8/13/2019 P'Plant Weekly
1/24
Opn No Opn Short text Work Unit
No.of
person
Durat
ion Unit Actual Durat Unit
10 C.S-1 Aeratn Blowr Suctin Filtrs Clening 1 HR 2 0.5 HR 30 min
20 C.S-1 Aeratn Blowr Oil Level&Oil TopUp 1 HR 2 0.5 HR 30 min
30 C.S-1 Aeratn Blowr V-Belts Condtn Chking 1 HR 2 0.5 HR 30 min
40 C.S-1 Etrctn Blowr Suctin Filtrs Clening 1 HR 2 0.5 HR 30 min
50 C.S-1 Etrctn Blowr Oil Level&Oil TopUp 1 HR 2 0.5 HR 30 min60 C.S-1 Etrctn Blowr V-Belts Condtn Chking 1 HR 2 0.5 HR 30 min
70 C.S-1 All Etrctn A/S Air Chambr Inspn 1 HR 2 0.5 HR 30 min
80 C.S-1 Al Etrctn ASB suctn filtrs clening 1 HR 2 0.5 HR 30 min
90 C.S-2 Aeratn Blowr Suctin Filtrs Clening 1 HR 2 0.5 HR 30 min
100 C.S-2 Aeratn Blowr Oil Level&Oil TopUp 1 HR 2 0.5 HR 30 min
110 C.S-2 Aeratn Blowr V-Belts Condtn Chking 1 HR 2 0.5 HR 30 min
120 C.S-2 Etrctn Blowr Suctin Filtrs Clening 1 HR 2 0.5 HR 30 min
130 C.S-2 Etrctn Blowr Oil Level&Oil TopUp 1 HR 2 0.5 HR 30 min
140 C.S-2 Etrctn Blowr V-Belts Condtn Chking 1 HR 2 0.5 HR 30 min
150 C.S-2 All Etrctn A/S Air Chambr Inspn 1 HR 2 0.5 HR 30 min
160 C.S-2 Al Etrctn ASB suctn filtrs clening 1 HR 2 0.5 HR 30 min170 Packer B.E Bearings Visual Inspectn 0.2 HR 1 0.2 HR 12 min
180 Packer B.E Gearbox Oil Level 0.2 HR 1 0.2 HR 12 min
190 Packer B.E Tensioning Dev. Visu Insp 0.2 HR 1 0.2 HR 12 min
200 Bulk B.E-1 Bearings Visual Inspectn 0.2 HR 1 0.2 HR 12 min
210 Bulk B.E-1 Gearbox Oil Level 0.2 HR 1 0.2 HR 12 min
220 Bulk B.E-1 Tensioning Dev. Visu Insp 0.2 HR 1 0.2 HR 12 min
230 Bulk B.E-2 Bearings Visual Inspectn 0.2 HR 1 0.2 HR 12 min
240 Bulk B.E-2 Gearbox Oil Level 0.2 HR 1 0.2 HR 12 min
250 Bulk B.E-2 Tensioning Dev. Visu Insp 0.2 HR 1 0.2 HR 12 min
260 Packer B/F Stack Monitoring 0.2 HR 1 0.2 HR 12 min
270 Packer B/F Air Purging Systm Condn 0.2 HR 1 0.2 HR 12 min
280 Packer B/F Casing Condn&Leakages 0.2 HR 1 0.2 HR 12 min
290 Packer B/F fan Damper Condition 0.2 HR 1 0.2 HR 12 min
300 Packer B/F fan Brgs Visual Inspn 0.2 HR 1 0.2 HR 12 min
310 Packer B/F RAL Coupling Condition 0.2 HR 1 0.2 HR 12 min
320 Bulk B/F-1 Stack Monitoring 0.2 HR 1 0.2 HR 12 min
330 Bulk B/F-1 Air Purging Systm Condn 0.2 HR 1 0.2 HR 12 min
340 Bulk B/F-1 Casing Condn&Leakages 0.2 HR 1 0.2 HR 12 min
350 Bulk B/F-1 fan Damper Condition 0.2 HR 1 0.2 HR 12 min
360 Bulk B/F-1 fan Brgs Visual Inspn 0.2 HR 1 0.2 HR 12 min370 Bulk B/F-1 RAL Coupling Condition 0.2 HR 1 0.2 HR 12 min
380 Bulk B/F-2 Stack Monitoring 0.2 HR 1 0.2 HR 12 min
390 Bulk B/F-2 Air Purging Systm Condn 0.2 HR 1 0.2 HR 12 min
400 Bulk B/F-2 Casing Condn&Leakages 0.2 HR 1 0.2 HR 12 min
410 Bulk B/F-2 fan Damper Condition 0.2 HR 1 0.2 HR 12 min
420 Bulk B/F-2 fan Brgs Visual Inspn 0.2 HR 1 0.2 HR 12 min
430 Bulk B/F-2 RAL Coupling Condition 0.2 HR 1 0.2 HR 12 min
