74
HIG 0 0 0 0
Total 7493 77878.0 7681.8 41616.5
Area of Land:
Ownership of
Land:Land Reservation:
Gen SC ST OBC Other Total
2485 547 299 0 1639 4970
vii) Any other, Specify) Rain water harvesting, STP is proposed
iv) Storm water drain (Yes / Yes
v) External Electrification Yes
vi) Solid waste Yes
i) Water Supply (Yes / No) Yes
ii) Sewerage (Yes / No) Yes
iii) Road (Yes / No) Yes
504339.9
20.44 Ha
GoM
Play ground, Commercial
No. of EWS beneficiaries
covered in the project:
7455.0 4970.0
Whether the provisions of Civic infrastructure has been made as per applicable
State norms/ CPHEEO norms/ IS code / NBC?
AHP (Scheme
No.3) to DPR of
construction of
4970 EWS houses
( Total project
EWS 4970 + LIG
1454 + MIG 1069
= 7493 Houses )
on Survey
No.62(New), 53 at
Nilaje Pada, MMR.
MMR
/
MHADA
25.57
24.89
30.00
11.77
12.26
17.45
PROJECT INFORMATION
Name of Scheme
Name
of City
/
Impl.
Agency
No. Of Dus
Project CostCarpet
Area
sq.mt.
Of
EWS
Tentati
ve Sale
Price
Per
Unit
GoI
Share
GoM
Share
Benefici
ary
Share
Rs. In Lakhs
Housing Infra Others
EWS 2695 28007.1 2142.5 13882.5
LIG 3378 28190.27 2237.91 13870.34
MIG 110 1841.46 116.02 933.84
HIG 0 0 0 0
Total 6183 58038.9 4496.4 28686.7
Area of Land:
Ownership of
Land:
Land Reservation:
Gen SC ST OBC Other Total
1348 297 162 0 888 2695
PROJECT INFORMATION
Name of Scheme
Name
of City
/
Impl.
Agency
No. Of Dus
Project CostCarpet
Area
sq.mt.
Of EWS
Tentati
ve Sale
Price
Per
Unit
GoI
Share
GoM
Share
Benefici
ary
Share
Whether the provisions of Civic infrastructure has been made as per applicable
State norms/ CPHEEO norms/ IS code / NBC?
AHP (Scheme
No.3) to DPR of
construction of
2695 EWS houses
( Total project EWS
2695 + LIG 3378 +
MIG 110 = 6173
Houses ) on
Survey No.135/1A,
119/1A at Rees,
Tal. Khalapur, Dist.
Raygad, MMR.
MMR
/
MHADA
30.00 16.35 37325.8
10.53 Ha
GoM
R-Zone
No. of EWS beneficiaries
covered in the project:
4027.5 2695.0
i) Water Supply (Yes / No) Yes
ii) Sewerage (Yes / No) Yes
iii) Road (Yes / No) Yes
vii) Any other, Specify) Rain water harvesting, STP is proposed
viii) In case, any
infrastructure has not been N.A.
iv) Storm water drain (Yes / Yes
v) External Electrification Yes
vi) Solid waste management Yes
Rs. In Lakhs
Housing Infra Others
EWS 660 6531.6 1136.6 3573.0
LIG 0
MIG 0
HIG 0
Total 660
Area of Land:
Ownership of Land:Land Reservation:
Gen SC ST OBC Other Total
330 73 40 0 217 660
PROJECT INFORMATION
Name of Scheme
Name
of City
/
Impl.
No. Of DusProject Cost
Carpet
Area
sq.mt.
Of
Tentati
ve Sale
Price
Per
GoI
Share
GoM
Share
Benefici
ary
Share
Whether the provisions of Civic infrastructure has been made as per applicable
State norms/ CPHEEO norms/ IS code / NBC?
AHP (Scheme No.3)
to DPR of
construction of 660
EWS houses ( Total
project EWS 660
Houses ) on Survey
No.86 at Kelawali,
MMR.
MMR
/
MHADA
25.02 17.03
1.04 Ha
No. of EWS beneficiaries
covered in the project:
9591.1
GoMG-1 Zone. D.P. preparation in process
990.0 660.0
i) Water Supply (Yes / No) Yes
ii) Sewerage (Yes / No) Yes
iii) Road (Yes / No) Yes
vii) Any other, Specify) Rain water harvesting, STP is proposed
viii) In case, any
infrastructure has not been N.A.
iv) Storm water drain (Yes / Yes
v) External Electrification Yes
vi) Solid waste management Yes
Rs. In Lakhs
Housing Infra Others
EWS 1632 13570.3 1339.03 16156.80
LIG 0 0 0 0
MIG 768 8970.24 471.64 12288
HIG 0 0 0 0
Total 2400 22541 1810.7 28444.8
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total832 180 98 522 1632
..…
…...
PROJECT INFORMATION
Whether the provisions of Civic infrastructure has been made as per applicable State
norms/ CPHEEO norms/ IS code / NBC?
