ARA Requirements & Coordination Procedure (DPEM)
SKIKDA LNG NEW TRAIN PROJECT
SKIKDA, ALGERIAdocument NO: PR101
ARA REQUIREMENTS AND COORDINATION PROCEDUREREVISION 517 APRIL
2008
SONATRACH
SKIKDA NEW LNG TRAIN PROJECT
SKIKDA, ALGERIA
ALGERIAN REGULATORY AUTHORITY (ARA - DPEM & ONML)
REQUIREMENTS AND COORDINATION procedure
BETWEEN ARA, PURCHASER (KBR) & SUPPLIER
Document NO. PR101
JOB NO.: J6404
517 Apr 08Issued for ImplementationD. PerryL. AlbrechtI.
Smith
43 Mar 08Issued for ImplementationD. PerryL. AlbrechtI.
Smith
38 Oct 07Issued for ImplementationL. AlbrechtD. PerryI.
Smith
224 July 06IFDAl TansiongcoI. MahmudB. Bradfield
16 Jun 06IFDA. TansiongcoI. MahmudB. Bradfield
023 Jan 06IFDAl TansiongcoJ. BrittonT. G. Jayanth
Rev.DateDescriptionByKBRKBRCLIENT
ChkdAppApp
CONTENTS
FRONT PAGE AND DOCUMENT REVISION RECORD
3ABBREVIATIONS
ALGERIAN REFERENCE DOCUMENTS31.0PURPOSE42.0GENERAL43.0TYPE OF
EQUIPMENT SUBJECT TO DPEM
CONTROL44.0DEFINITIONS55.0RESPONSIBILITIES66.0ITEMS SUBJECT TO
involvement of dpEM / ONML87.0Documentation SUBMITTALS158.0Scope of
DPEM Inspection (Circular 02 and 04)219.0Nameplates2410.0Document
Quantity & Format2411.0NOTICE OF INSPECTION &
TEST2612.0Equipment Release
Certificates2613.0ATTACHMENTS26ATTACHMENT 1: PRELIMINARY DOSSIER
FORMS, DOCUMENT 1 828ATTACHMENT 2: FINAL DOSSIER FORMS, DOCUMENTS
10 2438ATTACHMENT 3: DPEM DOCUMENTATION TRANSLATION
CHECKLIST53ATTACHMENT 4: FAX REQUEST FOR PRESENCE OF DPEM/ONML
INSPECTOR57ATTACHMENT 5: ARA / DPEM DOCUMENTATION &
ACTIVITIES58ATTACHMENT 6: FLOWCHART PRELIMINARY DOSSIER59ATTACHMENT
7: EQUIPMENT LISTINGS60
ABBREVIATIONSARA
Algerian Regulatory AuthorityDPEMDirection du Patrimoine
Energtique et Minier du Ministre de l Energie et des
MinesONMLOffice National de la Mtrologie Lgale (National
Organization for Legal MeasurementsSH
Sonatrach, the Client/OwnerKBR
Kellogg Brown & Root International, Inc., the
Purchaser/ContractorITP
Inspection and Test Plan
LNG
Liquefied Natural Gas
PSV
Pressure Safety ValvesQCP
Quality Control Plan
SDR
Supplier Document RequirementsALGERIAN REFERENCE DOCUMENTS
DPEM Circular No. 2 Technical Control Regulations for
Installations for the Treatment and Storage of Hydrocarbons and
Electric Power Generating Stations
DPEM Circular No 4 - Technical Inspection Regulations for
Installation for Export of Liquid Hydrocarbons, Liquefied
Hydrocarbons and Gasses Under Pressure and Associated WorksDecree
90-245 - Statutory Regulations for Gas Pressure Equipment
Decree 90-246 Statutory Regulations for Steam / Vapour Pressure
Equipment
Decree 88-35 Statutory Regulations for Pipelines and Auxiliary
Facilities Related to the Production and Transportation of
Hydrocarbons and Applicable Procedures
1.0 PURPOSE
The purpose of this document is to define the Skikda New LNG
Train Project responsibilities for the coordination of all parties
involved in the inspection and test activities, at fabrication
shops and jobsite that are subject to the approval and acceptance
of the Algerian Regulatory Authority (ARA), through agencies
Direction du Patrimoine Energie et des Mines (DPEM), and National
Office of Legal Metrology (ONML).
2.0 GENERAL
The requirements of this procedure apply to the equipment,
devices and material that are subject to ARA control. These
requirements do not have any effect on the inspections required by
Purchaser and any waiver by ARA is not to be construed as a waiver
of any other requirements for inspection by Purchaser or any other
obligation of the Supplier noted elsewhere in the Purchase
Order.Supplier and Suppliers sub-suppliers will be subject to
inspection of all materials and equipment being manufactured or
supplied. The Supplier shall pass on the requirements of these DPEM
inspections to all of the Suppliers contracts (purchase orders) to
its sub-suppliers. These inspections are in addition to any other
inspection or testing requirements noted elsewhere.
The Supplier will undertake to facilitate all inspections made
by ARA, Client personnel, or other third parties related to ARA or
Owner, under authority of ARA, on the premises. The Supplier
further undertakes to facilitate ARAs attendance at all inspection
or acceptance tests planned or required by contract to be conducted
by the Supplier or Sub-supplier.
REFERENCE: DPEM Circular No. 2 & 4, Algerian Decrees 90-245,
90-246 & 88-353.0 TYPE OF EQUIPMENT SUBJECT TO DPEM CONTROL
The following types of equipment are generally subject to DPEM
regulations and testing when they meet the criteria detailed
below.
Pressure equipment, with conditions.
Safety systems such as CO2, fire water pump and foam
extinguishing systems.
Fire fighting gas bottles and mass-produced pressure bottles of
ASME UM design (stamped or not)
Electrical equipment rated at 5.5 kV or higher.
Pressure Safety Valves, with conditions.
Valves (Control Valves, and other valves meeting piping
criteria)
Gas or vapour compressors, with conditions.
Instrument Air Compressors- air compressor casing
Fire extinguishers whose capacity exceeds five (5) Litres, with
conditions.
Auxiliary Systems for Packaged Equipment
Filters, fuel gas filters.
Lifting device above 5 tons. (ex: Overhead Crane and Man Lifts)
Shop Fabricated & Field-Erected Tanks (see paragraph 6.2.4)A
Preliminary and a Final Dossier are required for all the equipment
and material falling within DPEMs scope.
For off-the-shelf, (stock) items of piping materials safety
systems components, electrical power cables or other electrical
items (5.5 Kv and higher) that fall under the DPEM criteria, the
supplier shall submit a Technical File The contents of the dossiers
above are detailed in Sections 7.4, 7.5 and 7.7 of this procedure.
All documents must be provided In French & English and in
quantities shown in Section 10, and as summarized in Attachment
3.4.0 DEFINITIONS
The definitions below refer to terms used in this procedure and
are used for convenience of reference in this procedure only.
Contractual terms shall be as defined in the Project Terms and
Conditions of Purchase.
Preliminary & Final Dossier: A compilation of mandatory
documents which provides a record of quality checks performed by
the Supplier throughout the design and manufacture of the item. The
Dossiers require Algerian Regulatory Authority approval.
Direction du Patrimoine Energie et Mines (DPEM): An Algerian
Regulatory Authority Agency responsible for compliance with
applicable decrees and regulatory technical controls, and for
performing independent Inspection and Witness of Equipment Test at
fabrication locations and Algerian construction Sites.
National Office of Legal Metrology (ONML): An Algerian
Regulatory Authority Agency responsible for compliance with
applicable decrees and regulatory technical controls, and for
performing independent Inspection and Witness Testing of Fiscal
Metering Package at Suppliers location and Algerian construction
Sites.
Quality Control Plan (Inspection & Test Plan): Purchase
Order specific document that clearly identifies in chronological
and sequential order all manufacturing Inspection & Testing
requirements performed by the Supplier / Sub-supplier with facility
for all parties to indicate proposed Quality Control activities.
The Quality Control Plan identifies the witness and hold points for
the Supplier, Purchaser, Owner and ARA. Owner and ARA witness and
hold points will be provided by Purchaser Supplier Document
Requirements (SDR): A listing of documents required to be submitted
to Purchaser including document submittal codes and target dates
for submittal. Inspection and Test Plan (ITP): A Purchasers quality
control form contained in requisitions. Originals: The supplier
document that contains wet stamp, signatories and endorsed original
from which copies are made. The originals of the Dossiers shall be
delivered to the Purchaser.
5.0 RESPONSIBILITIES
5.1 Purchaser
The Purchaser (KBR) is responsible for the following:
Facilitating the service agreement between Purchaser and the
relevant ARA.
Advising the Supplier of relevant ARA involvement by including
this procedure in the inquiry (request for quotation)
documents.Ensuring Purchaser Inspector performs a review of
Preliminary & Final Dossier at Supplier location prior to
submittal to Purchasers home office for processing and forwarding
to ARA.
Controlling and expediting the submission and distribution of
the Suppliers Preliminary and Final Dossier to the relevant ARA and
Owner.
Ensuring the Purchasers inspector performs the required
activities prior to the ARA Inspection.
Issuing all inspection and test notifications to relevant ARA
per Section 11.0, and confirmation of ARA inspection activities to
the Supplier.
5.2 SupplierThe Supplier is responsible for the following:
5.2.1 Identifying, in the Bid, all items, components and/or
appurtenances in the scope of supply that meet the criteria of
paragraph 6.0 and, hence, are subject to ARA involvement. This is
particularly important for equipment such as compressors, control
valve actuators, hydraulic power supplies and the like that contain
piping, accumulators, filters and other components and
appurtenances that are dependant on the Suppliers design.
5.2.2 Submitting to Purchaser an overall schedule, including
tests, within the time shown after receipt of Purchase Order in the
Purchasers SDR included in the Purchase Order.5.2.3 Ensuring that
Attachment 1 Document 2, Certification by the Chamber of Commerce
of the Fabricator Signatures Algerian Consulate Stamp and Document
3 Certificate of Conformity and of Internal and External
Inspections, Attesting that the Equipment Constructed Conforms to
the Country of Origin is completed and fully signed by all parties,
including the Fabricators local Chamber of Commerce (as
applicable). 5.2.4 Ensuring Certificate of Conformity and of
Internal and External Inspection (Attachment 1 - Document 3) are
stamped by the Algerian Consulate.
