Top Banner
Edd Polaski Employment History and Construction projects review
21

Powerpoint Presentation For Edd Polaski

Jun 13, 2015

Download

Documents

aiaman

visual presentation of professional and scholastic history
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Powerpoint Presentation For Edd Polaski

Edd Polaski

Employment History and Construction projects review

Page 2: Powerpoint Presentation For Edd Polaski

Dear ReaderI believe that I have a proven record of accomplishments including organizational and management skills along with attentionto detail, from the ten plus years that I have been in this field. I am confident that I bring the strengths necessary to completemy assignments readily and effortlessly.

My eagerness comes from my desire to learn about the trade. Over the years I have accepted different positions in order to broaden my background while learning, growing, and trying to understand all aspects of construction management, as I worked my way through college .

While employed, some of the responsibilities that I have come to understand were successfully managing multiple simultaneous projects while consistently meeting the strict deadlines and budgets . During the course of my career, I have also:

Successfully managed, directed, and provided technical guidance for construction crews, consisting of both unionand non-union employees

Supervised the tactical planning and implementation of various construction projects ranging from $10,000 to $2 Million Administered, maintained and developed construction documents for their successful completion Preserved a line of open communication between the client, vendor, and sub-contractors for the life of a project Prepared, reviewed, and coordinated schematic, preliminary and working drawings for projects Sustained an efficient work habit capable of managing multiple projects, working autonomously and providing leadership

where needed Provide detailed phase schedules, programming and code reviews of projects Cultivated effective time management skills, maintained the ability of swift analysis, reacted to complex issues, refined

problem-solving skills, and to confidently and decisively take action when needed Developed cost analysis of projects for internal and external work forces based on architectural drawings and programs

Thank you in advance for taking the time to review my work.Edd Polaski

Page 3: Powerpoint Presentation For Edd Polaski

Resume

Page 4: Powerpoint Presentation For Edd Polaski

Industry Honors and Awards

• Customer Service Award – Bank of America

• New England Team Building Award – CBRE

• ATM Service Installation Award – CBRE

• Treasure Hunt development Award – CBRE (leadership & team building)

Page 5: Powerpoint Presentation For Edd Polaski

Scholastic Honors

• Golden Key Honor Society – 2009(awarded to top 15% of graduate students at East Carolina Univ. )

• Sigma Lambda Chi – 2010(International Construction Honor Society)

• Phi Kappa Phi – 2010(awarded to top 10 % of graduate students at East Carolina Univ. )

• Current gpa 4.0

Page 6: Powerpoint Presentation For Edd Polaski

Massachusetts Financial ServicesMFS

Duties• Design, organize, implement and maintain relocation of main office &

home office personnel in Boston and surrounding towns• Maintain as-built drawings to reflect occupancy and current furniture

layout• Develop and maintain extensive database for management of assets

including but not limited to artwork, furniture, telecommunication equipment

• Develop and test personnel databases for operator services including physical location, name, telephone numbers and other telecommunication information

• Direct liaison for office reconfiguration with local contractors• Also supported the IT department and served as a technical consultant for

email server operation

Page 7: Powerpoint Presentation For Edd Polaski

• Project Manager as consultant to larger corporations, Tufts Health Plan and John Hancock, Fleet Bank, Sovereign Bank including lock-box relocation

• Corporate moves and relocations• Oversee departmental corporate projects in

telecommunication & construction• Managed downsizing of corporate headquarters for

health and business centers• Manage client expectations & issues

Diversified Project Management

Page 8: Powerpoint Presentation For Edd Polaski

Verrillon Inc(formerly Intelcore)

Duties• Organize and implement relocation of office & research personnel from Boston to

Grafton, Ma• Design space plan for office layout• Negotiation and execution of furniture space plan, furniture selection/installation, clean

room cleaning & maintenance, database design/management, signage design/installation, and negotiated H.V.A.C. maintenance contracts.

• Assist Senior Project Manager with construction of Single Mode Fiber Optic manufacturing plant in Grafton, Ma.

• Develop voice/data network for new and existing locations• Present study of signage for corporate review, Provide documentation for bid review• Designed and selected vendors to manage the installation of the VoIP

data/communications network for this 65,000-square foot specialty fiber optic production facility. Oversaw the installation process from incubation to completion with vendors and the IT department.

• Also supported the IT department and served as a liaison to remote offices.