YES
YES
YES
Project Cost
Latur
/
MHAD
A
2448 10
Tentat
ive
Sale
Price
GoM
Share
GoI
Share
Benefi
ciary
Share
1632
Carpe
t
Area
sq.mt
No. Of Dus
Name
of City
/
Impl.
Name of Scheme
AHP (Scheme No.3) to
DPR of Construction of
1632 EWS t/s , 768
MIG t/s =2400 Houses
& amenities. Additional
MIDC
(plot no R-1), Latur.
28.94
vii) Any other, Specify)
viii) In case, any infrastructure
has not been proposed, reason
thereof
12077
150000 Sq.Mtr
MHADA
Residential
i) Water Supply (Yes / No)
iii) Road (Yes / No)
iv) Storm water drain (Yes / No)
v) External Electrification (Yes /
vi) Solid waste management (Yes
ii) Sewerage (Yes / No)
No. of EWS beneficiaries
covered in the project:
YES
YES
YES
Rs. In Lakhs
Housing Infra Others
EWS 364 2339.31 320.43 3094
LIG 0 0 0 0
MIG 0 0 0 0
HIG 0 0 0 0
Total 364 2339.31 320.43 3094
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total
186 40 22 116 364
..…
…...
Whether the provisions of Civic infrastructure has been made as per applicable State norms/
CPHEEO norms/ IS code / NBC?
YES
YES
YES
viii) In case, any infrastructure has not
been proposed, reason thereof
YES
YES
YES
Jalna
/
MHADA
546 9364
Carpet
Area
sq.mt.
Of
EWS
No. Of Dus
Name of City
/
Impl.
Agency
Tentat
ive
Sale
Price
Per
Benefic
iary
Share
GoM
Share
GoI
Share
Project CostName of Scheme
AHP (Scheme No.3) to
DPR of Construction of
364 EWS t/s at
S.No.488(Part ) Jalna
29.56
PROJECT INFORMATION
vii) Any other, Specify)
2184
41900 Sq.mtr
MHADA
Residential
i) Water Supply (Yes / No)
iii) Road (Yes / No)
iv) Storm water drain (Yes / No)
v) External Electrification (Yes / No)
vi) Solid waste management (Yes / No)
ii) Sewerage (Yes / No)
No. of EWS beneficiaries covered in the
project:
Rs. In Lakhs
Housing Infra Total
EWS 960 6817.66 292.36 9581
LIG 0 0 0 0
MIG 768 8512.99 412.69 11520
HIG 0 0 0 0
Total 1728 15330.65 705.05 21101
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total490 106 58 306 960
7180.80
104100.00 Sq.mtr
Not in possession of MHADA
Residential
i) Water Supply (Yes / No)
iii) Road (Yes / No)
No. of EWS beneficiaries covered in
the project:
YES
YES
YES
vii) Any other, Specify)
viii) In case, any infrastructure has not
been proposed, reason thereof
iv) Storm water drain (Yes / No)
v) External Electrification (Yes / No)
Carpet
Area
sq.mt.
Of EWS
No. Of Dus
Name of City
/
Impl. Agency
Name of Scheme
AHP (Scheme No.3) to DPR
of Construction of 960 EWS
t/s & 768 MIG = 1728 Houses
at S.No.472 Chikhalthana
Aurangabad
28.94
..…
…...
Whether the provisions of Civic infrastructure has been made as per applicable State norms/
CPHEEO norms/ IS code / NBC?YES
YES
YES
vi) Solid waste management (Yes / No)
ii) Sewerage (Yes / No)
PROJECT INFORMATION
9.98
Tentativ
e Sale
Price
Per Unit
GoM
Share
GoI
Share
Beneficia
ry Share
960.00
Project Cost
Aurangabad
/
MHADA
1440.00
Rs. In Lakhs
Housing Infra Total
EWS 192 1453.6 137.90 1912.32
LIG 128 1225.43 117.08 1664
MIG 0 0 0 0
HIG 0 0 0 0
Total 320 2679.03 254.98 3576.32
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total98 21 11 62 192
vii) Any other, Specify)
viii) In case, any infrastructure has
not been proposed, reason thereof
1432
20000 Sq.mtr
Not in possession of MHADA
No developement Zone
i) Water Supply (Yes / No)
iii) Road (Yes / No)
iv) Storm water drain (Yes / No)
v) External Electrification (Yes / No)
vi) Solid waste management (Yes /
ii) Sewerage (Yes / No)
No. of EWS beneficiaries covered in
the project:
YES
YES
YES
Carpet
Area
sq.mt.
Of EWS
No. Of Dus
Name of
City
/
Impl.
Agency
Name of Scheme
Approval to proposals
under AHP (Scheme No.3)
to DPR of Construction of
192 EWS t/s & 128 LIG =320
Houses at G.No.326 Satara
Aurangabad
28.94
..…
…...