5.2.5 Compiling the Preliminary Dossier and submitting it to the
Purchaser preferably 6 weeks after purchase order / sub-order
placement (but not less than 50 calendar days prior to commencement
of fabrication) for items relevant to DPEM / ONML involvement. See
Attachment 1 for Contents of this Dossier.5.2.6 Issuing to the
Purchaser all inspection notifications for DPEM / ONML activities
as indicated in the agreed Quality Control Plan. Notifications
shall be made at least 45 days in advance the tests in accordance
with the production and testing schedule. (See Section 11.0)5.2.7
Ensuring the applicable documentation is prepared and available for
DPEM inspectors review prior to test, per Section 8.1.5.2.8
Submitting Final Dossier to Purchaser within thirty (30) calendar
days after successful completion of scheduled works and prior to
shipment.5.2.9 Ensuring a French and English copy of each approved
Preliminary Dossier is retained for DPEM Inspectors review per
paragraph 8.1.5.3 DPEM / ONML
The DPEM/ONML is responsible for the following:
5.3.1 Approving the Preliminary and Final Dossier of designated
equipment and materials as indicated in the Convention
(Contract).
5.3.2 Reviewing and approving Preliminary Dossier and issuing
approval consent within forty five (45) calendar days of
submission.
5.3.3 Confirming attendance or non-attendance by their
representative at the indicated inspection activity, per Suppliers
Quality Control Plan (Inspection and Test Plan).5.3.4 ONML is
responsible for the Independent Inspection and Witness calibration
of Fiscal Metering packages.
5.3.5 Endorsing all relevant Final Dossier documents at
Suppliers facility (Documents 19, 20 & 22) during their
visit.
6.0 ITEMS SUBJECT TO involvement of dpEM / ONML
6.1 General:If a device (pressure container) or material is
within the DPEM scope as defined below, the supplier is notified by
the inclusion of this procedure in the procurement package. Members
of DPEM will conduct an inspection or witness testing. If DPEM does
not attend, they may request the Purchaser to assign a third party
to inspect or witness on their behalf. 6.2 Detailed Requirements
and Criteria Pressure Devices (Reference: Algerian Decree 90-245,
Gas Pressure Equipment) The following items are some examples that
are considered as pressure devices:
Furnaces-C02 Bottles (and other gasses) Reactors-N2 Fire
Extinguishers Columns-Compressor Heat Exchangers-Piping Air
Coolers-Pressure Vessels Separators-Filters
Please see Attachment 7 for Equipment Listings that require DPEM
presence. For detailed information see the individual Articles6.2.1
Other Gas Pressure Devices (Pressure Containers)Gas Pressure
Devices that are not steam or hot water vessels come within DPEM
scope when they are handling liquid hydrocarbon, compressed gas,
liquefied or dissolved gas and pressurized overheated liquids, and
if the following conditions are simultaneously met (Decree 90-245,
Article 2, Item 1): The design pressure exceeds 4 BarG The
characteristic number; i.e. the product of the design pressure
expressed in BarG, multiplied by the capacity expressed in Liters,
exceeds the number 80.
6.2.2 Steam Pressure Devices (Reference: Algerian Decree 90-246,
Steam Pressure Equipment)
This portion of the Algerian Regulations is not applicable to
this procedure for the Skikda New LNG Train Project.6.2.3 Storage
Tanks
The hydrocarbon, hazardous product and fire water storage tanks
are within the scope of DPEM.
The water storage tanks (other than fire water) are not subject
to DPEM inspection
Tanks operating at atmospheric pressure, with direct access to
the atmosphere, are generally excluded from the scope of DPEM.
Supplier is required to notify and obtain the advice of the
Purchaser for any tank designed to contain hazardous liquids which
could, under maximum overfill conditions, be subject to a
hydrostatic pressure such that the stress in any member is equal
to, or exceeds, five eighths (5/8) of the elastic limit of the
material being used.
6.2.4 Pumps (Decree 90-245, Article 2, Item 1)
Pumps, except firewater pumps, are generally excluded from the
DPEM scope but Supplier / Sub-supplier shall notify and obtain
advice from Purchaser for any pump which has a fabricated casing or
body. In that case, the criteria for gas pressure devices,
paragraph 6.2.2, shall apply.
6.2.5 Turbines
DPEM does not witness the testing of the turbines but will
witness its components that are under DPEM jurisdiction (e.g. lube
oil systems/piping systems).
6.2.6 Compressors (Decree 90-245, Article 1, Item 3)
Compressors of gases or vapors other than steam are within the
DPEM inspection scheme if the following two conditions are
simultaneously met for the fluids specified.
A. Non hazardous liquids
Delivery pressure exceeds 10 BarG Characteristic Number, i.e.,
the product of the maximum delivery pressure (expressed in BarG),
multiplied by the maximum design flow rate under delivery
conditions (expressed in cubic meters per minute), exceeds the
value 50.
B. Hazardous liquids (Explosive, flammable, toxic or
corrosive)
Delivery pressure exceeds 4 BarG Characteristic Number exceeds
the value 20.
C. DPEM shall attend hydrostatic testing of casting or body.
6.2.7 Appurtenances
Supplier is reminded that electrical ancillaries, instruments,
filters and interconnecting pipe work will be subject to DPEM
scrutiny if they exceed the characteristics defined in the relevant
paragraphs of this procedure.
6.2.8 All Gas Pressure Devices (Pressure Containing
Equipment)Supplier shall ensure that the equipment is designed for
hydrotest at 1.5 times the design pressure in the installed
condition. Further, under a pressure equal to the design pressure,
the stress in the metal in the wall under pressure is less than the
lower of the following two values: One third (1/3) of the tensile
strength of the metal at normal temperature
Five eights (5/8) of the yield stress (0.2% permanent
elongation) of the metal at maximum operating temperature.
If the operating conditions are likely to cause creep of the
metal, the work rate must also be limited according to the
specified temperature and service life.6.2.9 Motors and Engines
Low voltage utility Motors and Engine drivers are not normally
subject to DPEM scrutiny. High voltage and fire or emergency
service motors and engines may come under their scrutiny. If an
item comes within the DPEM scope, a Preliminary Dossier is required
to be submitted for DPEM review and approval.
A. Motors are subject to DPEM inspection if:
The maximum voltage rating is equal to or exceeds 5.5 kV
The motors drive fire pumps or other essential or emergency
services
DPEM shall attend routine and final acceptance tests of
motors.
B. Engines are not normally subject to DPEM scrutiny unless they
drive, either directly or indirectly, fire pumps or other essential
or emergency service. In these cases Preliminary and Final Dossiers
shall be submitted.
C. Appurtenances: Electrical ancillaries, instruments, fuel /
oil filters, pneumatic and hydraulic accumulators, and
interconnecting pipe work will be subject to DPEM scrutiny if they
exceed the characteristics defined in the relevant paragraphs of
this procedure.
6.2.10 Mechanical Handling, Passenger Lifts / Man-riding Hoists,
Overhead Cranes, For Mechanical handling equipment where the
designed safe working load equals, or exceeds, 5 metric tons, DPEM
require that one of its accredited Algerian third party inspection
agencies (like ENACT) attend load testing.
For items deemed within the scope above, a Technical File will
be submitted for the inspection agency for review and approval.
6.2.11 Electrical (Reference: DPEM Circular No. 2)
Electrical equipment may be subject to DPEM scrutiny. For items
deemed within the scope, a Preliminary Dossier, containing design
premises etc., is to be submitted for DPEM review and approval.
The following electrical equipment and material are within the
DPEM scope if the voltage rating is equal to or exceeds 5.5 kV.
A. Transformers
B. MCC
C. Switchgears
D. Switches (Large transition switching units)
E. Generators
F. Motors
G. Cables
DPEM retains an interest in emergency power supplies and other
safety related aspects such as grounding arrangements, lightning
protection, interlocks etc. Details of emergency switchboards and
safety related aspects may be required.
DPEM shall attend final acceptance tests of electrical appliance
to confirm compliance with IEEE, IEC and NEMA regulations
6.2.12 Instruments
With the exception of Pressure Safety valves, instruments and
instrument material are not normally subject to DPEM
inspection.
A second Algerian Authority ONML (National Office of Legal
Measurement) will be concerned only with legal measuring components
or systems, such as Fiscal Metering devices.A. Pressure Safety
Valves & Control Valves
Pressure Safety Valves are within the scope of DPEM. These
valves need to be checked for opening and closing pressures and
tightness. Their primary concerns will be the disposition of PSVs
within a system, the witnessing of off-line tests and correct
installation. Design appraisal and witnessing of tests of
individual PSVs in the factory will, if at all, be limited to
large, novel or particularly critical applications. Supplier shall
notify Purchaser of any non -standard items and obtain advice. The
valve body shall be classified by the criteria shown for piping
materials.
Control valves that will contain potentially hazardous gasses or
liquids under pressure may also be within the scope of DPEM, in
which case the above requirements for design appraisal and testing
shall apply.
DPEM shall attend hydrostatic testing of Pressure Safety Valves
and Control Valves. (Functional Test, Pressure Setting, Leak
Test).
B. Legal Measuring Instruments
Instruments concerned with measurement of physical properties of
a product for custody transfer are subject to approval, calibration
and certification by ONML. A Preliminary Dossier shall be prepared
for each type of instrument, such as LACT, MPFM, or other fiscal
metering device.C. General InstrumentsAll instruments and
instrument material shall be selected and /or designed such that
they are suitable for the purpose for which they are intended to be
used. Instruments with an electrical content that could therefore
be spark or heat-generating shall be suitable for use in the area
specified and defined by the Hazardous Area drawings, and as stated
in the Purchase Order or Subcontract and its attachments.D.
CertificationsSuitable internationally recognized Hazardous Area
Certification shall be submitted to PURCHASER for all explosion
proof electrical instruments intended to be located in hazardous
areas.
6.2.13 Piping, Process Piping and Pipeline System
Piping material may be subject to DPEM control. For items deemed
within the scope, a Preliminary Dossier, containing design premises
etc. is to be submitted.