440 Bulk B.E-1&2 Disch A/S Air Chmbr Inspctn 1 HR 2 0.5 HR 30 min
8/13/2019 P'Plant Weekly
2/24
450 Bulk B.E-1&2 Disch ASB Filters Clening 1 HR 2 0.5 HR 30 min
460 Packer spouts Nozzle aeriation 2 HR 2 1 HR 60 min
470 Packer spouts Ring Aeriation 2 HR 2 1 HR 60 min
480 Packer spouts Gate valve position 2 HR 2 1 HR 60 min
490 Packer spouts Silencers cleaning 2 HR 2 1 HR 60 min
500 Pkr spout Implrs&Implr Drive V-blt check 2 HR 2 1 HR 60 min510 Packer spouts Filling pot wear & clean 2 HR 2 1 HR 60 min
520 Packer Drive V-Belts for tension & wear 1 HR 2 0.5 HR 30 min
530 Pkr air supply&Pneu. cylinders Leakages 1 HR 2 0.5 HR 30 min
540 Pkr stools wear & tear inspection 1 HR 2 0.5 HR 30 min
550 Check for wear of Table rollers 1 HR 2 0.5 HR 30 min
560 Autopac sub assembly bolts tightening 3 HR 2 1.5 HR 90 min
570 Radimat ribbed belts inspection 1 HR 2 0.5 HR 30 min
580 PP All B/Cs Belt & Belt Joint Condition 0.5 HR 1 0.5 HR 30 min
590 PP All B/Cs Idlers Condition 0.5 HR 1 0.5 HR 30 min
600 PP All B/Cs Pulleys Condition 0.5 HR 1 0.5 HR 30 min
610 PP All B/Cs Bearings Visual Inspectn 0.5 HR 1 0.5 HR 30 min
620 PP All B/Cs Gearbox Oil Level 0.5 HR 1 0.5 HR 30 min
630 PP All B/Cs Couplings Condition 0.5 HR 1 0.5 HR 30 min
8/13/2019 P'Plant Weekly
3/24
Postage date Start date Start Time End Date End Time Confirmation Text
26.07.2013 26.07.2013 080100 26.07.2013 083000 Found Ok.
26.07.2013 26.07.2013 083100 26.07.2013 090000 Found Ok.
26.07.2013 26.07.2013 090100 26.07.2013 093000 Found Ok.
26.07.2013 26.07.2013 093100 26.07.2013 100000 Found Ok.
26.07.2013 26.07.2013 100100 26.07.2013 103000 Found Ok.26.07.2013 26.07.2013 103100 26.07.2013 110000 Found Ok.
26.07.2013 26.07.2013 110100 26.07.2013 113000 Found Ok.
26.07.2013 26.07.2013 113100 26.07.2013 120000 Found Ok.
26.07.2013 26.07.2013 120100 26.07.2013 123000 Found Ok.
26.07.2013 26.07.2013 123100 26.07.2013 130000 Found Ok.
26.07.2013 26.07.2013 080100 26.07.2013 083000 Found Ok.
26.07.2013 26.07.2013 083100 26.07.2013 090000 Found Ok.
26.07.2013 26.07.2013 090100 26.07.2013 093000 Found Ok.
26.07.2013 26.07.2013 093100 26.07.2013 100000 Found Ok.
26.07.2013 26.07.2013 100100 26.07.2013 103000 Found Ok.
26.07.2013 26.07.2013 153100 26.07.2013 160000 Found Ok.26.07.2013 26.07.2013 080100 26.07.2013 081200 Found Ok.
26.07.2013 26.07.2013 081300 26.07.2013 082400 Found Ok.
26.07.2013 26.07.2013 082500 26.07.2013 083600 Found Ok.
26.07.2013 26.07.2013 083700 26.07.2013 084800 Found Ok.
26.07.2013 26.07.2013 084900 26.07.2013 090000 Found Ok.
26.07.2013 26.07.2013 090100 26.07.2013 091200 Found Ok.
26.07.2013 26.07.2013 091300 26.07.2013 092400 Found Ok.
26.07.2013 26.07.2013 092500 26.07.2013 093600 Found Ok.
26.07.2013 26.07.2013 093700 26.07.2013 094800 Found Ok.
26.07.2013 26.07.2013 094900 26.07.2013 100000 Found Ok.
