SAUDI TECHNOLOGISTS CONSULTING ENGINEERS PREQUALIFICATION DOCUMENT Power and Water Projects Mineral Processing Plants Oil and Gas Plants Infrastructure Projects Petrochemical Plants Aviation Projects
SAUDI TECHNOLOGISTS CONSULTING ENGINEERS
PREQUALIFICATION DOCUMENT
Power and Water Projects Mineral Processing Plants
Oil and Gas Plants Infrastructure Projects
Petrochemical Plants Aviation Projects
MESSAGE
Engineering Trends and Latest Technology of Modern Projects with specialists Engineers, is the need of the hour in the Engineering Design and Project Management System. In this advancing competent and Technological Era, we are confronted with new challenge in every project, and to meet this, we exercise all our efforts for value added engineering design and project management services. We believe in the international partnership joint ventures affiliates to widen our expertise.
KHALED A. MUKAHAL MANAGING DIRECTOR FOUNDER OF SATECH
It’s our privilege to introduce experienced SATECH Managed by a strong diversified team of highly engineering professionals. Our personnel have in-depth design and project management knowledge of projects.
We believe in long term commitments and good business relations, which we achieved by our mission at every stage of Design and Project Management.
AHMED K. MUKAHAL
GENERALMANAGER
SATECH
INFORMATION
Managing Director
Mr. Khaled A. Makahal
General Manager Mr. Ahmed K. Mukahal
CONTACT PERSONS
Mr. S. V. RAMESHA Engineering and Design Manager
Mr. MUHAMMAD AFZAL Head of Transmission Lines and U/G Cable Systems
Mr. V. ARUL NOBLE Head of S/S, Protection and Controls
Mr. JAVED FAROOQ Projects Manager and Marketing
A d d r e s s
SATECH H.Q.
Saad Bin Abdul Aziz Street, Cross Road # 2 (Near Old Shola Market /Al-Rahmaniyah Mall)
P.O. 31759, Al-Khobar 31952 Tel. +966 (3) 899 7629 / 93 1251 / 893 4188
Fax +966 (3) 893 2065 Web Site: www.satech.com.sa
Email: [email protected]
Registrations Engineering License No. 486
Chamber of Commerce Membership No. 10311
TABLE OF CONTENTS
Sl. No. Description Page No.
1 History of Company 1
2 Vision and Mission of Company 2
3 Scope of Services 3
4 Range of Activities 4
5 Organization Structure 5
6 Manpower Resources 6
7 Engineers by Discipline and CADD Operators 7
8 Major Project Completed / On-Going 8
9 SATECH Office Location Map 18
10 SATECH Accomplished Projects Photos
11 Certificates
12 Company Registration
13 INTERNATIONAL AFFILIATES
NESPAK - RIYADH KSA
DMF - ABU DHABI, UAE
LAHAMAYER - GERMANY
LAHAMAYER - INDIA
POET CONSULTING - INDIA
History of Company
Saudi Technologists Consulting Engineers (SATECH) was established in 1976 as
an Engineering Consulting Organization, licensed in Saudi Arabia. SATECH is
operating under license issued by the Ministry of Commerce. SATECH holds
Membership of the Chamber of Commerce and Industry, Eastern Province.
The organization is manned by nearly Three Hundred and Twenty Four (324)
professional engineers and technical staff who have expertise in their respective
disciplines and vast experience in Planning, Design and Construction Management.
SATECH provides sound professional engineering services in wide variety of
disciplines from conceptual engineering to Structural engineering, design of
electrical power generation, transmission and distribution systems. The company
also offers services of monitoring execution project, development of technical
specifications, and management of construction sites.
SATECH’s in house capabilities are enhanced many folds by an out of Kingdom
supports from many Consultancy Offices in India, Abu Dhabi, Germany, etc.
SATECH is a dynamic organization and has extensive experience in Power
Distribution Network and industrial Projects. At present, SATECH serves as
Project Management on behalf of S.E.C (Saudi Electricity Company), Chamber of
Commerce and also as A/E for Design and Engineering of Power System for Royal
Commission Jubail.
SATECH’s Human Resource Division remains ever vigilant to enhance its
Manpower strength and expertise by inducting into the organization Competent
Engineers and Staff in Kingdom of Saudi Arabia and Abroad.
1
VISION
To Be The Most Successful, Respected, and Singled Out Engineering Consultants for both Clients and Employees. To achieve and sustain recognition as the market leader in engineering design and project Management Company in the Kingdom of Saudi Arabia, GCC, Iraq and North African (MENA) countries. Our goal: We should be known for High Engineering standards with most economical services. Value Added Engineering is the Motto of Our Company.
MISSION
To Provide Result-Oriented Consultancy Services to Our Clients by Offering Value Added and Cost-Effective Services to Improve Our clients' Performance. Our mission is, to provide both design and Project Management Services with most cost effective methods to our client keeping high standards of Engineering. To develop local and international man-power with team motivation. Maintain a professional environment and good relation with the employees, clients, vendors, & government agencies. We develop our professional team by training locally and abroad, & by updating the team with all high-tech software’s.
We maintain excellent customer relation by greater understanding of Projects. We deliver Project Design to our customers with high Standards of Engineering, keeping Quality and safety of the Project with utmost important.
2
MONITORING AND
PROJECTS, EXECUTION
PROJECT
FEASIBILITY
STUDY
Tender Document Development
Bid Evaluation
Risk Management
Tender Negotiation
Civil /Structural Engineering Designs
Mechanical Engineering
Design
Electrical and Telecom. Engineering
Design
Instrumentation Engineering Design
SCOPE OF SERVICES
The various natures of the projects executed by SATECH are depicted in the following block diagram. Broadly speaking the services offered by SATECH may be classified into the following major categories:
a. FEED and Detail Engineering b. Construction Supervision c. CAD & Geographical Information System
Saudi
Technologists Consulting Engineers
SATECH
3
RANGE OF ACTIVITIES
We provide complete Engineering Design, Project Management services, and High
Technical Professional Manpower For:
1. Power Plants, Substations, and Overhead Transmission Lines
2. Sewage and Diesel Plants, Pump Stations, and Pipeline network.
3. Control buildings RIB (Remote Instrumentation Buildings)
4. Data Center Buildings and Communication Networks
5. Analyzers, Shelters and Laboratory Buildings
6. Utilities for:
OIL AND GAS
PETROCHEMICAL
MINERAL PLANTS
7. Infrastructure Projects:
AIR PORTS
SEA PORTS
HOTELS
ROADS AND BRIDGES
HOSPITALS
COMMUNITY AND INDUSTRIAL AREA DEVELOPMENTS
4
5
MANPOWER RESOURCES
SATECH has at the moment a total of Three Hundred and Twenty Four (324
Nos.) employees. Its manpower resources represent technical, engineering,
and administrative and support staff belonging to a wide range of
nationalities. As such, its member staff has inherently developed the ability
and competence of working in an international environment. Many Engineers
possess Master of Engineering or Higher Degree. Most of the engineers have
long professional experience in their respective disciplines while some
engineers have also obtained professional training abroad. Their expertise
covers a wide range of engineering disciplines, which include the following
major areas:
- Feasibility studies
a. Risk Assessment
b. Hazop / Hazards
c. Value Engineering
d. Gate Review
- Project management
- Planning and designing
- Costing and scheduling
- Material management
- Quality assurance and control
- Construction management
- Financial analysis and management
- Progress monitoring and material management
SATECH has an adequate administrative and marketing setup, which remains
vigilant to enhance its manpower strength and expertise by inducting into the
organization competent engineers and other staff. It also has sound technical
support staff working as Computer Specialists, CADD Operators, Architects
and Surveyors.
With the competence and dedication of its employees, SATECH has been
able to successfully execute a number of prestigious projects offered by
Clients like SEC-ERB, ARAMCO, Ministry of Defense, Electricity
Corporation Riyadh, Petrokemya, etc. The details of projects executed by
SATECH are given in another Section.
