Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applications ® ®
52

Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

Feb 20, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

Powerware 5125 (9910-P65) UPSInstallation Guide for IBM Applications

®

®

Page 2: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

This product is covered by one or more of the following US Patent numbers: 5177676, 6314007, 6330176,6391489, 6483730, and 6599657.

IBM, pSeries, AIX, xSeries, AS/400, OS/400, and RS/6000 are registered trademarks and iSeries, OpenPower, andi5/OS are trademarks of International Business Machines Corp.Powerware is a registered trademark and X-Slot and ConnectUPS are trademarks of Eaton Power QualityCorporation.Microsoft and Windows are registered trademarks of Microsoft Corporation.Linux is a registered trademark of Linus Torvalds.Burndy is a registered trademark of Framatone Connectors International.

ECopyright 2005 Eaton Corporation, Raleigh, NC, USA. All rights reserved. No part of this document may bereproduced in any way without the express written approval of Eaton Corporation.

Page 3: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

Requesting a Declaration of ConformityUnits that are labeled with a CE mark comply with the following harmonized standards and EU directives:

S Harmonized Standards: IEC 62040-1-1 and IEC 62040-2; IEC 60950 Third Edition

S EU Directives: 73/23/EEC, Council Directive on equipment designed for use within certain voltage limits93/68/EEC, Amending Directive 73/23/EEC89/336/EEC, Council Directive relating to electromagnetic compatibility92/31/EEC, Amending Directive 89/336/EEC relating to EMC

The EC Declaration of Conformity is available upon request for products with a CE mark. For copies of the ECDeclaration of Conformity, contact:

Eaton Power Quality OyKoskelontie 13FIN-02920 EspooFinlandPhone: +358-9-452 661Fax: +358-9-452 665 68

Page 4: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

Class A EMC StatementsFCC Part 15NOTE This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant topart 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interferencewhen the equipment is operated in a commercial environment. This equipment generates, uses, and can radiateradio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmfulinterference to radio communications. Operation of this equipment in a residential area is likely to cause harmfulinterference in which case the user will be required to correct the interference at his own expense.

ICES-003This Class A Interference Causing Equipment meets all requirements of the Canadian Interference CausingEquipment Regulations ICES-003.

Cet appareil numérique de la classe A respecte toutes les exigences du Reglement sur le matériel brouilleur duCanada.

IEC 62040-2Some configurations are classified under IEC 62040-2 as “Class-A UPS for Unrestricted Sales Distribution.” Forthese configurations, the following applies:

WARNING This is a Class A-UPS Product. In a domestic environment, this product may cause radio interference, inwhich case, the user may be required to take additional measures.

VCCI Notice

Page 5: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

Special SymbolsThe following are examples of symbols used on the UPS or accessories to alert you to importantinformation:

RISK OF ELECTRIC SHOCK - Indicates that a risk of electric shock is present and the associatedwarning should be observed.

CAUTION: REFER TO OPERATOR’S MANUAL - Refer to your operator’s manual for additionalinformation, such as important operating and maintenance instructions.

This symbol indicates that you should not discard the UPS or the UPS batteries in the trash. Thisproduct contains sealed, lead-acid batteries and must be disposed of properly. For more information,contact your local recycling/reuse or hazardous waste center.

This symbol indicates that you should not discard waste electrical or electronic equipment (WEEE) inthe trash. For proper disposal, contact your local recycling/reuse or hazardous waste center.

Page 6: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

This page intentionally left blank.

Page 7: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A 9

Table of Contents

1 Installation 11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Parts List 11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Setup and Installation 14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Rack-Mount Setup 14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Installing the Internal Batteries 22. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .EBM Installation 23. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .UPS Installation 25. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Remote Emergency Power-off Installation 26. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Power Connections and Startup 28. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Load Segments 34. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2 Operation 35. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Turning the UPS On 35. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Starting the UPS on Battery 35. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Turning the UPS Off 35. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Initiating the Self-Test 36. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Operating Modes 36. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Normal Mode 37. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Battery Mode 37. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Bypass Mode 38. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Standby Mode 38. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Configuration Mode 38. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3 Communication Options 43. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .i5 Interface Overview 44. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .iSeries or AS/400 Interface Overview 45. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .i5, iSeries, or AS/400 and Serial Server Interface Overview 46. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Serial (TTY) Interface Overview 48. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .p5 or pSeries with Logical Partitions Interface Overview 49. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4 Service and Support 51. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Page 8: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

TABLE OF CONTENTS

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A10

Page 9: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A 11

Chapter 1 Installation

Parts List

Table 1. P65 Base Configuration

Quantity IBM MN IBM FC IBM PN Eaton PN Description

1 P65 — 39J2534 103003611-3901 P65 UPS 5000 VA, 4500W

1 — — 39J2535 103004715-3901 P65 Accessory Kit

2 — — 39J2536 103004696-3901 Battery Tray

Table 2. P65 Application Matrix

IBM MN IBM FC IBM PN Eaton PN DescriptionQuantity forp5/pSeries®

Rack Worldwide

Quantity fori5/iSeriest

Rack Worldwide

— 39J3550 103004705-3901 Left Adjustable RailAssembly (with rearhold-down bracket)

— 6632 39J3551 103004706-3901 Right Adjustable RailAssembly (with rearhold-down bracket)

1 each per P65 UPS

— 53P1965 103002843-3901 Rail Hardware Kit

— — 97P5674 103003944-3901 Rack Mounting Bracket Kit 1 per P65 UPS

— 29361 97P3886 103003564 Relay Interface Card andCable (25 ft/7.6m) Kit

— 1

— 2973 39J2538 103004733-3901 7188 and/or 9188 PDU to UPSPower Cord (4 ft/1.2m)

1 per P65 UPS

Varies2 Varies Varies IBM-Supplied UPS Input Power Cord 1 per P65 UPS

1Maximum: One FC 2934, 2936, or 2939 per P65 UPS.2See “Typical Power Connections” on page 31.

