Energy Management Across Multiple Buildings

Cian O’Riordan27 March, 2012Local Authority Energy Management Learning Tour

Page 2: Power therm

About PowerTherm Solutions

• 10 years old this month

• 6 engineers

• Energy Services– Energy & Maintenance Surveys– Energy Monitoring, Reporting & Verification– Energy & Maintenance Management– Energy Retrofit Design & Project Management– Specialist Energy Advice

Page 3: Power therm

Blue Chip Clients

Page 4: Power therm

A strategic approach to energy management

Commitment to a goal; assign responsibility; allocate resources.

Strategic plan - organisation structure and activities;energy monitoring;how energy savings will be identified and implemented.

Baseline energy use, identify energy users, energy drivers, savings

Analysis & monthly reports

Annual report & planning

Page 5: Power therm

e3 Energy Management

• UCD, Trinity College, DIT and DCU

• Launched 2004– 30 buildings, €3 million energy cost, – Goal10% reduction in 3 years– SEAI co-funding

• Service Providers - PowerTherm & WYG • Currently

– 90 buildings, €9 million energy cost– Goal 10% saving

Page 6: Power therm

General Approach - ARC

RoutinesBaseline studyAnnual energy

review & report

Monthly reports

Building surveys & investigations

BMS operationIdentify & resolve

Project management

ArchitectureSteering CommitteeProject Manager

Procurement Consultant

Account Managers

Energy Champions

M&R System

CultureCommunicate goal

& progressGHG & Cost

savings

Logo

Materials

PresentationsShutdown e-mail

Existing Media

Page 7: Power therm

e3 Accumulated Savings (€4.8m)

23,000 tonnes of CO2

Page 8: Power therm

Energy Monitoring & Reporting• A structured, multi-year approach is essential (M&V Plan)

• Energy savings cannot be directly measured• Establish a baseline year

• € savings = gas saved 2011 x gas AUP 2011

• Sophisticated approaches available, if required

• Keeping it simple:– Use same system for energy management and DECs – Annual data is essential, monthly data is valuable– Elec – online access – save data OR manual meter readings– Gas – manual meter readings– Oil/LPG – bills and tank opening/closing volumes– Meter point number, readings & date should be saved!

Page 9: Power therm

BMS Monitoring Cylon Active Energy

Page 10: Power therm
Page 11: Power therm

Raising Awareness

• Identify key groups, their impact, allocate resources accordingly

• Decide what you want them to do• Find a proportionate means to secure buy-in and

communicate the message• Develop a logo, turn it into a brand• Use a website as your awareness hub• Get a list of communications media / options• Make a plan...

Page 12: Power therm

Group Impact What we want Method

Design & refurb Very high Efficiency and metering integral part of design

Direct / organisational, CPD

BMS Very high Scheduling, setpoints, control strategies

Direct / organisational

Maintenance High Efficiency to be on a par with comfort Direct / contract management, CPD

Security High am - Leave lights offpm - Switch lights off, close windowsFeedback

Contract management

Cleaning Medium Switch lights off Contract management

IT/IS Medium Specific projects – build settings, comms room a/c, data centres

Direct communication / mole

Academic & research staff

Medium Efficient equipment operating practices

Energy champion, various general media

Administrative staff

Low Lights, windows, pc, office equipment Various general media

Students Very low

Page 13: Power therm
Page 14: Power therm

Lessons Learned for Multisite• Goal is essential

– Specific, measurable, achievable– Public commitment

• Strategy & structure should reflect goal– 5-15% can be achieved from awareness & operation

– For higher level of savings need capital programme– Awareness and operational based savings require

ongoing management

– Smarter controls and new installation require less ongoing management, but have a capital cost

Page 15: Power therm

Lessons learned from multi-site• Targeted Approach - Pareto principal

– Identify the 20% of buildings that consume 80% of use– Identify the 20% of people that influence 80% of use

• Structure– Leverage your own organisation – energy champions

– Use established groups and systems– Engage with information services and secure

commitment

Page 16: Power therm

One last thing...

...start with a clearly defined goal, policy and strategic plan.

Page 17: Power therm

Thank You

Page 18: Power therm
Page 19: Power therm

Saving MoneyBill management & procurement• Quick wins establish momentum and finance works

• Bill review– Sense check– Small accounts– Estimated readings– Tariff– Maximum Import Capacity / Supply Point Capacity– Power factor correction

• Procurement– After bill review– Save your energy data!