SATECH has also been providing engineers and technical personnel for the
Engineering Services and Construction supervision to Clients like SEC–ERB,
SABIC group of Companies, etc.
6
ENGINEERS BY DISCIPLINE AND CADD OPERATORS
Sl. No.
DISCIPLINE TOTAL
ENGINEERS
1. ELECTRICAL ENGINEERS 148
2. Civil/ STRUCTURAL ENGINEERS 62
3 ARCHITECTURAL ENGINEERS 6
4. MECHANICAL ENGINEERS 23
5. TELECOMMUNICATION ENGINEERS 14
6. INSTRUMENTATION ENGINEERS 8
CADD DESIGNERS
7 CIVIL 10
8 ARCHITECTURAL 11
9 MECHANICAL 8
10 ELECTRICAL 15
11 INSTRUMENTATION AND CONTROL 3
12 TECHNICAL SUPPORT 16
TOTAL 324
7
MAJOR PROJECTS COMPLETED/ ON GOING
Sl.No. Name of Project Date of Award
Date of Completion
Value of Work
Performed (SR)
Client(s)/Location
1. Detail Design (Safety Improvement for Uth. GOSPS 7,8 & 11)
Jan. '82 Mar. „84 SR 332,761 Uthmaniyah -
ARAMCO
2. Five Miscellaneous Jobs - Inter connection pipelines of Riyadh Oil Refinery Pipelines, Upgrading of Hydrocarbon facilities, Blast Proof control room design.
Mar. '82
Aug.‟ 84 SR
1,000,000
Riyadh Oil Refinery
c/o. Mace Saudi Arabia Ltd. Mr. Luke F.
DeBock
3. Detail Design (Khuff Gas test wells, re-design platform structures for well U-590)
Apr. '82 Jan. „84 SR 296,545 Rastanura - ARAMCO
4. Survey & Drafting (Update of Instrument and piping diagram for Refinery Plant 32, 34, 35)
Aug. '82
Mar. „84 SR 181,713 Rastanura - ARAMCO
5. Detail Design (Final design Uthmaniyah Power Distribution for Cathodic Protection on Phase – 2)
Aug. '82
Feb. „84 SR 1,764,646 Uthmaniyah -
ARAMCO
6. Engineering Design (Cathodic Protection for Wells & Flowlines)
Oct. „82 Jun. „85 SR
14,000,000 MAPLE (UK)
7. Detail Design (Uth. SSD Fencing at GOSP- 1, 2, 6, 7 &8)
Oct. '82 Apr. „84 SR 2,049,137 Uthmaniyah -
ARAMCO
8. Engineering and drafting (Engineering and Drafting Services for Project Design Services S. A D)
Oct. '82 Dec. „84 SR 966,000 Abqaiq/Uth./Yan
bu - ARAMCO
9. Detail Design (Retrofit D. C. Rotary D. C. Exciters with static exciter plt. 110)
Nov. '82
Jul. „84 SR 256,315 Abqaiq - ARAMCO
10. Engineering Design (Qassim Refinery)
Jan. '83 Apr. „84 SR 138,494 SABCO
(BECHTEL)
11. Engineering Study (General site review. Update Dha. North, Dha. Clinic & Abqaiq region, Abqaiq Clinic and Qurayyah)
Jan. '83
Jun. „84 SR 430,928 Dhahran / Abqaiq
- ARAMCO
12. Engineering & Drafting (Testing Services for 6GHZ Digital Communication Backbone System for the Eastern Province)
Feb. '83
Jun. „84 SR 190,316 Dhahran - ARAMCO
13. Design and Supervision of Feb. Aug. „84 SR 478,174 Rastanura -
Sl.No. Name of Project Date of Award
Date of Completion
Value of Work
Performed (SR)
Client(s)/Location
Abandon old pump house # 2 & replace substation # 19
'83 ARAMCO
14. Engineering Design (Installation Temporary Buildings Qassim Refinery
Mar. '83
Aug. „84 SR 360,000 Al – Yami Est.
15. Drafting (Excess flow check valves and piping modifications for Uth. Gas Plant 34 – C )
Mar. '83
Jan. „84 SR 89,700 Uthmaniyah -
ARAMCO
16. Construction Supervision (Offshore Structural Engineering)
Apr. '83 Jun. „83 SR 1,109,707 King Wilkinson
(UK)
17. Detail Design Drafting (Console Design for Dhahran Main Gate Operations)
Apr. '83 Dec. „84 SR 68,393 Dhahran - ARAMCO
18. Detail Design (GEC – N15, Preparation of Radio Network Configuration)
Apr. '83 Dec. „84 SR 169,773 Dhahran - ARAMCO
19. Detail Design ( Reroute 8” flow line from AD well to GOSP-1)
Apr. '83 Mar. „84 SR 109,240 Abqaiq - ARAMCO
20. Drafting & Engineering services (Khuff Gas Development wells J. O. 54368)
May '83 Oct. „85 SR 1,204,566 Uthmaniyah -
ARAMCO
21. Drafting & Engineering Services (Uth. Gas Plant C. P. Protection)
May. '83
Dec. „84 SR 84,870 Uthmaniyah -
ARAMCO
22. Design & Drafting (Khuff Gas Test wells “As Built” drawings Shedgum – 196 & Shedgum 212)
May. '83
Apr. „84 SR 112,391 Shedgum - ARAMCO
23. Cathodic Protection for Wells and Flowlines
May. '83
Jun. '85 SR
14,000,000
ARAMCO MAPLE Saudi Arabia Ltd.
24. Detail Design (GEC – N11, Console design Dhahran Fire Station)
Aug. '83
May „84 SR 84,985 Dhahran - ARAMCO
25. Detail Design (Uth.maniyah Gas Plant – SSD Fence Project design of main gate installation cct. Checkout)
Aug. '83
Mar. „84 SR 70,268 Uthmaniyah -
ARAMCO
26. Design (Ar – Rabiyah Housing Program)
Sep. '83
May „85 SR 2,507,784 Dhahran - ARAMCO
27. Detail Design (Cathodic Protection PA – 2 WP 115 and H2S monitoring system)
Sep. '83
May „84 SR 96,704 Uthmaniyah -
ARAMCO
Sl.No. Name of Project Date of Award
Date of Completion
Value of Work
Performed (SR)