Page 10: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A12

Table 3. P65 Options Matrix

IBM MN IBM FC IBM PN Eaton PN DescriptionQuantity for

p5/pSeries RackWorldwide

Quantity fori5/iSeries Rack

Worldwide

— 29341 53P4619 103002974-5501 -X Web/SNMPCard2 KitConnectUPSt Min: 0, Max: 1 —

— 29391 39J2627 103004741-5501 Relay-Serial Card and CableKit

— Min: 0, Max: 1

— 2938 38P9307 103003637-3901 Powerware EnvironmentalMonitoring Probe (EMP) andCAT 5 Cable (6 ft/1.8m) Kit

Min: 0, Max: 1Co-requisite:

FC 2934

— 6641 38P9300 103003387-3901 Extended Battery Module(EBM)

Min: 0, Max: 4

— — 38P9311 103003947-3901 EBM Accessory Kit 1 per FC 6641

— 97P5672 103002841-3902 Left Adjustable RailAssembly (with rearhold-down bracket)

— 6631 97P5673 103002842-3902 Right Adjustable RailAssembly (with rearhold-down bracket)

1 each per FC 6641

— 53P1965 103002843-3901 Rail Hardware Kit

— — 97P5674 103003944-3901 Rack Mounting Bracket Kit 1 per FC 6641

— 2916 04N7025 05146401-3901 120V Convenience PDU3

(for modems, etc.)Min: 0, Max: 1

1Maximum: One FC 2934, 2936, or 2939 per P65 UPS.2ConnectUPS-X Web/SNMP Card required if implementing Logical Partitions (LPARs) on p5 or pSeries.3Powered from rack PDU receptacle (10A type).

Table 4. P65 Accessory Kit (39J2535)

Quantity Eaton PN Description

1 164201541 Powerware 5125 Rack-Mount UPS (5000/6000 VA) User’s Guide

1 164201598 Powerware 5125 (9910-P65) Installation Guide for IBM Applications

1 05146745 Software Suite CD

1 157809009-002 UPS Front Cover (Bezel) Black

1 152601412-001 UPS to Server Communication Cable (RJ-45 to DB-9, 6 ft/1.8m)

1 124102022-006 UPS to Server Communication Cable (DB-9 to DB-9, 12 ft/3.6m)

Page 11: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A 13

Table 5. EBM Accessory Kit (38P9311)

Quantity Eaton PN Description

1 164201518 Powerware 9125 Two-in-One EBM (5000/6000 VA) User’s Guide

1 164201542 Powerware 9125 (9910-P64) Installation Guide for IBM Applications

1 164201598 Powerware 5125 (9910-P65) Installation Guide for IBM Applications

2 157604397-003 Joining Bracket

4 180190110-306 Joining Bracket Screws (M4×10 mm)

Table 6. Rack Mounting Bracket Kit (97P5674)

Quantity Eaton PN Description

2 157604739-003 Rack Mounting Bracket (Black)

4 180160049-203 Rack Mounting Bracket Screws (#6-32×3/8”)

Page 12: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A14

Setup and Installation

The P65 UPS can be purchased separately or factory-installed in an IBMiSeries or pSeries rack.

NOTE If the UPS is pre-installed in an IBM rack, continue to “Installing the InternalBatteries” on page 22. If you are installing the UPS in an IBM iSeries (0550, 0551, or 0553type) or pSeries (7014 type) rack, continue to the following section, “Rack-Mount Setup.”

Rack-Mount Setup

The rail kit can be mounted in 19-inch panel racks from 24 to 30 inchesdeep.

NOTE Mounting rails are required for each individual cabinet. The UPS uses FC 6632 andthe EBM uses FC 6631.

NOTE If placing the P65 in a rack with existing equipment, the rack must be reconfiguredto install the heaviest item in the bottom of the rack. The UPS weighs 73 kg (161 lb) and theEBM weighs 77.1 kg (170 lb).

Each rail kit requires one (1) of each item in the following list (supplied):

S Left adjustable rail assembly

S Right adjustable rail assembly

S Rail hardware kit

S Rack mounting bracket kit

Page 13: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A 15

The following steps explain how to install the rail kit(s):

NOTE If installing EBM(s), install the EBM rails (FC 6631) below the UPS rails (FC 6632).

NOTE All hardware referenced in Steps 2 through 4 are contained in the rail hardware kit.

1. Loosen the assembly wing nuts on both rail assemblies and adjustthe rail size for the depth of your rack (see Figure 1).

