Top Banner

of 28

power plant PPT.

Oct 15, 2015

Download

Documents

Sanjay Sharma

thermal power plant
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 5/26/2018 power plant PPT.

    1/28

    INDUSTRIAL TRAINING REPORT

    ON

    PANIPAT THERMAL POWER

    STATION

    (A UNIT OF H.P.G.C.L., HARYANA)

    HINDU COLLEGE OF ENGG. , SONIPAT

  • 5/26/2018 power plant PPT.

    2/28

    INTRODUCTION

    The salient eat!"es # the $lant a"e as !n%e"&

    UNIT NO. DATE OFCOMMISSIONING

    CAPACITY IN MW

    UNIT-1 01-11-1979 117.8 MW

    UNIT-2 27-03-1980 110 MW

    UNIT-3 01-01-1985 110 MW

    UNIT-4 11-01-1987 110 MW

    UNIT-5 28-03-1989 210 MW

    UNIT-6 04-07-2001 210 MW

    UNIT-7 16-10-2004 250 MWUNIT-8 02-02-2005 250 MW

    DAILY COAL REQ. 15000M.T.

    HEIGHT OF COOLING TOWERS 123.5 !"#. IN STAGE

    1$2

    143.5 !"#. IN STAGE

    3$4140 !"#. IN STAGE

  • 5/26/2018 power plant PPT.

    3/28

    FUNCTIONAL DISCRIPTION

    The the"'al $#e" stati#n !"ns !el * !ses the"es!ltant t# 'a+e the stea', hih %e"i-es the t!"#ene"at#".

    COAL FLOW STEAM FLOW

    WATER FLOW

  • 5/26/2018 power plant PPT.

    4/28

    GENERAL DESCRIPTION

    1. Cool!" #o$%&.2. Cool!" $'#%& ()*(.3. T&'!+*++o! l!% 3-('+%.4. U!# #&'!+/o&*%& 3-('+%.5. El%#& "%!%&'#o& 3-('+%.6. Lo$ (&%++)&% #)&!%.7. Co!%!+%&.8. I!#%&*%'#% (&%++)&% #)&!%.9. S#%'* "o%&!o& 'l%.10. H" (&%++)&% #)&!%.11. Co'l o!%o&.

    12. Co'l o((%&.13. P)l%&+% /)%l *ll.14. ol%& &)*.15. A+ o((%&-16. S)(%&%'#%&.17. Fo&% &')"# /'!.18. %%'#%&.19. A& !#'%.20. Eo!o*+%&.21. A& (&%%'#%&.22. C*!% S#'.23. Fl)#)'#o!

  • 5/26/2018 power plant PPT.

    5/28

    %OILER FEED PUMP

  • 5/26/2018 power plant PPT.

    6/28

  • 5/26/2018 power plant PPT.

    7/28

    PLANT LAYOUT

    CRUSHER

    COAL MILLS

    FURNACE /OILER 0RUM

    ELECTROSTATIC PRECIPITATOR

    CHIMNEY

    TUR/INE

    TUR/O GENERATOR

    CON0ENSOR

  • 5/26/2018 power plant PPT.

    8/28

    COOLING WATER (C.W.) PUMP

    COOLING TOWER

    RAW WATER PUMP HOUSE

    CLEARIFIER PUMP HOUSE CON0ENSATE E1TRACTION PUMP

    LOW PRESSURE HEATER

    0EAREATER /OILER FEE0 PUMP(/.F.P.)

    HIGH PRESSURE HEATER(H.P.)

    ECONOMISER

  • 5/26/2018 power plant PPT.

    9/28

    GENERAL WOR&ING DIAGRAM

  • 5/26/2018 power plant PPT.

    10/28

    TYPES OF CIRCUIT %REA&ER

    #il i"!it "ea+e"s

    ai" last i"!it "ea+e"

    s!l$he" he2al!O"i%E i"!it "ea+e"

  • 5/26/2018 power plant PPT.

    11/28

    6.6 '( )*#)+*" ,#'#

    ' &)# &%'%& + ' %% $-

    Ma+es #" "ea+s a i"!it eithe" 'an!all3 #" 3"e'#te #nt"#l !n%e" n#"'al #n%iti#ns.

    /"ea+s a i"!it a!t#'atiall3 !n%e" a!lt#n%iti#ns.

  • 5/26/2018 power plant PPT.

    12/28

    SF6 CICUIT EAE

  • 5/26/2018 power plant PPT.