Client(s)/Location
28. Detail Design (Shedgum Gas Plant – SSD Fencing)
Sep. '83
Mar. „84 SR 64,521 Shedgum - ARAMCO
29. Drafting & Engineering services (Instrument / drafting services to S. P. O. E. D. Safaniyah Prod.
Oct. '83 Jan. „84 SR 93,880 Safaniyah -ARAMCO
30. Detail Design (Reconfiguration of Dhahran 2 – way radio channel)
Oct. '83 May „84 SR 69,173 Dhahran - ARAMCO
31. Engineering Design (Mechanical Structural and Pipe work for new Hexane Plant) - Yanbu
Nov. '83
May „85 SR 250,000 Pits Burgh – Des Moines (PDM) –
Saudi Arabia
32. Design & Construction Supervision of Higher Alpha Oilfins Factory (HAO Project)
Nov. '83
Jul. „85 SR 830,001 Saudi
Petrochemical (Kemya)
33. Project proposal & Final Design (General Engineering Services for SAI / PPD – A & YPP /PDS)
Nov. '83
Mar. „85 SR 310,684 Yanbu - ARAMCO
34. Engineering & Design (Petroline Engineering Library update )
Nov. '83
Oct. „85 SR 1,029,020 Yanbu Plants
Library
35. Architectural & Engineering Design & Supervision (General Engineering Services for ER – 2780 Ar – Rabiyah executive Housing Program)
Dec. '83
Jun. „85 SR 2,394,808 Dhahran - ARAMCO
36. Design of Khuff Gas Wellhead Air Reserve Vessel Jan. '84 Aug. „85 SR 134,566
Uthmaniyah - ARAMCO
37. Conceptual & Detail Design Khuff Gas Flowline U – 623 to U – GOSP – 10
Jan. '84 Aug. 85 SR 162,993 Dhahran - ARAMCO
38. Engineering Support for B1-3221
Jan. '84 Oct. „85 SR 673,212 Uthmaniyah -
ARAMCO
39. Engineering Design & Drafting Al – Mutawa Commercial Center SIHAT, K. S. A
Feb. '84
Aug. „85 SR 105,000 Villa Construction
& Supervision
40. Engineering Design & Drafting (Administration Building for the R. A. S. F at the king Khaled Airbase – Khamis Musshayt
Feb. '84
Jul. „85 SR 168,000 Ballast - Nedam
41. Design & Construction Supervision of Higher Alpha Olifins Factory (HAO Project)
Feb. '84
Dec. „85 SR 105,000 Saudi
Petrochemical (Kemya)
42. Khuff Gas Well U – 616 to U – Feb. Sep. „85 SR 359,425 Uthmaniyah -
Sl.No. Name of Project Date of Award
Date of Completion
Value of Work
Performed (SR)
Client(s)/Location
GOSP – 11 Project Proposal '84 ARAMCO
43. Engineering & Drafting Services (Utilization of Swimming pool water for Fire Fighting at E/W Pipeline pump stations No. 3,6 & 10)
Feb. '84
Apr. „85 SR 99,038 PDS UNIT, YANBU - ARAMCO
44. Engineering and Detail Design (Reroute of 36” / 24” Fuel Gas Line 1800 ft. – Yanbu)
Feb. '84
May „85 SR 224,334 Yanbu - ARAMCO
45. Uthmaniyah Gas Plant Drafting Support
Mar. '84
Dec. „85 SR 165,600 Uthmaniyah -
ARAMCO
46. Engineering & Drafting Services Design Modification and Upgrading to Switchrack 20 – MR – 1 NGL Product Exchange Area
Mar. '84
May „85 SR 85,506 PDS UNIT, YANBU - ARAMCO
47. Engineering & Drafting (Documentation Services for Disaster Control center communication System )
Mar. '84
Feb. „85 SR 134,651 Dhahran - ARAMCO
48. Area & Skid Lighting for Shedgum & Uthmaniyah Khuff Gas wells
Apr. '84 Sep. 85 SR 120,758
Uthmaniyah - ARAMCO
49. Retrofit Rotary D. C. Exciters with Static Exciters-EWO-57554 PIT 110 Contract No. SO177/716-530/11
May. '84
Jan. '85
SR 256,315
ARAMCO, Abqaiq
Mr. M. G. Brown
50. 1180 Retrofit Rotary D. C. Exciters with static Exciters EWO- 57554 Plt 11 Rev # 2 Dated 12/11/94 Contract No. 15854/00
May. '84
Jan. '85
SR
256,315.50
ARAMCO, Abqaiq Mr. M. G. Brown
51. Engineering Design (2” Wash Oil Line 2-1-/2 from PEM-REF to Yanpet.)
Aug. „84
Apr. „85 SR 184,147 Dhahran - ARAMCO
52. Engineering & Drafting (Testing Services for 6GHZ Digital Communications System and Record Updating )
Aug. „85
Apr. „86 SR 184,147 Dhahran - ARAMCO
53. Detail Design (GEC – N12 Combining & Interfacing remote Controllers to ARAMCO VHF / UHF Base Station)
Aug. „84
Apr. „85 SR 91,347 Dhahran - ARAMCO
54. Conceptual & Detail Design (ARAMCO Aviation Center
Oct. „85 May „86 SR 730,136 Dhahran - ARAMCO
Sl.No. Name of Project Date of Award
Date of Completion
Value of Work
Performed (SR)
Client(s)/Location
Facilities – EPIA)
55. Engineering Work Orders Contract No. 15854/00
Nov. „84
Mar. „85 SR 310,684 ARAMCO H.M.
Al-Yahya
56. Reroute of 36" Fuel Gas Line Yanbu, JO-29156
Dec. '84
May. '85 SR 224,334
ARAMCO R. Crosby
57. ARAMCO Aviation Center Facilities at KFIA Contract No. 15854/00
Mar. '85
Nov. '85 SR
1,150,556
ARAMCO A. M. Al - Aqeel
58. Khuff Gas Wellhead Air Reserve Vessel BI – 8107
Apr. '85 Jan. '86 SR 196,468
ARAMCO
M. A. Mullen
59. Khuff Gas Well U - 616 to U-GOSP-11 Project Proposal, BI-8157
Apr. '85 Sep. '86 SR 359,425
ARAMCO
K. W. Richardson
60. Engineering Support for BI-3221 (All Uthmaniyah GOSPS) SO-362/713660/094 Contract No. SO-362/713-660/094
May. '85
Oct. '86 SR 673,212
ARAMCO, Dhahran
61. Engineering Support for Uthm. GOSPs B1-3221
May. „85
Mar. „86 SR 673,212 ARAMCO
T.M. Simpson
62. Khuff Gas Wellhead Air Reserve Vessel: BI-8107
Jun. '85
Sep. '85
SR 144,194 ARAMCO
M. A. Mullen
63. Uthmn Gas Plant Drafting Support
Jun. '85
Dec. '85 SR 165,600
ARAMCO P. Collela
64. Khuff Gas Flowline U - 623 to U - GOST - 10
Jul. '85 Oct. 85 SR 162,993
ARAMCO
J. F. Yamzon
65. Area and Skid Lighting for Shedgum and Uthmn. Khuff Gas Wells.
Jul. '85 Oct. '85 SR 120,758
ARAMCO
A. Q. Regino
66. Hexene Purification Project Electrical, Instrumentation Design
Aug. '85
Dec. '85 SR 135,750 PDM Saudi
Arabia Mr. G. Heywood
67. Khuff Gas Flowline U - 606 to U-GOSP - 11
Aug. '85
Dec. '85 SR 784,873
ARAMCO
J. F. Yamzon
68. Saudi Fisheries Fish Depot Processing Plant (Haskoning) Service Order 002-SATECH
Sep. '85
Oct. '86 SR 575,000
Saudi Fisheries Company, Dammam.
Mr. S. H. Mid
69. Khuff Gas Flowline U - 623 to U - GOSP - 10, BI - 8150 JO - 54512
Sep. '85
Mar. '86
SR 694,051
ARAMCO J. F. Yamzon
70. Ar Rabiyah Executive Housing Jan. '86 Sep. '87 ARAMCO
Sl.No. Name of Project Date of Award
Date of Completion
Value of Work
Performed (SR)
Client(s)/Location
Project - ER 2780 - Details Design Contract No. SD-380/713-320/05 R2
SR 930,994
Mr. G. White
71. Khuff Gas Flowline U-616 to GOSP-11, BI-80574 Rev. # 5 Contract No. SO-381/713-620/170R5
Dec '86 Apr. '88
SR 536,289
ARAMCO, Abqaiq
72. Higher Alphs Olifins Facilities (HAO Project) Contract No. 5CEN-6102 Jan. '86 May '87
SR 162,300
Al Jubail Petrochemical
Company (Kemya)
Mr. G. M. Staudt
73. Khuff Gas Flowlines, U-623 to U-GOSLP-10, BI -8150; JO - 54512
Jan. '86 Mar. '87
SR 588,136
ARAMCO A. R. Al-Dahhan
74. Khuff Gas Flowline U-616 to U- GOSP - 11, BI - 8159, JO - 81575
Jan. '86 Apr. 87
SR 536,289 ARAMCO
A. I. Al - Worthan
75. Ar-Rabiyah Executive Housing Project, ER-2780 Design & Supervision
Jan. „86
Sep. „87 SR 930,994 ARAMCO
G.J. White
76. Detail Design of Khuff Gas Flow Line U-616 to GOSP-11 BI-8157 Contract No. SD-381/713-620/170R5
Jan. '86 Aug. '87
SR 536,289
ARAMCO Mr. A. I. Al Worthan Abqaiq
77. Detail Design of Khuff Gas Well Uthmaniyah -627 to Uthmaniyah Kuff Gas Mainifold BI-8157 Contract No. SD-382/713-620/169 R1
Jan. „86
Aug. „86
SR 586,175
ARAMCO Mr. W. Al Ghalayini
78. BI-8157, JO-81576 Khuff Gas Well U-626, to Uthmn. Khuff Manifold.
Jan. '86 Aug. '86
SR 586,175
ARAMCO W. Al - Ghalayini
79. Provide Drafting / Training Assistance within Contractor's Office
Jan. '86 Jul. '86
SR 120,000
ARAMCO
80. Relocation of Aviation Facilities at King Fahd International Airport BI-3240 Contract No. SD384/713-320/001
Jan. '86
June. '86
SR 49,153
ARAMCO Mr. J.C. White
Dhahran
81. Uthmaiyah Gas Plant Drafting Contract No. SD-386/213-
Jan. „86
Oct. „86 SR 96,075 ARAMCO
Mr. L.G. Gall P.
