Top Banner
25/05/2016 1 The Value Driven-Agile PMO PPM Conference, Holland 25 th May, 2016 Michael Nir President Sapir Consulting US The Agile PMO – great results NOW Michael Nir President @ Sapir Consulting US M.Sc. Engineering, PMP®, SAFe™ accredited Author of 10 bestseller business books Global clients Integrating the hard and soft parts of Business, Development and more The Agile PMO – great results NOW Management consultant, Agile coach, speaker and author
29

PPM conference Netherlands Agile PMO Keynote

Apr 15, 2017

Download

Technology

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PPM conference Netherlands Agile PMO Keynote

25/05/2016

1

The Value Driven-Agile PMO PPM Conference, Holland

25th May, 2016

Michael Nir President Sapir Consulting US

The Agile PMO – great results NOW

Michael Nir

President @ Sapir Consulting US

• M.Sc. Engineering, PMP®, SAFe™

accredited

• Author of 10 bestseller business books

• Global clients

• Integrating the hard and soft parts of

Business, Development and more

The Agile PMO – great results NOW

Management consultant, Agile coach, speaker and author

Page 2: PPM conference Netherlands Agile PMO Keynote

25/05/2016

2

Agile Thinking and the PMO

The Agile PMO – great results NOW

The Agile PMO is expanding on the

manifesto to address end-to-end Agility

• It is all about value – and no,

documents don’t provide it;

• A Lean method for selection and

prioritization;

• PMO focus on strategic resources, Agile

provides the local empirical leadership;

• PMO perception – leading the change;

• How many of you manage a PMO or

have a PMO in the organization

• Is your PMO driving Agile thinking?

• Is your PMO a change agent?

• Complete the sentence: “Yes we

have a PMO in the organization

and… “

The Agile PMO – great results NOW

Reflect

Page 3: PPM conference Netherlands Agile PMO Keynote

25/05/2016

3

Gartner 2012

ESI 2013

The Agile PMO – great results NOW

PMOs Don’t Deliver Value

The Agile PMO – great results NOW

>> The PMO Challenge: 72 percent of respondents

claimed the PMO had been challenged by senior

management. The top two were

• lack of perceived value (44%);

• lack of project/program maturity in the

organization (41%)

State of PMOs - 2015

Page 4: PPM conference Netherlands Agile PMO Keynote

25/05/2016

4

50% Failures

The Agile PMO – great results NOW

The Agile PMO – great results NOW

An organizational structure that standardizes the project-related governance processes and facilitates the sharing of resources, methodologies, tools and techniques PMBOK 5th edition

PMBOK Definition – Where’s the Value?

Page 5: PPM conference Netherlands Agile PMO Keynote

25/05/2016

5

The Agile PMO – great results NOW

How did we get to 50% failures in PMOs?

Pete Recruited to head the PMO of Boston-Tech

• 2.5 Billion in sales

• 12 Global locations

• 17,500 employees

• Integrated product

• Responsible for portfolio delivery of business

software solutions

Build me a PMO worthy of Maine-tech!

Yes Master

The Agile PMO – great results NOW

The Story of Pete the PMO Manager

Page 6: PPM conference Netherlands Agile PMO Keynote

25/05/2016

6

I need a Staff

Maybe Select Tools

Training Need

Assessment?

Support the PMs

New Reports

and Templates

PMBOK? PLC

The Agile PMO – great results NOW

Common First Steps of a PMO

I need a Home

No Tools

No Tools

Training

Training

No Tools No Process

The Agile PMO – great results NOW

What the Gap Analysis Identifies

Page 7: PPM conference Netherlands Agile PMO Keynote

25/05/2016

7

I need Reports! Better Control! A methodology

NOW

The Agile PMO – great results NOW

What the Gap Analysis Identifies – Executives

I need a Staff

Maybe Select Tools

Training Need

Assessment?

Support the PMs

New Reports

and Templates

PMBOK? PLC

The Agile PMO – great results NOW

Back in the Office

Pay me a Lot! I can help

Page 8: PPM conference Netherlands Agile PMO Keynote

25/05/2016

8

What Would

You Do?

The Agile PMO – great results NOW

Discuss with the Person Next to You

We’re not thinking End-to-End Agility

The Agile PMO – great results NOW

PMOs are not Functioning as Value Driven, Change Agents

Page 9: PPM conference Netherlands Agile PMO Keynote

25/05/2016

9

The Typical Next Steps – PMO Failures

• The Tactical PMO

• The Process PMO

• The Chocking PMO

• The Tools PMO

50% The Agile PMO – great results NOW

‘The bureaucracy is

expanding to meet the

needs of the

expanding

bureaucracy’

(O. Wilde.)