PROJECT INFORMATION
Whether the provisions of Civic infrastructure has been made as per applicable State norms/
CPHEEO norms/ IS code / NBC?YES
YES
YES
Project Cost
Aurangabad
/
MHADA
288 10
Tentativ
e Sale
Price Per
Unit
GoM
Share
GoI
Share
Beneficia
ry Share
192
Rs. In Lakhs
Housing Infra Total
EWS 192 14440.6 154.21 1914
LIG 48 490.8 53.52 624
MIG 0 0 0 0
HIG 0 0 0 0
Total 240 14931.4 207.73 2538
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total
98 21 12 61 192
..…
…...
PROJECT INFORMATION
Whether the provisions of Civic infrastructure has been made as per applicable State norms/ CPHEEO
norms/ IS code / NBC?YES
YES
YES
Project Cost
Aurangabad
/
MHADA
288
GoM
Share
GoI
Share
Benefici
ary
Share
192
Carpet
Area
sq.mt.
Of EWS
No. Of Dus
Name of City
/
Impl. Agency
Name of Scheme
AHP (Scheme No.3) to DPR of
Construction of 192 EWS t/s
& 48 LIG = 240 Houses at
G.No.134 Waladgoan,
Aurangabad
28.94
vii) Any other, Specify)
viii) In case, any infrastructure has not been
proposed, reason thereof
1432
20000 Sq.mtr
Not in possession of MHADA
No developement Zone
i) Water Supply (Yes / No)
iii) Road (Yes / No)
iv) Storm water drain (Yes / No)
v) External Electrification (Yes / No)
vi) Solid waste management (Yes / No)
ii) Sewerage (Yes / No)
No. of EWS beneficiaries covered in the project:
YES
YES
YES
Rs. In Lakhs
Housing Infra Total
EWS 240 1623.7 126.20 2345
LIG 0 0 0 0
MIG 160 1842.76 140.1 2400
HIG 0 0 0 0
Total 400 3466.46 266.3 4745
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total
122 26 14 78 240
vii) Any other, Specify)
viii) In case, any infrastructure has not been
proposed, reason thereof
1745
20000 Sq.mtr
Land granted possession to be taken by MHADA
Residential Zone
i) Water Supply (Yes / No)
iii) Road (Yes / No)
iv) Storm water drain (Yes / No)
v) External Electrification (Yes / No)
vi) Solid waste management (Yes / No)
ii) Sewerage (Yes / No)
No. of EWS beneficiaries covered in the project:
YES
YES
YES
Carpet
Area
sq.mt.
Of EWS
No. Of Dus
Name of City
/
Impl. Agency
Name of Scheme
AHP (Scheme No.3) to DPR of
Construction of 240 EWS t/s
& 160 MIG = 400 Houses at
G.No.9 Nakshatrawadi,
Aurangabad
28.6
..…
…...
PROJECT INFORMATION
Whether the provisions of Civic infrastructure has been made as per applicable State norms/ CPHEEO
norms/ IS code / NBC?
YES
YES
YES
Project Cost
Aurangabad
/
MHADA
360
GoM
Share
GoI
Share
Benefici
ary
Share
240
Rs. In Lakhs
Housing Infra Total
EWS 368 2963.52 253.08 3654.2
LIG 160 1779.69 110.03 2080
MIG 0 0 0 0
HIG 0 0 0 0
Total 528 4743.21 363.11 5734.2
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total188 40 22 118 368
10
Tentativ
e Sale
Price
Per Unit
GoM
Share
GoI
Share
Benefici
ary
Share
368
..…
…...
PROJECT INFORMATION
Whether the provisions of Civic infrastructure has been made as per applicable State
norms/ CPHEEO norms/ IS code / NBC?
YES
YES
YES
Project Cost
Aurangab
ad
/
MHADA
552
Carpet
Area
sq.mt.
Of
No. Of Dus
Name of
City
/
Impl.
Name of Scheme
AHP (Scheme No.3) to
DPR of Construction of
368 EWS t/s& 160 LIG =
528 Houses at
Padegoan G.No.68
Aurangabad.
28.94
vi) Solid waste management (Yes
ii) Sewerage (Yes / No)
No. of EWS beneficiaries covered
in the project:
YES
YES
YES
vii) Any other, Specify)
viii) In case, any infrastructure
has not been proposed, reason
2734
43839 Sq.mtr
Not in possession of MHADA
Residential Zone
i) Water Supply (Yes / No)
iii) Road (Yes / No)
iv) Storm water drain (Yes / No)
v) External Electrification (Yes /
Rs. In Lakhs
Housing Infra Total
EWS 898 6459.55 577.10 8585
LIG 0 0 0 0
MIG 436 6160.36 2699.21 8860
HIG 122 2725.66 645.62 3371
Total 1456 15346 3921.9 20816
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total466 102 56 274 898
vii) Any other, Specify)
viii) In case, any infrastructure
has not been proposed, reason
thereof
6340
118439.73 Sq.mtr
MHADA
Residential Zone
i) Water Supply (Yes / No)
iii) Road (Yes / No)
iv) Storm water drain (Yes / No)
v) External Electrification (Yes /
vi) Solid waste management
ii) Sewerage (Yes / No)
No. of EWS beneficiaries
covered in the project:
YES
YES
YES
Carpet
Area No. Of Dus
Name of
CityName of Scheme
AHP (Scheme No.3) to
DPR of Construction of
898 EWS, 436 MIG &
122 HIG = 1456
Housesat Akoli,
28.48
..…
…...