Sl.No. Name of Project Date of Award
Date of Completion
Value of Work
Performed (SR)
Client(s)/Location
700/40 Collela
82. 1984 Maintain Potential Flowlines BI-8150/JO-54517 Contract No. SO-391-713-660/103
Jan. '86
Apr. '86 SR 28,728
ARAMCO Uthmaniyah MR. M. I. Al
Multhem
83. Removal of redundant instrumentation, Modification - 3 NGL - EWD – 140 Contract No. SO-387/713-630/Y27
Jan. '86
Mar. '86 SR 11,550 ARAMCO Yanbu Mr. R. K. Naylor
84. 1984 Maintain Potential Flowlines BI-8150/JO54515 Contract No. SO-388/713-660/106R1
Jan. '86 Jun. '86 SR 39,822
ARAMCO Uthmaniyah Mr. M. I. Al
Mulhea
85. 1984 Maintain Potential Flowlines BI-8150/JO-54520 Contract NO. SO 391/713-660/104R1
Jan. '86 Jun. '86
SR 28,718
ARAMCO Uthmaniyah Mr. M. I. Al
Mulhem
86. Design for Frantel National Hotel – Najran Five Star Hotel Feb '86 Mar '86
SR 415,000
Al Robaya Establishment,
Mr. K. R. Mathew
87. Design / Drafting Support for Completion of As – Built, Ar- Rabiyah, Phase I
Mar. „86
Nov. „86 SR 49,336 ARAMCO J.A. Belvo
88. Piping Hexane Mar '86 Sep '86 SR 230,058
PDM Saudi Arabia
Mr. G. Heywood
89. Reconnect Uthmaniyah-217 and 219 To Uthmaniyah GOSP-11 JO-54591 Contract No. SO-393/713-610/107R2
Mar. '86
Oct. '86 SR 48,994
ARAMCO Uthmaniyah Mr. M. I. Al
Mulhem
90. Engineering Support for Uthmaniyah 60SPs Construction Contract No. SO-394/713-610/108
Apr. '86 Jul. '86 SR 47,518
ARAMCO Udhailiyah Mr. I. M. Simpson
91. Field Engineering Support – Kemya Contract No. 5CEN - 6102
Apr. '86 Oct. '86
SR 225,817
Al Jubail Petrochemical
Company (KEMYA)
Mr. I. Katab Engg. Dept.
92. EWD # 161 - Platform for Firewater Jockey Pump Contract No. SO-395/713-630/Y33R1
May. '86
Jul. '86 SR 3100 ARAMCO Yanbu
Sl.No. Name of Project Date of Award
Date of Completion
Value of Work
Performed (SR)
Client(s)/Location
93. Abandon Old Pump House - 2 and replace Sub - Station - 19, 131 - 8146 PRI.4
May. '86
May. '87
SR 135,147
ARAMCO R. I. Cimioco
94. Abandon Old Pumphouse - 2 Pumps and Replace Substation - 19, BI-8146, PRI, - 41
May. '86
Aug. '86
SR 82,696
ARAMCO I. K. Al – Binali
95. Abandon Old Pumphouse –2 Pumps and Replace S/S – 19, BI- 8146, PRI, - 41
May. „86
Aug. „86 SR 82,696 ARAMCO
I.K. Al-Binali
96. Detail Design of Andr-303 Trunkline to Andr-GOSP-1 and Fire water System Extension at Andr-GOSP-2 Contract #540/713-200/141
Sept. '86
Nov. „90 SR 633,000 Saudi ARAMCO (PPD/MPPD)
Abqaiq
97. Engineering Services for SCECO East/Central 380kV Interconnection. Contract No. 80870/01
Oct. '86 Apr. 87 SR 222,000
SCECO, Dammam
Mr. J. D. McNab
98. Update JORC As Built Drawings P & Ids and Piping Layout Project No. 225
Oct. '86 Sep '87 SR
1,994,000
Jeddah Oil Refinery
Company (JORC) Mr. A. Saber
99. EWD # 170 – Yanbu & Yanbu Petromine Refinery # 1 East/West Pipeline Mofifications Platforms Conract No.SO-406/713-200/Y47
Oct. „86
Nov. „86 SR 5,846.40 ARAMCO Yanbu Mr. D.A. Mehar
100. Engineering Assistance and Drafting Coordination Contract No. SO-409/213-700/47
Nov. „86
Dec. „86 SR
24,964.80
Uthmaniyah Gas Plant ARAMCO Mr. P. Colella
101. Design/Drafting support for As Built Drawings – Ar Rabyah, Phase-I Rev. # 1 dated 09/03/87 Contract No. So-408/713-400/00
Nov. „86
Mar. „87 SR 61,418 ARAMCO Dahran Mr. G.J. White
102. Design/Drafting support for Completion of As-Built Ar-Rabiyah Phase I.
Nov. „86
Mar. „87 SR 49,336 ARAMCO J.A. Belvo
103. Foodstuffs Production Facilities at Royal Commission for BINZAGR – Yanbu. Design & Supervision
Dec '86 May '87 SR 900,000
Best Foods Saudi Arabia Limited
(CPC) Mr. S. McCall
104. Engineering Services contract No. C-3120
Dec. „86
Jun. „88 SR 150,000 Arabian Electrical
Industries Limited
Sl.No. Name of Project Date of Award
Date of Completion
Value of Work
Performed (SR)
Client(s)/Location
105. Field Engineeing Support Kemya Revision # 1 Dated 21/04/86 Contract No. SO-AFS-S-5003R-O
Jan. „87
Sep. „87 SR 249,787
Al-Jubail petrochemical Co. (Kemya)
Mr. G.M. Staudt
106. Khuff Gs Well Shedgum – 238 to Shedgum SOSP –2, Rev. # 3 Dated 28/10/87 Contract No. SO-415/713-200/022 R3
Jan. „87
Feb. „88 SR 623,392 ARAMCO
Uthmaniyah Mr. P. Collele
107. Khuff Gas SH-238 to SH-GOSP-2
Jan. „87
Mar. „87 SR 623,373 ARAMCO
A.R. Al-Dahhan
108. EWD # 162 Cot Fire Water Jockey Pumps Modifications Contract No.SO-416713-200/Y59
Jan. „87
Mar. „87 SR 30,004 ARAMCO Yanbu Mr. D. A. Meher
109. Digitization of Juaymah Gas Plant PandID‟s Phase II
Feb '87 May „90 SR 260,000 Saudi ARAMCO
Abqaiq
110. Desing and supervision of Wadi Leban / Swedi Pipelines and Pumping Stations
Feb 87 Oct 89 SR 650,000 MACE S,A, Ltd. / M.O.A., Riyadh
111. Detail design of trunkline and associated well tie-in to Abq.-GOSP-3
Mar. '87
Nov. „90 SR 633,000 Saudi ARAMCO
Abqaiq
112. Detail design of BI-8167 Trunkline/ Testline of U-663 and Flowlines to Tie-in (07) wells to U-GOSP-11
Mar. '87
Sep. „90 SR 789,000 Saudi ARAMCO
Abqaiq
113. Off shore platforms and pipelines, maintain potential
Mar. '87
May. '90 SR 233,000 Saudi ARAMCO
Rastanura
114. Detail design of trunklines between AD-GOSP-6 and U-GOSP-8
Apr. '87 Aug. „90 SR 688,000 Saudi ARAMCO
Abqaiq
115. Supervision of Construction for N.I.C. Co.
May. „87
Dec. „90 SR 300,000 National
Industrial Gas Co. Dahran
116. Khuff Gas Well U-628 to Uthmaniyah Manifold Rev. # 1 Dated 20/10/87 Contract No. SO-435/713-200/036R1
May.„87
Mar. „88 SR 258,240 ARAMCO Abqaiq
Mr. A. I. Al Worthan
117. Khuff Gas Well U-628 to
May.„87
Dec. „88 SR 451,096 ARAMCO
A.I. Al Worthan
Sl.No. Name of Project Date of Award
Date of Completion
Value of Work
Performed (SR)
Client(s)/Location
Uthmaniyah Manifold.