A. Process Piping (Ref: Decree 90-245, Article 2, Item 4)
The piping for plant is subject to DPEM inspection if the
following three (3) conditions are simultaneously met:
The design pressure exceeds 10 BarG The internal diameter
exceeds 80 mm
The Characteristic Number, i.e., the product of the design
pressure expressed BarG, multiplied by the internal diameter
expressed in mm, exceeds the number 1500.
B. Piping for Flowlines and Export Pipeline (Ref: Decree
88-35)
This portion of the Algerian Regulations is not applicable to
this procedure for the Skikda New LNG Train Project.6.2.14
Valves
Valves, other than control valves and PSVs, made in accordance
with internationally recognized Codes and Standards are considered
by DPEM as pipe fittings.For non-standard valves, the criteria laid
down for Pressure Vessels in Section 6.2.2 will apply.
DPEM shall attend hydrostatic testing of valves within its scope
(body hydro and leak test).
6.2.15 Process Pipe & Pipe Fittings (Supplier shop
fabrication and field fabrication) Pipe and pipe fittings for use
in services other than steam and water are within the DPEM
inspection scope if the following three (3) conditions are
simultaneously met:
A. Non-hazardous gases and liquids other than steam or water
Inside Diameter > 80mm
Design Pressure > 10 BarG Characteristic Number > 1500
(the product of the design pressure expressed in BarG multiplied by
the internal diameter expressed in mm, exceeds the number 1500) B.
Explosive, flammable, corrosive or toxic gases or liquids
Inside Diameter > 80mm
Design Pressure > 4 BarG Characteristic Number > 1000
C. Requirements for Steam and Super-heated water pipes are not
applicable to the Skikda New LNG Train Project due to the diameter
of the pipe.
NOTE: Cold water pipes are not within the DPEM inspection
scope.
6.2.16 Piping Specialties
Piping specialties are considered by DPEM as pressure retaining
items. The criteria laid down for pressure vessels in paragraph
6.2.2 of this procedure apply.
6.2.17 Loss Prevention Systems and Equipment
Loss prevention systems and equipment are normally subject to
DPEM control. For items deemed within the scope, a Preliminary
Dossier, containing design premises etc is to be submitted for DPEM
review and approval before manufacture starts. (Ref: Circular No.
2).A. Fire Fighting
Fire fighting systems are within the scope of DPEM. DPEM will
appraise firewater distribution, drawings, firewater demand
calculations, the positions of hydrants, monitors, hose-reels
etc.
Foam, powder and inert gas systems will similarly be
examined.
Fire extinguishers and other mobile or portable fire fighting
devices shall also be examined for suitability of design and
construction as well as their disposition on site.
DPEM shall attend hydrostatic testing and functional testing for
all fire fighting equipment.
Pressure retaining items shall be considered as pressure vessels
as defined in paragraph 6.2.2 of this procedure. Supplier shall
notify and obtain the advice of Purchaser regarding the inclusion
of any pressure retaining item within the DPEM scope.
B. Bottles of Carbon Dioxide, Nitrogen and other gasses are
within the DPEM scope if the following two conditions are
simultaneously met:
Design pressure greater than 4 BarG The product of the design
pressure expressed in BarG multiplied by the capacity expressed in
Liters; exceeds the number 10.NOTE: CO2 and N2 gas bottles are
typically supplied to the Supplier direct from their Sub-supplier,
under the Suppliers responsibility, in accordance with the
specification provided. Supplier shall submit Preliminary and Final
Dossiers in accordance with this procedure. When the DPEM Engineer
visits site and reviews the dossiers, they will stamp the bottles
alongside the supplied serial number, manufacturer name and date of
manufacture. These stamps are required to enable refilling of the
bottles in Algeria.C. Fire Extinguishers (with parts having a
capacity greater that five (5) liters) are within the DPEM scope if
the following two (2) conditions are simultaneously met: (Ref
Decree 90-245, Article 2, item 5) Design pressure greater than 4
BarG The product of the design pressure expressed in BarG,
multiplied by the capacity expressed in Liters, exceeds the number
80, or if the capacity is greater that one (1) liter, the product
is ten (10)D. Fire & Gas Detection Equipment (in Plant Safety
Dossier) gas, flame, smoke, cold and heat detectors and alarms
shall be subject to DPEM approval. Location drawings and details of
each detector type deployed shall be submitted.
The fire and gas system logic, panels, and data transmission is
subject to DPEM review.
DPEM shall attend functional tests of Fire and Gas Detection
systems.
6.2.18 Sewage Networks (Ref: DPEM Circular No. 2, Plant Safety
Dossier)
Sewage Networks shall be within DPEM scope. The following shall
be subject to control by DPEM:
A. General map of sewage networks
B. Construction of sumps and manholes
C. Hydraulic guard against flame spread / propagation
D. Calculation of sewage network flow rates
E. Material used.
6.2.19 Pipelines associated with Hydrocarbons Productions (Ref:
DPEM Circular No. 4, Pipeline System Dossier, and Decree 88-35) See
paragraph 7.8 for Table of Content The following pipelines are
considered as associated with hydrocarbons production:
A. Flowline pipelines that connect either the wellhead to the
center for hydrocarbon gas processing or separation and processing
centers to the re-injection facilities, or the separation centers
to the flow main centers (C.P.C).
B. Service pipelines that connect the re-injection facilities to
injection wellhead.
C. Sewers that connect either the processing centers to the main
pipelines, or either flowline main centers to main pipelines,
processing and separation centers located in an exploration license
area to a re-injection center in another exploration license
area.6.2.21For package units, skids and systems, the Supplier is to
review the individual components to see if they fall under DPEM
regulations, if so, each individual item requires a Dossier. The
Supplier shall supply KBR with a detailed list of each individual
component and their characteristics that relate to DPEM criteria
for that type of equipment (ex.: design temperature and pressure,
flow rate, volume and size).7.0 Documentation SUBMITTALSThis
Section details documents to be prepared and submitted by
suppliers, subcontractors and/or the contractor, and the general
sequence of submittal. (See also paragraph 10.0 and Attachment 5)
7.1 Suppliers Bid Inclusion (Pre-Award)
The Purchasers Requisition Form SDR will indicate the
requirement to submit Preliminary and Final Dossiers or Technical
files for relevant items, parts and appurtenances of the scope of
supply that are to be involved with the DPEM based on the criteria
listed in Section 6.0.
The Supplier shall include within his quotation the relevant
items/parts of the scope of supply that are in accordance with the
criteria.
The Supplier shall also confirm that his quotation includes all
documentation and submittals relative to DPEM involvement
(Schedules, Preliminary Dossier, Final Dossier, Technical Files and
relevant Test Data) in accordance with this procedure and SDR.
The Supplier shall be aware of the documentation requirements
contained in this procedure. It is incumbent on each Supplier to
ensure that the necessary reviews and approvals can be obtained in
a timely manner such that there will be no slippages in equipment
deliveries.
Summarized ARA document submission and Inspection Notification
Schedule etc, are shown in the DPEM documentation and activities
Coordination Schedule (see Attachment 5 for reference).
7.2 Inspection Coordination Schedule
The Supplier is to prepare an overall schedule including shop
fabrication, inspection and testing activities and document
submission that can be used by the Purchaser and DPEM for planning
inspection visits for the equipment, and to maintain the schedule
updated as required. The schedule is to be issued to Purchaser
within the time after Purchase Order commitment as indicated in the
Purchase Order form SDR. Further submissions shall be attached to
the weekly/monthly report or made as required by the. SDR.7.3
Quality Control Plan (Inspection & Test Plan)
The Supplier is to submit a specific and unique Purchase Order
Quality Control Plan (Inspection & Test Plan) in accordance
with project requirements (SDR) to cover all the activities;
Fabrication, Inspection & Test performed by the Supplier
necessary to provide the equipment (See Attachment 1, Document
8).
Purchaser Requisitioning Engineer, Quality Manager, and Project
Procurement Quality Control Manager will review the Suppliers
Quality Control Plan (Inspection & Test Plan) which must be
tied together with the Suppliers Fabrication Schedule in the
shop.
The DPEM Representative will be invited to witness the testing
of equipment in accordance with the criteria stated in paragraph
8.1 The Supplier is responsible for indicating on the Quality
Control Plan (Inspection & Test Plan) the required
Inspection/Testing activities of the DPEM in accordance with the
criteria stated in paragraph 8.1.
7.4 Preliminary Dossier Supplier shall prepare Preliminary
Dossier in accordance with this document and submit to Purchaser.
The Purchaser will check the Dossier and submit to DPEM for
approval.Preliminary Dossier for items relevant to DPEM involvement
is to be submitted to the Purchaser preferably 6 weeks after
purchase order / sub-order placement but no less than 50 calendar
days prior to commencement of fabrication of the relevant item.
Purchaser shall submit the Preliminary Dossier to the DPEM for
approval on the Suppliers behalf. Purchaser shall also expedite the
required approval and inform the Supplier when this has been
obtained.
The Preliminary Dossier shall be composed of the documents
mentioned below.
The Preliminary Dossiers shall be separate to the Final Dossier
and shall be complete with a cover sheet (per Attachment 1) and an
index with clearly indicated section dividers containing the
relevant document number, indicating selected contents.
Provide a Table of Contents, (if more than one volume, each
volume shall have Table of Contents)
Section 1A letter of request for approval of the Preliminary
Dossiers (Attachment 1 Document 1). Supplier to complete and insert
(2 originals in English & French). Signed by the responsible
Supplier Project Director or Manager.Section 2Certification by the
local Chamber of Commerce of the Fabricators Signatures and
Algerian Consulate Stamp (Att 1, Doc 2) (2 originals in English
& French). It requires endorsement and stamping by Chamber of
Commerce or State Department & Algerian Consulate. This
document is the Suppliers responsibility for completion including
the signature of the local Chamber of Commerce and the stamp of the
nearest Algerian Consulate to the place of fabrication.
Section 3Certificate of Conformity and of Internal and External
Inspections (Att 1, Doc 3) (2 originals in English and French).
Requires endorsement and stamping by local Chamber of Commerce or
State Dept. & Algerian Consulate. This document is the
suppliers responsibility for completion, including the stamp of the
nearest Algerian Consulate to the place of fabrication. Section
4Equipment / Material description (Att. 1, Doc 4)
Section 5Design Calculations (Att. 1, Doc 5)
Section 6Drawings and Data Index listing the pertinent document
numbers applicable to the equipment (Att 1, Doc 6) include general
arrangement drawings other relevant detailed drawings and / or data
sheets.