Rear

Front Rail Assembly

Assembly Wing Nuts

Figure 1. Adjusting the Rail Depth

2. Select the proper holes in the rail for positioning the UPS and anyoptional cabinets in the rack.

Place the first rail at the bottom, using positions 1 and 6 for thefront hex-head screws. If you are installing additional rails, place thenext rail four holes above the last installed screw (see Figure 2).

Page 14: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A16

Position 1

Position 6

Position 10

Position 15

First Rail

Second Rail

Figure 2. Front Rack Screw Positions

3. Secure the rail to the front of the rack with two hex-head screws(see Figure 3).

Front Rack Hex-Head Screws

Figure 3. Securing the Front of the Rail

Page 15: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A 17

4. Using two clip nuts and two hex-head screws, attach the rail to therear of the rack (see Figure 4 and Figure 5).

The bottom rail uses positions 2 and 4 for the rear hex-headscrews. If you are installing additional rails, place the next rail sevenholes above the last installed screw.

Position 2

Position 4

Position 11

Position 13

First Rail

Second Rail

Figure 4. Rear Rack Screw Positions

Clip Nuts

Figure 5. Securing the Rear of the Rail

Page 16: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A18

5. Repeat Steps 3 and 4 for each rail.

6. Tighten the assembly wing nuts on all rail assemblies.

7. Place the UPS on a flat, stable surface with the front of the UPSfacing toward you.

8. Align the mounting brackets with the screw holes on the side of theUPS and secure with the supplied #6-32×3/8” flat-head screws(see Figure 6).

9. If installing additional EBMs, repeat Steps 7 and 8 for each cabinet.

Mounting Bracket

Figure 6. Installing the Mounting Brackets

Page 17: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A 19

CAUTIONThe UPS and EBM are heavy. A minimum of two people are required to lift the UPS or EBMinto the rack.

10. Slide the UPS and any optional EBMs into the rack.

11. After installing the UPS chassis, secure the front of the UPS to therack using two hex-head screws in the top and bottom positions ofeach mounting bracket (see Figure 7). Repeat for each cabinet.

OptionalEBM

UPS

Hex-HeadScrews

Figure 7. Securing the Mounting Brackets

Page 18: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A20

12. Slide the UPS rear hold-down bracket into the slot on the UPS rearpanel.

Be sure the rear hold-down bracket is fully seated and then tightenthe wing nuts. The UPS is now secured in the rack.

UPS RearHold-DownBracket

Figure 8. Securing the Back of the UPS

Page 19: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A 21

13. For each optional EBM, slide the EBM rear hold-down bracket intothe slots on the EBM rear panel.

Be sure the rear hold-down bracket is fully seated and then tightenthe wing nut. The EBM is now secured in the rack.

EBM RearHold-DownBracket

Figure 9. Securing the Back of the EBM

14. Continue to the following section, “Installing the Internal Batteries.”

Page 20: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A22

Installing the Internal Batteries

To install the battery trays into the UPS chassis:

1. Locate the cartons labeled “Battery Tray” (IBM PN 39J2536).

2. Verify that the battery circuit breaker on the UPS rear panel is in theOFF position (see Figure 13 on page 24).

3. Unscrew and set aside the battery retaining bracket (see Figure 10).

Battery Retaining Bracket

Figure 10. Battery Retaining Bracket

4. Slide the battery trays into the chassis (see Figure 11).

Figure 11. Installing the Battery Trays

5. Secure the battery trays to the chassis with the battery retainingbracket and screws removed in Step 3.

Page 21: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A 23

6. Align the UPS front cover (provided in the P65 accessory kit) withthe right retaining hook and front cover holes on the UPS cabinet.Insert the UPS front cover (see Figure 12).

Figure 12. Installing the Front Cover

7. If you are installing an optional Extended Battery Module, continueto the following section, “EBM Installation;” otherwise, continue to“Power Cord Connections” on page 28.

EBM Installation

CAUTIONA small amount of arcing may occur when connecting an EBM to the UPS. This is normal andwill not harm personnel. Insert the EBM cable into the UPS battery connector quickly andfirmly.

If you are installing an optional EBM(s), use the following steps:

1. Verify that all battery circuit breakers are in the OFF position (seeFigure 13).

2. Plug the EBM cable into the UPS battery connector.

3. If additional EBMs are to be installed, plug the EBM cable of thesecond cabinet into the battery connector on the first EBM. Repeatfor each additional EBM. Up to four EBMs may be connected to theUPS.

4. Continue to the following section, “Power Cord Connections.”

NOTE After UPS installation, ensure maximum battery runtime by configuring the UPS forthe correct number of EBMs (see “Configuration” on page 38).

Page 22: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A24

UPS BatteryConnector

EBM Cable

EBM BatteryConnectors

Battery CircuitBreakers

Battery Circuit Breaker

Figure 13. Typical EBM Installation

Page 23: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A 25

UPS Installation

NOTE Do not make unauthorized changes to the UPS; otherwise, damage may occur toyour equipment and void your warranty.

The following steps explain how to install the UPS:

1. If you are installing power management software, connect yourcomputer to the USB port, UPS communication port, or optionalX-Slott card (see Table 10 on page 43). For the communicationport, use only the serial cable supplied in the P65 accessory kit.