PROJECT INFORMATION
Whether the provisions of Civic infrastructure has been made as per applicable
State norms/ CPHEEO norms/ IS code / NBC?
YES
YES
YES
Project Cost
Amravat
i
/
MHADA
1347 10
Tentati
ve Sale
GoM
Share
GoI
Share
Benefi
ciary
898
Rs. In Lakhs
Housing Infra Total
EWS 304 1744.1 258.39 2587
LIG 0 0 0 0
MIG 108 1203.1 126.4 1330
HIG 0 0 0 0
Total 412 2947 384.8 3917
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total152 34 18 100 304
..…
…...
PROJECT INFORMATION
Whether the provisions of Civic infrastructure has been made as per applicable
State norms/ CPHEEO norms/ IS code / NBC?
YES
YES
YES
Project Cost
Amravati
/
MHADA
456 9
Tenta
tive
Sale
Price
GoM
Share
GoI
Share
Benefi
ciary
Share
304
Carpe
t
Area
sq.mt
No. Of Dus
Name of
City
/
Impl.
Name of Scheme
AHP (Scheme No.3) to
DPR of Construction of
304 EWS + 108 MIG =
412 Houses at S. No.53
Badnera Dist Amravati
28.48
vii) Any other, Specify)
viii) In case, any infrastructure has
not been proposed, reason
1827
28317.00 Sq.mtr
MHADA
Residential Zone
i) Water Supply (Yes / No)
iii) Road (Yes / No)
iv) Storm water drain (Yes / No)
v) External Electrification (Yes /
vi) Solid waste management (Yes /
ii) Sewerage (Yes / No)
No. of EWS beneficiaries covered
in the project:
YES
YES
YES
Rs. In Lakhs
Housing Infra Total
EWS 312 1790 358.01 2505
LIG 0 0 0 0
MIG 0 0 0 0
HIG 0 0 0 0
Total 312 1790 358.01 2505
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total
156 34 19 103 312
..…
…...
PROJECT INFORMATION
Whether the provisions of Civic infrastructure has been made as per applicable
State norms/ CPHEEO norms/ IS code / NBC?
YES
YES
YES
Project Cost
Amravati
/
MHADA
468 8
Tenta
tive
Sale
Price
Per
GoM
Share
GoI
Share
Benefic
iary
Share
312
Carpe
t Area
sq.mt
. Of
EWS
No. Of Dus
Name of
City
/
Impl.
Agency
Name of Scheme
AHP (Scheme No.3) to
DPR of Construction
of 312 EWS at
S.No.489 Nandgaon
Peth Dist. Amravati
28.48
vii) Any other, Specify)
viii) In case, any infrastructure
has not been proposed, reason
thereof
1725
18314.18 Sq.mtr
Not in possession of MHADA
Residential Zone
i) Water Supply (Yes / No)
iii) Road (Yes / No)
iv) Storm water drain (Yes / No)
v) External Electrification (Yes /
vi) Solid waste management (Yes
ii) Sewerage (Yes / No)
No. of EWS beneficiaries covered
in the project:
YES
YES
YES
Rs. In Lakhs
Housing Infra Total
EWS 256 1537.4 258.77 2021.5
LIG 0 0 0 0
MIG 20 3212.9 1699.7 4912.6
HIG 24 4626.5 1699.7 6326.3
Total 300 9377 3658.3 13260
Area of Land:
Ownership of Land:
Land Reservation
Gen SC ST OBC Other Total129 28 15 84 256
..…
…...
PROJECT INFORMATION
Whether the provisions of Civic infrastructure has been made as per applicable
State norms/ CPHEEO norms/ IS code / NBC?
YES
YES
YES
Project Cost
Amravati
/
MHADA
384 8
Tenta
tive
Sale
Price
GoM
Share
GoI
Share
Benefi
ciary
Share
256
Carpet
Area
sq.mt.
Of
No. Of Dus
Name of
City
/
Impl.