Section 7Approved Welding Procedure Specifications (WPS)
(signatures affixed) Section 8Quality Control Plan (Inspection and
Test Plan) (Att 1, Doc 8).
The above Dossier, once completed per sample Attachment 1, shall
be sent in accordance with Purchase Order SDR to Purchasers
Document Control Center, who shall submit them to the relevant
parties.
The Supplier shall not proceed with fabrication activities
before obtaining DPEM approval. Time frame for approval, including
transmission period is 7 weeks after receipt of the Preliminary
Dossier by the Purchaser who checks it and sends it to DPEM. After
this period the Purchaser shall authorize the Supplier to commence
fabrication in the absence of a DPEM reply.Notes:
1. An advance Preliminary Dossier can be forwarded without the
official Countrys Chamber of Commence or State Department or
equivalent entity and Algerian Consulate stamping and signature for
Section 2 and 3 in cases where these documents would require a lot
of time and cause a delay in the transmission of the Preliminary
Dossiers to the DPEM. In the Preliminary Dossier, Supplier shall
state that the Chamber of Commerce and Algerian Consulate stamping
and signature is being obtained and in progress. The outstanding
stamped and endorsed documents, sections 2 and 3 are to be
transmitted by the Supplier to Purchaser within 3 weeks of the
Preliminary Dossier submittal.
2. A series of identical equipment shall be grouped in one (1)
single Preliminary Dossier; however, this file must indicate each
item number in the complete list. A Final Dossier must be provided
for each item.
3. For equipment description (Section 4) for reactors, columns,
heat exchangers, air coolers exchangers, compressors, separators,
filters, pressure vessels and tanks, the DPEM model (Attachment 1,
Document 4) shall be used.
For equipment description for other pressure devices (valves,
pressure safety valves), electrical equipment and material and for
the overhead cranes, the DPEM model (Attachment 1, Document 4)
shall be modified with regard to the specifics of each kind of
apparatus.
4. The calculations (Attachment 1, Section 5), concerning the
pressure devices required in the Preliminary Dossier shall detail
principally the thickness of the parts under pressure (shells,
heads, nozzles) and opening reinforcements.
5. The Welding Procedure Specification (WPS) is required only
for pressure devices, tanks, valves and line pipes for
pipeline.
6. Number of copies required to be submitted are shown in
Section 10 of this procedure.
7. The Table of Contents in Attachment 1 is mandatory for
pressure equipment. If a section is not relevant, please indicate
Not Applicable.
8. Purchaser recommends that documents 1, 2 & 3 (of
Attachment 1) are produced on relevant supplier / sub-supplier
letter head paper.
9. Supplier is required to retain a copy of each Preliminary
Dossier (English and French) for DPEM inspectors review during the
shop visit.
10. The Preliminary Dossier is a separate document from the
Final Dossier.
11. The Purchasers assigned inspector, where possible, will
review and endorse the Preliminary Dossier at the Supplier /
Sub-supplier location to ensure correct compilation prior to
submittal to the Purchaser.12. If changes to the work are made
after approval of the Preliminary Dossier, for example, item
tagging, or instrument manufacturer or model number, a revised
dossier must be submitted in the same manner as the original.13.
The requirements for endorsement and stamping by the Chamber of
Commerce, Department of State or other such entity prior to
stamping by the Algerian Consulate vary from country to country.
PURCHASER advises the Supplier to verify the requirements in their
country as soon as possible. In some areas the Supplier may find a
document authentication service provider to obtain the endorsements
and stamps.
7.5 Final Dossier
The Supplier shall prepare a Final Dossier in accordance with
this procedure as per Attachment 2. The Final Dossier is separate
from the Preliminary Dossier and shall be completed with a cover
sheet (Attachment 2) and an index, with clearly indicated section
dividers containing the relevant document number, indicating
section contents.
The Final Dossier for relevant items of DPEM involvement is to
be submitted to the Purchaser within 30 calendar days after
successful completion of scheduled works and prior to shipment.
The Purchasers assigned inspector will review the Final Dossier
at the Suppliers location on successful completion of scheduled
DPEM test activities to ensure correct compilation prior to
submittal to Purchaser.
Provide a Table of Contents (if more than one volume, each
volume shall have Table of Contents).Section 10Copy of DPEM letter
of Preliminary Dossier approval (Att 2, Doc 10).Section 11Copy of
letter or fax requesting the presence of DPEM Inspector (Att 2, Doc
11) (Purchaser will provide to Supplier).Section 12Copy of DPEM
response to request (Att 2, Doc 12) (Purchaser will provide to
Supplier).Section 13Welding Procedure Qualification Record (PQR)
(Att 2, Doc 13).Section 14Weld Maps, Welder Qualification Record
and logs of welders who performed on the equipment manufacture (Att
2, Doc 14).Section 15Material Test Certificates (MTRs): Legible
certificates, identifying materials, parts, components, including
welding electrodes (Att 2, Doc 15).Section 16NDE reports (Att 2,
Doc 16)
Section 17Post Weld Heat Treatment chart, if applicable (Att 2,
Doc 17)
Section 18Internal & External Inspection certificate (Att 2,
Doc 18) (2 originals in English & French) signed by attending
DPEM or his delegated representative, Purchasers & Suppliers
Inspector
Section 19Hydrostatic Test Certificates (Att 2, Doc 19). (2
originals in English & French) signed by attending DPEM or his
delegated representative, Purchasers & Supplier Inspector to
also include Suppliers test certificates or ASME U1A form or TEMA
forms.
Section 20Copy of DPEM Pro Forma nameplate (French) for Pressure
Vessels, DPEM Model 21, (Att 2, Doc 20) Note: only the French
version is required to be affixed to the pressure vessel.Section
21Test Certificate (Att 2, Doc 21) (2 originals in English and 1
French) signed by attending DPEM or his delegated representative,
Purchasers & Suppliers Inspectors. For electrical equipment,
identify the tests that were conducted. (See paragraph 8.2.6) This
form is Not Applicable if the only test required for the equipment
is a hydrostatic test which is evidenced by Attachment 2 Document
19. (See paragraph 9.0)Section 22Copy of DPEM Pro Forma nameplate
(French) for Heat Exchanger equipment DPEM Model (Att 2, Doc 22)
Note: only the French version is required to be affixed to the heat
exchanger.Section 23Photocopy of DPEM French nameplate and other
nameplates (i.e. ASME Code Nameplate, TEMA nameplate, etc., if
applicable).
Section 24Copy of Supplier equipment Final/As-Built drawings.
This shall include the drawings in Section 6 of the Preliminary
Dossier plus any other applicable drawings.7.6 Plant Safety Systems
Dossier (Ref DPEM Circular No. 2)A Plant Safety File dossier is a
Purchaser/Contractor-compiled document for a site installed system,
and shall be submitted to DPEM by the Contractor prior to
Pre-Commissioning. The files of the safety systems must be approved
by DPEM, with concurrent review by a designated Sonatrach Safety
Manager. To this end, the Supplier shall transmit to the
Purchaser/Contractor (KBR) a Technical File covering his scope of
work, for the systems listed below; to enable the Purchaser to
include the data in the safety system file dossier.
A. Emergency shutdown system
B. Flare network
C. Fire, heat, cold, smoke and gas detection
D. Fire fighting systems (Network of fire water, CO2 and
chemical extinguishing systems).
E. Grounding network
F. Lightning protection system
7.7 Technical File (For Safety System Components and certain
other items as indicated in 7.6 )
To facilitate approval, the Supplier shall prepare a Technical
File containing the documents listed below as appropriate, and send
them to the Purchaser. All documents must be provided in French
& English.
Section AA letter of request for approval of the Technical File
(Attachment 1 Document 1). Supplier to complete and insert (2
originals in English & French).Section BCertification by the
Chamber of Commerce of the Fabricators or Stockists Signatures and
Algerian Consulate Stamp (Att 1, Doc 2) (2 originals in English
& French). Requires endorsement and stamping by Chamber of
Commerce or State Dept. & Algerian Consulate. This document is
the Suppliers responsibility for completion including the signature
of the local Chamber of Commerce and the stamp of the nearest
Algerian Consulate to the place of fabrication.
Section CCertificate of Conformity and of Internal and External
Inspections (Att 1, Doc 3) (2 originals in English and French). It
requires endorsement and stamping by Chamber of Commerce &
Algerian Consulate. This document is the suppliers responsibility
for completion, including the stamp of the nearest Algerian
Consulate to the place of fabrication.
Section DEquipment / Material description (Att 1, Doc 4).Section
ECopy of letter or fax requesting the presence of DPEM Inspector
(Att 2, Doc 11). (Purchaser will provide to Supplier, as
applicable).Section FInternal & External Inspection certificate
(Att 2, Doc 18) (2 originals in English & French) signed by
attending DPEM or his delegated representative, Purchasers &
Suppliers Inspectors.Section GHydrostatic Test Certificates (Att 2,
Doc 19). (2 originals in English & French), signed by attending
DPEM or his delegate representative or Purchasers & Suppliers
Inspectors to include Suppliers test certificates or ASME U1A form
or TEMA forms.Section HMaterial Test Certificates (MTRs): Legible
certificates, identifying materials, parts components, including
welding electrodes (Att 2, Doc 15). NDE reports (Att 2, Doc 16) if
applicable.
Some equipment may require a different format for the technical
file. The Supplier may propose a format to Purchasers ARA Liaison
coordinator for approval. The ARA Liaison coordinator is identified
at the Kickoff meeting or Pre-inspection meeting between the
Purchaser and Supplier.The front cover for Technical File dossiers
shall be modified to say Technical File (See sample Dossier Cover
page, Attachment 1 or 2).
The Technical Files shall be sent to Purchaser within 14
calendar days after issue of a Purchasers Inspection Release
Certificate. Purchaser will then forward to DPEM for review and
approval.7.8 Pipeline System Dossier:This portion of the Algerian
Regulations is not applicable to this procedure for the Skikda New
LNG Train Project.8.0 Scope of DPEM Inspection (DPEM Circular 02
and 04)
The list below summarizes typical Test and Inspection activities
to be witnessed, and/or documents to be reviewed, by the DPEM.8.1
At Suppliers Shop
8.1.1 DPEM will witness testing including, but not limited to,
tests listed here.