2. If your rack has conductors for grounding or bonding of ungroundedmetal parts, connect the ground cable (not included) to the groundbonding screw.

Load SegmentCircuit BreakersUSB Port

Battery Connector

CommunicationPort Battery Circuit Breaker

IEC 320-C19 Receptacles

L6-30 Receptacle

IEC 320-C13Receptacles

Power Cord (3 ft/0.9m)with L6-30 Plug

X-SlotCommunication

Bay

GroundBonding Screw

REPO Port

Figure 14. UPS Rear View

3. If an emergency power-off (disconnect) switch is required by localcodes, see the following section, “Remote Emergency Power-off”to install the REPO switch before powering on the UPS.

4. Continue to “Power Cord Connections” on page 28.

Page 24: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A26

Remote Emergency Power-off Installation

The P65 includes a REPO port that allows power to be switched off atthe UPS output receptacles from a customer-supplied switch in aremote location.

The REPO feature shuts down the protected equipment immediatelyand does not follow the orderly shutdown procedure initiated by anypower management software. The UPS does not automatically restartwhen the REPO switch is reset; the UPS must be manually restarted.

Any devices that are operating on battery power are also shut downimmediately. When the REPO switch is reset, the equipment will notreturn to battery power until the UPS is manually restarted.

If the Off button is pressed after the REPO is activated, the UPSremains in Standby mode when restarted until the On button ispressed.

WARNINGThe REPO circuit is an IEC 60950 safety extra low voltage (SELV) circuit. This circuit must beseparated from any hazardous voltage circuits by reinforced insulation.

CAUTIONTo ensure the UPS stops supplying power to the load during any mode of operation, theinput power must be disconnected from the UPS when the emergency power-off function isactivated.

NOTE The REPO function activates when the REPO contacts close.

NOTE If the REPO function is not needed, the REPO connector must remain installed in theREPO port on the UPS rear panel.

NOTE For Europe, the emergency switch requirements are detailed in Harmonizeddocument HD-384-48 S1, “Electrical Installation of the Buildings, Part 4: Protection for Safety,Chapter 46: Isolation and Switching.”

Use the following procedure to install the REPO switch:

1. Verify that the UPS is off and unplugged.

2. Remove the REPO connector from the REPO port on the UPS rearpanel.

Page 25: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A 27

3. Connect isolated, normally-open, dry contacts (rated to handle60 Vdc maximum, 30 Vac RMS maximum, and 20 mA maximum)across the REPO device to Pin 1 and Pin 2 (see Figure 15).Use stranded, non-shielded wiring, size 18–22 AWG(0.75 mm2–0 mm2).

NOTE A separate contact must simultaneously cause UPS input AC power to be removed.

4. Reconnect the REPO connector to the REPO port.

Pin 1 Pin 2

Figure 15. REPO Connector

5. Verify that the externally-connected REPO switch is not activated toenable power to the UPS output receptacles.

6. Plug in the UPS and start the UPS by pressing the On button forapproximately three seconds.

7. Activate the external REPO switch to test the REPO function.

8. De-activate the external REPO switch and restart the UPS.

9. Continue to the following section, “Power Cord Connections.”

Page 26: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A28

Power Connections and Startup

The device power cord connection(s) determine if the setup can providedual-redundant power to the protected device(s). See Figure 16 for anon-redundant powered device; Figure 17 shows a dual-redundantpowered device.

Legend (Figure 16 and Figure 17)

1 UPS to utility (mains) power cord

2 PDU to UPS power cord

3 PDU to utility (mains) power cord

UPS

PDU

Mains 1 2

Figure 16. Connecting One PDU (Non-Redundant) to UPS

Mains1 2 3

TVSS Protected orSecond UPSUPS

PDU

Mains

PDU

Figure 17. Connecting Two PDUs (Dual-Redundant) to UPS

1. If you are installing a UPS and non-redundant power to the device(s)is desired, plug the PDU power cord into the UPS output receptacle(see Figure 16) using the supplied power cord.

If you are installing a UPS and dual-redundant power to thedevice(s) is desired, two PDUs are required. Plug the first PDUpower cord into the UPS output receptacle (see Figure 17) usingthe supplied power cord. Then plug the second (redundant) PDUpower cord into a non-UPS protected output receptacle (mains) orinto a second UPS.

Page 27: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A 29

NOTE The redundant power source must be protected with Transient Voltage SurgeSuppression (TVSS).

2. Plug the equipment to be protected into the appropriate UPS outputreceptacles (see page 34 for more information on load segments).

NOTE DO NOT protect laser printers with the UPS because of the exceptionally highpower requirements of the heating elements.

NOTE To prevent an overload alarm, verify that the total equipment ratings do not exceedthe UPS capacity.

3. Verify that all load segment circuit breakers are in the ON position.

4. Remove the breaker tie from all battery circuit breakers.

5. Switch all battery circuit breakers to the ON position.

6. Plug the UPS power cord into a power outlet.

Theμ indicator flashes, indicating the UPS is in Standby modewith the equipment offline.

7. Press and hold the On button for approximately three seconds.

Theμ indicator stops flashing and the load level indicators displaythe percentage of load being applied to the UPS. The UPS is now inNormal mode and supplying power to your equipment.