    13/28

    TRANSFORMERS

    The t"ans#"'e" is the '#st #n-enient *

    e#n#'ial %e-ie #" t"anse" # $#e" "#' #ne

    -#ltae t# an#the" -#ltae at the sa'e "e4!en3.

    It #"+s #n the $"ini$le # elet"#'aneti

    in%!ti#n.

  • 5/26/2018 power plant PPT.

    14/28

  • 5/26/2018 power plant PPT.

    15/28

    TYPES OF TRANSFORMER

    STEP5UP TRANSFORMER 5 hih ste$5!$ the

    -#ltae at se#n%a"3 si%e alle% ste$5!$ t"ans#"'e".

    STEP50OWN TRNSFORMER5 hih ste$5%#n

    the -#ltae at se#n%a"3 si%e a"e alle% ste$5%#n

    t"ans#"'e".

  • 5/26/2018 power plant PPT.

    16/28

  • 5/26/2018 power plant PPT.

    17/28

    MAIN PARTS OF POWER TRANSFORMERS

    PRIMARY WIN0ING

    SECON0RY WIN0ING

    OIL TAN6

    CONSER7ATOR

    /REATHER

    TU/ES FOR COOLING

    TRNSFORMER OIL

    EARTH POINT

    TEMPERATURE GAUGE

    /UCHHOL8 RELAY

    PRIMARY TERMINALS

    SECON0ARY TERMINALS

  • 5/26/2018 power plant PPT.

    18/28

    ACCESSORIES OF TRANSFORMERS

    OIL CONSER7ATOR

    /REATHER

    /UCHHOL8 RELAY E1PLOSION 7ENT

    TEMP. IN0ICATOR

    /USHING TAP CHANGER

    COOLING TYPES

  • 5/26/2018 power plant PPT.

    19/28

  • 5/26/2018 power plant PPT.

    20/28

    SWITC/-GEAR

    Sith ea" is a #nt"#l sith that #nt"#ls the #$e"ati#n #a $#e" i"!it.

    T$o /)!#o! o/ ' +$# ! (o$%& ++#%*+ '&%-

    T# $e"'it the t"ans'issi#n lines t# e #n-enient $!t int# an%

    ta+en #!t "#' se"-ie. T# %isale the s#'e $lant an% lines hen these e#'e

    a!lt3, t# e "a$i%l3 an% sael3 is#late% 3 a!t#'ati 'eans.

  • 5/26/2018 power plant PPT.

    21/28

    LIG/TING ARRESTER

    A lihtin a""este" is %e-ie, hih $"#-es l#

    i'$e%ane $ath #" the l# # !""ent eteen the

    line an% ea"th hen the s3ste's -#ltae in"eases

    '#"e than the %esi"e -al!e an% "eains its #"iinal$"#$e"ties # an ins!lat#" at n#"'al -#ltae.

  • 5/26/2018 power plant PPT.

    22/28

  • 5/26/2018 power plant PPT.

    23/28

    CAPACITOR %AN&

  • 5/26/2018 power plant PPT.

    24/28

    210 MW TUR%O GENERATOR

    M#%e"n eat!"es # %i"et ##lin 3 ate" *

    h3%"#en a"e in#"$#"ate% in the 9

  • 5/26/2018 power plant PPT.

    25/28

    %US %ARS

    A !s a" in elet"ial $#e" %ist"i!ti#n "ee"s t#

    thi+ st"i$s # #$$e" #" al!'in!' that #n%!t

    elet"iit3 ithin a sith#a"%, %ist"i!ti#n #a"%s,

    s!stati#n, #" #the" elet"ial a$$a"at!s The sie # the !s a" is i'$#"tant in %ete"'inin

    the 'a2i'!' a'#!nt # !""ent that an e sael3

    a""ie%. /!s a"s an ha-e a "#ss5seti#nal a"ea #

    as little as

  • 5/26/2018 power plant PPT.

    26/28

  • 5/26/2018 power plant PPT.

    27/28

    DESCRIPTION OF ARIOUS PARTS

    STATOR WIN0ING AN0 INSULATION

    0ISTILLATE HEA0ERS OR STATOR WATER

    HEA0ER

    TERMINAL /USHINGS

    ROTOR

    FIEL0 WIN0ING

    SHAFT MOUNTE0 FANS

    SLIP RINGS

  • 5/26/2018 power plant PPT.

    28/28

    TUR%O GENERATOR