A. Review of Material Test Certificates.
B. Review of Test and Inspection Records previously conducted by
Supplier.
C. Visual and Dimensional Check.
D. Non Destructive Test Reports where applicable.
E. All Hydrostatic Tests Pressures to be a minimum of one and a
half (1.5X) times the Design Pressure.
F. Functional or Performance Test where applicable.
8.1.2 For all inspections, Supplier shall make available for
Purchasers & DPEM inspection, the complete inspection, test
records and certificates, whether witness or non-witnessed.
8.1.3 The Supplier shall also have available a copy of each
approved Preliminary Dossier (for the DPEM Inspector).
8.1.4 If the results of the test are satisfactory, DPEM
Inspector (or his delegate) witnessing the testing shall sign the
test certificates (Document 18, 19 and/or 21), jointly with
representatives of Purchaser and the Supplier. The DPEM Inspector
shall then stamp the inspected equipment.
8.1.5 In the event or non-reply or non-arrival of DPEM Inspector
to the location of tests, these shall be carried out as scheduled
in the presence of Purchaser and the agreed assigned Suppliers
Third Party Inspectors. The test results shall be submitted to
Purchaser then forwarded to DPEM for review and approval.
8.2 Typical TestsTypical DPEM Tests carried out which fulfill
the criteria indicated in this procedure are as follows:
8.2.1 Pressure Retaining Equipment: Hydraulic or, where
approved, pneumatic tests.
8.2.2 For Tanks: (shop and/or field tests)A. Stationary Roof
Tanks
Tank strength and tightness tests (hydrostatic, under and over
pressure tests)B. Floating Roof Tanks
Hydrostatic Test
Reports on other field or shop tests and inspections, signed by
Engineer and Client, shall be made available to DPEM
representative.
8.2.3 Gas Compressors: Hydraulic or, where approved, pneumatic
tests (body/casing hydrostatic test).
8.2.4 Relief Valves: Verify the opening and closing pressures
and seat tightness.
8.2.5 Pipelines: As noted above.
8.2.6 Electrical Equipment rated 5.5kv or higher:
A. Motors 5.5 KV and above
In accordance with Project Specifications
Complete test for one motor of each group
Abbreviated test for motors not subject to Complete test
B. Switchgear 5.5 kV and above
In accordance with Project Specifications
Power Frequency Voltage Test
Auxiliary circuit voltage test
Mechanical operation test
Check of wiring
C. Transformers 5.5 kV and above
In accordance with Project Specification
Wiring resistance measurement
Measurement of voltage ratio and check phase displacement
Measurement of short circuit impedance and load loss
Dielectric routine test
D. Generators 5.5 kV and above: In accordance with Project
Specification.
E. Cable 5.5Kv and above: In accordance with Project
Specification
8.2.7 Hot Water System: Hydraulic or, where approved,
pneumatic.
8.2.8 Mobile Equipment: Hydraulic or, where approved,
pneumatic.
8.2.9 Fire Extinguishers: Hydraulic or, where approved,
pneumatic.
Other tests, required by the standards and regulations in force,
will be done in the presence of Purchaser. All documentation and
records from those tests will be given to the DPEM inspectors upon
their request.
The relevant Test Procedures for the equipment associated with
DPEM / ONML involvement must be submitted by the Supplier for
Purchasers review within 2 (two) weeks prior to the test date.
9.0 Nameplates
Supplier shall affix the Standard Code Stamped Nameplate for
ASME or TEMA code (as required). Additionally, Supplier is to affix
a DPEM model Nameplate, in French, in accordance with Attachment 2
Document 20 or 22 on all pressure-containing equipment in
accordance with the Purchase Order, and as follows:
Nameplate size: 160 x 200 mm.
Material: 7 mm Thick, 304 Stainless Steel.
Character and stamping to be preferably 6mm high but not less
than 4mm high with a depth of 0.5mm.
The Official DPEM Stamp is less than in diameter.
The DPEM Nameplate (French) is to be stamped by the DPEM, for
equipment that has been witnessed by DPEM.
Nameplates are to be supplied for pressure containing equipment
only.
Electrical equipment > 5.5 kV that has been involved with the
DPEM does not require the French nameplates.
10.0 Document Quantity & FormatThe DPEM requires English
& French or bilingual documents (Doc 1 to 24 per Attachment 1
and 2), as indicated in Attachment 3, which shall be used for
official submission. Each document shall be prepared in two (2)
original copies (1 French & 1 English or 2 bilingual).
Purchaser recommends the use of bilingual documents in both English
and French and has stated this option in the text of this
procedure.10.1 Quantities
Documents identified for submittal to the Algerian Regulatory
Authorities shall be submitted to Purchaser in the following
quantities and format:10.1.1 If dossiers are in both a French
version and an English Version, the following quantities are
required:Preliminary DossiersFinal Dossiers & Technical
Files
For DPEM1 original French1 original French
For Client1 copy English + 1 copy French1 copy English + 1 copy
French
For Purchaser original English & 2 copy French (Note: 1 copy
French to Site DC)1 original + 1 copy French
Totals:1 original French, 3 copies French and 1 original English
& 1 copy English. One (1) electronic copy of French and of
English1 original French & 2 copies French and 1 original
English & 1 copy English. One (1) electronic copy of French and
of English
10.1.2 If bilingual dossiers are supplied then the following
quantities are required:Preliminary DossiersFinal Dossiers &
Technical Files
For DPEM1 original 1 original
For Client2 copies2 copies
For Purchaser 1 original + 2 copies (Note: 1 copy to Site DC)1
original + & 1 copy
Totals:2 originals, 4 copies. One (1) electronic copy 2
originals + 3 copies One (1) electronic copy
10.2 Format
The Preliminary Dossier, Final Dossier, Technical File and
Safety Dossier are all separate and shall be in hard cover 3 or 4
ring binders.
Provide a general Table of Contents. If more than one (1)
volume, each volume shall have a Table of Contents.
These Dossiers shall have section dividers and numbered
accordingly. Each section shall have a title page. If a section is
not relevant to a particular item of material or equipment, the
divider shall be included and the title page shall be annotated Not
Applicable.10.3 Front Cover & Spine
The front cover and spine of the Preliminary, Final or Technical
Dossiers shall contain information as shown in the attached sample
pages, the first sheet each of Attachment 1 and Attachment 2. 11.0
NOTICE OF INSPECTION & TEST
When items, components and appurtenances subject to ARA
involvement are agreed between the supplier and the purchaser and
ARA activities indicated on Suppliers Quality Control Plan,
Supplier shall notify the Purchaser of indicted ARA inspection
activities. The notification shall be sent to the Purchasers
Project Procurement Quality Control Manager and Purchasers ARA
Liaison coordinator. This shall be sent by the supplier at least
forty five (45) calendar days before the expected date of test. The
defined date shall be confirmed by the Supplier as indicated above
twenty-one (21) calendar days before the test. Contact information
for the ARA Liaison coordinator and other Purchaser personnel will
be provided at the Kickoff meeting or the Pre-inspection meeting
between the Purchaser and Supplier.The Purchasers ARA Liaison
coordinator, on receipt of the notifications from the Supplier,
will forward to the relevant ARA the request for Inspection per
Attachment 4.
The relevant ARA will confirm their intention on the indicated
inspection at least fourteen (14) calendar days prior to the
defined inspection date, Purchasers ARA Liaison coordinator will
relay it to the Supplier at least seven (7) days prior to Defined
Inspection date with a copy to Purchasers Project Quality Control
Manager.
In the event of a non attendance reply from the ARA, the
Purchasers ARA Liaison coordinator may instruct the Supplier to
assign a third party inspector to perform activities on behalf of
ARA on the schedule date.
The PURCHASER assigned third party inspector will not stamp
nameplate on behalf of the ARA.12.0 Equipment Release
Certificates
Final equipment release paperwork should describe the individual
items which have been DPEM witnessed, e.g. compressor fuel gas
drums mounted on a skid with filter, pump, etc., and indicate DPEM
witness.If not witnessed, the releases should also describe the
individual items, and indicate lack of DPEM witness.Equipment which
has not been stamped, but is subject to DPEM Inspection and Tests
in supplier shop, must be reported to the ARA with the Purchasers
Inspection Report. DPEM will review these dossiers in the
field.13.0 ATTACHMENTS
Attachment 1Documents 1 8Preliminary Design Dossier
Attachment 2Documents 10 24Final Dossier
Attachment 3DPEM Document Translation Checklist
Attachment 4DPEM Document Request for DPEM/ONML Inspector
Attachment 5ARA Documentation & Activities Coordination
ScheduleAttachment 6Flowchart Preliminary DossierAttachment
7Equipment ListingATTACHMENT 1: PRELIMINARY DOSSIER FORMS, DOCUMENT
1 8DOSSIER REGLEMENTAIRE / REGULATORY DOSSIER
DIRECTION DE LA PROTECTION DU PATRIMOINE
ENERGITIQUE ET MINIER
DIRECTION OF ENERGY AND MINE PATRIMONY PROTECTION
MINISTERE DE LENERGIE ET DES MINES
MINISTRY OF ENERGY AND MINES
PROJET DU NOUVEAU TRAIN DE GNL SKIKDASKIKDA NEW LNG TRAIN
PROJECT
DESIGNATION DE LEQUIPEMENT / EQUIPMENT DESIGNATION
COMMANDE NO.. /PURCHASE ORDER NO. _________________________
DOSSIER DETUDE PRELIMINAIRE
PRELIMINARY DESIGN DOSSIER
CONTRAT / CONTRACT
KBR
RAISON SOCIALE OU FOURNISSEUR / COMPANY OR VENDOR
SOMMAIRETABLE OF CONTENTS
1. LETTRE DE DEMANDE DAPPROBATION1. LETTER FOR APPROVAL
REQUEST
2. CERTIFICATION PAR LA CHAMBRE DE COMMERCE DES SIGNATURES DU
FABRICANT VISA DU CONSULAT ALGERIEN2. CERTIFICATION BY THE CHAMBER
OF COMMERCE OF THE FABRICATOR SIGNATURES ALGERIAN CONSULATE
STAMP
3. CERTIFICAT DE CONFORMITE ET DE VISITES INTERIEURES ET
EXTERIEURES, ATTESTANT QUE LEQUIPMENT EST DE CONSTRUCTION CONFORME
POUR UTILISATION DANS LE PAYS DORIGINE3. CERTIFICATE OF CONFORMITY
AND OF INTERNAL AND EXTERNAL INSPECTIONS, ATTESTING THAT THE
EQUIPMENT CONSTRUCTED CONFORMS TO THE CONTRY OF ORIGIN
4. ETAT DESCRIPTIF4. DESCRIPTION STATEMENT
5. NOTES DE CALCUL5. DESIGN CALCULATIONS
6. PLANS DETAILLES AVEC INDEX6. DETAILED DRAWINGS WITH INDEX
7. SPECIFICATIONS DE PROCEDURES DE SOUDAGE (W.P.S)7. WELDING
PROCEDURE SPECIFICATIONS (WPS)
8. PLAN DE QUALITE DINSPECTION ET DESSAIS8. QUALITY INSPECTION
AND TESTING PLA N
(9 Not used) ( 9 Not used)
DOCUMENT No 1DOCUMENT No 1
LETTRE DE DEMANDE DAPPROBATIONLETTER FOR APPROVAL REQUEST
MINISTERE DE LENERGIE
Direction du Patrimoine Energtique et Minier
80, Avenue Ahmed Ghermoul Alger
A lAttention de Monsieur le DirecteurMINISTERE DE LENERGIE
Direction du Patrimoine Energtique et Minier
80, Avenue Ahmed Ghermoul Alger
A lAttention de Monsieur le Directeur
N/Rf:Our Ref:
V/Rf:Your Ref:
OBJET: Projet de Dveloppement Skikda Projet
Dossier dEtude PrliminaireSubject: Skikda LNG Project
Preliminary Design Dossier
Monsieur le Directeur,
Nous avons lhonneur de vous soumettre pour approbation le prsent
Dossier dEtude Prliminaire relatif lquipement.. repre n.., destin
tre incorpor aux installations des ouvrages concentrs du projet
dcrit ci-dessus.