26.07.2013 26.07.2013 100100 26.07.2013 101200 Found Ok.
26.07.2013 26.07.2013 101300 26.07.2013 102400 Found Ok.
26.07.2013 26.07.2013 102500 26.07.2013 103600 Found Ok.
26.07.2013 26.07.2013 103700 26.07.2013 104800 Found Ok.
26.07.2013 26.07.2013 104900 26.07.2013 110000 Found Ok.
26.07.2013 26.07.2013 110100 26.07.2013 111200 Found Ok.
26.07.2013 26.07.2013 111300 26.07.2013 112400 Found Ok.
26.07.2013 26.07.2013 112500 26.07.2013 113600 Found Ok.
26.07.2013 26.07.2013 113700 26.07.2013 114800 Found Ok.
26.07.2013 26.07.2013 114900 26.07.2013 120000 Found Ok.26.07.2013 26.07.2013 120100 26.07.2013 121200 Found Ok.
26.07.2013 26.07.2013 121300 26.07.2013 122400 Found Ok.
26.07.2013 26.07.2013 122500 26.07.2013 123600 Found Ok.
26.07.2013 26.07.2013 123700 26.07.2013 124800 Found Ok.
26.07.2013 26.07.2013 124900 26.07.2013 130000 Found Ok.
26.07.2013 26.07.2013 130100 26.07.2013 131200 Found Ok.
26.07.2013 26.07.2013 131300 26.07.2013 132400 Found Ok.
26.07.2013 26.07.2013 130100 26.07.2013 133000 Found Ok.
8/13/2019 P'Plant Weekly
4/24
26.07.2013 26.07.2013 133100 26.07.2013 140000 Found Ok.
26.07.2013 26.07.2013 080100 26.07.2013 090000 Found Ok.
26.07.2013 26.07.2013 090100 26.07.2013 100000 Found Ok.
26.07.2013 26.07.2013 100100 26.07.2013 110000 Found Ok.
26.07.2013 26.07.2013 110100 26.07.2013 120000 Found Ok.
26.07.2013 26.07.2013 120100 26.07.2013 130000 Found Ok.26.07.2013 26.07.2013 130100 26.07.2013 140000 Found Ok.
26.07.2013 26.07.2013 140100 26.07.2013 143000 Found Ok.
26.07.2013 26.07.2013 153100 26.07.2013 160000 Found Ok.
26.07.2013 26.07.2013 143100 26.07.2013 150000 Found Ok.
26.07.2013 26.07.2013 150100 26.07.2013 153000 Found Ok.
26.07.2013 26.07.2013 140100 26.07.2013 153000 Found Ok.
26.07.2013 26.07.2013 103100 26.07.2013 110000 Found Ok.
26.07.2013 26.07.2013 132500 26.07.2013 135500 Found Ok.
26.07.2013 26.07.2013 135600 26.07.2013 142500 Found Ok.
26.07.2013 26.07.2013 142600 26.07.2013 155500 Found Ok.
26.07.2013 26.07.2013 113100 26.07.2013 120000 Found Ok.
26.07.2013 26.07.2013 120100 26.07.2013 123000 Found Ok.
26.07.2013 26.07.2013 123100 26.07.2013 130000 Found Ok.
8/13/2019 P'Plant Weekly
5/24
Opn No Opn Short text Work Unit
No.of
persons Duration
10 C.S-1 Aeratn Blowr Bearings Grease TopUp 1 HR 1 1
20 C.S-1 Extrn Blowr Bearings Grease TopUp 1 HR 1 1
30 C.S-2 Aeratn Blowr Bearings Grease TopUp 1 HR 1 1
40 C.S-2 Extrn Blowr Bearings Grease TopUp 1 HR 1 1
50 Rotary screen internals inspection 6 HR 2 3
60 Pkr pneu.cylinders Ease of Movement 2 HR 2 170 Pkr pneu.cylinders operation condition 2 HR 2 1
80 Pkr pneu.cylinders Piston wear&Leakages 2 HR 2 1
90 Packer feeding system inspection 8 HR 2 4
100 Radimat pneu.cylinders Ease of Movement 2 HR 2 1
110 Radimat pneu.cylinders operatn condition 2 HR 2 1
120 Radimat pneu.cylindrs Piston wear&Lekags 2 HR 2 1
130 Radimat roller chain tension check 2 HR 2 1
140 Radimat roller chain Lubrication 1 HR 2 0.5
150 A.Pac Straight running of Hoist chain 4 HR 2 2
160 A.pac Wear&tear of hoist chain&sprocket 4 HR 2 2
170 Lubricate Hoist chain of A.Pac 4 HR 2 2
