    Page 1

    Siem

    ensAG

    2012.A

    llrightsreserved

    .

    January 2012 Jan Beiler / Peter Trauner Energy Sector / Services AL: N ECCN: N

    Siemens AG 2011. All rights reserved.

    High Efficient Peak

    Power on DemandPOWER-GEN Middle East, February 6-8, 2012,

    Qatar, Doha

    Jan Dirk Beiler

    Senior Performance Engineer

    Development Lead for Wet Compression

    Modernization and Upgrade Engineering

    Peter Trauner

    Head of Performance Increase

    Advanced 50Hz Frames

    Siemens AG 2012. All rights reserved.

  • 7/29/2019 PowerGen Middle East 2012 Doha High-Efficient-Peak-Power-On-Demand Beiler.

    2/18

    Page 2

    Siem

    ensAG

    2012.A

    llrightsreserved

    .

    January 2012 Jan Beiler / Peter Trauner Energy Sector / Services AL: N ECCN: N

    High Efficient Peak Power on Demand

    Power-Gen Middle East 2012

    High efficient

    Peak Power on demand

    Jan Dirk Beiler

    Senior Performance EngineerDevelopment Lead for Wet Compression

    on 50Hz Service Frames

    Modernization and Upgrade Engineering

    Peter Trauner

    Head of Marketing

    Performance Increase for

    Advanced 50Hz Frames

    Contents

    Need for power on demand

    Wet Compression description

    Performance benefits

    Experiences

    Conclusion

  • 7/29/2019 PowerGen Middle East 2012 Doha High-Efficient-Peak-Power-On-Demand Beiler.

    3/18

    Page 3

    Siem

    ensAG

    2012.A

    llrightsreserved

    .

    January 2012 Jan Beiler / Peter Trauner Energy Sector / Services AL: N ECCN: N

    Wet Compression

    Need for Power on Demand

    Rising need for

    power on demand

    Solutions for

    flexible power on demand

    Backup power needed

    High flexibility

    Power need for

    seasonal or

    daily peak time

    Gas turbine plants

    Modernizations and upgrades

    for existing plants

    ?

  • 7/29/2019 PowerGen Middle East 2012 Doha High-Efficient-Peak-Power-On-Demand Beiler.

    4/18

    Page 4

    Siem

    ensAG

    2012.A

    llrightsreserved

    .

    January 2012 Jan Beiler / Peter Trauner Energy Sector / Services AL: N ECCN: N

    High Efficient Peak Power on Demand

    Power-Gen Middle East 2012

    High efficient

    Peak Power on demand

    Jan Dirk Beiler

    Senior Performance EngineerDevelopment Lead for Wet Compression

    on 50Hz Service Frames

    Modernization and Upgrade Engineering

    Peter Trauner

    Head of Marketing

    Performance Increase for

    Advanced 50Hz Frames

    Contents

    Need for power on demand

    Wet Compression description

    Performance benefits

    Experiences

    Conclusion

  • 7/29/2019 PowerGen Middle East 2012 Doha High-Efficient-Peak-Power-On-Demand Beiler.

    5/18

    Page 5

    Siem

    ensAG

    2012.A

    llrightsreserved

    .

    January 2012 Jan Beiler / Peter Trauner Energy Sector / Services AL: N ECCN: N

    Wet Compression Short Introduction

  • 7/29/2019 PowerGen Middle East 2012 Doha High-Efficient-Peak-Power-On-Demand Beiler.

    6/18Page 6

    Siem

    ensAG

    2012.A

    llrightsreserved

    .

    January 2012 Jan Beiler / Peter Trauner Energy Sector / Services AL: N ECCN: N

    Wet Compression Hardware Scope

  • 7/29/2019 PowerGen Middle East 2012 Doha High-Efficient-Peak-Power-On-Demand Beiler.

    7/18Page 7

    Siem

    ensAG

    2012.A

    llrightsreserved

    .

    January 2012 Jan Beiler / Peter Trauner Energy Sector / Services AL: N ECCN: N

    High Efficient Peak Power on Demand

    Power-Gen Middle East 2012

    High efficient

    Peak Power on demand

    Jan Dirk Beiler

    Senior Performance EngineerDevelopment Lead for Wet Compression

    on 50Hz Service Frames

    Modernization and Upgrade Engineering

    Peter Trauner

    Head of Marketing

    Performance Increase for

    Advanced 50Hz Frames

    Contents

    Need for power on demand

    Wet Compression description

    Performance benefits

    Experiences

    Conclusion

  • 7/29/2019 PowerGen Middle East 2012 Doha High-Efficient-Peak-Power-On-Demand Beiler.

    8/18Page 8

    Siem

    ensAG

    2012.A

    llrightsreserved

    .

