PRESENT INSTALLED CAPACITYRAJASTHAN POWER SCENARIO

Total installed capacity-5296 MW(in Raj.)

RAJASTHAN POWERRajasthan SCENARIO Energy sources in

Introduction of K.S.T.P.S.

Location:

Bank of river chambal at up stream of Kota Barrage. Sakatpura, Kota. Total 7 units 1240MW Availability of large amount of water. Location at broad gauge Delhi-Mumbai railway. Concentration of load. Constant water supply. Transmission and grid sub station are quit near.

Installed capacity:

Favorable conditions:

Introduction: Commissioning of unitsStages I Units 1 2 II 3 4 III IV V 5 6 7 Rating 110 MW 110 MW 210 MW 210 MW 210 MW 195 MW 195MW Cost 143Cr. 143Cr. 480Cr. 143Cr. 480 Cr. 535 Cr. -Date Commission 13/01/83 17/01/83 25/04/88 01/05/89 21/03/94 30/04/03 -of

Raw Material Suppliers: Bharat cooking coal field, Dhanbad. South eastern coal field limited, Bilaspur.

*Height of chimney 180 meters.

Sections of K.S.T.P.S.

Coal handling plant. Water treatment plant. Boiler. Turbine Generator Ash handling plant.

Fuel used in power plants

Fuel used:

Coal.

Types of coal:

Bituminous*.

Out of Rajasthan. Ash content = 0.4% Calorific value=3600kcal/kg. From Rajasthan. Low calorific value.

Lignite.

* Bituminous coal is used in K.S.T.P.S.

Coal handling plantTHROUGH TRAIN RAW MATERIAL UNLOAD USING WAGON TRIPLER DISCHARGED TO UNDERHOPPER TX VIA BELT FEEDER CRUSHING HOUSE

PROCESSING OF COALHANDLING PLANTFURNANCE

BUNKER SEND TO DIRECT FIRING COAL MILL TO FORM PULVERISED COAL

WATER TREATMENT PLANT

RAW MATERIAL

RIVER

BOILER, TURBINE & GENETATORBOILER:WATER FROM DM WATER PLANT

BOILER

STEAM

TURBINE:STEAM (High Temp. & Pressure)

TURBINE

MECHANICAL ENERGY

GENERATOR:MECHANICAL ENERGY OF TURBINE

GENERATOR

ELECTRICAL ENERGY

4.STEAM TURBINE

Steam turbine is a rotating machine which Converts the Heat Energy of Steam to Mechanical Energy. The Thermal Power Plants with steam turbine uses Rankine cycle. The stages are arranged in HP, IP and LP turbines, driving alternating current full capacity Turbo generators. There are no. of blades alternatively fix & rotate due to which velocity is increased &

5.ASH HANDELING PLANT

ELECTRO STATIC PRECIPITATOR (ESP). Chimney. Ash

Fly ash (80%).

Used for making bricks. Cement. Used to improve fertility. Roads.

Bottom ash (20%)

6.CONTROL ROOM

In control room various controls are provided simultaneously various measurement are made various relays are provided here. Instrumentation Limited Kota is major supplier of apparatus.

Conclusion

K.S.T.P.S. has established a record of excellence & earned various productivity award from The Ministry of power, Government of India. I have gain a little bit experience what is the environment in company it will prove very beneficial for increasing my practical knowledge.