If the alarm beeps or a UPS alarm indicator stays on, refer to“Troubleshooting” in the Powerware 5125 Rack-Mount UPS(5000/6000 VA) User’s Guide.

The UPS automatically sets the output voltage based on the inputvoltage. To change the output voltage, see “Configuration” onpage 38.

8. If optional EBMs are installed, see “Configuration” on page 38 tospecify the number of EBMs installed.

NOTE The batteries charge to 80% capacity in approximately 3 hours. However, it isrecommended that the batteries charge for 48 hours after installation or long-term storage.

Page 28: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A30

Table 7. Plug Types Supported

IBM Plug Type Description Quantity Supported

12 NEMA L6-30P 1

— IEC 320-C14 4

— IEC 320-C20 4

If you have questions about implementing non- or dual-redundant power,the following options are available:

S www.oem.powerware.com/ibm-ups/pdf/nemadiagm.pdf orwww.oem.powerware.com/ibm-ups/pdf/iecdiagm.pdf

S Submit your question to “Ask the Expert” atwww.oem.powerware.com/ibm-ups/

S Submit your question to our FAQ database atwww.oem.powerware.com/IBM_faq/afmmain.asp

S Contact the IBM office or Business Partner servicing your account

Page 29: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A 31

Table 8. Typical Power Connections

Item Description

1 NEMA L6-30R

2 NEMA L6-30P

3 IEC 320-C13

4 IEC 320-C19/C20

5 Burndy® UTG Connector

6 Country-specific UPS power (mains) cord

IBM FC IBM PN Plug Type Supplier Description

1420 11F0113 12 IBM NEMA L6-30P, 14 ft/4.3m

1421 11F0114 12 IBM NEMA L6-30P, 6 ft/1.8m

1422 46F4593 40 IBM RS 3750, 6 ft/1.8m

1423 46F4594 40 IBM RS 3750, 14 ft/4.3m

1424 31F4466 46 IBM IEC-309 (P+N+G) 32A, 14 ft/4.3m

1425 87G6067 KP IBM KP, 14 ft/4.3m

1426 11F0106 PDL IBM PDL, 14 ft/4.3m

1427 11F0107 PDL IBM PDL-NZ, 14 ft/4.3m

7 PDU to UPS power cord

IBM FC IBM PN Plug Type Supplier Description

6654 25R2555 12 IBM Burndy to NEMA L6-30P, 14 ft/4.3m

2973 39J2538 12 Eaton Burndy to NEMA L6-30P, 4 ft/1.2m

8 PDU to utility (mains) power cord*

IBM FC IBM PN Plug Type Supplier Description

6654 25R2555 12 IBM Burndy to NEMA L6-30P, 14 ft/4.3m

6655 25R2557 40 IBM Burndy to RS 3750, 14 ft/4.3m

6656 25R2553 46 IBM Burndy to IEC-309 (P+N+G) 32A, 14 ft/4.3m

6657 25R2558 PDL IBM Burndy to PDL, 14 ft/4.3m

6658 25R2559 KP IBM Burndy to KP, 14 ft/4.3m

9 2974 39J2590 — Eaton Burndy to IEC 320-C20, 6 ft/1.8m

*Other power cords are supported by the PDU. Power cords shown are similar in voltage and amperage to the UPS.

Page 30: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A32

NOTE P65 supports: PDU types 5160 or 9176 with FC 2970; PDU types 5161 or 9177 withFC 2971.

NOTE P65 does not support iSeries PDU 5162, IEC-309 (3P+N+G) 16A.

NOTE P65 with 2973 has a maximum output capacity of 4500 watts even though IBM PDU7188 or 9188 can support higher power output. Plan accordingly.

(7) IBM (6) 612

PDUIBM

iSeriesor

pSeries 7188 or9188

Dev

ice

P654500W

UPS

1 2 6

MainsVaries55

3333

4 4 4 4

Figure 18. P65 with Non-Redundant Power

(7) IBM (6) 612

PDUIBM

iSeriesor

pSeries 7188 or9188

Dev

ice

P654500W

UPS

1 2 6

MainsVaries55

3333

4 4 4 4

(9)

3

PDUIBM

iSeriesor

pSeries 7188 or9188

Dev

ice

55

Figure 19. P65 with Non-Redundant Power to Multiple PDUs

Page 31: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A 33

IBM (6) 612

PDUIBM

iSeriesor

pSeries 7188 or9188

Dev

ice

P654500W

UPS

1 2 6

MainsVaries5 (7)

3333

4 4 4 4

8

PDUIBM

iSeriesor

pSeries 7188 or9188

8

MainsVaries5 IBM (8)

5

5

Figure 20. P65 with Dual-Redundant Power

Page 32: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

INSTALLATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A34

Load Segments

Load segments are sets of receptacles that can be controlled by powermanagement software, providing an orderly shutdown and startup ofyour equipment. For example, during a power outage, you can keep keypieces of equipment running while you turn off other equipment. Thisfeature allows you to save battery power. See your power managementsoftware manual for details (refer to the Software Suite CD orwww.powerware.com for the latest information).

NOTE If the power management software is not used, the individual load segments cannotbe controlled.

NOTE The circuit breaker for Load Segment 1 does not include the corded receptacle.