Name of Scheme
AHP (Scheme No.3) to
DPR of Construction of
256 EWS, 20 MIG & 24
HIG =300 Housesat
S.No.34 Yavtmal
Dist.Yavtmal
30
vii) Any other, Specify)
viii) In case, any infrastructure
has not been proposed, reason
thereof
1216
17733.00 Sq.mtr
Not in possession of MHADA
Residential Zone
i) Water Supply (Yes / No)
iii) Road (Yes / No)
iv) Storm water drain (Yes / No)
v) External Electrification (Yes /
vi) Solid waste management (Yes
ii) Sewerage (Yes / No)
No. of EWS beneficiaries covered
in the project:
YES
YES
YES
Rs. In Lakhs
Housing Infra Total
EWS 268 1742 148.00 2450
LIG 0 0 0 0
MIG 20 164.05 101.73 265.8
HIG 16 125.76 101.73 227.5
Total 304 2031.8 351.46 2943
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total
134 30 18 86 268
vii) Any other, Specify)
viii) In case, any infrastructure has not been
proposed, reason thereof
1799
39300.00 Sq.mtr
MHADA
Residential Zone
i) Water Supply (Yes / No)
iii) Road (Yes / No)
iv) Storm water drain (Yes / No)
v) External Electrification (Yes / No)
vi) Solid waste management (Yes / No)
ii) Sewerage (Yes / No)
No. of EWS beneficiaries covered in the
project:
YES
YES
YES
Carpet
Area
sq.mt.
Of
No. Of Dus
Name of City
/
Impl. Agency
Name of Scheme
AHP (Scheme No.3) to DPR of
Construction of 268 EWS, 20
MIG & 16 HIG = 304 Houses at
S.No.52/A, 53/2, 3,4,5
Buldhana Dist Buldhana
29.34
..…
…...
PROJECT INFORMATION
Whether the provisions of Civic infrastructure has been made as per applicable State norms/
CPHEEO norms/ IS code / NBC?
YES
YES
YES
Project Cost
Amravati
/
MHADA
402
GoM
Share
GoI
Share
Benefic
iary
Share
268
Rs. In Lakhs
Housing Infra Others
EWS 2016 14147.16 1458.4 7778.02
LIG 0
MIG 0
HIG 0
Total 2016
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total1008 222 121 665 2016
vii) Any other, Specify) NO
viii) In case, any infrastructure has not been proposed,
reason thereof…...
iv) Storm water drain (Yes / No) YES
v) External Electrification (Yes / No) YES
vi) Solid waste management (Yes / No) YES
i) Water Supply (Yes / No) YES
ii) Sewerage (Yes / No) YES
iii) Road (Yes / No) YES
11.60
6.16 Ha
MHADA
R-Zone
No. of EWS beneficiaries covered in the project:
2016.00 18343.58
Whether the provisions of Civic infrastructure has been made as per applicable State norms/ CPHEEO norms/ IS code /
NBC?
Approval to proposals under AHP
(Scheme No.3) to DPR of
Construction of 2016 T/s EWS,
Mouza- Mahadulla S.No.23/2 and
Lonara S.No.143/144 Nagpur
Nagpur
/
MHADA
29.91 3024.00
PROJECT INFORMATION
Name of Scheme
Name of City
/
Impl. Agency
No. Of DusProject Cost
Carpet
Area
sq.mt. Of
EWS
GoI Share GoM
Share
Beneficiar
y Share
Tentative
Sale Price
Per Unit
Rs. In Lakhs
Housing Infra Others
EWS 192 5021.27 357.16 1684
LIG 112
MIG 112
HIG 0
Total 416
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total140 21 12 0 19 192
vii) Any other, Specify) Rain water harvesting, STP is proposed
viii) In case, any infrastructure has not
been proposed, reason thereofNA
iv) Storm water drain (Yes / No) YES
v) External Electrification (Yes / No) YES
vi) Solid waste management (Yes / No) YES
i) Water Supply (Yes / No) YES
ii) Sewerage (Yes / No) YES
iii) Road (Yes / No) YES
10
10,700 SqM
MHADA
R-Zone
No. of EWS beneficiaries covered in the
project:
192 6583
Whether the provisions of Civic infrastructure has been made as per applicable State
norms/ CPHEEO norms/ IS code / NBC?
AHP (Scheme No.3) to DPR
of construction of 192 EWS
houses (Total project 192
EWS + 112 LIG + 112 MIG =
416 Houses ) on G.No.609
at Adgaon, Dist.Nashik.
Nashik
/
MHADA
28.11 288
PROJECT INFORMATION
Name of Scheme
Name of
City
/
Impl.
No. Of DusProject Cost
Carpet
Area
sq.mt.
Of
GoI
Share
GoM
Share
Benefi
ciary
Share
Tentati
ve Sale
Price
Per
Rs. In Lakhs
Housing Infra Others
EWS 448 2673.1 305.22 1344.9
LIG 0
MIG 0
HIG 0
Total 448
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total224 49 22 0 153 448
vii) Any other, Specify) NO
viii) In case, any infrastructure has not been proposed,
reason thereof…...
iv) Storm water drain (Yes / No) YES
v) External Electrification (Yes / No) YES
vi) Solid waste management (Yes / No) YES
i) Water Supply (Yes / No) YES
ii) Sewerage (Yes / No) YES
iii) Road (Yes / No) YES
1.04 Ha
Govt. Land
Public Housing
No. of EWS beneficiaries covered in the project:
448.00 3203.20
Whether the provisions of Civic infrastructure has been made as per applicable State norms/ CPHEEO norms/ IS code
/ NBC?