180 Chk Straight runing of chain(Pres bar) 4 HR 2 2
190 Wear& tear of press bar chain&sprocket 4 HR 2 2
200 Lubricate Press bar drv chain(A.Pac) 2 HR 2 1
210 Check for wear of toothed belts(A.Pac) 4 HR 2 2
220 Adjust tension of toothed belts(A.Pac) 4 HR 2 2
230
240
250
260
270
280
290300
310
320
330
340
350
360
370
380
8/13/2019 P'Plant Weekly
6/24
Unit Actual Dur Unit Postage date Start date Start Time End Date End Time
HR 1 HR 31.07.2013 12.07.2013 120100 12.07.2013 130000
HR 1 HR 31.07.2013 12.07.2013 130100 12.07.2013 140000
HR 1 HR 31.07.2013 12.07.2013 140100 12.07.2013 150000
HR 1 HR 31.07.2013 12.07.2013 150100 12.07.2013 160000
HR 4 HR 31.07.2013 12.07.2013 070100 12.07.2013 110000
HR 1 HR 31.07.2013 26.07.2013 070100 26.07.2013 080000HR 1 HR 31.07.2013 26.07.2013 080100 26.07.2013 090000
HR 1 HR 31.07.2013 26.07.2013 090100 26.07.2013 100000
HR 4 HR 31.07.2013 12.07.2013 110100 12.07.2013 150000
HR 1 HR 31.07.2013 26.07.2013 100100 26.07.2013 110000
HR 1 HR 31.07.2013 26.07.2013 110100 26.07.2013 120000
HR 1 HR 31.07.2013 26.07.2013 130000 26.07.2013 140000
HR 1 HR 31.07.2013 26.07.2013 140100 26.07.2013 150000
HR 0.5 HR 31.07.2013 26.07.2013 120100 26.07.2013 123000
HR 2 HR 31.07.2013 26.07.2013 070100 26.07.2013 090000
HR 2 HR 31.07.2013 26.07.2013 090100 26.07.2013 110000
HR 2 HR 31.07.2013 26.07.2013 110100 26.07.2013 130000
HR 2 HR 31.07.2013 26.07.2013 130100 26.07.2013 150000
HR 1 HR 31.07.2013 26.07.2013 150100 26.07.2013 160000
HR 1 HR 31.07.2013 12.07.2013 070100 12.07.2013 080000
HR 2 HR 31.07.2013 12.07.2013 080100 12.07.2013 100000
HR 2 HR 31.07.2013 12.07.2013 100100 12.07.2013 120000
8/13/2019 P'Plant Weekly
7/24
Confirmation Text
DONE
DONE
DONE
DONE
DONE
FOUND OKFOUND OK
FOUND OK
FOUND OK
FOUND OK
FOUND OK
FOUND OK
FOUND OK
DONE
FOUND OK
FOUND OK
DONE
FOUND OK
FOUND OK
DONE
FOUND OK
FOUND OK
8/13/2019 P'Plant Weekly
8/24
Opn No Opn Short text Work Unit
No.of
persons Duration Unit
10 Chk Fr belt run(slip free way)on pullys 0.5 HR 1 0.5 HR
20 Chk. all pulleys surface wear rate 0.5 HR 1 0.5 HR
30 Check for all idlers rotation 0.5 HR 1 0.5 HR
40 Chk. the alignment & fastening of idlers 1 HR 1 1 HR
50 Visual chk.Belt run in straight¢re 0.5 HR 1 0.5 HR60 Chk. correct running of the belt 0.5 HR 1 0.5 HR
70 Chk.Belt edges & surface damage 0.5 HR 1 0.5 HR
80 Chk.Geared motor alignment 1 HR 1 1 HR
90 Chk.Geared motor Unusual noise durng opn 0.5 HR 1 0.5 HR
100 Chk. geared motor Oil leakages 0.5 HR 1 0.5 HR
110 Gearbox internals inspection&change oil 8 HR 2 4 HR
8/13/2019 P'Plant Weekly
9/24
Actual Duration Unit Postage date Start date Start Time End Date End Time
0.5 HR 15.07.2013 12.07.2013 080100 12.07.2013 083000
0.5 HR 15.07.2013 12.07.2013 083100 12.07.2013 090000
0.5 HR 15.07.2013 12.07.2013 090100 12.07.2013 093000
1 HR 15.07.2013 12.07.2013 093100 12.07.2013 103000
0.5 HR 15.07.2013 12.07.2013 103100 12.07.2013 1100000.5 HR 15.07.2013 12.07.2013 110100 12.07.2013 113000
0.5 HR 15.07.2013 12.07.2013 113100 12.07.2013 120000
1 HR 15.07.2013 12.07.2013 120100 12.07.2013 130000
0.5 HR 15.07.2013 12.07.2013 130100 12.07.2013 133000