    January 2012 Jan Beiler / Peter Trauner Energy Sector / Services AL: N ECCN: N

    Wet Compression Peak Power on Demand

    0

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    10 15 20 25 30 35 40 45 50

    Ambient temperature [C]

    PowerincreasebyWet

    Compression[%ofbaseloadpower]

    Shaft lim

    itreache

    d Maximumm

    ass flow(design)

    75%ofdesign massflo

    w

    50%ofdesignmass flow

    Minimum mass flow (start

    )

    0

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    10 15 20 25 30 35 40 45 50

    Ambient temperature [C]

    PowerincreasebyWet

    Compression[%ofbaseloadpower]

    Shaft lim

    itreache

    d Maximumm

    ass flow(design)

    75%ofdesign massflo

    w

    50%ofdesignmass flow

    Minimum mass flow (start

    )

    Limits to the performance

    Electrical components

    Combustion stability

    Shaft limit (mechanical)

    Auxiliary systems

    Hardware configuration

    Surge limits

    Maximum power increase

    has to be evaluated sitespecific

    Flexible reaction on power demand

    Stepless power adjustment within operation range

    High reserve power potential

  • 7/29/2019 PowerGen Middle East 2012 Doha High-Efficient-Peak-Power-On-Demand Beiler.

    9/18Page 9

    Siem

    ensAG

    2012.A

    llrightsreserved

    .

    January 2012 Jan Beiler / Peter Trauner Energy Sector / Services AL: N ECCN: N

    Performance SGT5-4000F

    First Time Implementation

    Startmassflow

    Gas turbine delta power output with Wet Compression:

    Up to 16% of base load power

    Gas turbine delta efficiency with Wet Compression:Up to 2.1% of base load efficiency

    Water mass flow :

    Up to 10.2 kg/s

    Wet Compression

    performance

    measured at first

    time application for

    SGT5-4000F

    @ 30C, 60% r.H.

  • 7/29/2019 PowerGen Middle East 2012 Doha High-Efficient-Peak-Power-On-Demand Beiler.

    10/18Page 10

    Siem

    ensAG

    2012.A

    llrightsreserved

    .

    January 2012 Jan Beiler / Peter Trauner Energy Sector / Services AL: N ECCN: N

    Wet Compression - Influence of Relative Humidity

    Example:

    Variation of humidity at 30C

    ambient temperature

    Comparison between inlet cooling

    and Wet Compression

    (calculation for SGT5-2000E)

    Wet Compression isonly little affected by

    humid air conditions

  • 7/29/2019 PowerGen Middle East 2012 Doha High-Efficient-Peak-Power-On-Demand Beiler.

    11/18Page 11

    Siem

    ensAG

    2012.A

    llrightsreserved

    .

    January 2012 Jan Beiler / Peter Trauner Energy Sector / Services AL: N ECCN: N

    High Efficient Peak Power on Demand

    Power-Gen Middle East 2012

    High efficient

    Peak Power on demand

    Jan Dirk Beiler

    Senior Performance EngineerDevelopment Lead for Wet Compression

    on 50Hz Service Frames

    Modernization and Upgrade Engineering

    Peter Trauner

    Head of Marketing

    Performance Increase for

    Advanced 50Hz Frames

    Contents

    Need for power on demand

    Wet Compression description

    Performance benefits

    Experiences

    Conclusion

  • 7/29/2019 PowerGen Middle East 2012 Doha High-Efficient-Peak-Power-On-Demand Beiler.

    12/18Page 12

    Siem

    ensAG

    2012.A

    llrightsreserved

    .

    January 2012 Jan Beiler / Peter Trauner Energy Sector / Services AL: N ECCN: N

    5 x SGT5-2000E

    3 x SGT5-4000F

    2 x SGT5-4000F

    6 x SGT5-4000F (planned)

    More than 35 x on

    following frame types:

    SGT6-2000E

    SGT6-3000E

    SGT6-5000F

    4 x SGT5-4000F (Grid)

    2 x SGT5-2000E

    2 x SGT5-4000F (Grid)

    Experiences

    Wet Compression systems are running

    more than 50 x worldwide:

  • 7/29/2019 PowerGen Middle East 2012 Doha High-Efficient-Peak-Power-On-Demand Beiler.

    13/18Page 13

    Siem

    ensAG

    2012.A

    llrightsreserved

    .

    January 2012 Jan Beiler / Peter Trauner Energy Sector / Services AL: N ECCN: N

    Gas Turbine Safety using Wet Compression

    Gas turbine

    safety

    Specific

    CFD-calculation to

    optimize the sprayrack

    Advanced

    compressor coating

    to minimizecorrosion

    Integrated safety

    functions to ensure

    operation within

    expectations

    Optimizedoperation regimes

    to minimize effects

    3-staged filter

    concept

    Fully integration inthe gas turbine

    control

  • 7/29/2019 PowerGen Middle East 2012 Doha High-Efficient-Peak-Power-On-Demand Beiler.