Approval to proposals under AHP
(Scheme No.3) to DPR of
Construction of 448 T/s EWS
Adgaon S.No 1560 Dist Nashik
Nashik
/
MHADA
29.00 672.00
PROJECT INFORMATION
Name of Scheme
Name of City
/
Impl. Agency
No. Of DusProject Cost
Carpet
Area
sq.mt. Of
EWS
GoI
Share
GoM
Share
Beneficiary
Share
Rs. In Lakhs
Housing Infra Others
EWS 224 1336.6 152.61 672.44
LIG 0
MIG 0
HIG 0
Total 224
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total
112 25 11 0 76 224
PROJECT INFORMATION
Name of Scheme
Name of City
/
Impl. Agency
No. Of DusProject Cost
Carpet
Area
sq.mt. Of
EWS
GoI
Share
GoM
Share
Beneficiar
y Share
Whether the provisions of Civic infrastructure has been made as per applicable State norms/ CPHEEO norms/ IS code
/ NBC?
Approval to proposals under AHP
(Scheme No.3) to DPR of
Construction of 224 T/s EWS
Deolali S.No 216 (Pt), Dist Nashik
Nagpur
/
MHADA
29.00 336.00
1.67 Ha
Govt. Land
Public Amenity
No. of EWS beneficiaries covered in the project:
224.00 1601.60
i) Water Supply (Yes / No) YES
ii) Sewerage (Yes / No) YES
iii) Road (Yes / No) YES
vii) Any other, Specify) NO
viii) In case, any infrastructure has not been proposed,
reason thereof…...
iv) Storm water drain (Yes / No) YES
v) External Electrification (Yes / No) YES
vi) Solid waste management (Yes / No) YES
Rs. In Lakhs
Housing Infra Others
EWS 168 1122.42 68.92 446.44
LIG 112 1040.78 64.38 414.61
MIG 56 801.81 49.93 389.34
HIG 0 0 0 0
Total 336 2965.01 183.23 1250.39
Area of Land:
Ownership of
Land:
Reservation on
Land:
Gen SC ST OBC Other Total84 17 10 0 57 168
168.00 1218.00
PROJECT INFORMATION
Name of
Scheme
Name of
City
/
Impl.
Agency
No. Of Dus
Project Cost Carpet
Area
sq.mt.
Of EWS
GoI
Share
GoM
Share
Benefici
ary
Share
Tentativ
e Sale
Price
Per Unit
Whether the provisions of Civic infrastructure has been made as per applicable State
norms/ CPHEEO norms/ IS code / NBC?
AHP (Scheme
No.3) to DPR of
construction of
168 EWS,
112LIG, 56
MIG houses
Gat
No.308(pt),
Shirur, Dist.
Pune.
PMR
/
MHADA
30 252.009.75
1.00 ha
GOM
Residential
No. of EWS beneficiaries
covered in the project:
i) Water Supply (Yes / Yes
ii) Sewerage (Yes / No) Yes
iii) Road (Yes / No) Yes
vii) Any other, Specify) Rain water harvesting,STP
iv) Storm water drain Yes
v) External Electrification Yes
vi) Solid waste Yes
Housing Infra Others
EWS 224 1469.90 78.43 582.03
LIG 140 1310.05 70.52 203.50
MIG 56 741.53 40.03 358.01
HIG 0 0.00 0.00 0.00
Total 420 3521.48 188.98 1143.54
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total112 25 13 0 74 224
vii) Any other, Specify) Rain water harvesting,STP
iv) Storm water drain (Yes / No) Yes
v) External Electrification (Yes / No) Yes
vi) Solid waste management (Yes / Yes
i) Water Supply (Yes / No) Yes
ii) Sewerage (Yes / No) Yes
iii) Road (Yes / No) Yes
Whether the provisions of Civic infrastructure has been made as per applicable State norms/
CPHEEO norms/ IS code / NBC?
AHP (Scheme No.3) to
DPR of construction of
224 EWS, 140 LIG, 56
MIG houses Gat
No.1131(pt), Shirur,
Dist. Pune.
PMR
/
MHADA
29.93 3369.51
1.00 ha
GOM
Residential
No. of EWS beneficiaries covered in
the project:
224 1570
PROJECT INFORMATION
Name of Scheme
Name of
City
/
Impl.
No. Of DusProject Cost
Carpet
Area
sq.mt.
Of
GoI
Share
GoM
Share
Benefi
ciary
Share
Tentati
ve Sale
Price
Per
Rs. In Lakhs
Housing Infra Others
EWS 1154 7754.8 570.96 3374.7
LIG 0 0
MIG 0 0
HIG 0 0
Total 1154 7754.8 570.96 3374.7
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total577 127 69 0 381 1154
vii) Any other, Specify) Rain water harvesting,STP
iv) Storm water drain (Yes / No) Yes
v) External Electrification (Yes / No) Yes
vi) Solid waste management (Yes / Yes
i) Water Supply (Yes / No) Yes
ii) Sewerage (Yes / No) Yes
iii) Road (Yes / No) Yes
Whether the provisions of Civic infrastructure has been made as per applicable State
norms/ CPHEEO norms/ IS code / NBC?
