PROYEK HOOVER DAM DI BLACK CANYON,SUNGAI COLORADOJakarta, 20
Juni 2015DISUSUN OLEH :
Wilie Hade Santoso (41113120109)Agus Susanto (41113120030)Miftah
Fauzi(41111120087)Meindra Putri W.(41113120052)Utami
Sutjitraningdyah (41113120098)Yosie Malinda (41113120118)
DOSEN : Budi Santosa, ST., MT.
JURUSAN TEKNIK SIPILUNIVERSITAS MERCU BUANA
PENDAHULUAN HOOVER DAM
HOOVER DAM
TUJUAN PROYEK HOOVER DAM
DIVERSION TUNNELS
Two 50-foot diametyer tunnels drilled into the canyonThe tunnels
diverted the water around the damn while it was being
constructedThe Tunnels area combined 3 miles in length
Building MaterialsUse of quick-dry concreteThis called for the
concrete to be required to be moved quickly from the production
plant to the dam siteIf it was not moved quickly enough it would
set, and had to be scraped out by hand
PROSES KONSTRUKSI HOOVER DAM PENGEBORAN DINDING BATU
PEMBERSIHAN TEMBOK LEMBAH BLACK CANYONPELAKSANAAN KONSTRUKSI
HOOVER DAMBANGUNAN PENGAMBILAN AIR BAKU (INTAKE)FAKTOR YANG
MEMPENGARUHI LOKASI INTAKEPERLENGKAPAN INTAKEKRITERIA
PERENCANAAN/DESAIN INTAKEJEMBATAN HOOVER DAMGbr . Jembatan Hoover
Dam yang sudah selesai dibangun TAHAPAN PEMBANGUNAN HOOVER DAM
BRIDGESPEMBUATAN PONDASI UNTUK KOLOM-KOLOM JEMBATANPEMBUATAN KOLOM
PENYANGGA JEMBATANPEMBUATAN PILAR MELENGKUNG PADA STRUKTUR
JEMBATANGbr . Kedua ujung pelengkung Hoover Dam Bridge
dihubungkan.PEMBANGUNAN PLAT LANTAIGbr . Pembangunan plat lantai
beton pada Hoover Dam BridgeA