0.5 HR 15.07.2013 12.07.2013 133100 12.07.2013 140000
5 HR 15.07.2013 12.07.2013 080100 12.07.2013 130000
8/13/2019 P'Plant Weekly
10/24
Confirmation Text
Found ok
Found ok
Found ok
Found ok
Found okFound ok
Found ok
Found ok
Found ok
Found ok
Internals found ok & Oil replaced
8/13/2019 P'Plant Weekly
11/24
Opn N Opn Short text Work Unit
No.of
persons Duration Unit
10 Chk Fr belt run(slip free way)on pullys 0.5 HR 1 0.5 HR
20 Chk. all pulleys surface wear rate 0.5 HR 1 0.5 HR
30 Check for all idlers rotation 0.5 HR 1 0.5 HR
40 Chk. the alignment & fastening of idlers 1 HR 1 1 HR
50 Visual chk.Belt run in straight¢re 0.5 HR 1 0.5 HR60 Chk. correct running of the belt 0.5 HR 1 0.5 HR
70 Chk.Belt edges & surface damage 0.5 HR 1 0.5 HR
80 Chk.Geared motor alignment 1 HR 1 1 HR
90 Chk.Geared motor Unusual noise durng opn 0.5 HR 1 0.5 HR
100 Chk. geared motor Oil leakages 0.5 HR 1 0.5 HR
110 Gearbox internals inspection&change oil 8 HR 2 4 HR
8/13/2019 P'Plant Weekly
12/24
Actual Duration Unit Postage date Start date Start Time End Date End Time Confirmation Text
0.5 HR 10.06.2013 07.06.2013 070100 07.06.201 073000 Found ok
0.5 HR 10.06.2013 07.06.2013 073100 07.06.201 080000 Found ok
0.5 HR 10.06.2013 07.06.2013 080100 07.06.201 083000 Found ok
1 HR 10.06.2013 07.06.2013 083100 07.06.201 093000 Found ok
0.5 HR 10.06.2013 07.06.2013 093100 07.06.201 100000 Found ok0.5 HR 10.06.2013 07.06.2013 100100 07.06.201 103000 Found ok
0.5 HR 10.06.2013 07.06.2013 103100 07.06.201 110000 Found ok
1 HR 10.06.2013 07.06.2013 110100 07.06.201 120000 Found ok
0.5 HR 10.06.2013 07.06.2013 130000 07.06.201 133000 Found ok
0.5 HR 10.06.2013 07.06.2013 133100 07.06.201 140000 Found ok
4 HR 10.06.2013 10.06.2013 080100 10.06.201 120000 Internals found ok &
8/13/2019 P'Plant Weekly
13/24
il replaced
8/13/2019 P'Plant Weekly
14/24
Opn N Opn Short text Work Unit
No.of
persons Duration Unit
10 All Buckets Visual Inspection 6 HR 2 3 HR
20 Drive Pulley Friction Lining Condition 2 HR 2 1 HR
30 Gearbox Internals Inspection 2 HR 2 1 HR
40 Tyre Coupling Inspection 2 HR 2 1 HR
50 Rubber Lip Condn. At Elevator Discharge 2 HR 2 1 HR60 Belt & Belt Joint Condition 4 HR 2 2 HR
70 Drive Vibration Analysis 4 HR 2 2 HR
80 Drive Pulley Bolted Connection Tight Fit 6 HR 2 3 HR
90 Takeup Pulley Bolted Cnnctions Tight Fit 4 HR 2 2 HR
100 Condn of Clamp Connection(Torque Value) 6 HR 3 2 HR
110 Steel Structure Inspection 2 HR 1 2 HR
120 Belt Slackness Measuring 1 HR 1 1 HR
130 All Bearings Inspection & Greasing 12 HR 3 4 HR
140 Tail Drum & NiHard Brgs. Inspection 4 HR 2 2 HR
150 Belt&Bucket Rubber Strips Shore Hardness 3 HR 2 1.5 HR
160 All Bucket Bolts Tightening 180 HR 3 60 HR
170 Gearbox Oil Replacement 12 HR 3 4 HR
10 Frames & Stringer Condition 1 HR 1 1 HR20 All Bearings Grease TopUp 2 HR 2 1 HR
30 GB O/P Coupling Grease TopUp 2 HR 2 1 HR
40 Gearbox Internal Inspection 1 HR 2 0.5 HR
50 Coupling Inspection & Greasing 4 HR 2 2 HR
60 All Bearings Inspection & Greasing 40 HR 4 10 HR
70 Gearbox Oil Change 10 HR 2 5 HR
60
All Buckets Visual Inspection 6 HR 2 3 HR
Drive Pulley Friction Lining Condition 2 HR 2 1 HR