The P65 has two load segments as shown in Figure 21.

LoadSegment 2

LoadSegment 1

Load Segment 1Circuit Breaker

Load Segment 2Circuit Breaker

Figure 21. UPS Load Segments

Page 33: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A 35

Chapter 2 Operation

This section describes:

S Turning the UPS on and off

S Starting the UPS on battery

S Operating modes

Turning the UPS On

After the UPS is connected to utility power, it enters Standby mode. Toturn on the UPS, press and hold the On button for approximately threeseconds (shown in Figure 22 on page 36). Theμ indicator illuminatesand the load level indicators display the percentage of load being appliedto the UPS.

Starting the UPS on Battery

NOTE Before using this feature, the UPS must have been powered by utility power at leastonce.

To turn on the UPS without using utility power, press and hold theOn button for approximately three seconds. The UPS supplies powerto your equipment and goes into Battery mode.

Turning the UPS Off

To turn off the UPS:

1. Prepare your equipment for shutdown.

2. Press and hold the Off button for approximately three seconds.The UPS switches to Standby mode (if utility power is available) andremoves power from your equipment.

3. Unplug or remove utility power from the UPS; the UPS shuts downin five seconds. The load level and battery indicators flash brieflyprior to shutdown.

If you do not unplug or remove utility power from the UPS, itremains in Standby mode.

Page 34: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

OPERATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A36

Initiating the Self-Test

Press and hold the button for three seconds to initiate the self-test.If the alarm beeps or a UPS alarm indicator stays on, refer to“Troubleshooting” in the Powerware 5125 Rack-Mount UPS(5000/6000 VA) User’s Guide.

Operating Modes

P65’s front panel indicates the UPS status through the UPS indicators.Figure 22 shows the UPS front panel indicators and controls.

On Button

Off Button

Alarm Reset Button

Normal Mode Indicator (Solid Green)Standby Mode Indicator (Flashing Green)

Bypass Mode Indicator (Solid Red) Red

Flashing

Unlit

Green

Indicator Legend

Load Level IndicatorsBattery Mode Indicator

Battery Service Indicator

Figure 22. UPS Front Panel

Page 35: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

OPERATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A 37

Normal Mode

During Normal mode, theμ indicator illuminates and the front paneldisplays the percentage of UPS load capacity being used by theprotected equipment (see Figure 23). The UPS monitors and charges thebatteries as needed and provides power protection to your equipment.

>100%

76–100%

51–75%

26–50%

0–25%

Figure 23. Load Level Indicators

When all of the load level indicators and the indicator are illuminated,power requirements exceed UPS capacity; refer to “Troubleshooting” inthe Powerware 5125 Rack-Mount UPS (5000/6000 VA) User’s Guide formore information.

Battery Mode

When the UPS is operating during a power outage, the alarm beepsintermittently, the indicator illuminates, and theμ flashes. Whenthe utility power returns, the UPS switches to Normal mode operationwhile the battery recharges.

If battery capacity becomes low while in Battery mode, the indicatorstarts flashing and the alarm becomes continuous. Immediatelycomplete and save your work to prevent data loss and similar difficulties.

When utility power is restored after the UPS shuts down, the UPSautomatically restarts. The indicator flashes until the battery hasrecharged to an acceptable level.

Page 36: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

OPERATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A38

Bypass Mode

In the event of a UPS overload or internal failure, the UPS transfers yourequipment to utility power. Battery mode is not available; however, theutility power continues to be passively filtered by the UPS. The alarmsounds and theμ indicator illuminates red. The UPS switches toBypass mode when:

S The UPS has an overtemperature condition.

S The UPS has an overload condition of 102 to 110% for 2 minutes.

S The UPS has an overload condition >110% for 12 cycles.

S The UPS detects a fault in the UPS electronics.

Standby Mode

When the UPS is turned off and remains plugged into a power outlet,the UPS is in Standby mode. Theμ indicator flashes and the load levelindicators are off, indicating that power is not available to yourequipment. The battery recharges when necessary.

Configuration Mode

When the UPS is in Configuration mode, the front panel LEDs representthe configuration options. Use the control buttons (On button,Off button, and button) to modify the UPS configuration.Figure 24 shows the indicators and Table 9 explains the correspondingoptions.

1. Press the On button and the button simultaneously for threeseconds. The UPS switches to Configuration mode.

The indicators flash briefly and then display the enabled options.

NOTE If the indicators start cycling automatically from left to right, repeat Step 1 and besure to press both buttons.

2. Press the On button to scroll through the options. Each time youpress the button, the UPS beeps. The indicator for the selectedoption indicates the current setting; flashing represents disabledoptions (see Figure 24 and Table 9).

Page 37: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

OPERATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A 39

If you press the On button and nothing happens, the UPS is still inOperation mode. Repeat Step 1 to enter Configuration mode, andthen perform Step 2.

3. Press the Off button ONCE to select the option.

Repeat Steps 2 and 3 for each option. Scrolling past the lastindicator returns to the first configuration option.

NOTE The UPS exits Configuration mode automatically after two minutes of inactivity.

4. Press the button to confirm the selection and exit Configurationmode. If you do not press the button, the UPS defaults to theoriginal settings.

