WELCOME IL 47 Public Information Meeting #2 Waubonsee Community College Tuesday, May 3, 2016 4 – 7 p.m.
WELCOME
IL 47
Public Information Meeting #2
Waubonsee Community College
Tuesday, May 3, 2016
4 – 7 p.m.
Project Summary, Update, and Next Steps
Present Purpose and Need
Solicit Input on Development of Project
Transportation Improvement Alternatives
MEETING PURPOSE
PROJECT LOCATION
Kaneville
Sugar Grove
Aurora
Elburn
Maple Park
North Aurora
Batavia
Geneva
Project Location
From: Old Oaks Road /
College Drive
To: Green Road
Length: Approx. 2 miles
STUDY AREA
Roadway Study Limit – Logical Termini
Study Area Boundary
LEGEND
From: ½ mile west of IL 47
To: ½ mile east of IL 47
Phase I
• Preliminary Engineering
• Environmental Studies
Phase II
• Contract Plan Preparation
• Land Acquisition
Phase III
Construction
PROJECT PHASES
Context Sensitive Solutions (CSS) involves stakeholders
in the project development process
CSS reflects the project surroundings – its “context”
CSS addresses all aspects of a project:
Safety and mobility
Community
Environment
Usability
Multimodalism
PUBLIC INVOLVEMENT PROGRAM
National Environmental Policy Act (NEPA) 1969
Compliance required for federal funding eligibility
Full range of reasonable alternatives, including
the “no-build” alternative
Comprehensive environmental review
(avoid, minimize, mitigate impacts)
Coordination with environmental resource
agencies
NEPA/404 Merger Meetings at Key Milestones
ENVIRONMENTAL PROCESS
PUBLIC &
COMMUNITY ADVISORY GROUP (CAG)PROJECT STUDY
GROUP (PSG)
STUDY GROUPS
COOPERATING AGENICES
(NEPA-404 MERGER GROUP)
PHASE I PROCESS
Human and
Natural
Environment
Hydraulics,
Drainage &
BridgeRoadway,
Geometrics
& Traffic
Vehicular/
Pedestrian
Safety
Data
Collection
Purpose
and
Need
Evaluate
Alternatives
Define
Alternatives
and
Evaluation
Criteria
Select
Preferred
Alternative
2015 2016 2017
Stakeholder Outreach
Concerns
Access
Safety
Capacity
Noise
Suggestions
Adding Thru Lanes
Adding Turn Lanes
Upgrading Shoulders
Installing Signals
PUBLIC MEETING #1 – JULY 2015
Interchange
Support Full Access
Oppose Full Access
General
Stormwater
Maintenance
Land Use
Zoning
CAG MEETING #1 – SEPTEMBER 2015
• Reviewed Issues and Concerns
• Developed Draft Problem Statement
Purpose and Need
Problem Statement
Transportation Needs
Community Concerns
Technical Evaluation
Traffic Analysis
Safety Analysis
PURPOSE AND NEED
CAG MEETING #2 – NOVEMBER 2015
Finalized the Problem Statement
Reviewed Technical Evaluation Information
Reviewed Draft Purpose and Need
Developed CAG Design Considerations
Improve System Linkage
Accommodate Land Use and Economic Development
PROJECT PURPOSE
PURPOSE AND NEED STATEMENT
Improving the currently limited access to I-88
Improving connectivity of Truck Routes
Supporting the expressway system with the
strategic regional arterial (SRA) System
Improving mobility with shorter trips and travel
times
Improving emergency vehicle response and
transport
SYSTEM
LINKAGE
LAND USE &
ECONOMIC
DEVELOPMENT
Serving existing and future land
uses and increased population
PURPOSE AND NEED STATEMENT
Reviewed the Purpose and Need
Presented a Tool Box on Highways and Interchanges
Developed Initial Range of Alternatives
CAG MEETING #3 – MARCH 2016
Continuous Process with Multiple Rounds of Evaluation
Screen Alternatives Based Upon Characteristics
ALTERNATIVE DEVELOPMENT AND
EVALUATION PROCESS
Address the Purpose and Need
Transportation Performance, Pedestrian Safety Elements,
Environmental and Community Factors, and Costs
DETAIL INCREASES THROUGH THE PROCESS
INITIAL RANGE OF ALTERNATIVES
Alignment Alternatives
Interchange AlternativesDiamond Type
Partial Cloverleaf Type
Indirect Type
Develop a Full Range of Alternatives
Screen Alternatives
Develop Alternatives Carried Forward
For Further Study
Public Meeting #3
NEXT STEPS
View exhibits
Meet the project study team
Provide input on purpose & need and initial alternatives
Suggest improvement alternatives
IN THE NEXT ROOM
Deadline: May 17, 2016
Comment Forms
PROVIDING INPUT AND FEEDBACK
Public Meetings and Hearing
Community Advisory Group Workshops
Press Releases
Project Website
Agency Websites
COMMUNICATIONS
www.SugarGroveInterchange.org
Thank You!
The presentation will restart in 3 minutes
Welcome!
The presentation will begin in 2 minutes
Welcome!
The presentation will begin in 1 minute