Gearbox Internals Inspection 2 HR 2 1 HR
Tyre Coupling Inspection 2 HR 2 1 HR
Rubber Lip Condn. At Elevator Discharge 2 HR 2 1 HR
8/13/2019 P'Plant Weekly
15/24
Actual Duration Unit Postage date Start date Start Time End Date End Time Confirmation Text
3 HR 27.04.2013 15.02.2013 01.03.2013 Found ok
1 HR 27.04.2013 15.02.2013 01.03.2013 Found ok
1 HR 27.04.2013 15.02.2013 01.03.2013 Found ok
1 HR 27.04.2013 15.02.2013 01.03.2013 Found ok
1 HR 27.04.2013 15.02.2013 01.03.2013 Found ok2 HR 27.04.2013 15.02.2013 01.03.2013 Found ok
2 HR 27.04.2013 15.02.2013 01.03.2013 Found ok
3 HR 27.04.2013 15.02.2013 01.03.2013 Found ok
2 HR 27.04.2013 15.02.2013 01.03.2013 Found ok
2 HR 27.04.2013 15.02.2013 01.03.2013 Found ok
2 HR 27.04.2013 15.02.2013 01.03.2013 Found ok
1 HR 27.04.2013 12.04.2013 26.04.2013 Found ok
4 HR 27.04.2013 15.02.2013 01.03.2013 Found ok
2 HR 27.04.2013 12.04.2013 26.04.2013 Found ok
1.5 HR 27.04.2013 12.04.2013 26.04.2013 Found ok
60 HR 27.04.2013 12.04.2013 26.04.2013 Done
4 HR 27.04.2013 15.02.2013 01.03.2013 Oil replaced.
1 HR 26.01.2013 18.01.2013 080100 18.01.2013 090000 Found ok1 HR 26.01.2013 25.01.2013 080100 25.01.2013 090000 Grease tap up Done
1 HR 26.01.2013 18.01.2013 090100 18.01.2013 100000 Bc-28 coupling greas
0.5 HR 26.01.2013 18.01.2014 100100 18.01.2013 103000 Found ok
2 HR 26.01.2013 18.01.2015 103100 18.01.2013 123000 Found ok
10 HR 26.01.2013 25.01.2013 080100 25.01.2013 180000 Bc-28 bearings greas
5 HR 26.01.2013 18.01.2013 123100 18.01.2013 173000 All belt coneyor gear
31.05.2013 17.05.2013 31.05.2013 Found ok
31.05.2013 17.05.2013 31.05.2013 Replaced for Silo -2 b
31.05.2013 17.05.2013 31.05.2013 Found ok
31.05.2013 17.05.2013 31.05.2013 Found ok
31.05.2013 17.05.2013 31.05.2013 Found ok
8/13/2019 P'Plant Weekly
16/24
tap up done
replaced
motor oil replaced.
ulk loading elevators
8/13/2019 P'Plant Weekly
17/24
Opn No Opn Short text Work Unit
No.of
persons Duration Unit
10 Chk Alignment&clearance of flex.Coupling 6 HR 2 3 HR
20 Chk Flex Coupling set for wear & tear 4 HR 2 2 HR
30 Chk.Sign of corrosion on sup. Structure 3 HR 2 1.5 HR
40 Chk. Deformation of subassemblies 2 HR 2 1 HR
50 Chk.Welding seams of Sup. Stucture 2 HR 2 1 HR60 Repair the coat of paint(sup. Structure) 4 HR 2 2 HR
70 Chk Locknuts Fr compltnes(conectng elmnt 6 HR 2 3 HR
80 Chk tightfit of dyn.loded scrws(Co.Elm) 6 HR 2 3 HR
90 check the fastening of flanged brgs 6 HR 2 3 HR
100 Chk.Unusual noise during operation(brgs) 2 HR 2 1 HR
110 Hoist sprocket brgs greasing 10 HR 2 5 HR
120 Chk.Alignment of Toothed belt pulley 16 HR 2 8 HR
130 check the running of the belt & tension 4 HR 2 2 HR
140 Chk.Intrfernce fit of Toothed belt pully 4 HR 2 2 HR
75 37.5
8/13/2019 P'Plant Weekly
18/24
Actual Duration Unit Postage date Start date Start Time End Date End Time Confirmation Text
3 HR 30.03.2013 29.03.2012 080100 29.03.201 110000 FOUND OK
2 HR 30.03.2013 29.03.2012 110100 29.03.201 130000 FOUND OK
1.5 HR 30.03.2013 29.03.2012 130100 29.03.201 143000 FOUND OK
1 HR 30.03.2013 29.03.2012 143100 29.03.201 153000 FOUND OK