3

2

4

On Button

Off Button

Alarm Reset Button

Configuration Mode Indicators

Press the On and Alarm Reset buttonssimultaneously to enter Configurationmode.

1Press the On button toscroll to the next option.

Press the Off button ONCE totoggle an option on or off.

Press the Alarm Resetbutton to save the settingand exit Configurationmode.

Figure 24. Using Configuration Mode

Page 38: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

OPERATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A40

Table 9. Configuration Mode Indicators and Options

Configuration ModeIndicators Option Indicator

Status Explanation

200/208VNominal OutputV l

On(default)

Selecting this option changes the nominal output voltage to200/208V.p

VoltageFlashing 200/208V is disabled; one of the other output voltage options is

selected.

220V NominalOutput Voltage

On Selecting this option changes the nominal output voltage to220V.p g

Flashing 220V is disabled; one of the other output voltage options isselected.

230V NominalOutput Voltage

On Selecting this option changes the nominal output voltage to230V.p g

Flashing 230V is disabled; one of the other output voltage options isselected.

240V NominalOutput Voltage

On Selecting this option changes the nominal output voltage to240V.p g

Flashing 240V is disabled; one of the other output voltage options isselected.

Site WiringFault Alarm

On Alarm sounds when the polarity of the outlet is reversed or theground connection is missing; have a qualified electricianrepair the outlet wiring.

Flashing(default)

Alarm DOES NOT sound when the polarity of the outlet isreversed or the ground connection is missing.

0 EBMs On(default)

Zero EBMs are configured.

Flashing One of the other EBM configurations is selected.

1 EBM On One EBM is configured.

Flashing One of the other EBM configurations is selected.

2 EBMs On Two EBMs are configured.

Flashing One of the other EBM configurations is selected.

Page 39: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

OPERATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A 41

ExplanationIndicatorStatusOptionConfiguration Mode

Indicators

3 EBMs On Three EBMs are configured.

Flashing One of the other EBM configurations is selected.

4 EBMs On Four EBMs are configured.

Flashing One of the other EBM configurations is selected.

Page 40: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

OPERATION

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A42

Page 41: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A 43

Chapter 3 Communication Options

If you want the UPS to communicate with your computer, use Table 10to determine which communication option is correct for your application.

Table 10. Communication Options

Application Software Suite CDand Serial Cable

ConnectUPS-XWeb/SNMP Card Kit

(FC 2934)

Relay InterfaceCard and Cable Kit

(FC 2936)

Relay-Serial Cardand Cable Kit

(FC 2939)

IBM i5/iSeries Server — — X —

IBM i5/iSeries Server andSerial Server (Microsoft®

Windows®, Linux®, AIX®, orother operating systems)

— — — X

IBM p5/pSeries Server,OpenPowert, or xSeries®

Server with Single Serial(TTY) Connection

X — — —

IBM p5/pSeries Server,OpenPower, or xSeriesServer with LPARs and/orNetwork (WebServer)Connection (UPS as anode)

— X — —

Follow the installation instructions with the Software Suite CD or theapplicable card kit. This section shows the communication optionoverviews. For additional information and a current listing of supportedoperating systems, go to www.powerware.com.

Page 42: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

COMMUNICATION OPTIONS

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A44

i5 Interface Overview

To connect the UPS to an i5 you need:

S An Eaton-supplied Relay Interface Card and AS/400® interface cable(labeled 05142494), located in the FC 2936 carton labeled “Cable Kitfor IBM iSeries”

S An IBM-supplied UPS interface cable (labeled 1827), included withthe server

Follow the instructions included with the Relay Interface Card and CableKit to install the card and set UPS monitoring functions in i5/OSt.Installation may include removal of an existing X-Slot card from the UPS.

Connect the cables as shown in Figure 25.

AS/400 Interface Cable(labeled 05142494)

UPS Interface Cable(labeled 1827)

UPS

Communication Port

“P1-T1” UPS Port

IBM i5 Server

Relay Interface Card

Figure 25. i5 Interface

Page 43: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

COMMUNICATION OPTIONS

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A 45

iSeries or AS/400 Interface Overview

To connect the UPS to an iSeries or AS/400 you need:

S An Eaton-supplied Relay Interface Card and AS/400 interface cable(labeled 05142494), located in the FC 2936 carton labeled “Cable Kitfor IBM iSeries”

Follow the instructions included with the Relay Interface Card and CableKit to install the card and set UPS monitoring functions in OS/400®.Installation may include removal of an existing X-Slot card from the UPS.

Connect the cable as shown in Figure 26.

CommunicationPort

“J14” UPS Port(location mayvary by model)

AS/400 Interface Cable(labeled 05142494)

IBM iSeries Server

UPS

Relay Interface Card

Figure 26. iSeries or AS/400 Interface

Page 44: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

COMMUNICATION OPTIONS

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A46

i5, iSeries, or AS/400 and Serial Server Interface Overview

To connect the UPS to an i5, iSeries, or AS/400 and a serial server youneed:

S An Eaton-supplied Relay-Serial Card, an AS/400 interface cable(labeled 124902074-030), and a serial interface cable (labeled124102022-003), located in the FC 2939 carton labeled “Cable Kit forIBM iSeries and Windows or AIX/Linux Servers”

S For the i5 only: An IBM-supplied UPS interface cable (labeled 1827),included with the server

S For the serial server only: Powerware LanSafe Power ManagementSoftware from the Software Suite CD, located in the P65 accessorykit

Follow the instructions included with the Relay-Serial Card and Cable Kitto install the card and set UPS monitoring functions in i5/OS and serial(TTY) server. Installation may include removal of an existing X-Slot cardfrom the UPS.

