PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce OECD-April 2013
13

PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

Oct 19, 2019

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

PPP challenges and initiatives

in France

Francois BERGERE Director French MoF PPP taskforce

OECD-April 2013

Page 2: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

2

1. French PPP market: track

record to date Building on a long experience of concessions, the new

availability-payment PPP toolbox – around the Contrat de

Partenariat – has managed a quick ramp up since its

adoption:

2004, general legislation on “contrats de partenariat” (CP),

2005, creation of the MoF PPP taskforce (MAPPP)

New law passed in July 2008 to improve, extend & clarify the legal framework for PPPs

2009-10: PPP used for Economic stimulus package

Page 3: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

3

First feedback promising quality- & quantity-wise, but limited visibility on future deal flow

Feedback & Prospects First encouraging assessment for PPPs

• Over 500 projects attributed (2004-2012) for an aggregate amount of investment >16 bn€

• France= 1st or 2nd market by volume of PPP investment in 2011-12 (EIB) due to its mega infra projects.

• But still a niche (<5 % of total public investmt)

• Large number of projects of limited size (admin. Buildings, street lighting, road works…) at local level

• 90% of project equipment delivered on time, on budget (PWC study of PPP performance June 2011)

• Still too early to assess operating performance

Page 4: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

4

2-New Challenges ahead

Limited visibility for 2013 & beyond, due to crisis:

1.Budgetary sustainability

Projected Fiscal base of procuring authorities revised downwards

2.Financing issues

Credit crunch still affecting market, with Banks MIA

& bonds still nascent

3. Political reassessment & media treatment (PPP bashing?)

Page 5: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

5

+ Beyond the crisis:

- increasing worries about LT adaptability &

sustainability of PPPs

- First projects gone wrong (Evry Hospital:

320M€)

- Complexity management both on public and

private sides: PPP deals are complex to assess,

conduct, structure & control

-limited market share for SMEs & non-French

players

- Off-balance sheet constraint in view of evolving

IPSAS & Eurostat criteria

Page 6: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

6

2.1-Budgetary sustainability

Fiscal constraint stronger than ever at central & local levels

Global lifecycle costing in PPPs makes real cost over time appear more clearly

More selectivity required upstream in launching new projects (cf Gallois report )

Budgetary sustainability study now required for central projects ( Dec 27 Sept 2012)

Page 7: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

7

2.2- Financing issues: a lingering

crisis impact

• French market for PPP projects impacted in 2008-9

and again in 2011-12 by the Credit crunch

• Several large domestic banks have withdrawn

from PPP market

•Big-ticket PPP projects in the pipe only managed to

close in 2010/11 thanks to specialized para-statal

windows ( EIB, CDC…)+ State guarantee,

•Situation difficult for small to medium projects :

increasing spreads+ unavailability of LT financing

•Concerns about New financial regulations: Basel 3

Page 8: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

8

2-3 Political reassessment :

New gov’t in place since 2012

Concerns about policies inherited

from previous govt

Issue of frontier between public &

private sensitive

Some high profile failures blown

up by media => public opinion

issue

Page 9: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

9

3- Audit & recommendations by

MoF -Jan 13

•1 Comprehensive audit performed in H-2

2012 by IGF (Ministry internal audit)

•2 Critical review of PPP projects

procedures, control & results

•3 Proposals to reinforce VfM study stage

& better protect public interests

•4- But no overall challenging of PPP

policy

Page 10: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

10

3-1 Recommendations

Unify legal framework around CP ( currently

several sectoral variants co-exist)

Clarify & strengthen legal conditions for use

Avoid budgetary grounds for resorting to PPPs

Centralize reporting/follow up of all contracts

Systematize ex post assessments

Generalize VfM preliminary comparative study to

all large gov’t projects

Page 11: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

11

3-2 Prospects for 2013 & beyond • Reassessment under way of potential

projects/sectors eligible for PPPs ( Energy transition,

Plan Numerique, Plan Campus, Grand Paris...)

• More brownfield ( rehab, modernization…), less

greenfield + Smaller unit size

• Financing issues: find new sources of LT financing

on capital markets (thru securitization, EU Project

bonds…) + public co-funding (subsidies upfront,

milestone payments…) or refinancing + user-fees

when possible…

• Pipeline programming & regular dealflow to attract

compétition

Page 12: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

12

4-Comparison with UK-PFI

Divergences:

– Minimum size requirement

– Equity funding competition to increase share of equity

– Public sector investment in SPV’s equity to improve transparency

– Fewer new projects are being launched upstream

– Limits to eligible sectors

Convergences

- Overall positive record of PPP so far despite somme weak points

- Limit “ soft services” + more flexibility required

- Centralize competences within public sphere

Page 13: PPP challenges and initiatives in France - OECD.org - S2 - Francois BERGERE - France.pdf · PPP challenges and initiatives in France Francois BERGERE Director French MoF PPP taskforce

13

Thank you for your attention!

Mission d’Appui aux PPP/ French MoF

139, Rue de Bercy

F-75572 Paris CEDEX 12

Tel: 33 (0) 1 44 87 71 7534 78

E-mail: [email protected]

Web: http://www.economie.gouv.fr/ppp