Nous vous prions dagrer, Monsieur le Directeur, nos
salutations.
Directeur du ProjetDear Sir,
Please find attached for your approval the Preliminary Design
Dossier related to the equipment .., reference No , destined to be
incorporated into the facilities of the project work described
below.
Yours faithfully,
Project Director
DOCUMENT No. 2DOCUMENT No. 2
CERTIFICATION PAR LA CHAMBRE DE COMMERCE DES SIGNATURES DU
FABRICANT VISA DU CONSULAT ALGERIENCERTIFICATION BY THE CHAMBER OF
COMMERCE OF THE FABRICATOR SIGNATURES ALGERIAN CONSULATE STAMP
FABRICANT:FABRICATOR:
NOM:NAME:
CACHET DE LA SOCIETE:COMPANY STAMP:
CHAMBRE DE COMMERCE LOCALE:LOCAL CHAMBER OF COMMERCE:
Nom:Name:
Signature:Signature:
Nous certifions par la prsente que les signatures de: We hereby
certify that the signatures below of:
Nom:Name:
Nom:Name:
Nom:Name:
Sont celles des signataires mandats de:Are those of the
signatories commissioned by:
Nom du Fabricant:
Fabricators Name:
Cachet:Stamp:
CONSULAT ALGERIENALGERIAN CONSULATE:
Date:Date:
Signature:Signature:
Timbres apposerStamp to be affixed
DOCUMENT No 3DOCUMENT No 3
CERTIFICAT DE CONFORMITE ET DE VISITES INTERIEURES ET
EXTERIEURES, ATTESTANT QUE LEQUIPMENT EST DE CONSTRUCTION CONFORME
POUR UTILISATION DANS LE PAYS DORIGINECERTIFICATE OF CONFORMITY AND
OF INTERNAL AND EXTERNAL INSPECTIONS, ATTESTING THAT THE EQUIPMENT
CONSTRUCTED CONFORMS TO THE CONTRY OF ORIGIN
Je soussign:I, the undersigned:
Nom: First Name:
Prnom :Last Name:
Directeur Gnral de la Socit:Managing Director of the Company
(adresse exacte)(exact address)
Certifie que lquipement ( no. ), destin aux installations de
sera conu et fabriqu conformment aux documents soumis pour
approbation la Direction du Patrimoine Energtique et Minier, rpond
en tous point au rglement applicable en Algrie.Certify that the
equipment ( no. ), destined to the installations of will be
designed and fabricated in accordance with the documents submitted
to the Direction of Energy and Mines Patrimony Protection (DPEM)
and in strict conformance with the regulations applicable in
Algeria.
Cet quipement sera, avant de le prsenter lpreuve rglementaire de
la Direction du Patrimoine Energtique et Minier, visit
intrieurement et extrieurement par un Technicien dsign par mes
soins. La vrification portera sur la conformit de la pice de
lquipement avec son plan de construction, lexactitude des
renseignements figurant sur ltat descriptif, notamment en ce qui
concerne les paisseurs de tles, les caractristiques du mtal et les
modes dassemblage.Prior to be presented for the regulatory testing
by the Direction of Energy and Mines Patrimony Protection, this
equipment will be internally and externally inspected by a
Technician, that I would personally designate. The inspection will
relate to the compliance of the equipment with its construction
drawing, the accuracy of the information indicated on the
description statement, notably the thickness of the metal sheet,
the characteristics of the metal and the methods of assembly.
Je certifie par ailleurs, que toutes les pices dquipement
prsentant un vice quelconque de construction ne sera pas prsent
lpreuve.Furthermore, I certify that any part of the equipment
showing a fabrication defect of any type will not be subject to
testing.
A Le,In on,
LE FABRICANTFABRICATOR
CONSULAT ALGERIEN
ALGERIAN CONSULATE
Timbre apposerStamp to be affixed
DOCUMENT No 4DOCUMENT No 4
ETAT DESCRIPTIFDESCRIPTION STATEMENT
Job No.: J6404
Job No.: J6404
Client:SONATRACHClient:SONATRACH
Lieu: SKIKDA / ALGERIELocation: SKIKDA, ALGERIA
ETAT DESCRIPTIFDESCRIPTION STATEMENT
Ordre dAchat No:Purchase Order No:
No Item (repre):Item Number (reference):
No Fabrication:Fabrication No:
Service
:Service:
Nom et Adresse du Fabricant :Fabricators Name and Address:
Anne de Construction:Year of Fabrication
CARACTERISTIQUES TECHNIQUESTECHNICAL CHARACTERISTICS
Types: (rcipient, chaudire, changeur, four) Type of Equipment:
(vessel, boiler, exchanger, furnace)
Dnomination de lappareil Equipment Name:
Forme gnrale: General Shape:
Fluide vhicul: hydrocarbure eau vapeur ou autre Type of Fluid
Carried: hydrocarbon water steam or other
Pression de calcul: Design Pressure:
Pression maximale de service: Maximum Service Pressure :
Pression essai: Test Pressure:
Temprature de calcul: Design Temperature:
Temprature de service: Service Temperature:
Temprature dessai: Test Temperature:
Matriaux Utiliss: Materials Used:
Epaisseur(s): Thickness (es):
Charge limite de rupture: Breaking Point Load:
Contrainte admissible: Permissible Stress:
Coefficient de joint: Joint Coefficient:
Radiographie: Radiography:
Traitement thermique: Thermal Treatment:
Surpaisseur de corrosion: Corrosion Allowance:
Essais non destructifs: Non Destructive Examination:
Volume intrieur: Internal Volume:
DOCUMENT No. 5DOCUMENT No. 5
NOTES DE CALCULDESIGN CALCULATIONS
DOCUMENT No. 6DOCUMENT No. 6
PLANS DETAILLES AVEC INDEXDETAILED DRAWINGS WITH INDEX
DOCUMENT No. 7DOCUMENT No. 7
SPECIFICATIONS DE PROCEDURES DE SOUDAGE (W.P.S)WELDING PROCEDURE
SPECIFICATIONS
(WPS)
DOCUMENT No. 8DOCUMENT No. 8
PLAN DE QUALITE DINSPECTION ET DESSAISQUALITY INSPECTION AND
TESTING PLAN
Dcrire:Describe:
Contrle visuel, dimensionnelVisual and Dimensional
Inspection:
Contrle U.S, Radiographie, Ressuage, MPTUltrasonic Testing,
Radiography, Dye Penetrant, Magnetic Particle Testing
lpreuve hydrostatiqueTest activities:
ATTACHMENT 2: FINAL DOSSIER FORMS, DOCUMENTS 10 24DOSSIER
REGLEMENTAIRE / REGULATORY DOSSIER
DIRECTION DE LA PROTECTION DU PATRIMOINE
ENERGITIQUE ET MINIER
DIRECTION OF ENERGY AND MINE PATRIMONY PROTECTION
MINISTERE DE LENERGIE ET DES MINES
MINISTRY OF ENERGY AND MINES
PROJET DU NOUVEAU TRAIN DE GNL SKIKDA
SKIKDA NEW LNG TRAIN PROJECT
DESIGNATION DE LEQUIPEMENT / EQUIPMENT DESIGNATION
COMMANDE No. /PURCHASE ORDER No. _________________________
DOSSIER FINAL
FINAL DOSSIER
CONTRAT / CONTRACT
KBR
RAISON SOCIALE OU FOURNISSEUR / COMPANY OR VENDOR
SOMMAIRETABLE OF CONTENTS
10. LETTRE DAPPROBATON DU DOSSIER DETUDE PRELIMINAIRE EMISE PAR
DPEM10. APPROVAL LETTER OF THE PRELIMINARY DESIGN DOSSIER ISSUED BY
DPEM
11. LETTRE OU TELEX EMIS PAR LENTREPRENEUR DEMANDANT LA PRESENCE
DE LINSPECTEUR DPEM POUR LES EPREUVES ET CONTROLES EN
USINE11.LETTER OR TELEX ISSUED BY THE CONTRACTOR REQUESTING THE
PRESENCE OF THE DPEM INSPECTOR FOR TESTS AND INSPECTIONS AT THE
FABRICATOR SHOP
12. REPONSE ECRITE DE DPEM CONFIRMANT OU NON LA PRESENCE DE SON
REPRESENTANT OU DE SON DELEGUE12.WRITTEN REPLY FROM DPEM CONFIRMING
WHETHER OR NOT THE PRESENCE OF ITS REPRESENTATIVE OR ITS
DELEGATE
13. CERTIFICAT DHOMOLOGATION DES PROCEDURES DE SOUDAGE
(PQR)13.QUALIFICATION CERTIFICATES OF THE WELDING PROCEDURES
(PQR)
14. ATTESTATION DE QUALIFICATION DES SOUDEURS ET OPERATEURS DE
SOUDAGE VALIDES A LA DATE DES OPERATIONS DE SOUDAGE14.QUALIFICATION
CERTIFICATES OF WELDERS OR WELDING OPERATORS (VALID AT THE DATE OF
THE WELDING OPERATIONS)
15. CERTIFICATS DES MATERIAUX AYANT SERVI POUR LELABORATION DES
PARTIES ET PIECES DE LAPPAREIL (CARACTERISTIQUES PHYSICO-CHIMIQUES)
ET DES ELCTRODES.15.CERTIFICATES OF THE MATERIALS USED FOR THE
FABRICATION OF THE PARTS AND SECTIONS OF THE EQUIPMENT (PHYSICAL
AND CHEMICAL CHARACTERISTICS) AND ELECTRODES
16. RAPPORT DETAILLE DES CONTROLES NON DESTRUCTIFS EFFECTUES SUR
LES SOUDURES OU SURFACE DES APPAREILS OU/ET LEURS ELEMENTS ET LES
RAPPORTS DES CONTROLES DESTRUCTIFS EFFECTUES LORS DE LA
FABRICATION.16.DETAILED REPORTS OF THE NON DESTRUCTIVE EXAMINATION
CARRIED OUT ON EQUIPMENT WELDS OR SURFACES AND/OR THEIR PARTS, PLUS
REPORTS OF THE DESTRUCTIVE TESTING PERFORMED DURING THE
FABRICATION.