The Agile PMO – great results NOW

The Process PMO

Page 10: PPM conference Netherlands Agile PMO Keynote

25/05/2016

10

Starting with tools -

Eternalizes the wrong

WOW

The Agile PMO – great results NOW

Focusing on Tools not on Value

We can do

Better!

The Agile PMO – great results NOW

The Agile PMO

Page 11: PPM conference Netherlands Agile PMO Keynote

25/05/2016

11

The Agile PMO – great results NOW

The Agile PMO

A centralized portfolio management entity

that enables faster delivery of products

• Promotes Lean thinking – remove obstacles

• Pull across product delivery organization

• Effective resource allocation, capacity

planning

• Change agent

The Agile PMO – Embrace Value

The Agile PMO – great results NOW

The Agile PMO

A centralized portfolio management entity

that enables faster delivery of products

• Promotes Lean thinking – remove obstacles

The Agile PMO – Embrace Value

Page 12: PPM conference Netherlands Agile PMO Keynote

25/05/2016

12

The Agile PMO – great results NOW

Toyota Defined 7 Wastes

• Waste reduction is an effective

way to increase profitability

• From a customer's point of view,

value-added work is a process that

adds value that a customer is

willing to pay for

• Waste occurs in product

development as well

Manufacturing Product Development

Transport Redundant or unnecessary interfaces

Inventory Missing features or gold-plated features

Motion Task switching

Waiting Waiting time

Over Production Sloppy requirements

Over Processing Project bureaucracy

Defects 2nd or more iterations and revisions

Effective, Streamlined Delivery - Reduce Waste

The Agile PMO – great results NOW

Page 13: PPM conference Netherlands Agile PMO Keynote

25/05/2016

13

Project Management Example from my organization

Redundant or unnecessary interfaces

Missing features or gold-plated features

Task switching

Waiting time

Sloppy requirements

Project bureaucracy

2nd or more iterations and revisions

Examples from My Organization

The Agile PMO – great results NOW

PMO is Positioned to Lead Waste Removal

The Agile PMO – great results NOW

How long are tasks waiting in Queue?

Is it ‘easy’ adding a

template? How about

removing one?

Page 14: PPM conference Netherlands Agile PMO Keynote

25/05/2016

14

Streamline delivery– KANBAN the Waterfall

The Agile PMO – great results NOW

• Visualize work

• Prioritize work

• Limit work

PMO is Best Positioned to Remove

Project and Process waste

The Agile PMO – great results NOW

Effective, Streamlined Delivery - Reduce Waste

Page 15: PPM conference Netherlands Agile PMO Keynote

25/05/2016

15

The Agile PMO – great results NOW

Adding Value by Doing Less The 25/25 Rule: Achieving More by Doing Less Boaz Ronen, Tel Aviv University Faculty of Management Thomas G . Lechler, Stevens Institute of Technology Edward A . Stohr, Stevens Institute of Technology

How Much ???

The Agile PMO – great results NOW

The Agile PMO

A centralized portfolio management entity

that enables faster delivery of products

• Pull across product delivery organization

The Agile PMO – Embrace Value

Page 16: PPM conference Netherlands Agile PMO Keynote

25/05/2016

16

The Agile PMO – great results NOW

Traditional Opportunity Management is ‘Push’ Managed

Push; when Opportunities/Projects arrive

• Receive a business case

• Accepted into the project/product organization regardless of work-in-

progress

• Increases utilization – reduces throughput

• Over allocation of resources

and ‘bad’ multi-tasking

The Agile PMO – great results NOW

Pull Framework with Kanban is Best for Managing Incoming Opportunities

Pull; when Opportunities/Projects

arrive:

• Staggered in a Kanban

• Pulled into the project/product

organization based on system load

• Throughput is managed

• Projects and products are completed

faster

Page 17: PPM conference Netherlands Agile PMO Keynote

25/05/2016

17

The Agile PMO – great results NOW

Pull Framework with Kanban is Best for Managing Incoming Opportunities

PMO is best positioned to

manage incoming opportunities Kanban

The Agile PMO – great results NOW

Pull Across Product Delivery Organization

Page 18: PPM conference Netherlands Agile PMO Keynote

25/05/2016

18

If I stopped now…

The Agile PMO – great results NOW

The Agile PMO – great results NOW

The Agile PMO

A centralized portfolio management entity

that enables faster delivery of products

• Effective resource allocation, capacity

planning

The Agile PMO – Embrace Value

Page 19: PPM conference Netherlands Agile PMO Keynote

25/05/2016

19

The Agile PMO – great results NOW

Traditional, Portfolio Driven, Capacity Planning, Fails

Planning resource allocations:

• Multi project resource constrained scheduling is complex (NP problem);

• The tactical and operative schedule is mostly wishful thinking;

• Often when resource conflicts occur

– managers resort to the one ‘rule of

thumb’ that never fails – those who

yell loudest, win

The Agile PMO – great results NOW

Alternative Capacity and Resourcing Methods Provide Better Results

Page 20: PPM conference Netherlands Agile PMO Keynote

25/05/2016

20

Operative capacity planning should be

based on an effective ‘Pull’ method

The Agile PMO – great results NOW

The Agile PMO – great results NOW

The Agile PMO

A centralized portfolio management entity

that enables faster delivery of products

• Change agent

The Agile PMO – Embrace Value

Page 21: PPM conference Netherlands Agile PMO Keynote

25/05/2016

21

Deadline

• PMO - our clients are looking

for…delivery on October 2016

• Scrum team - this is not part of

the Agile Manifesto or Scrum

handbook, Software is difficult

to predict

The Agile PMO – great results NOW

PMO and Agile Scrum Teams – Speak Different Languages

Commitment

• PMO - You said it will be

delivered in two weeks

• Scrum team - We’ve

committed to commit we

didn’t commit to deliver

The Agile PMO – great results NOW

PMO and Agile Scrum Teams – Speak Different Languages

Page 22: PPM conference Netherlands Agile PMO Keynote

25/05/2016

22

Agile leadership and the shoe continuum

The Agile PMO – great results NOW

Extreme Agile

Business Portfolio

Let’s investigate further

The Agile PMO – great results NOW

Extreme Agile

Business Portfolio

Agile Leadership and the Shoe Continuum

The Developer

Page 23: PPM conference Netherlands Agile PMO Keynote

25/05/2016

23

The Agile PMO – great results NOW

Extreme Agile

Business Portfolio

Agile Leadership and the Shoe Continuum

The Scrum Master

The Agile PMO – great results NOW

Extreme Agile

Business Portfolio

Agile Leadership and the Shoe Continuum

The Coach

Page 24: PPM conference Netherlands Agile PMO Keynote

25/05/2016

24

The Agile PMO – great results NOW

Extreme Agile

Business Portfolio

Agile Leadership and the Shoe Continuum

Winter in Boston Agile

The Agile PMO – great results NOW

Extreme Agile

Business Portfolio

Agile Leadership and the Shoe Continuum

PMO Comfort

Page 25: PPM conference Netherlands Agile PMO Keynote

25/05/2016

25

The Agile PMO – great results NOW

Extreme Agile

Business Portfolio

Agile Leadership and the Shoe Continuum

PMO Portfolio Manager

The Agile PMO – great results NOW

Extreme Agile

Business Portfolio

Agile Leadership and the Shoe Continuum

Page 26: PPM conference Netherlands Agile PMO Keynote

25/05/2016

26

The Agile PMO – great results NOW

Extreme Agile

Business Portfolio

Agile Leadership – Establish Collaboration

The Agile PMO – great results NOW

Extreme Agile

Business Portfolio

Use the Manifesto as a Starting Point

Page 27: PPM conference Netherlands Agile PMO Keynote

25/05/2016

27

The Agile PMO – great results NOW

The Agile PMO

A centralized portfolio management entity

that enables faster delivery of products

• Promotes Lean thinking – remove obstacles

• Pull across product delivery organization

• Effective resource allocation, capacity

planning

• Change agent

The Agile PMO – Embrace Value

A centralized portfolio management entity that enables faster delivery of products: • Organization innovation is delivered

through projects

• Our competitors are figuring out how to deliver faster and faster and yet faster

The Agile PMO – great results NOW

We Must Change – Refocus PMO on Value

Page 28: PPM conference Netherlands Agile PMO Keynote

25/05/2016

28

The Agile PMO – great results NOW

What is One Thing You Can

Change?

The Agile PMO – Embrace Value

[email protected]

Increase your Return from Projects!

Page 29: PPM conference Netherlands Agile PMO Keynote

25/05/2016

29

The Agile PMO – great results NOW

John Deere