118. Shedgum Khuff Gas Flowline Loops and Manifold Extension BI-8160 Revision # Dated 20/10/87 REV # 2 Contract No. SO-436/713-200/037R2
Jun. '87
Apr. '87 SR 587,924
ARAMCO, Abqaiq Mr. S. M. Al Aradi
119. BI-8160 / JOB-81605/6/7/8 Shedgum Khuff Gas Manifold Expansion and Flowline Loops.
Jun. '87
Aug. '88 SR 672,337
ARAMCO
S. M. Al - Aradi
120. Design of Flowlines for Abqaiq and Uthmaniyah Wells
Jun. „87
Jun. „90 SR 364,000 ARAMCO Abqaiq
121. Design of water injection header and Laterals for Andr-284, 291 and 293
July. '87
Jun. „90 SR 385,000 Saudi ARAMCO
Abqaiq
122. Detail design of Transmission Line and Testline of SDGM-268 and Wells to SDGM-GOSP-5
Aug. '87
Nov. „90 SR 629,000 Saudi ARAMCO
Shedgum
123. Detail design of Tieing-in Andr-249 and 252 to U-WIPS-2
Aug. '87
Oct. „90 SR 355,000 Saudi ARAMCO
Abqaiq
124. Detail design of Trunkline/ Testlines and 7 Flowlines to SDGM-GOSP-3
Sep. '87
Oct. „90 SR 770,000 Saudi ARAMCO
Abqaiq
125. Engineering Services Sep.
„87 Mar. „88 SR 150,000
Al-Kawther Industries Ltd.
Mr. Sahl S. Hefzi
126. Provide Engineering and Design related services to YPR Sep.
'87 Dec. '88
SR 250,000
Yanbu Petrominy Refinery Y.P.R Mr. Saleh A. Al
Zaid
127. Detail design of Fire Protection and Detection System
Oct. '87 Nov. „90 SR 314,000 Saudi ARAMCO
Dhahran
128. Design of Tie-in Water Supply Wells Andr-892, 893, 894 to North Andr Header
Oct. '87 Nov. „90 SR 360,000 Saudi ARAMCO
Ainder
129. Update existing drawings Nov. '87
Nov. „90 SR 308,000 Saudi ARAMCO
Abqaiq
130. BI-3104 Instrument Loop Diagram for E/W Pipeline Area III
Dec. '87
Jul. '88 SR 216,359
.
ARAMCO J. F. Nelson
Sl.No. Name of Project Date of Award
Date of Completion
Value of Work
Performed (SR)
Client(s)/Location
131. OSI Program, Zuluf Offshore GOSP - 4, Plant G-52.
Jan. '88 Apr. '88 SR 95,034
ARAMCO
S. Al - Rowaili
132. Detail design of Heavy Equipment Fac. / Fuel Proj. Drainage EWO-295-1 & EWO - 306 E, P, F.E.
Feb. '88
Oct. '90 SR 141,000
Saudi ARAMCO Yanbu
133. BI-8160 Flowline Loop on Khuff Gas Well Shedgum 233 to Shedgum Manifold.
Mar. '88
Dec. '88 SR 116,528
ARAMCO
S. M. Al - Aradi
134. Design of Facility / Community Maintenance Shop Modification
Apr. '88 Feb. „91 SR 296,000 Saudi ARAMCO
Yanbu
135. Replacement of Deepwell Anodes at COT Yanbu, EWO – 241
Apr. '88 Dec. '88 SR 116,528
ARAMCO
S. M. Al - Aradi
136. BI-8159 Khuff Gas Well SH - 238 Tie - In to SH - GOSP2
Apr. '88 Dec. '88 SR 136,135
ARAMCO
A.R. Al - Dahhan
137. EWO 253 Yanbu NGL Onshore/Offshore Drawings Update. Contract No. 19125/01
May'88 Dec. '88 SR 581,805
ARAMCO
M.A. Meher
138. BI-8160 Flowline Qatif Wells 21 & 43 Injections. Contract No. 19125/01
Jun. '88
Aug. '88 SR 228,256
ARAMCO
K.D. Slattery
139. Design & Supervison Services for the Fisheris Processing Centers in Riyadh & Jeddah with the association of HASKONING (Holland)
Jan. '89 Mar. '91 SR 2,500,000 Saudi Fisheries
Co.
140. BI-8167 Design of Trunkline for F/L Sh-32, 224 & 225 Tie-in SH-GOSP-1. E, P, F.E.Contract #530/713-200/128
Mar. '89
Aug. „90 SR 284,000 Saudi ARAMCO (PPD/MPPD)
Abqaiq
141. Drafting of As-Built drawings for Various Projects
Mar. '89
Aug. „90 SR 120,000 Saudi ARAMCO
Abqaiq
142. General Engineering and Design Services supervision and Drafting
Mar 89 Feb 92 SR 650,000 SAMAREC Jeddah
143. Design & Management Supervision of Replace/ Repair QJ-3 Pipeline
Jul. '89 Jan. „91 SR 767,000 Saudi ARAMCO
Dhahran
Sl.No. Name of Project Date of Award
Date of Completion
Value of Work
Performed (SR)
Client(s)/Location
144. Al-Qahtani Pipe Coating Terminal – Yanbu Design & Supervision
Jun. '90
Mar. '91 SR 900,000 Al-Qahtani Co.
145. Design & Supervision Services for Al-Aujan Beverage Plant in IInd Industrical City - Dammam
Jun. '90
Dec. '91 SR 800,000 Saudi Danish
Company – Mr. Thorsen
146. Residence Complex for Mr. Abdul Rehman Dabal at Mazroueye, Dammam
July „ 92
Dec „92 SR 90,000 Mr. Abdul
Rehman Al-Dabal - Dammam
147. A Conceptual and detail Design & Supervision of Multistorey Dispensery including Emergency facilities, X-Ray Dept, Laboratories Dept, 14 Specialised Clinics and a complete floor for Administrattion
Apr. „93 Aug. „93 SR
1,100,000 AL- FARABY Dispensary.
148. Design & Construction Supervision of WALLS ICE CREAM FACTORY in Dammam 2nd Industrical City
Jun. '93
Jan. '95 SR 1,500,000 BINZAGR WALLS
ICE CREAM
149. Design & Supervision of Pitmoss Plant in 2ND Industrial City
Jan. '94 Jun. '95 SR 1,000,000 AL-OMARY Plant
150. Labor camp in Jubail Industrial City, Design Services
May „94 Aug „94 SR 80,000 MesSRs Assad
Saeed Co.