17. DIAGRAMME DES TRAITEMENTS THERMIQUES17.THERMAL TREATMENT
CHARTS
18. CERTIFICAT DINSPECTION DE VISITES INTERNES ET EXTERNES18.
INTERNAL AND EXTERNAL INSPECTION CERTIFICATES
19. CERTIFCAT DEPREUVE HYDROSTATIQUE19.HYDROTESTING
CERTIFICATE
20. PLAQUE DIDENTIFICATION POUR APPAREIL A PRESSION20. NAME
PLATE FOR PRESSURE EQUIPMENT
21. CERTIFICAT DESSAI21.TEST CERTIFICATE
22. MODELE DE PLAQUE DIDENTIFICATION POUR ECHANGEUR DE
CHALEUR22.PRO-FORMA NAME PLATE FOR HEAT EXCHANGER
23. PHOTOCOPIE DU PLAQUE DIDENTIFICATION23.PHOTOCOPY OF
NAMEPLATE
24. PLAN FINAL, AS-BUILT PLANS FINAL24FINAL DRAWINGS/AS-BUILT
DRAWINGS
DOCUMENT No 10DOCUMENT No 10
LETTRE DAPPROBATION DU DOSSIER DETUDE PRELIMINAIRE EMISE PAR
DPEMAPPROVAL LETTER OF THE PRELIMINARY DESIGN DOSSIER BY DPEM
DOCUMENT No 11DOCUMENT No 11
LETTRE OU TELECOPIE OU TELEX EMIS PAR LENTREPRENEUR DEMANDANT LA
PRESENCE DE LINSPECTEUR DPEM POUR LES EPREUVES ET CONTROLES EN
USINELETTER OR FAX OR TELEX ISSUED BY THE CONTRACTOR REQUESTING THE
PRESENCE OF THE DPEM INSPECTOR FOR TESTS AND INSPECTIONS IN
SHOP
MINISTERE DE LENERGIEMINISTERE DE LENERGIE
A LATTENTION DE MONSIEUR LE DIRECTEUR DU PATRIMOINE ENERGITIQUE
ET MINIER
80, RUE AHMED GHERMOUL
ALGERA LATTENTION DE MONSIEUR LE DIRECTEUR DU PATRIMOINE
ENERGITIQUE ET MINIER
80, RUE AHMED GHERMOUL
ALGER
N/REF:OUR REF.:
OBJET: P.O #SUBJECT: P.O. NUMBER
No:No:
MATERIEL:MATERIAL:
VALEUR DU MATERIEL:MATERIAL VALUE
COMMANDE No:ORDER No:
Suite votre tlex du , nous vous informons que les essais sur la
commande rfrence ci-dessus se drouleront le . Nous vous serions
reconnaissants de nous faire parvenir votre accord.Pursuant to your
telex dated , please be advised that the tests on the above
referenced order will be carried out on .
Therefore, we would be obliged if you could confirm your consent
to the above.
Nom de la personne contacter:Name of the contact person:
Tel:Telephone:
Fax:Fax:
Adresse:Address:
Merci de bien vouloir conformer la prsence de votre reprsentant
ou la rfrence de laccord de drence de laccord de dlgation.Please
confirm the attendance of your representative or advise of the
reference of the delegation approval.
Salutations respectueusesYours faithfully
DOCUMENT No 12DOCUMENT No 12
REPONSE ECRITE DE DPEM CONFIRMANT OU NON LA PRESENCE DE SON
REPRESENTANT OU DELEGUEWRITTEN REPLY FROM DPEM CONFIRMING THE
ATTENDANCE OF ITS REPRESENTATIVE OR DELEGATE
DOCUMENT No 13DOCUMENT No 13
CERTIFICATS DHOMOLOGATION DES PROCEDURES DE SOUDAGE
(PQR)QUALIFICATION CERTIFICATES OF WELDING PROCEDURES (PQR)
DOCUMENT No 14DOCUMENT No 14
ATTESTATIONS DE QUALIFICATION DES SOUDEURS ET OPERATEURS DE
SOUDAGEQUALIFICATION CERTIFICATES OF WELDERS AND WELDING
OPERATORS
DOCUMENT No 15DOCUMENT No 15
CERTIFICATS DES MATERIAUX AYANT SERVI POUR LAPPROBATON DES
PARTIES ET PIECES DE LAPPAREIL ET DES ELECTRODESCERTIFICATES OF
MATERIALS USED, EQUIPMENT PARTS AND COMPONENTS AND WELDING
ELECTRODES
DOCUMENT No 16DOCUMENT No 16
RAPPORT DETAILLE DES CONTROLES NON DESTRUCTIFS EFFECTUES SUR LES
SOUDURES OU SURFACE DES APPAREILS OU/ET LEURS ELEMENTS ET LES
RAPPORTS DES CONTROLES DESTRUCTIFS EFFECTUES LORS DE LA
FABRICATION.DETAILED REPORTS OF THE NON DESTRUCTIVE EXAMINATION
CARRIED OUT ON EQUIPMENT WELDS OR SURFACES AND/OR THEIR PARTS AND
REPORTS OF THE DESTRUCTIVE TESTING PERFORMED DURING THE
FABRICATION.
DOCUMENT No 17DOCUMENT No 17
DIAGRAME DES TRAITEMENTS THERMIQUES (SIL Y A LIEU)THERMAL (HEAT)
TREATMENT CHARTS
(IF APPLICABLE)
DOCUMENT No 18DOCUMENT No 18
CERTIFICATS DINSPECTION DES VISITES INTERNES ET EXTERNESINTERNAL
AND EXTERNAL INSPECTION CERTIFICATES
Equipement:Equipment:
Dsignation:Designation:
No dItem:Item No:
Service:Service:
Fabricant: (Adresse exacte)Fabricator:
Je certifie par la prsente que lquipement susmentionn a t soumis
une inspection interne et externe et quil sest avr conforme au:I
hereby certify that the above mentioned equipment was subject to an
internal and external inspection and deemed to comply with:
Plan(s) No.:Drawing(s):
Fabricant:
Nom Signature:Name Signature
Date:Date:
Visiteur Dlgu:Delegated Inspector:
Nom Signature:Name Signature
Date: Date:
DOCUMENT No 19DOCUMENT No 19
CERTIFICAT DEPREUVE HYDROSTATIQUEHYDROSTATIC CERTIFICATE
Je certifie par la prsente que:I hereby certify that:
Dsignation Equipement:Equipment Designation:
No dItem:Item No:
Service:Service:
A t mis lpreuve dune manire satisfaisante sous une pression
hydraulique de:Has been successfully tested under a hydraulic
pressure of:
Bar effectif:Active Bar:
Dure:Duration:
Fabricant:Fabricator:
Nom Signature:Name Signature:
Date:Date:
Visiteur Dlgu:Delegated Inspector:
Nom Signature:Name Signature:
Date:Date:
DOCUMENT No 20DOCUMENT No 20
MODELE DE PLAQUE DIDENTIFICATION POUR APPAREIL SOUS
PRESSIONPRO-FORMA NAME PLATE FOR PRESSURE EQUIPMENT
No. de fabrication/ItemVolumeFabrication/Item No.Volume
FluidePoids videType of FluidEmpty Weight
Code UtilisSurepaisseur de CorrosionCode UsedCorrosion
Allowance
Traitement ThermiqueRadiographieThermal TreatmentRadiography
Press Max Service Temp Max ServiceMax Service PressureMax
Service Temp.
Pression de CalculTemperature de CalculDesign PressureDesign
Temperature
Pression dEpreuve HydrostatiqueDate dEssaiHydrotest PressureTest
Date
PourFor
Conu parDesigned by
Fabriqu parFabricated by
DOCUMENT No 21DOCUMENT No 21
CERTIFICAT DESSAITEST CERTIFICATE
Je certifie par la prsente que:I hereby certify that:
Dsignation quipement:Equipment Designation:
No Item:Item No:
Service:Service:
A t mis lpreuve dune manire satisfaisante sous une pression
hydrostatique de:Has been successfully tested under a hydraulic
pressure of:
Bar effectif:Active Bar:
Dure: Duration:
(ou)(or)
A t mis lpreuve dune manire satisfaisante:Has been successfully
tested:
Dsignation dessai:
Fabricant:Fabricator:
Date:
Signature:
Visiteur DlguDelegated Inspector:
Date:
Signature:Signature:
Date:Date:
Signature:
Date:Date:
Signature:
Note: (*) certificats dessais pour les quipements lectriques et
de levage seront prpars et contresignsNote: Test certificates for
electrical equipment shall be prepared and countersigned.
