Top Banner
Trio Budi Trio Budi Agus Agus Susanto Susanto 6506 040 021 6506 040 021 PPNS PPNS - ITS ITS
30

PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

Mar 27, 2019

Download

Documents

vankhue
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

Trio Budi Trio Budi AgusAgus SusantoSusanto 6506 040 0216506 040 021PPNS PPNS -- ITSITS

Page 2: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

PPNS PPNS -- ITSITS

Page 3: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

LatarLatar belakangbelakango Adanyateguranteguran daridaripihakpihak audit audit asuransiasuransi

tentang integrated system yang adadi gudang

oDalam kesehariannyadetektordetektor asapasap dimatikandimatikankarena mobilitas forklift,

hal ini menimbulkanspotspot--yang adadi gudang

o PemasanganPemasangan detektordetektorpanaspanas yang yang salahsalah

menyebabkan deteksikebakaran menjaditerlambat dan tidak

berguna

hal ini menimbulkanspotspot--spot spot kosongkosong yang tidak

mampu mendeteksikebakaran

oAdanyaflammable liquid yang disimpan di

gudang (HSD)

Page 4: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

TujuanTujuan PenelitianPenelitian

� Untuk merancang ulang integrated system dengan media pemadam foam di gudang 5 PT. PJB Unit PembangkitGresikGresik

� Untuk memasang dan menempatkan detektor di gudang5 PT. PJB Unit Pembangkit Gresik

� Untuk menghitung kebutuhan foam total integrated system di gudang 5 PT. PJB Unit Pembangkit Gresik

Page 5: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

PPNS PPNS -- ITSITS

Page 6: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

PengumpulanPengumpulan DataData

� Layout Gedung gudang,

� Layout Area gudang,

Layout Existing Integrated � Layout Existing Integrated System

Page 7: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

HIRARCHIRARC

HIRARC digunakan untuk mengetahui bahaya apasaja yang terdapat pada gudang serta menilai resikosecarakualitatif danselanjutnyaditentukancara-carasecarakualitatif danselanjutnyaditentukancara-carauntuk mengontrol bahaya-bahaya tersebut

Page 8: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

� Dari HIRARC PT PJB UP Gresik dapat diketahuiresiko kebakaran mempunyai tingkat resiko High Risk dengantindakanpengendalianyang telahadaRisk dengantindakanpengendalianyang telahadaberupa sistem pemadam otomatis.

Page 9: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

EvaluasiEvaluasi Existing ISExisting IS

Evaluasi existing integrated system yang meliputi

1.Evaluasi jenis detektor

Evaluasijumlahdetektor2.Evaluasijumlahdetektor

3.Evaluasi penempatan titik-titik detektor

4.Evaluasi pemasangan detektor

5.Evaluasi media pemadam

Page 10: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

PerhitunganPerhitungan detektordetektor

Detektor yang digunakan adalah heat detector jenisfixed temperatur

Luasan 1 : 8 detektor

Luasan 2 : 45 detektor

Page 11: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

PerhitunganPerhitungan KebutuhanKebutuhan FoamFoam

Merupakan perhitungan untuk menentukankebutuhan foam guna memenuhi ruangan denganvolume rendaman3656.195 m3 dalamwaktu3 volume rendaman3656.195 m3 dalamwaktu3 menit.

Page 12: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

PerhitunganPerhitungan KebutuhanKebutuhan FoamFoam

R = (V/T) x CN x CL

= (3656.195 m3/3 min) x 1.15 x 1.2

= 1681.8497 m3/min= 1681.8497 m3/min

Page 13: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

PerhitunganPerhitungan Foam generatorFoam generator

Discharge expansion foam = 632 m3/min

Jumlahfoam generator = 1681.8497 m3/min : 632m3/minJumlahfoam generator = 1681.8497 m3/min : 632m3/min

= 2.661

≈ 3

Page 14: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

PerhitunganPerhitungan Foam SolutionFoam Solution

Flow foam solution = 1120 liter/min

Total foam solution = 1120 liter/min x 3Total foam solution = 1120 liter/min x 3

= 3360 liter/min

Page 15: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

PerhitunganPerhitungan Foam ConcentrateFoam Concentrate

Waktu operasi IS = 25 menit

Total foam concentrate= 3360 liter x 25 min x 0.02Total foam concentrate= 3360 liter x 25 min x 0.02

= 1680 liter

Page 16: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

PerhitunganPerhitungan KebutuhanKebutuhan AirAir

Kebutuhan air = 0.98 / 0.02 x 1680 liter

= 82320 liter

Page 17: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

PenentuanPenentuan PeralatanPeralatan ISIS

Menentukan macam-macam kelengkapan Integrated system seperti :Proportioner4” Foam generatorProportioner4” Foam generator

Bladder Tank (kapasitas 500gal) Deluge valve 4”

Hydraulic Concentrate CV Pompa

Reservoir air Heat Detector

Alarm Titik Panggil Manual

Local Control Panel

Page 18: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

PerhitunganPerhitungan Head LossesHead Losses

Head Losses Major :

Head Losses Minor : Head Losses Minor :

Head Statis : tinggi sisi discharge – tinggi permukaan air

Head Tekanan :