151. Construction Management of Combined Mussalah and Dammam Facilities at Dhahran Main Storehouse
Oct. '94 Apr. „95 SR 240,000 Al-Guhaidan Est. / Saudi ARAMCO,
Dhahran, KSA
152. Construction Supervision Combined Mussalah and Dam-mam Facilities at Juaymah, KSA
Oct. '94 Apr. „95 SR 40,000 Al-Guhaidan Est. / Saudi ARAMCO,
Juaymah, KSA
153. Detail design of 230/34.5kV Substation No.1 of SABAYEK Ferro Alloys Project
Apr. '95 Jan. „96 SR 150,000 MAPHAR
Jubail
154. Detail design of 34.5/4.16kV Substation of SABAYEK Ferro Alloys Project
Apr. '95 Oct. „95 SR 80,000 MAPHAR
Jubail
Sl.No. Name of Project Date of Award
Date of Completion
Value of Work
Performed (SR)
Client(s)/Location
155. Detail design of Product Handling No.1 Substation, 460V of SABAYEK Ferro Alloys Project
Apr. '95 Sep. „95 SR 60,000 MAPHAR
Jubail
156. Mr. Al- Fozan Villa at Cornishe Al- Khobar
June „95
Sept „95 SR 80,000. Mr. AL Fozan –
Cornishe Khobar.
157. Installation supervision of Electrical Power Points for SAMS and Stand-by Equipments – Dhahran.
Jul ‟95 Dec „96 SR 138,000.. Al-Guhaidan Est. / Saudi ARAMCO,
Dhahran
158. Installation of 69 kV U/G Cable & Associated Pilot Cable and Non-Metallic Fiber Optic Cable between Ibn-Khaldoun BSP, Dammam BSP, Dammam P/P & other Grid Stations In Dammam Area, Contract No. 82335/00
Aug '95
May „97 SR 120,000. Al-Ojaimi Co./ SCECO-EAST
Dammam
159. Mr. Misbah AL- Dajani Villa at Dana, Dhahran
Sept „95
Feb „96 SR 40,000. Mr. Misbah
Dajani,Dana-Dhahran
160. Food Court at Khobar Cornishe between Burger King and McDonald
Dec „95 May „96 SR 140,000. H.H.Prince Faisal
Bin Fahad Al- Saud
161. 230kV (D/C) O/H Tranmission Lines (Third Line,)Qatif BSP to Ras Tanura Refinery Substation # 80
Jan 96
Mar 96
SR 650,000
Saudi Services for Electro
Mechanic work Co. Ltd. (SSEM)
SCECO East
162. Design and Engineering: 115kV Wood H-Frame T/L: Power Supply to Saudi ARAMCO E/W Pump Station # 2
Apr. „96 Sep. „97 SR 220,000
SCECO-East / Al-Haider Co. for Trad. & Cont.
163. SCECO East Contract No.82655/00 General Engineering Services
Apr „96
Apr 2000
SR 594,864
SCECO East
164. Design and Engineering: Upgrading of 115 kV (DC) T/L from Berri P/P to Jubail Area Substation, SCECO-EAST, Contract No-82361/00
May „96 Aug. „98 SR 375,000
Al-Haider Co. for Trading &
Contracting / SCECO-EAST
165. Yanpet Infrastructure Expansion Project 115kV Feeder to Yanpet.
May 96 Oct 96 SR 550,000 SSEM/Royal Commission Yanbu KSA
Sl.No. Name of Project Date of Award
Date of Completion
Value of Work
Performed (SR)
Client(s)/Location
166. King Abdul Aziz University Telephone Exchange network of more than 20,000 lines
July 1996
Dec, 2000
SR 16,200,000
King Abdul Aziz Univeristy
167. Warehouse and Office building at SNAS area Khobar
Sept „96
Nov „96 SR 30,000. Mr.Marwan
Dardas.
168. Design and Engineering: 230 kV (D/C) O/H Transmission Lines (Third Line), Qatif BSP to Ras Tanura Refinery Substation # 80 Contract #82629/00
Sep. '96
Aug. „98 SR 320,000
Saudi Services for Electro Mechanic Works Co. Ltd. (SSEM) / SCECO-EAST,Qatif/
Rastanura
169. Design and Engineering: 69kV U/G Cables Replacement; Qatif BSP to Safwa Lines 1 & 2
Nov. '96
May „97 SR 190,000
Al-Nafjan Contracting Est./
SCECO-East Qatif / Safwa
170. Residential biulding in Rakah area Khobar
Jan „97 Mar „97 SR 60,000. Al khodary Co.
171. 69kV U/G Cables Replacement;Qatif BSP to Safwa Lines 1 & 2.
Jan 97 Mar 97 SR 180,000 Al-Nafjan
Contracting Est./SCECO East
172. AL –Khodary family Villa ,at Green Belt in Khobar
May ‟97 Jan‟98 SR 90,000. Mrs Abdulah
Khodary Khobar.
173. Construction Management for New Ghazlan Power Plant Integration and Reinforcement of 230 kV System in Northern Area.Contract No.82800/00
Jul. „97 Dec. 2000
SR
6,600,000
SCECO-East
174. Construction Management for Power Supply to Saudi ARAMCO‟s New Hawiyah Gas Plant. Contract No. 82992/00
Jul 1997
Dec 2000
SR 6000,000
SCECO East
175. King Fahd University Telephone Exchange network of more than 14,000 lines
Sep, 1997
Oct, 2000
SR 9,300,000
King Fahd University
176. Site Preparation for Hawiyah Gas Plant,115kV O/H T/L, SCECO-East Contract # 44202/00
Oct. '97 Dec. „97 SR 135,000
Ahmed Al-Binali & Sons
Co.Hawiyah / SCECO-East
177. Development of Scope of Work for O & M of Kharkhair Power Plant Project and Distribution Network. Phase-I
Oct. '97 Mar. „98 SR 270,000 SCECO-East Kharkhair
178. Design of Yanpet Infrastructure Expansion Project
115kV Feeder to Yanpet
Jan. '98 Jan. „99 SR 265,000 SSEM / Royal Commission, Yanbu, K.S.A.
Sl.No. Name of Project Date of Award
Date of Completion
Value of Work
Performed (SR)
Client(s)/Location
179. Chamber of Commerce Jan, 98 Dec, 1998
210,000
Chamber of Commerce
180. Development of Scope of Work for O& M of Kharkhair Power Plant Project and Distribution Network; Phase-II
Mar 98 Feb 2001 SR 540,000
Saudi Electricity Company EOA
181. Construction Management for Power Supply to Saudi ARAMCO‟s New Hawiyah Gas Plant. Contract No. 82992/00
Oct. '98
Apr. 2001
SR 2,995,000
Saudi Electricity Company EOA
182. Drafting Services May „99 Dec, 99 SR 72,000
Arabian Thermal Air Industries
(ATAI)
183. General Engineering Services
Jun „99 Jan. 2002 SR 216,500
Al-Jubail Petrochemical
Company (Kemya)
184. Improvement of Sea Water Inlet and other Facilities at Qurayyah Power Plant SCECO- East Contract # 83770/00
Oct. '99
Sep. 2000
SR 345,000
Raymond Saudi Arabia Limited/
SCECO-ERB
185. Design and Engineering of Power System Royal Commission for Jubail
Dec. '99
Oct. 2005
SR 7,222,830
Royal Commission,
Jubail
186. Quality Monitoring and Inspection Services for SCECO-East Contract No. 83320/00
Dec. '99
Jul. 2005
SR 4,649,222
Saudi Electricity Company EOA
187. Design and Engineering : 115/134.5 Kv 45 BC S/S in Jubail Industrial City for Royal Commission
Feb. „2000
Jun. 2002 SR 500,000 Royal
Commission Jubail
188. Design and Enginering 2x115Kv Underground power cables + F.O cable from Jubail Southwest S/S 45 BC S/S
Feb.„2000
Jun. „2002 SR 160,000 Royal
Commission Jubail
189. Engineering & Design Services of 69kV U/G and Fiber Optic Cable Installation in Dammam Area
Apr 2000
Apr 2001 SR 230,000
SSEM SCECO ERB
190. King Fahd University , Ethernet based Enterprise network upgrade, totaling to 10,000 points with interanet /internet services
Apr, 2000
Sep, 2001 SR 4,055,000 King Fahd University
Sl.No. Name of Project Date of Award
Date of Completion
Value of Work
Performed (SR)
Client(s)/Location
191. Construction Management and Project Monitoring of Diesel Power Plant and Overhead Distribution Network at Kharkhair Area. Contract No. 83419/00
Jul „2000
Jan 2002
SR 3,410,272
SCECO East
192. Design and Engineering Services SEC-ERB contract No. 83330
20, Jul 2000
July, 2001 SR 3,836,964 SCECO East
193. Drafting Services of Civil/ Structural works for Restoration of Piers at King Abdul Aziz Navy Base, Jubail
Aug 2000
Oct 2000 SR 55,800
Al Rabiah in Association with COWI consulting
Engineers
194. Engineering & Desing Services of 132kV O/H T/L and Fibre Optice system in Riyadh Muzahimiyah and Qassim
Aug 2000
March 2001
SR 137,000
Al-Sharif KEC /
SEC-ERB
195. Construction Management of S/S & T/L Projects for Power Supply of HARDAD and FARAS /SHEDGUM Expansion Projects
Dec 2000
Nov 2003
SR 5,160,000
SCECO East
196. Design and Engineerng : D/C 69 KV OH T/L from Dhahran Central S/S to Al-Maha S/S
Jan.‟2001
Oct. „2002 SR 80,000 Al-Yami
197. Design and Engineering : D/C 115 Kv OH Transmission line from Mahasen BSP to SANG S/S
Jun.„2001
Mar. „2002 SR 160,000 Al-Ertifaa
198. 3 Design and Engineering: reinforcement of power distribution network, Jubail industrial City .