Approval to proposals
under AHP (Scheme
No.3) to DPR of
construction of 1154
EWS houses
S.No.1653(pt),
Chikhali, Pimpri-
Chinchwad Dist. Pune
PCMC
/
MHADA
29.73 173110.14
2.00ha
GOM
Residential
No. of EWS beneficiaries covered in
the project:
1154 8851
PROJECT INFORMATION
Name of Scheme
Name of
City
/
Impl.
No. Of DusProject Cost
Carpet
Area
sq.mt.
Of EWS
GoI
Share
GoM
Share
Benefi
ciary
Share
Tentati
ve Sale
Price
Per
Rs. In Lakhs
Rs. In Lakhs
Housing Infra Others
EWS 126 858.13 123.9 248
LIG 0 0 0 0
MIG 0 0 0 0
HIG 0 0 0 0
Total 126 858.13 123.9 248
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total63 14 8 0 41 126
vii) Any other, Specify) Rain water harvesting,STP
iv) Storm water drain (Yes / No) Yes
v) External Electrification (Yes / No) Yes
vi) Solid waste management (Yes / No) Yes
i) Water Supply (Yes / No) Yes
ii) Sewerage (Yes / No) Yes
iii) Road (Yes / No) Yes
Whether the provisions of Civic infrastructure has been made as per applicable State
norms/ CPHEEO norms/ IS code / NBC?
AHP (Scheme No.3) to
DPR of construction of
126 EWS houses
S.No.566(pt), Dighi,
Tal.Haweli, Dist. Pune
PCMC
/
MHADA
28.55 1899.76
0.4023 Ha
GOM
Residential
No. of EWS beneficiaries covered in
the project:
126 915
PROJECT INFORMATION
Name of Scheme
Name of
City
/
Impl.
Agency
No. Of DusProject Cost
Carpet
Area
sq.mt.
Of
EWS
GoI
Share
GoM
Share
Benefici
ary
Share
Tentati
ve Sale
Price
Per
Unit
Rs. In Lakhs
Housing Infra Others
EWS 750 4757.4 397.72 2127.7LIGMIGHIGTotal 750.00 4757.39 397.72 2127.70
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total
375 83 45 0 247 750
vii) Any other, Specify)Rain water harvesting,STP
iv) Storm water drain (Yes / No) Yes
v) External Electrification (Yes / No) Yes
vi) Solid waste management (Yes / No) Yes
i) Water Supply (Yes / No) Yes
ii) Sewerage (Yes / No) Yes
iii) Road (Yes / No) Yes
5407.81
6.43 Ha
GoM
R zone
No. of EWS beneficiaries covered in the
project:
1125.00 750.00
Whether the provisions of Civic infrastructure has been made as per applicable State norms/
CPHEEO norms/ IS code / NBC?
Approval to proposals under
AHP (Scheme No.3) to DPR
of construction of 750 EWS
houses S.No.818(618),
Chakan, Dist. Pune
PMR
/
MHADA 28.55 9.71
PROJECT INFORMATION
Name of Scheme
Name of City
/
Impl. Agency
No. Of DusProject Cost
Carpet
Area sq.mt.
Of EWS
Tentative
Sale
Price Per
Unit
GoI
Share
GoM
Share
Beneficiary
Share
Rs. In Lakhs
Housing Infra Others
EWS 760 5436.4 375.5 2217.5LIGMIGHIGTotal 760.00 5436.40 375.50 2217.51
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total
380 84 46 0 250 760
vii) Any other, Specify)Rain water harvesting,STP
iv) Storm water drain (Yes / No) Yes
v) External Electrification (Yes / No) Yes
vi) Solid waste management (Yes / No) Yes
i) Water Supply (Yes / No) Yes
ii) Sewerage (Yes / No) Yes
iii) Road (Yes / No) Yes
6129.40
1.3 Ha
GoM
R zone
No. of EWS beneficiaries covered in
the project:
1140.00 760.00
Whether the provisions of Civic infrastructure has been made as per applicable State norms/
CPHEEO norms/ IS code / NBC?
Approval to proposals under
AHP (Scheme No.3) to
DPR of construction of 760
EWS houses S.No. 12 (P),
Talegaon, Pune
PMR
/
MHADA 30 10.56
PROJECT INFORMATION
Name of Scheme
Name of City
/
Impl. Agency
No. Of DusProject Cost
Carpet
Area sq.mt.
Of EWS
Tentative
Sale Price
Per Unit
GoI Share GoM
Share
Beneficiary
Share
Rs. In Lakhs
Housing Infra Others
EWS 775.82 90.01 33.71 899.54LIGMIGHIGTotal 775.82 90.01 33.71 899.54
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total
56 13 7 0 36 112
PROJECT INFORMATION
Name of Scheme
Name of City
/
Impl. Agency
No. Of DusProject Cost
Carpet
Area sq.mt.