Page 19: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

Head LossesHead Losses

Pipa Major Losses Minor Losses Total Losses

Pipa Suction 1.23 m 3.04 m 4.27 m

Pipa Utama 18.49 m 42.05 m 60.54 mPipa Utama 18.49 m 42.05 m 60.54 m

Pipa Cabang 1 54.25 m 2.62 m 56.87 m

Pipa Cabang 2 18.12 m 2.07 m 20.19 m

Pipa Cabang 2.2 3.02 m 1.55 m 4.57 m

Pipa Cabang 2.3 18.95 m 0.99 m 19.94 m

Total 166.38 m

Page 20: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

PerhitunganPerhitungan Total HeadTotal Head

Head Statis : 1.58 m

Head Tekanan: 65.67 mHead Tekanan: 65.67 m

Total Head : 166.38 m + 1.58 m + 65.67 m + 2.35 m

: 235.98 m

Page 21: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

PerhitunganPerhitungan DayaDaya PompaPompa

Efisiensi pompa = 75 %

Dayaair Dayaair

Pw = 0.163 x γ x Q x H total

= 0.163 x 995.7 x 0.0549 x 235.98

= 20605.8 watt

= 20.6058 Kwatt

= 27.632 hp

Page 22: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

KavitasiKavitasi

Kavitasi adalah terjadinya gelembung uap di dalam kipas pompa.

Ketika gelembung –gelembung uap meletus timbul gaya yang besarpada dinding kipas dan pada sudu yang dapat menyebabkankerusakan pada pompa.

Page 23: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

KavitasiKavitasi

Agar tidak terjadi kavitasi maka

NPSH yang tersedia>NPSH yang diperlukanNPSH yang tersedia>NPSH yang diperlukan

10.68 m > 9.41 m

Page 24: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

KetebalanKetebalan PipaPipa

Tebal Minimum Pipa Utama : 0.237”

Minimum Outside Diameter Pipa Utama : 4.474”

Tebal Minimum Pipa Cabang : 0.203”

Minimum Outside Diameter Pipa Cabang : 2.906”

Tebal Minimum Pipa Suction : 0.258”

Minimum Outside Diameter Pipa Cabang : 5.516”

Page 25: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

KesimpulanKesimpulan

� Berdasarkan HIRARC PT PJB UP Gresik, potensi kebakaran digudang 5 ada 3 dimana ketiga-tiganya mempunyai risk level High Risk.

� Jenis detektor yang cocok digunakan di gudang 5 adalah jenisHeat detector – fixed temperature

� Jumlah heat detector yang dipasang adalah 53 heat detector.

� Jarak maksimum pemasangan antar heat detector adalah 4.06 meter dengan jarak maksimum heat detector dengan dindingadalah 2.03 meter.

Page 26: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

KesimpulanKesimpulan

� Pemasangan heat detector diletakkan pada ceiling tidakkurang dari 4 inchi (100 mm) dari sisi dinding atau pada sisidinding antara 4 inchi (100 mm) dan 12 inchi (300 mm).

� Media pemadam yang digunakan adalah foam jenis high expansion foam.

� Besar kapasitas foam generator yang dibutuhkan yaitu1681.8497 m3/min.

� Jumlah foam concentrate yang dibutuhkan adalah 1680 liter.

� Kapasitas bladder tank yang digunakan 1892 liter.

Page 27: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

KesimpulanKesimpulan

� Sumber air berasal dari penampungan air dengan kapasitasreservoir 105.3 m3.

� Sistem perpipaan pada perancangan ini menggunakan pipa� Sistem perpipaan pada perancangan ini menggunakan pipagalvanized iron karena jenis pipa ini tahan terhadap korosi.

� Pompa yang digunakan adalah Horizontal split case multi stage centrifugal pump dengan head maksimal 255 meter dankapasitas debit maksimal 1000 Gpm.

� Outside diameter minimum untuk pipa utama adalah 4.474inch dan untuk pipa cabang adalah 2.906inch.

Page 28: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

SaranSaran

� Agar perhitungan lebih akurat, untuk mengetahui viskositascampuran antara air dan foam concentrate (foam solution) sebaiknya dilakukan uji coba di laboratorium. Karena dalamTugas Akhir ini viskositas air diasumsikan tidak mengalamiperubahan setelah bercampur dengan foam concentrate.

� Dibutuhkan percobaan untuk menentukan debit air yang tepatpada pipa cabang. Jumlah debit yang tepat akan memberikanperhitungan head loss yang lebih akurat pula.

Page 29: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

SaranSaran

� Dibutuhkan prosedur dan manual perawatan dan pengujianintegrated system.

� Agar tidak terjadi kegagalan dalam pengoperasian peralatan� Agar tidak terjadi kegagalan dalam pengoperasian peralatanini maka ikutilah panduan mengenai live time masing-masingkomponen dari pabrik pembuatnya.

� Dikarenakan bentuk dan ukuran antara gudang 1-6 PT PJB UP Gresik identik, maka hasil penelitian ini juga bisa diaplikasikanpada gudang 1, 2, 3, 4 dan 6.

Page 30: PPPPNNSS -ITITS TTririoo BBuuddii A AgguussSuSussananttoo ... · Head Losses Pipa Major Losses Minor Losses Total Losses Pipa Suction 1.23 m 3.04 m 4.27 m Pipa Utama 18.49 m 42.05

TEKNIK KESELAMATAN DAN KESEHATAN KERJATEKNIK KESELAMATAN DAN KESEHATAN KERJA

POLITEKNIK PERKAPALAN NEGERI SURABAYAPOLITEKNIK PERKAPALAN NEGERI SURABAYA

Trio Budi Trio Budi AgusAgus SusantoSusanto 6506 040 0216506 040 021