Oct. „2001
July, 2002 SR 450,000 Royal
Commission Jubail
199. Mr. Naif Al-khodary Villa at Bahrain causeway area ,Khobar
Jul.2002
Oct,‟2002 SR 60,000. Mr. Naif Al-
khodary Khobar.
200. Residencial Building at Lexus showroom area in Khobar
Jan.2003
Mar „2003 SR 50,000 Mr.Naif Al-khodary Khobar
201. Mr. Mohammad Al-Assaf Rsidential Villa at Doha ,Dhahran
Mar.‟2003
July 2003 SR 50,000. Mr.Mohd Al-Assaf Doha Dhahran.
202. S Saudi Services for Electro mechanic works Co. 69 Kv U/G T/L & F.O Cable installation
March 2003
March, 2004
SR 230,000 SCECO East,
SSEM
Sl.No. Name of Project Date of Award
Date of Completion
Value of Work
Performed (SR)
Client(s)/Location
203. Supervision work for the roofing reconstruction of the processing area more than
2500m in the Dammam Plant.
May 2003
Sept 2003 SR 80,000. Saudi Fisheries Co- Dammam
204. Mr.Sami Al-Khodary Villa at Green Belt- Khobar
Aug.‟2003
Nov 2003 SR 50,000 Mr.Sami Al-
Khodari Khobar
205. El-Mandeb , Engineeering & Design Services for new Street Lights
Sep, 2003
Dec, 2003 SR 31,000 El-Mandeb Co.
206. Instrumentation & Control Design Services
2003 July, 2006 SR 190,635 Sofcon Co.
207. National contracting Co. (NCC) Design and Engineering works of 69 Kv & Fiber optic U/G cables & taleemi S/S SEC-ERB Contract No. 83723/00
Oct, 2003
Feb, 2003 SR 155,000 NCC/SEC-EOA
208. Al-Ertifa , Engineering and Design Services
May 2003
Oct 2003 SR 34,750 Al-Ertifa Co.
209. Design and Engineering Services for Construction of new 115/13.8Kv S/S 16BD
July 2004
May, 2005 SR 1,534,446
Saud Consult/RC
210. Engineering and design services for New St. Lighting for Jyaumah & Dammam SEC-Erb Contract No. 83844/00
Sep, 2003
Dec, 2003 SR 131,000 El-Mandeb/ SEC-
EOA
211. Design of 115 KV overhead Transmission lines Sec-ERB contracto No. 83426/00
Jan, 2004
June, 2004
SR 1350 SCECO East
212. Saudi German , Engineering and Design Services
Jan, 2004
March, 2004
SR 25,000 Saudi German
Co.
213. Warehouse Building annex attached to an existing Ware house SNAS Area ,Khobar
Feb 2004
Apr 2004 SR 30,000. Mr.Marwan
Dardas
214. C.C.C. Engineering and Design services
2004 July 2004 SR 20,000 C.C.C. Co.
215. Engineering & Design Services for construction of BCIC Plant-2
Feb, 2004
May, 26 2004
SR 95,000 BCIC Co.
216. Increased Power Supply for Plant expanstion
March, 2004
May 2004 SR 16,650 MK Cables
217. Contract No. 83400/00 Design and Engineering Services
Jan, 2005
Jan, 2007 SR 253,312 SCECO East
218. Contract No. 10442066/00 Gen. Engineering Services
29 Jan, 2005
July, 2009 SR 206,800 SCECO East
Sl.No. Name of Project Date of Award
Date of Completion
Value of Work
Performed (SR)
Client(s)/Location
219. Al-Ojaimi Services of Draft Man
Jan,2005
Feb, 2005 SR 15,019 Al-Ojaimi Co.
220. Engineering Design And Consulting Services For Power Supply To SAUDI ARAMCO Khursaniyah Producing and Gas Facilities. Contract No:83400/00
Jan, 2005
June, 2005
SR 253,312 Saudi Elecrticity
Company Eastern Operating Area.
221. Engineering Design And Consulting Services For 380 KV Double Curcuit OH T/L from AL-Fadhili Substation to Shamlul Switching S/S.380KV Double Circuit OH T/L Shamlul Switching Station To Sudair S/S SEC- EOA Cont No:30531005/00 & Cont No:30531076/00
June, 2005
July, 2006 SR 7,000,000 Saudi Elecrticity
Company Eastern Operating Area.
222. Supervision work for the expansion of the processing area of the Plant in Dammam.
July 2005
Dec, 2005 SR 70,000. Saudi Fisheries Co Dammam.
223. Design & Engineering of 380kV OHTL for Al-Fadhili S/S to Shamlul Switching Station + From Shamlul switching Station to Sudair S/S
July 2005
Dec, 2006 SR 650,000 SSEM/SEC-EOA
224 Design & Engineering for O/H Lines Distribution Network-Khurais
Feb 2006
Mar, 2007 SR 1,452,000 Saud
Consult/Aramco
225
SEC-COA # 10531123/00 Installation of OH Line for Circuit S/S 8600, 8
Feb, 2006
Feb, 2008 SR 100,000 Al-Haider
226
Construction Management of 380 kV D/C OHTL Fadhili –Shamlul-Sudair SEC-Contract 30531676/00 & 30531065/00
Jan 2006
Jan, 2008 SR 7,868,000 SEC-EOA
227
Design and Engineering for Power & Telecom Network. RC Contract No. 068-T08
Nov 2005
In Progress
SR 6,819,543 RC Jubail
228 E.S.Generation SEC-EOA Contract No: 30522122/00
June 2006
June2009 SR
32,887,233 SEC-EOA
229 Enhancement of Telecommunication systems supporting energy Transmission Network
May 2006
May, 2007 SR 145,000 Al-Fanar
Sl.No. Name of Project Date of Award
Date of Completion
Value of Work
Performed (SR)
Client(s)/Location
230 115/13.8 kV Substation 16 BD and related works - Jubail
Aug 2006
Aug, 2008 SR 335,000 Saud Consult
231 SEC-EOA # 30631079/00 Construction of 380 kV Doubel Circuit OHTL Works Associated with the integration of Phase-I of Qurayyah -2 P/P
Aug 2006
Aug, 2008 SR 319,000 N.C.C.
