Top Banner
Project XXXX Service Tech Production Planning Module __________________________________________________________________________________________ ________ Caritor Protected Page 1 of 22
22
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript

1

EBP2.0 Release 2 ------ Heading

Project XXXX Service Tech

Production Planning Module

TABLE OF CONTENTS

I. Define MRP controllers.

II. Shop Floor Control.

III. Define Order Type.

IV. Define Order Type dependent parameters.

V. Define Checking Control.

VI. Define Scheduling Parameters for Production Orders.

VII. Define Confirmation Parameters for Order types.

VIII. Define Number ranges for Order Types.

IX. Define Task list assignment for Material Types.

Master Data

Define MRP controllers

The person responsible for a group of materials in MRP in a plant or company.

Material that takes part in material requirements planning must be assigned to an MRP controller.

MRP controller has to be defined for Materials for which MRP run is required. It can be a person or group of persons.

1. Title: Define MRP Controllers

2. Short Description: Plant 3001, Plant 3010, Plant 3020, Plant 3050, Plant 3060, Plant 3070,Plant 3080

3. IMG Path: Implementation Guide for R/3 Customizing(Production( Production planning( Master production scheduling (Master Data ( Define MRP controllers

4. Transaction Code: SPRO

MRP controllers Assigned to Various Plants

Shop Floor ControlDefine Order TypeA tool that categorizes orders according to purpose.

The order type contains information that is necessary for managing orders.

Example

Production orders

Maintenance orders

Capital investment orders

An order type has the controlling parameters of an order.

With a particular order type we can define,

Controlling partner update

Settlement profile

Status Management

1. Title: Define Order Type

2. Short Description: Order Types were created for 7 plants of XXXX Service Tech Company.

3. IMG Path: Implementation Guide for R/3 Customizing(Production( Shop Floor Control( Master data( Order( Define Order Types

4. Transaction Code: OPJH

Production Order Types

Rework Order Types

Define Order Type dependent parameters

Here we are defining the parameters that are valid for each order type and plant.

1. Title: Define Order Type dependent parameters

2. Short Description: Order Type dependent parameters were defined for order types

3. IMG Path: Implementation Guide for R/3 Customizing(Production( Shop floor control( Master data( Order ( Define order type dependent parameters

4. Transaction Code: OPL8

Define Checking Control

For a plant-order type combination we can define a checking control.

We can specify the following actions,

Whether an availability check is to be carried out (During creation or release an order)

Whether an availability check is to be carried out when we save an order that has been created or released

Which checking rule is to be used

What effect a material shortfall is to have on the creation or release of an order (error or warning message)

1. Title: Define Checking Control

2. Short Description: Checking controls have been defined for order creation, order release.

3. IMG Path: Implementation Guide for R/3 Customizing(Production( Shop Floor Control( Opearation ( opearations ( Availability check ( Define Checking control

4. Transaction Code :OPJK

Checking Control assigned to Plant 3001

Checking Control assigned to Plant 3010

Checking Control assigned to Plant 3020

Checking Control assigned to Plant 3060

Checking Control assigned to Plant 3080

Checking Control

Scheduling Parameters for Production orders

Scheduling Parameter for Plant 3001

Scheduling Parameter for Plant 3010

Scheduling Parameter for Plant 3020

Scheduling Parameter for Plant 3050

Scheduling Parameter for Plant 3060

Scheduling Parameter for Plant 3070

Scheduling Parameter for Plant 3080

Define Parameters for Order Confirmation

Confirmation Parameters for Plant 3001

Confirmation Parameters for Plant 3010

Confirmation Parameters for Plant 3020

Confirmation Parameters for Plant 3050

Confirmation Parameters for Plant 3060

Confirmation Parameters for Plant 3070

Confirmation Parameters for Plant 3080

Routing Data for material Types

The task list type N has to be assigned to the new material types created

HAL1

FERT1

Number Range assignment for Production Order Types

Business Function: 1

Rework Order types

Business Function: 2

DateRELIANT Confidential & Privileged Draft 00Page 1

__________________________________________________________________________________________________

Caritor ProtectedPage 2 of 18

_1252241039.doc
_1252246640.doc
_1252158901.doc