Page 9: Powerpoint Presentation For Edd Polaski

The May Company Dba Filene’s

• Eastern New England Department Store Chain of 67 stores now closed

• Designed, managed and provided turn key operation for all internal personnel movement

• Project Manager in Construction Department• Manage high profile interior specialty retail projects• Completed over 200 fast paced projects• Created and maintained departmental database to monitor

contracts, change/purchase orders and all financial accounting for department

• Manage client expectations & issues

Page 10: Powerpoint Presentation For Edd Polaski

CB Richard Ellis

• TCC (Trammel Crow Company) merged into CB Richard Ellis (Project & Property Management Corporation)

• Project Manager for ATM and Minor Renovation team• Manage multiple concurrent high profile installations across the United

States for the Bank of America account• High degree of continental travel, 140 separate flights in one year• Interact with multiple bank managers and office personnel through-out

an extensive corporate environment• Proficient in multitasking, managing multiple separate regional projects,

controlling costs, meeting minutes, RFI’s, contract negotiation, scheduling of contractors, architects and various subcontractors

• Projects include office expansions, bank renovations, and new ATM installations

• Manage client expectations & issues

Page 11: Powerpoint Presentation For Edd Polaski

2008 Project Territory

My projects for 2008

Page 12: Powerpoint Presentation For Edd Polaski

Treasure Hunt

• Developed an interactive means for all corporate employees to learn about the company through a treasure hunt website. This website featured various questions about the organization which employees were asked to discover information

• With help of the corporate HQ in Charlotte, N.C. development, management and monitoring this hunt as the sole manager

Page 13: Powerpoint Presentation For Edd Polaski

Projects

• Manhattan, Bronx, Florida & North Carolina ATM installations

• Manage security, all financial documentation and interaction of site development with Bank of America corporate managers & weekly meetings

• Manage installation with weekly onsite visits• Manage client expectations & issues

Page 14: Powerpoint Presentation For Edd Polaski

Minor Renovations duties

• Renovate existing Bank of America branches while bank was operational

• Construction must refrain from interfering with customers

• Existing conditions with furniture must remain while under construction

• Replace carpeting, seating, remove wall covering, repair walls and repaint, installation of flat panel monitors and telecommunication equipment and teller windows with bullet proof technology

Page 15: Powerpoint Presentation For Edd Polaski

ATM & Renovation Locations • Arizona• Connecticut• Delaware• Florida• Maine

• Massachusetts• New York City• North Carolina• Pennsylvania• South Carolina• Tennessee• Texas• Virginia

• Washington DCProject territory for 2006-2008

Page 16: Powerpoint Presentation For Edd Polaski

Archer Corporation

• Architectural Millwork Installation Company• Management of staff union carpenters• Multiple projects ranging from $5K to $1M• Maintain financial documentation, communication with

client and staff, maintain leadership skills while mentoring staff, helps team execute career development plans and reviews the status reports of team members and addresses issues as appropriate.

• Manage issues and client expectations

Page 17: Powerpoint Presentation For Edd Polaski

Project Assignments$750 million biologics manufacturing facility for Bristol Myers Squibb. Phase I of the project includes four main buildings: a BioPharma manufacturing facility, a central utility building, an administrative/quality research laboratory and a warehouse/storage structure.

Project consists of installation of Stainless Steel cabinetry, epoxy countertops as well as enamel coated laboratory cabinets and fume hoods into a laboratory environment.

Managed a constant crew of 15 carpenters, time sheets, union payroll, client communication, invoicing and billing, plan reading, estimating and schedule forecasting.

Page 18: Powerpoint Presentation For Edd Polaski

Hospital Millwork Install

• Ten month, multi-level, 14 carpenter installation of hospital millwork.

• Stainless Steel cabinetry, corian window sills, curved hand and bumper rail, plastic laminate cabinets and countertops, wooden elevator panels, portals and wood entries, MRI cabinetry, linear accelerator room cabinetry

• Wooden Portals, Paneling and Laboratory Rooms, Reception Areas and Handrail

• Manage issues and client expectations

Page 19: Powerpoint Presentation For Edd Polaski

College Research Laboratory

• $1M Laboratory installation of wood cabinets, epoxy countertops, stainless steel clean rooms, fume hoods, eye wash stations

• 12 full time carpenters, 3 months installation, phased construction

• Floor Mounted & Suspended Strut

Page 20: Powerpoint Presentation For Edd Polaski

Newsletter• Created & designed company newsletter

Page 21: Powerpoint Presentation For Edd Polaski

References

References and letters available upon requestPlease send an email for a complete list of projects

Thank you in advance for taking the time to review my work

Edd [email protected](781) 925-9945