  • Public Private Partnership And Port Efficiency: The Nigerian Experience

    By

    Habib Abdullahi Managing Director, Nigerian Ports Authority

    At the 12th Intermodal Africa Conference & Exhibition Lagos Oriental Hotel, Lagos, Nigeria

    March 2014

  • Contents

    Introduction

    Existing PPP Structures in NPA

    Impacts of PPPs on Nigerian Ports

    Investment Opportunities

    Conclusion

    2

  • Introduction Ports in Nigeria

    Lagos Port Complex

    Tin Can Island Port

    Rivers Port

    Delta Port

    Onne Port Complex

    Calabar Port

    3

  • Prior to the Port Reforms in Nigeria, port services were characterised by :

    Inadequate funding

    Ineffectiveness and inefficiency

    Bureaucratic bottlenecks

    Multiple and uncoordinated security Agencies

    Decaying Port Infrastructure

    Restive dock labour

    Inadequate cargo handling equipment etc

    To eliminate the weaknesses, Government embarked on the port reforms of 2006 which significantly increased the level of private participation in the port sector.

    Introduction Contd

    4

  • Terminal Concessions

    Joint Ventures

    Management Contracts

    Existing PPP Structures in NPA

    5

  • PORTS NO. OF CONCESSIONS

    Lagos Ports Complex 6 + 1 (ICD)

    Tin Can Island Port Complex 4 + 1 (BOT)

    Rivers Port 2

    Delta Ports Complex 5

    Onne Ports (FOT & FLT) 4

    Calabar Port 3

    Total 24 + 2

    6

    Terminal Concessions

    ICD Inland Container Depot BOT Build, Operate & Transfer

  • Joint Ventures

    WRECK REMOVAL CHANNEL DREDGING

    7

    MAIN ACTIVITY NO. OF JVs

    Channel Management (LCM, BCC &

    CCC) - Dredging, Surveys, Navigational

    Aids, Wreck Removal e.t.c

    3

    Towage Services 1

    Ship Building & Repair 1

    Ship Waste Management All Pilotage Districts

  • More efficient port services

    Upsurge in cargo throughput

    Reduction in cargo dwell time in ports

    Improved vessel turn around time

    Deeper and safer navigation channels

    Improved port infrastructure through rehabilitation, upgrading and greenfield developments etc

    Impacts of PPPs on Nigerian Ports

    8

  • Trend of Cargo Throughput (Mt) Excl. Crude Oil Terminals

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

    29

    36 37 40 41

    45 46

    57

    64 66

    77

    83

    77 77

    PRE-CONCESSION POST CONCESSION Millions

    9

    2012/2013 drop in throughput attributable

    mainly to:

    - Global economic

    recession

    - Security challenges in

    the Gulf of Guinea

  • Turn Around Time of Vessels (Days)

    PRE-CONCESSION POST CONCESSION

    0

    2

    4

    6

    8

    10

    12

    2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

    7.01

    7.91

    11.3

    7.89

    6.44

    7.4

    5.31 5.6

    5

    6.7

    5.9 6.2 6

    5.2

    10

    On-going automation of processes like e-payment

    solution will guarantee

    quicker delivery

    Quest to increase private participation in the

    provision of towage

    services is bound to

    further impact turn around

    time

  • WAFMAX Inaugural Call at Onne Port in Dec. 2013 (the result of channel dredging campaign by one of the JVs)

    11

  • Port Infrastructure/Facility Upgrades

    FLT 4 DEVELOPMENT

    Before Dredging June 2005 During Piling Feb. 2006

    12

  • 1985 2013

    Port Infrastructure/Facility Upgrades Contd

    FLT Transformation

    13

  • Port Infrastructure/Facility Upgrades Contd

    FOT Transformation

    1995 2013

    14

  • Port Infrastructure/Facility Upgrades Contd

    Calabar Port Transformation

    1985 2013

    15

  • Port Infrastructure/Facility Upgrades Contd

    Warri Oil & Gas Free Port Transformation

    1990s 2013

    16

  • Channel Management;

    Pilotage and Towage Services

    Utilities Water & Electricity (Independent Power Project)

    Information & Communication Technology (ICT)

    Greenfield Port Developments

    Investment Opportunities

    17

  • Greenfield Port Developments: Deep Sea Ports

    18

    Deep Sea

    Ports

    Lekki

    Agea

    Ogidigben

    Olokola

    Badagry

    Ibaka

  • The increased participation of the private sector has been a key ingredient in improving the fortunes of Nigerian Ports

    Several areas still exist in the ports that are open to further private sector participation e.g. greenfield deep sea port developments

    A subsisting Act of Parliament gives backing to PPP transactions in Nigeria. This is in addition to the political will of Government.

    The Nigerian environment and its port sector in particular is thus conducive for private sector participation.

    Conclusion

    19

  • Thank you