    14/18Page 14

    Siem

    ensAG

    2012.A

    llrightsreserved

    .

    January 2012 Jan Beiler / Peter Trauner Energy Sector / Services AL: N ECCN: N

    Operation Experience Compressor

    Operation experience with Wet Compression

    on SGT5-2000E since 2004 :

    No pitting corrosion could be found atSGT5-2000E

    Coating loss on the leading edge and on thepressure side, but coating stays intact in the

    areas where salt residuals are left on the

    blades and vanes

    The leading edge gets rougher (needle

    structure) but no significant shortening of the

    blade width by erosion

    No tendency to pitting corrosion

    Lasting corrosion protection

    Base blade material not weakened

  • 7/29/2019 PowerGen Middle East 2012 Doha High-Efficient-Peak-Power-On-Demand Beiler.

    15/18Page 15

    Siem

    ensAG

    2012.A

    llrightsreserved

    .

    January 2012 Jan Beiler / Peter Trauner Energy Sector / Services AL: N ECCN: N

    High Efficient Peak Power on Demand

    Power-Gen Middle East 2012

    High efficient

    Peak Power on demand

    Jan Dirk Beiler

    Senior Performance EngineerDevelopment Lead for Wet Compression

    on 50Hz Service Frames

    Modernization and Upgrade Engineering

    Peter Trauner

    Head of Marketing

    Performance Increase for

    Advanced 50Hz Frames

    Contents

    Need for power on demand

    Wet Compression description

    Performance benefits

    Experiences

    Conclusion

  • 7/29/2019 PowerGen Middle East 2012 Doha High-Efficient-Peak-Power-On-Demand Beiler.

    16/18Page 16

    Siem

    ensAG

    2012.A

    llrightsreserved

    .

    January 2012 Jan Beiler / Peter Trauner Energy Sector / Services AL: N ECCN: N

    Siemens Gas Turbine Modernization

    SGT5-4000F Wet Compression

    Higher operational flexibility

    Wet C gives you additional electricity of up to 75,000 MWh/year.

    Assumption: 30MW power improvement, peak load operation (250 days/ year, 10 h/day)

    Customer needs in general

    Power Efficiency

    Reliability & availability

    Operational flexibility

    Reduction of maintenance costs

    Emission reduction

    Up to 30 MW power output improvement * Power on demand

    Benefits can include:

    * Subject to specific technical plant evaluation,

    expected values with test tolerance @ ISO condition.

  • 7/29/2019 PowerGen Middle East 2012 Doha High-Efficient-Peak-Power-On-Demand Beiler.

    17/18Page 17

    Siem

    ensAG

    2012.A

    llrightsreserved

    .

    January 2012 Jan Beiler / Peter Trauner Energy Sector / Services AL: N ECCN: N

    Siemens AG 2012. All rights reserved.

    Thank you for your attention

    Jan Dirk BeilerSenior Performance Engineer

    Development Lead for Wet Compression

    Modernization and Upgrade Engineering

    Peter Trauner

    Head of Marketing

    Performance Increase for

    Advanced 50Hz Frames

  • 7/29/2019 PowerGen Middle East 2012 Doha High-Efficient-Peak-Power-On-Demand Beiler.

    18/18Page 18

    Siem

    ensAG

    2012.A

    llrightsreserved

    .

    January 2012 Jan Beiler / Peter Trauner Energy Sector / Services AL: N ECCN: N

    Disclaimer

    This document contains forward-looking statements and information that is, statements related to future, not past,

    events. These statements may be identified either orally or in writing by words as expects, anticipates, intends,

    plans, believes, seeks, estimates, will or words of similar meaning. Such statements are based on our current

    expectations and certain assumptions, and are, therefore, subject to certain risks and uncertainties. A variety offactors, many of which are beyond Siemens control, affect its operations, performance, business strategy and results

    and could cause the actual results, performance or achievements of Siemens worldwide to be materially different from

    any future results, performance or achievements that may be expressed or implied by such forward-looking

    statements. For us, particular uncertainties arise, among others, from changes in general economic and business

    conditions, changes in currency exchange rates and interest rates, introduction of competing products or technologies

    by other companies, lack of acceptance of new products or services by customers targeted by Siemens worldwide,changes in business strategy and various other factors. More detailed information about certain of these factors is

    contained in Siemens filings with the SEC, which are available on the Siemens website, www.siemens.com and on

    the SECs website, www.sec.gov. Should one or more of these risks or uncertainties materialize, or should underlying

    assumptions prove incorrect, actual results may vary materially from those described in the relevant forward-looking

    statement as anticipated, believed, estimated, expected, intended, planned or projected. Siemens does not intend or

    assume any obligation to update or revise these forward-looking statements in light of developments which differ from

    those anticipated.

    Trademarks mentioned in this document are the property of Siemens AG, it's affiliates or their respective owners.