Follow the software installation instructions contained on the SoftwareSuite CD to install the Powerware LanSafe software.

If you have an i5, connect the cables as shown in Figure 27. Otherwise,see Figure 28 to connect the cables.

AS/400 Interface Cable(labeled 124902074-030)

UPS Interface Cable (labeled 1827)

“P1-T1” UPS Port

IBM i5 Server

Serial Interface Cable(labeled 124102022-003)

UPS

Communication Port

Serial (TTY)Server

Relay-Serial Card

Figure 27. i5 and Serial Server Interface

Page 45: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

COMMUNICATION OPTIONS

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A 47

Relay-Serial Card

CommunicationPort

“J14” UPS Port(location mayvary by model)

IBM iSeries Server

UPS

AS/400 Interface Cable(labeled 124902074-030)

Serial Interface Cable(labeled 124102022-003)

Serial (TTY)Server

Figure 28. iSeries or AS/400 and Serial Server Interface

Page 46: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

COMMUNICATION OPTIONS

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A48

Serial (TTY) Interface Overview

To serially (TTY) connect the UPS to a p5, pSeries, RS/6000®,OpenPower or other system you need:

S An Eaton-supplied serial interface cable (labeled 152601412-001 or124102022-006), located in the P65 accessory kit

S Powerware LanSafe Power Management Software from theSoftware Suite CD, located in the P65 accessory kit

For p5 installations, you also need:

S An IBM-supplied 2-port Asynchronous EIA adapter (FC 5723) installedon a p5 server (the pSeries does not require an EIA adapter)

S An IBM-supplied maintenance package 5200-05 for AIX 5.2L V5.2(APAR IY66260); or the maintenance package 5300-01 for AIX 5.3LV5.3 (APAR IY62267)

Follow the software installation instructions contained on the SoftwareSuite CD to install the Powerware LanSafe software. Connect the serialcable as shown in Figure 29.

Communication Port

Serial Interface Cable(labeled 124102022-006or 152601412-001)

IBM p5 Server

2-Port AsynchronousEIA Adapter

(FC 5723)

UPS

Figure 29. Serial (TTY) Interface

Page 47: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

COMMUNICATION OPTIONS

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A 49

p5 or pSeries with Logical Partitions Interface Overview

To connect the UPS to a p5 or pSeries with LPARs you need:

S An Eaton-supplied ConnectUPS-X Web/SNMP Card, located in theFC 2934 carton labeled “ConnectUPS-X Web/SNMP Card Kit”

S NetWatch software from the Software Suite CD, located in the P65accessory kit

S A customer-supplied Ethernet cable

S An available Ethernet port on the server

Follow the instructions included with the ConnectUPS-X Web/SNMPCard Kit to install the card and set UPS monitoring functions. Installationmay include removal of an existing X-Slot card from the UPS.

Follow the software installation instructions contained on the SoftwareSuite CD to install the NetWatch software onto each LPAR.

Connect the Ethernet cable as shown in Figure 30.

Ethernet Cable(customer-supplied)

IBM p5 Server

The server must havean available Ethernet port.

UPS

Communication Port

Figure 30. p5 or pSeries with LPARs Interface

Page 48: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

COMMUNICATION OPTIONS

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A50

Page 49: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A 51

Chapter 4 Service and Support

In the United States and Canada, call 1-800-IBMSERV (1-800-426-7378). InEurope, the Middle East, and Africa (EMEA); Latin America; orAsia-Pacific, call the IBM office that services your account. Please haveyour serial, model, and part number ready when you call (see Figure 31).

For additional information, see the appropriate user’s guide for the UPSor EBM.

(S/N Bar Code 39)

Part Number

S991010R4AAA

(Data: P39J2534)(IBM Part Number Bar Code 39)

Front Panel Label

Rear Panel LabelModel Number

Serial Number

IBM/UPSType-Model/Feature: 9910-P65(P) IBM P/N: 39J2534

(S) Serial Number: 9910-10R4AAA

(2P) EC: H86503

(Serial Number Bar Code 39)(Data: S991010R4AAA)

(Data: 2PH86503)(EC Number Bar Code 39)

Assembled in MexicoDate of MFG: YYYYMMDD

Serial Number

Figure 31. Example of IBM Serial Number Labels

Comments

We welcome your comments about this manual. Please send yourquestions or suggestions for improvements [email protected].

Page 50: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

SERVICE AND SUPPORT

EATON Powerware® 5125 (9910-P65) Installation Guide for IBM® Applications S 164201598 Rev A52

Page 51: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with
Page 52: Powerware 5125 (9910-P65) UPS Installation Guide for IBM Applicationsoem.powerware.com/ibm-ups/pdf/p65install.pdf · 2005. 9. 12. · 7. Place the UPS on a flat, stable surface with

*164201598A*164201598 A