232 Design & Engineering Services For Private Villa
Sep 2006
Feb 2007 SR 25,000 Ibrahim Alraya,
Al-Khobar
233 Desing & Engineering Services For Private Villa
Dec 2006
Apr 2007 SR 25,000 Mohammad Hifzi
Khobar
234 Engineering and Design Serivces for Temporary Support Structures Required for FCCU Sea Water Scrubber Project
Jan 2007
Sep, 2008 SR 168,327 ABA Corp
235 Construction Management for Power Supply Project to Saudi Aramco E/W Pump Station Contract No. 30633080/00
Mar 03 2007
Nov, 2008 SR 2,033,200 Saudi Elecrticity
Company Eastern Operating Area.
236 132 kV OHTL Modification in Jizan Area, SEC-SOA Contract No. 40631138/00
Mar, 2007
In Progress
SR 100,000 Al-Haider
237 Developments of Bid Documents Contract No. 30782040/00
Mar 28 2007
Mar, 2009 SR
12,116,185 Saudi Elecrticity Company EOA
238 Project Management Services of Company Projects Contract No. 30731051/00
July 2007
In Progress
SR 29,498,980
Saudi Elecrticity Company EOA
239 Site Supervision for DTA Project for 2008 at SOA Contract No. 40731109/00
Feb 03 2008
In Progress
SR 18,494,400
Saudi Elecrticity Company EOA
240 Engineering & Design Services SEC-EOA Cont No. 30731116/00
Feb, 2008
In Progress
SR 250,000
Al-Haider
241 Desing & Engineering Services For Malila Factory
Feb 2008
Dec 2009 SR 25,000 Ditra Company
Dammam
242 Asharqia Chambers Design & Supervision Services for Invstment Building in Royal Comission Of Jubail Cont # -OPD -JP-070001
Mar 31 2008
In Progress
SR 2,522,800
Asharqia Chamber of Commerce -
Jubail
243 Design & Engineering Services For Workshop + Labor Camp
June 2008
Dec 2009 SR 500,000 Jar Company
Dammam
244 Engineering support Services – Contract No. 30832120/00
Aug 2008
In Progress
SR 86,486,120
Saudi Elecrticity Company EOA
Sl.No. Name of Project Date of Award
Date of Completion
Value of Work
Performed (SR)
Client(s)/Location
245 Construction Management for SEC Central Region –Contract No. 10831076/00
Dec, 16 2008
In Progress
SR 18,999,800
Saudi Elecrticity Company EOA
246 General Engineering Services (DED) Contract No. 30842153/00
Dec, 24 2008
In Progrerss
SR 113,193,600
Saudi Elecrticity Company EOA
247 Engineering Design of 72,000m2 Housing Compound for 300 people, Mosque, Cafeteria, Central Kitchen & gardens. Maintenance Hangar for Cranes.
Jan. 2009
Jun. 2009 SR 600,000 Ejar Cranes,
Dubai
248 Power Supply to SWCC Pump Station from SEC 230/115 kV S/S Jubail Southeast Cont # EPWTS
Apr, 2009
In Progress
SR 341,400 S.S.E.M.
249 115 Kv Power Supply to Jubail 2, 115/34.5 kV Secondary Industries S/S 4, Cont. # 071-C13
May, 2009
In Progress
SR 176,000 S.S.E.M.
250 Design & Supervision Services for Fire Fighting Plant in 2nd Industrial City – Dammam
Jun. 2009
Jan. 2011 SR 1,500,000 H.H. Prince Faisal
Bin Fahad Al-Faisal Al-Saud
251 Design of 132 kV OHTL between S/S No. 8780 & 8782 in wadi al-Dawaser SEC-COA Cont. # 10331229/00
July, 2009
In Progress
SR 260,000 N.C.C
252 Construction of Dhahran South 380/115/13.8 kV BSP (Phase-I), SEC-EOA Cont. # 30731170/00
July, 2009
In Progress
SR 1,000,000 S.S.E.M.
253 Design Engineering Services For Ware House
Dec 2009
Mar 2010 SR 30,000 Gulf Guide Company
Dammam Port
254 Design Engineering Services For Mosque
Jan 2010
Dec 2010 SR 40,000 Ibrahim Alraya –
Al-Khobar
255 Desing & Engineering Services For Office Building
Feb 2010
Dec 2010 SR 50,000 Modern Printing Press Dammam
256 Consturction Management - SEC- (COA) Contract No. 10931134/00
Feb. 2010
In Progress
SR 14,637,800
Saudi Electricity Company EOA
257 Consturction Management - SEC-COA (Princes Nura University) Contract No. 10933164/00
Jun. 2010
In Progress
SR 16,226,000
Saudi Electricity Company EOA
Sl.No. Name of Project Date of Award
Date of Completion
Value of Work
Performed (SR)
Client(s)/Location
258 Design and Engineering Services for Construction of Shumaisi S/S 8151, Souht Olaya S/S 8156, Manfoha S/S 8134 & 2nd Industrial City S/S 8174 Contract No.10931062/00
Jun. 2010
In Progress
SR 1,100,000
Al-Toukhi Company for
Industry Trading & Contracting,
Riyadh
259 SWL-Safe Working Load Limit For Gantries And Other Steel Structures
Nov. 2010
06 Weeks SR 24,000
M.K Cable Management (Saudi Arabia)
LTD
260 General Engineering Services (TSD) Contract No. 31062064/00
Nov. 2010
In Progress
SR 971,830 Saudi Electricity Company EOA
261 Engineering & Design Services For Ware House and Office Building
Dec 2010
In Progress
SR 50,000 Al Quraishi Company Dammam
262 Design & Supervision Services for the Investment Building of Modern Printing Press in the 2nd Industrial City - Dammam
Jan. 2011
In Progress
SR 1,500,000 Modern Printing
Press – Al-Khobar
263 Contract # 31031112/00 Construction Management For 132kV S/S Works For Qurayyat Generation And Qurayyat Tabarjal 380kV OHTL
Mar. 2011
In Progress
SR 13,756,700
Saudi Electricity Company EOA
264 Contract # 21033109/00 Consultant Site Supervision Services for Customer for Fund Projects WOA
Nov. 2011
In Progress
SR 16,176,000
Saudi Electricity Company WOA
265 Design & Engineering SEC-COA Contract # 11031157/00 Qassim-4 BSP
Aug. 2011
In Progress
SR 1,452,000 Saudi Electricity
Company COA/SSEM
266 Construction of Najran University 380/132/13.8kV BSP Al-Najran
Aug. 2011
In Progress
SR 1,409,150 Saudi Electricity
Company SOA/ABB
267 Design & Engineering SEC-COA Power Factor Correction in Hail, Contract # 11031168/00 PTS # 11 CM01
Dec. 2011
In Progress
SR 970,000 Saudi Electricity
Company COA/ISCOSA
268 Design & Engineering Services for SBW Parking AreaT emporary Support Structure
Dec. 2011
In Progress
SR 20,000 SAMREF Rawabi
Specilized Contracting Co.
269 Construction Management services for Qurayyah IPP Integration 380/230kV
2012 In
Progress SR 1,900,000
SAMSUNG/HAJR ELECTRICITY PRODUCTION CO. Al-Khobar,
17
SE
C -
SH
OA
IBA
PO
WE
R P
LA
NT
SATECH ACCOMPLISHED PROJECTS
SE
C 1
15
KV
HA
FA
R A
L-B
AT
IN S
UB
ST
AT
ION
T
RA
NS
FO
RM
ER
SE
C-
11
5 k
V
QA
ISU
MA
H P
OW
ER
PL
AN
T S
UB
ST
AT
ION
SE
C-
IND
OO
R
HA
FA
R A
L-B
AT
IN S
UB
ST
AT
ION
CA
BL
ES
AN
D G
AS
PIP
EL
INE
P
RO
JEC
T
JU
BA
IL
- R
OY
AL
CO
MM
ISS
ION
–
JU
BA
IL
PIP
ELIN
E
PR
OJE
CT
SA
BIC
-PE
TR
O C
HE
MIC
AL
132kV SUBSTATION IN RIYADH