Of EWS
Tentative
Sale
Price Per
Unit
GoI
Share
GoM
Share
Beneficiary
Share
Whether the provisions of Civic infrastructure has been made as per applicable State norms/ CPHEEO
norms/ IS code / NBC?
Approval to proposals under
AHP (Scheme No.3) to DPR
of construction of 112 EWS
houses S.No.49A/1A,Godoli,
Dist. Satara
Adj to Satara MC
/
MHADA 27.94 8.03 619.36
0.61 Ha
GoM
R zone
No. of EWS beneficiaries covered in the
project:
132.00 112.00
i) Water Supply (Yes / No) Yes
ii) Sewerage (Yes / No) Yes
iii) Road (Yes / No) Yes
vii) Any other, Specify)Rain water harvesting,STP
iv) Storm water drain (Yes / No) Yes
v) External Electrification (Yes / No) Yes
vi) Solid waste management (Yes / No) Yes
Housing Infra Others
EWS 48 285.32 41.61 144.43
LIG
MIG
HIG
Total 48.00 285.32 41.61 144.43
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total
24 5 2 0 17 48
vii) Any other, Specify)Rain water harvesting,STP
iv) Storm water drain (Yes / No) Yes
v) External Electrification (Yes / No) Yes
vi) Solid waste management (Yes / No) Yes
i) Water Supply (Yes / No) Yes
ii) Sewerage (Yes / No) Yes
iii) Road (Yes / No) Yes
0.226 Ha
GoM
R Zone
No. of EWS beneficiaries covered in the project:
72.00 48.00
Whether the provisions of Civic infrastructure has been made as per applicable State norms/ CPHEEO norms/ IS code /
NBC?
Approval to proposals under AHP
(Scheme No.3) to DPR of
construction of 48 EWS houses
S.NO. 164(pt) 1+2 Sangli
Sangli
/
MHADA29.7 9.82
PROJECT INFORMATION
Name of Scheme
Name of City
/
Impl. Agency
No. Of DusProject Cost
Carpet
Area sq.mt.
Of EWS
Tentative
Sale
Price Per
Unit
GoI
Share
GoM
Share
Housing Infra Others
EWS 88 517.2 86 266.24LIGMIGHIGTotal 88.00 517.20 86.00 266.24
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total
44 10 4 0 30 88
PROJECT INFORMATION
Name of Scheme
Name of City
/
Impl. Agency
No. Of DusProject Cost
Carpet
Area sq.mt.
Of EWS
Tentative
Sale
Price Per
Unit
GoI
Share
GoM
Share
Whether the provisions of Civic infrastructure has been made as per applicable State norms/ CPHEEO norms/ IS
code / NBC?
Approval to proposals under AHP
(Scheme No.3) to DPR of
construction of 88 EWS houses
S.NO. 215/3, SANGLI
Sangli
/
MHADA 29.7 9.88
0.65 Ha
GoM
R Zone
No. of EWS beneficiaries covered in the project:
132.00 88.00
i) Water Supply (Yes / No) Yes
ii) Sewerage (Yes / No) Yes
iii) Road (Yes / No) Yes
vii) Any other, Specify)Rain water harvesting,STP
iv) Storm water drain (Yes / No) Yes
v) External Electrification (Yes / No) Yes
vi) Solid waste management (Yes / No) Yes
Rs. In Lakhs
Housing Infra Total
EWS 260 1561.38 321.08 2393.81
LIG 0 0 0 0
MIG 30 4819.28 2110 6929.28
HIG 14 3185.72 1181 1499.57
Total 304 9566.38 3612.08 10823
Area of Land:
Ownership of Land:
Reservation on Land:
Gen SC ST OBC Other Total130 29 16 85 260
vii) Any other, Specify) ..…
viii) In case, any infrastructure has not been proposed,
reason thereof…...
iv) Storm water drain (Yes / No) YES
v) External Electrification (Yes / No) YES
vi) Solid waste management (Yes / No) YES
i) Water Supply (Yes / No) YES
ii) Sewerage (Yes / No) YES
iii) Road (Yes / No) YES
23310.53 Sq.mtr
Not in possession of MHADA
Residential Zone
No. of EWS beneficiaries covered in the project:
260.00 1799.20
Whether the provisions of Civic infrastructure has been made as per applicable State norms/ CPHEEO norms/ IS
code / NBC?
Approval to proposals under AHP
(Scheme No.3) to DPR of
Construction of 260 EWS, 30 MIG
& 14 HIG = 304 Houses at
S.No.52/2 Wadgaon Dist.Yavtmal
Amravati
/
MHADA
30 390.00
PROJECT INFORMATION
Name of Scheme
Name of City
/
Impl. Agency
No. Of DusProject Cost
Carpet
Area
sq.mt. Of
EWS
GoI
Share
GoM
Share
Beneficiar
y Share