1 HR 30.03.2013 29.03.2012 153100 29.03.201 163000 FOUND OK2 HR 30.03.2013 22.03.2013 080100 22.03.201 100000 FOUND OK
3 HR 30.03.2013 22.03.2013 080100 22.03.201 110000 FOUND OK
3 HR 30.03.2013 22.03.2013 110100 22.03.201 140000 FOUND OK
3 HR 30.03.2013 22.03.2013 140100 22.03.201 170000 FOUND OK
1 HR 30.03.2013 29.03.2012 163100 29.03.201 173000 FOUND OK
5 HR 30.03.2013 22.03.2013 100100 22.03.201 150000 DONE
7 HR 30.03.2013 22.03.2013 080100 22.03.201 150000 FOUND OK
2 HR 30.03.2013 22.03.2013 150100 22.03.201 170000 FOUND OK
2 HR 30.03.2013 22.03.2013 150100 22.03.201 170000 FOUND OK
8/13/2019 P'Plant Weekly
19/24
Opn No Opn Short text Work Unit
No.of
persons Duration
10 Pulleys Condition Checking 4 HR 2 2
20 Oil Replacing 4 HR 2 2
30 Non- Return Valve Condtion 4 HR 2 2
40 Safety Valve Conditon Checking/Cleaning 2 HR 2 1
10 Bearings Grease TopUp 2 HR 2 1
20 Bearings Inspection & Greasing 8 HR 2 4
30 Gearbox Internal Inspection & Oil Change 10 HR 2 5
40 Screw Inspection 4 HR 2 2
24
10 All Bearings & Coupling TopUp 1 HR 2 0.5
20 All Bearings Inspection & Greasing 8 HR 2 4
30 Coupling Inspection & Greasing 4 HR 2 2
40 Impeller Inspection 3 HR 2 1.5
10 Glands Condition 1 HR 2 0.5
20 Bearings Grease TopUp 1 HR 2 0.5
30 Casing To Rotor Gaps Measuring & Adjust 8 HR 2 4
40 Geared Motor Condition 6 HR 2 3
Rtry scrn brgs&cuplg inspection&Greasing 17 HR 2 8.5
Rtry scrn G/B internals insp.&oil change 10 HR 2 5
Delta blower oil replacement 4 HR 2 2
Pkr Geared motor intrnls chk.&change oil 6 HR 2 3
Pkr G/B internals inspection&change oil 8 HR 2 4
Pulleys Condition Checking 4 HR 2 2
Oil Replacing 4 HR 2 2
Non- Return Valve Condtion 4 HR 2 2
Safety Valve Conditon Checking/Cleaning 2 HR 2 1
8/13/2019 P'Plant Weekly
20/24
Unit Actual Duration Unit Postage date Start date Start Time End Date End Time
HR 10.11.2012 10.11.2012 10.11.2012
HR 10.11.2012 10.11.2012 10.11.2012
HR 10.11.2012 10.11.2012 10.11.2012
HR 10.11.2012 10.11.2012 10.11.2012
HR 08.02.2013 08.02.2013 08.02.2013
HR 6 HR 08.02.2013 08.02.2013 080100 08.02.2013 140000
HR 3 HR 08.02.2013 08.02.2013 080100 08.02.2013 110000
HR 2 HR 08.02.2013 08.02.2013 110100 08.02.2013 130000
HR 0.5 HR 15.02.2013 15.02.2013 15.02.2013
HR 5 HR 15.02.2013 15.02.2013 080100 15.02.2013 130000
HR 2 HR 15.02.2013 15.02.2013 130100 15.02.2013 150000
HR 1.5 HR 15.02.2013 15.02.2013 150100 15.02.2013 163000
HR 0.5 HR 15.02.2013 15.02.2013 080100 15.02.2013 083000
HR 0.5 HR 15.02.2013 15.02.2013 083100 15.02.2013 090000
HR 4 HR 15.02.2013 15.02.2013 090100 15.02.2013 130000
HR 3 HR 15.02.2013 15.02.2013 130100 15.02.2013 160000
HR 8.5 HR 02.02.2013 01.02.2013 080100 01.02.2013 163000
HR 5 HR 02.02.2013 01.02.2013 080100 01.02.2013 130000
HR 2 HR 16.02.2013 15.02.2013 080100 15.02.2013 100000
HR 3 HR 16.02.2013 15.02.2013 100100 15.02.2013 130000
HR 4 HR 16.02.2013 15.02.2013 130100 15.02.2013 170000
HR 2 HR 14.03.2013 13.03.2013 080100 13.03.2013 100000
HR 2 HR 14.03.2013 13.03.2013 100100 13.03.2013 120000
HR 3 HR 14.03.2013 13.03.2013 120100 13.03.2013 150000
HR 2 HR 14.03.2013 13.03.2013 150100 13.03.2013 170000
8/13/2019 P'Plant Weekly
21/24
Confirmation Text
Found Ok.