DOCUMENT No 22
MODELE DE PLAQUE DIDENTIFICATION POUR ECHANGEUR DE CHALEURNAME
PLATE PRO-FORMA FOR HEAT EXCHANGER
No dItemItem No
Calandre TubeShellTube
Fluides
Press Max ServiceMax Service Pressure
Press Calcul
Design Pressure
Temp. Max ServiceMax Service Temperature
Surpaisseur de CorrosionCorrosion Allowance
Press Epreuve HydrostatiqueHydrotest Pressure
Traitement
ThermiqueThermal Treatment
RadiographieRadiography
Code de Calcul UtilisDesign Code Used
Volume Volume
Surface
Surface
No
No
Date dessai
Test Date
Poids vide/faisceauEmpty weight/bundle
Pour
For
Conu par
Designed by
Fabriqu par
Fabricate by
DOCUMENT No 23DOCUMENT No 23
PHOTOCOPIE DU PLAQUE DIDENTIFICATIONPHOTOCOPY OF NAMEPLATES
DOCUMENT No 24DOCUMENT No 24
PLANS FINAL, PLANS AS-BUILT FINAL DRAWINGS / AS-BUILT
DRAWINGS
ATTACHMENT 3: DPEM DOCUMENTATION TRANSLATION
CHECKLISTPreliminary & Final Dossiers are separate documents
and are not be to combined.
The table below identifies the required documents required for
the DPEM Preliminary Dossier and necessary translations.
Doc No.DescriptionLanguage Translation
1.Letter of request for approval of the preliminary
dossier.English & French
2.Certification of the fabricator signatures. (*) (**)English
& French
3.Certificates of conformance and internal and external
inspections. (*) (**)English & French
4.Description Statement.English & French
5.Design Calculations.English
6.Detailed drawings with index.English
7.Welding procedure specifications (WPS)English
8.Inspection and testing plansEnglish
9.Deleted
The stamp of the nearest Algerian consulate of the fabrication
place is required for all documents marked by an asterisk (*). The
stamp may be on the back of the form or on a separate page duly
referenced. The stamp of the Fabricators local Chamber of Commerce
is required for all documents marked ** (as applicable) The stamp
may be on the back of the form or on a separate page duly
referenced.Required Documents for DPEM Final Dossier.
Doc No.DescriptionLanguage Translation
10.Approval letter of the preliminary design dossier by
DPEM.French
11.Letter or telex issued by the contractor requesting the
presence of the DPEM inspector for tests and inspections at the
fabricator shop.English & French
12.Written reply from DPEM confirming whether or not the
presence of its representative or its delegate. If non-attendance
of DPEM, written instruction for Purchaser for Supplier to assigned
approved third party inspection agency.French
13.Qualification certificates of the welding procedures
(PQR).English
14.Qualification certificates of welders or welding operations
(valid at the date of the welding operations).English
15.Certificates of the materials used for the fabrication of the
parts and sections of the equipment (physical and chemical
characteristics) and electrodes.English
16.Detailed reports of the non-destructive examination carried
out on equipment welds or surfaces and/or their parts, plus reports
of the destructive testing performed during the fabrication.English
& / or French
17.Thermal treatment charts.English
18.Internal and external inspection certificates.English &
French ***
19.Hydrostatic testing certificates.English & French ***
20.Pro-forma Name plate for pressure equipment.English &
French
21.Test certificates.English & French ***
22.Pro-forma name plate for Heat Exchangers.English &
French
23.Photocopy of NameplatesFrench for DPEM nameplate, English for
manufacturers nameplates
24Final Drawings / As Built DrawingsEnglish
(***) All documents marked by an asterisk are required to be
signed by attending DPEM inspector or his delegated representative
(TPI), Purchaser and Suppliers Inspector.
ATTACHMENT 4: FAX REQUEST FOR PRESENCE OF DPEM/ONML
INSPECTOR
From:_______________________________________________________________________
_______________________________________________________________________
To:MINISTERE DE LENERGIE
Monsieur le Directeur
Direction de la Protection du Patrimoine
80, Avenue Ahmed Ghermoul, Alger.
VIA:KBRP.O.
Number________________________________________________________
Our References: Fax
No._____________________on_________________________________
Subject:REQUEST FOR DPEM / ONML INSPECTORWe request the presence
of a DPEM/ONML Inspector for test at the plant listed below.
DESIGNATION
Manufacturer
Facility
Item No.Equipment Facility Test DateAddress
FAX DE DEMANDE DE PRESENCE DINSPECTEUR DPEM/ONML
Expditeur::
: Ministre de lEnergie
Monsieur le Directeur
Direction de la Protection du Patrimoine
80, Avenue Ahmed Ghermoul, Alger.
VIA:KBRCommande No. _____________________________N/Rfrences:FAX
NO. ___________________ du __________________Objet: CONTROLES
REGLEMENTAIRES EN USINE
Nous avons lhonneur de vous demander de designer un inspecteur
de votre societe pour assister aux tests des equipements en Usine
repris dans le programme ci dessous:
DESIGNATIONArticle No.EquipmentFabrication Date EssaisLieu
ATTACHMENT 5: ARA / DPEM DOCUMENTATION &
ACTIVITIESACTIVITYRESPONSIBILITYTIME FRAME
PROVIDE DESIGN TO SUPPLIERPURCHASER (KBR)WITHIN 14 CALENDAR DAYS
AFTER RECEIPT OF PO
SET UP INSPECTION COORDINATION SCHEDULESUPPLIERWITHIN 14
CALENDAR DAYS AFTER RECEIPT OF PO
PREPARE PRELIMINARY DOSSIER & SUBMIT TO PURCHASERSUPPLIERTO
ARRIVE 7 WEEKS PRIOR TO SUB ORDERS OR FABRICATION START
PROVIDE PURCHASER WITH STAMPED FORMS FOR PRELIMINARY
DOSSIERSUPPLIER4 WEEKS BEFORE START OF FABRICATION
SUBMIT PRELIMINARY DOSSIER TO DPEM FOR
APPROVALPURCHASERIMMEDIATELY AFTER REVIEW
APPROVE / REJECT PRELIMINARY DOSSIER, W/ NOTIFICATION BY
FAXDPEMWITHIN 45 CALENDAR DAYS AFTER RECEIPT
SEND PRELIMINARY NOTICE OF INSPECTION TO PURCHASERSUPPLIER45
CALENDAR DAYS PRIOR TO TEST
SEND PRELIMINARY NOTICE OF INSPECTION TO DPEMPURCHASER45
CALENDAR DAYS PRIOR TO SCHEDULED TEST
SEND FINAL NOTICE OF INSPECTION TO PURCHASERSUPPLIER21 CALENDAR
DAYS PRIOR TO TEST
SEND FINAL NOTICE OF INSPECTION TO DPEMPURCHASER14 CALENDAR DAYS
PRIOR TO SCHEDULED TEST
CONFIRM WITNESS OR NOT WITNESS, TO PURCHASERDPEM7 DAYS PRIOR TO
SCHEDULED TEST
CONFIRM WITNESS OR NOT WITNESS, TO SUPPLIERPURCHASER5 DAYS PRIOR
TO SCHEDULED TEST
SCHEDULE THIRD-PARTY INSPECTION IF REQUIREDPURCHASER7 DAYS PRIOR
TO SCHEDULED TEST
WITNESS TESTINGALL PARTIESSCHEDULED DATE, IF POSSIBLE
SUBMIT FINAL DOSSIER TO PURCHASERSUPPLIER30 DAYS AFTER WORK
COMPLETION, PRIOR TO SHIPMENT
ATTACHMENT 6: FLOWCHART PRELIMINARY DOSSIER
1. Supplier will submit Preliminary Dossiers per paragraph
10.1.1 or 10.1.2 to the Purchaser Document Control Center at least
fifty (50) calendar days before commencement of fabrication.
2. The Purchaser will transmit one French or one (1) bilingual
original to DPEM for approval at least forty five days before
commencement of fabrication.
3. The Purchaser will retain one English or one (1) bilingual
original and 2 French copies for records, the Client will receive 1
English and 1 French or 2 bilingual copies via the Purchaser.
4. DPEM will fax approval of the Preliminary Dossier to the
Purchaser.5. Purchaser will provide an electronic copy of the DPEM
approval to the Supplier.ATTACHMENT 7: EQUIPMENT
LISTINGSItemRequirementsPR 101 Article
Vessels>4 Barg and if Barg x liters > 806.2.2
- other Gas Pressure containers>4 Barg and if Barg x liters
> 806.2.2
CO2 & N2 Bottles>4 Barg and if Barg x liters >
806.2.17
Exchangers>4 Barg and if Barg x liters > 806.2.2
Compressors>10 Barg, Barg X m3/min >50 for non-hazardous
or 20 for hazardous6.2.7
Generators5.5 kV and above6.2.11
Fire ProtectionFirewater distribution systems; foam, powder and
inert gas systems; fire extinguishers {5 liters>4 Barg, Barg X
liters >80 or 1 liter >4 Barg, Barg X liters > 10}; fire
and gas detection equipment [detectors and alarms]6.2.17
Electrical5.5 kV and above6.2.9 & 6.2.11
Pipe and Materials>3" and >10 Barg for non-hazardous gas
and liquid (other than steam or water) or >4 Barg for Explosive,
flammable, corrosive or toxic gas or liquid. Characteristic Number
(>1Barg, >80mm dia, >10 Barg max, dia in mm X Barg
>1500 for non-hazardous, 1000 for hazardous)6.2.13 & 6.2.15
& 6.2.16 & 6.2.19
PumpsFirewater pumps or if pump has fabricated body and is >4
Barg, and if Barg x liters >806.2.5
Valve BodiesPSV & non standard6.2.12
All Valves4" and larger and 4 Barg and higher
Control Valve ActuatorsAll Accumulators6.2.12
TanksFirewater, hydrocarbon, and hazardous products (which could
be subject to pressure that the stress is equal to or exceeds 5/8
of the elastic limit of the material being used6.2.4
Heaters and FurnacesAll6.2.2
Lifting Device5T and larger6.2.10
4
4
5
4
4
5
5
DPEM
4
2
PURCHASER (KBR-Houston)
PROJECT TEAM
(QA)
DCC
5
1
SUPPLIER
Page 2 of 60 KBR