Top Banner
PowerPoint Design Template add your subheading A risk-based approach to wastewater treatment plant cost-effective permitting Fanlin Meng, Guangtao Fu, David Butler University of Exeter June 16 th , 2015
14

PowerPoint Design Template

Nov 14, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PowerPoint Design Template

PowerPointDesign Template add your subheading

A risk-based approach to wastewater

treatment plant cost-effective permitting

Fanlin Meng, Guangtao Fu, David Butler

University of Exeter

June 16th, 2015

Page 2: PowerPoint Design Template

2 A risk-based approach to wastewater treatment plant cost-effective permitting

Motivation

Challenge 1: Increasingly stringent water quality standards (e.g. Water Framework Directive)

Challenge 2: Carbon reduction commitment (e.g. CRC Energy Efficient Scheme)

Tightening up effluent discharge limits

Page 3: PowerPoint Design Template

3 A risk-based approach to wastewater treatment plant cost-effective permitting

Motivation

Sustainable

urban

design

Pollution

prevention

Resource

recovery and

recycling

Innovative

wastewater

treatment

technologies

Efficient

operation

and control

of UWWSs

Safe

wastewater

disposal

Technological

innovation

solutions

Higher

benefit

Less

change

Modelling of urban wastewater systems;

Optimisation of control strategies.

Page 4: PowerPoint Design Template

4

Other

discharges

in the

catchment

WWTP

effluent

discharge

Upstream river flow

rate and water qualityDownstream water

quality target

Effluent flow rate and

water quality

Stochastic permitting model River Quality Planning (RQP):

A risk-based approach to wastewater treatment plant cost-effective permitting

Current permitting policy

Permit

Initial 95%ile

Initial

90%ile/99%ile

value

90%ile/99%ile

standard

Singe objective:

Compliance of the environmental standards

Multi-criteria analysis?

(e.g. environmental risk, cost, GHG emissions)

Page 5: PowerPoint Design Template

5

Methodology

Other

discharges

in the

catchment

WWTP

effluent

discharge

Upstream river flow

rate and water quality

Downstream water

quality target

Effluent flow rate and

water quality (95%ile)

a) Environmental risk function:

Risk

A risk-based approach to wastewater treatment plant cost-effective permitting

Page 6: PowerPoint Design Template

6

Methodology

b) Cost function:

A risk-based approach to wastewater treatment plant cost-effective permitting

a) Dynamic modelling of the WWTP;

b) Performance indicators:

Operation cost (GHG emissions, cost); and

Effluent water quality (in 95%ile).

c) Optimisation of WWTP control

strategy:

Optimal search methods (e.g. Genetic

Algorithm); or

Scenario analysis.

Page 7: PowerPoint Design Template

7

Methodology

c) Cost-risk analysis:

A risk-based approach to wastewater treatment plant cost-effective permitting

Cost-risk

analysis

RQP+

Dynamic

model

Risk

function

Cost

function

Page 8: PowerPoint Design Template

8

Case study

A semi-hypothetical case study:

A risk-based approach to wastewater treatment plant cost-effective permitting

Receiving waters

WWTP

Primary

clarifierAeration tank

Effluent

Return

sludge

Waste

sludge

O2

Secondary

clarifierSludge

treatment

Storm

tank

Upstream

WWTP effluent

River and rainfall: English Midlands;

Wastewater treatment plant (simulated by SIMBA): Norwich (UK);

Page 9: PowerPoint Design Template

9

Results and discussion

A risk-based approach to wastewater treatment plant cost-effective permitting

‘A1’ (current):

3.9 mg/L

‘A2’(permit):

2.1 mg/L

However….

Unachievable!

Page 10: PowerPoint Design Template

10

Results and discussion

A risk-based approach to wastewater treatment plant cost-effective permitting

‘B1’ compared to ‘A1’:

Effluent 95%ile :73% lower ;

Operational cost: 8% lower;

Risk: 75% lower;

‘A1’ & ‘B1’:

Same aeration rate;

Different sludge pumping

rates;

‘A1’ ‘B1’

!

Page 11: PowerPoint Design Template

11

Results and discussion

A risk-based approach to wastewater treatment plant cost-effective permitting

Scenario analysis to optimise control strategy in WWTP:

(O2- aeration rate, RS- return sludge pumping rate, WS- waste sludge pumping rate)

Baseline sludge pumping rate: RS- 14400 m3/d, WS- 660 m3/d;

Optimised sludge pumping rate: RS- 24000 m3/d, WS- 240 m3/d;

Page 12: PowerPoint Design Template

12

Results and discussion

A risk-based approach to wastewater treatment plant cost-effective permitting

‘B1’ (current): 1.1 mg/L;

‘B2’ (cost-effective): 1.5 mg/L;

‘B3’ (least cost): 1.9 mg/L;

All comply with the WFD;

From ‘B1’ to ‘B2’:

Operational cost: 60,000

£/year (8%) saving;

Risk: 0.0016 mg/L (22%)

increase;

From ‘B1’ to ‘B3’:

Operational cost: 70,000

£/year (9%) saving;

Risk: 0.0034 mg/L (47%)

increase;

‘B1’ ‘B2’ ‘B3’

Page 13: PowerPoint Design Template

13

Conclusions

A cost-effective effluent permitting approach based on integrated cost-risk analysis:

a) Cost function: scenario analysis (based on dynamic models);

b) Risk function: exploiting information already provided in RQP and by adding a consequence function;

Benefits:

a) Multi-criteria decision making;

b) Optimisation of control strategies;

c) Maximised WWTP performance in an energy and environmental efficient manner;

Further work:

a) Integrated urban wastewater system;

b) Real-time control strategy;

A risk-based approach to wastewater treatment plant cost-effective permitting

Page 14: PowerPoint Design Template

PowerPointDesign Template add your subheading

The authors would like to thank the financial support from

SANITAS project (EU FP7 Marie Curie Initial Training Network –

ITN – 289193). The support from Environment Agency and

Atkins is duly acknowledged.

Fanlin Meng, Guangtao Fu, David Butler

Contact: [email protected] / [email protected]

A risk-based approach to wastewater

treatment plant cost-effective permitting