Done
Found Ok.
Found Ok.
Grease Replaced.
Bearing inspection done found ok
Oil replaced and internals found ok.
Found Ok.
Grease Replaced.
Bearing inspection done found ok
Oil replaced and internals found ok.
Found Ok.
Gland rope replaced
Grease topup doneDone
Found Ok.
Found Ok.
Grease Replaced.
Internals found ok & Oil replaced
Oil replaced
Internals found ok & Oil replaced
Internals found ok & Oil replaced
Found Ok.
Oil replaced
Found Ok.
Found Ok.
8/13/2019 P'Plant Weekly
22/24
Opn No Opn Short text Work Unit
No.of
persons Duration
10 Chk.Sign of corrosion on sup. Structure 1 HR 1 1
20 Chk. Deformation of subassemblies 1 HR 1 1
30 Chk.Welding seams ofSup. Stucture 1 HR 1 1
40 Repair the coat of paint(sup. Structure) 2 HR 1 2
50 Chk Locknuts of connecting element 2 HR 2 160 Chk screws fr tight fit(conectng Elmnt) 2 HR 2 1
70 Chk Bellows Fr Fastening,Function ,Beds 4 HR 2 2
80 Chk Seals Fr Fastening and wear & tear 2 HR 2 1
90 Remove dust and material caking 2 HR 2 1
100 Check the Brake of Electric winch 2 HR 2 1
110 Chk the Lift limiters of Electric winch 1 HR 1 1
120 Chk.Wear&tear,Damage of winch wire rope 1 HR 2 0.5
130 Chk wire rope rollup on the cable drum 1 HR 2 0.5
140 Chk Wear&tear of Diaphragm(Fil lvl ind.) 2 HR 2 1
150 Chk. filtr Fr deposit(Fil lvl ind.) 1 HR 1 1
160 Remove dust&material caking(Fil lvl ind) 2 HR 2 1
170 Chk Fastening&alignmnt of Unbalnce motor 4 HR 2 2
180 Chk.Fastening of external vibrator 2 HR 2 1
8/13/2019 P'Plant Weekly
23/24
Unit Actual Duration Unit Postage date Start date Start Time End Date End Time
HR 1 HR 20.07.2013 19.07.2013 080100 19.07.2013 090000
HR 1 HR 20.07.2013 19.07.2013 090100 19.07.2013 100000
HR 1 HR 20.07.2013 19.07.2013 100100 19.07.2013 110000
HR 2 HR 20.07.2013 19.07.2013 130100 19.07.2013 150000
HR 1 HR 20.07.2013 19.07.2013 080100 19.07.2013 090000HR 1 HR 20.07.2013 19.07.2013 090100 19.07.2013 100000
HR 2 HR 20.07.2013 20.07.2013 080100 20.07.2013 100000
HR 1 HR 20.07.2013 19.07.2013 100100 19.07.2013 110000
HR 1 HR 20.07.2013 19.07.2013 110100 19.07.2013 120000
HR 1 HR 20.07.2013 19.07.2013 120100 19.07.2013 130000
HR 1 HR 20.07.2013 19.07.2013 110100 19.07.2013 120000
HR 0.5 HR 20.07.2013 19.07.2013 120100 19.07.2013 123000
HR 0.5 HR 20.07.2013 19.07.2013 130100 19.07.2013 143000
HR 1 HR 20.07.2013 19.07.2013 143100 19.07.2013 153000
HR 1 HR 20.07.2013 19.07.2013 120100 19.07.2013 130000
HR 1 HR 20.07.2013 19.07.2013 153100 19.07.2013 163000
HR 2 HR 20.07.2013 20.07.2013 100100 20.07.2013 120000
HR 1 HR 20.07.2013 19.07.2013 163100 19.07.2013 173000
8/13/2019 P'Plant Weekly
24/24
Confirmation Text
Found Ok.
Found Ok.
Found Ok.
Done
Found Ok.Found Ok.
Found Ok.
Found Ok.
cleaned
Found Ok.
Found Ok.
Found Ok.
Found Ok.
Found Ok.
Found Ok.
Found Ok.
Found Ok.
Found Ok.