    POWER PLANT FAMILIARIZATIONBY

    ErEr.. RandhirRandhir KumarKumar

  • 8/4/2019 Power Plant Familiar is at Ion

    2/45

    1 Intake

    2 Penstock

    3 Transformer

    4. Power House

    5. Generator

    6. Runner

    7. Draft tube

    8. Tail Race

    Principle of operation of a Hydro Station

    The kinetic energy of falling water is first converted into mechanical

    energy in Turbine & then the mechanical energy is converted into

    electrical energy in Generator.

  • 8/4/2019 Power Plant Familiar is at Ion

    3/45

  • 8/4/2019 Power Plant Familiar is at Ion

    4/45

    View of a Hydro Unit

    Components

    Generator

    Turbine

    Auxiliaries

  • 8/4/2019 Power Plant Familiar is at Ion

    5/45

    Generator

    Cooler

    Rotor

    Stator

    Thrust Bearings

    Air Gap

  • 8/4/2019 Power Plant Familiar is at Ion

    6/45

  • 8/4/2019 Power Plant Familiar is at Ion

    7/45

    Stator Core

    Made up of Silicon Steel laminated sheet with high permeability and

    low hystersis & eddy current losses

  • 8/4/2019 Power Plant Familiar is at Ion

    8/45

    Stator Winding

    windings are copper conductors which carries the generated voltage.

  • 8/4/2019 Power Plant Familiar is at Ion

    9/45

    Rotor

    It carries magnetic pole

    & is revolved by

    turbine, resulting in

    power generation in

    stator.

  • 8/4/2019 Power Plant Familiar is at Ion

    10/45

    Rotor

  • 8/4/2019 Power Plant Familiar is at Ion

    11/45

    Pole

    Pole are mounted on

    rotor and It fulfills the

    need of a rotating

    magnetic field

    Damper Bars

    Dovetail keys

    Core

  • 8/4/2019 Power Plant Familiar is at Ion

    12/45

    Slip Rings

    Slip rings are installed on rotor to

    transfer the field current from the

    external excitation equipment to the

    field winding.The current flows through the

    stationary carbon brushes to the

    rotating slip rings, through insulated

    bars mounted in the hollow shaft

    and to the polecoilconne

    ctions.

  • 8/4/2019 Power Plant Familiar is at Ion

    13/45

    Guide Pads

    To restrict the radial

    movement of machine.

    GENERATOR

  • 8/4/2019 Power Plant Familiar is at Ion

    14/45

    Segmented type guide bearing assembly

  • 8/4/2019 Power Plant Familiar is at Ion

    15/45

    Thrust Bearing carries the whole weight of the machine.

    Thrust Bearing highpressure lubrication

    port

    Thrust Bearing

    H S Lubrication systemto safeguard thrustpads during starting &stopping of machine.

  • 8/4/2019 Power Plant Familiar is at Ion

    16/45

    Bearing Pad Arrangement

    Thrust Pad

    H S

    Lub Oil

    Guide Pad

    C

    O

    o

    l

    e

    r

    Cold Water

    Hot Water

    Oil

    GENERATOR

    TURBINE

  • 8/4/2019 Power Plant Familiar is at Ion

    17/45

    Classification

    Types of Turbine

    Kaplan Francis Pelton

    Medium & lower

    head up to 80 mwhen discharge

    & load vary widely

    Medium & high

    Heads in the rangeof 30-550m, turbine

    discharge varying

    in acceptable limit

    Heads greater than

    400m varying head,discharge and

    load conditions

    CLICK

  • 8/4/2019 Power Plant Familiar is at Ion

    18/45

    Kaplan Runner

    In a Kaplan runner blade angle varies with changing position ofguide vanes. The runner blade servomotor is installed between the

    main turbine shaft and the generator shaft or inside the runner hub .

    Oil Pipe line inside shaft

    Hub

    Cone

    RunnerS

    ervomotor

  • 8/4/2019 Power Plant Familiar is at Ion

    19/45

    PELTON FRANCIS

  • 8/4/2019 Power Plant Familiar is at Ion

    20/45

    Spiral Casing

    Guide Vane

    Servomotor

    Runner

    Shaft Seal

  • 8/4/2019 Power Plant Familiar is at Ion

    21/45

    Spiral Casing

    Water from penstock enters the spiral casing which makes equal water thrust at

    each guide vane

    Stay Vane

  • 8/4/2019 Power Plant Familiar is at Ion

    22/45

    Spiral Casing

    Stay Ring

    Stay Vane

    Guide

    Vane

  • 8/4/2019 Power Plant Familiar is at Ion

    23/45

    Turbine

  • 8/4/2019 Power Plant Familiar is at Ion

    24/45

    The wicket gate operating mechanism is installed with eccentric pins betweenthe gate operating ring and each wicket gate to allow individual adjustment

    of wicket gate openings. Shear pins with carefully calculated size are

    provided with an operating mechanism. A pin will shear, should a wicket

    gate become blocked, and the remaining gates can be operated as

    required.

    WICKET GATESAND OPERATING MECHANISM

    REGULATING RING

  • 8/4/2019 Power Plant Familiar is at Ion

    25/45

    Penstock Gate / MIV

    Penstock

    Gate

    MIV

  • 8/4/2019 Power Plant Familiar is at Ion

    26/45

    Brake

    H SLub

    OPU system Cooling water

    Drainage , Dewatering

    Some other auxiliaries

  • 8/4/2019 Power Plant Familiar is at Ion

    27/45

    Practical braking speed 25-30% of rated speed

    Brake

    Air for Brake

    Oil for Jack

    Rotating Machine

  • 8/4/2019 Power Plant Familiar is at Ion

    28/45

    Oil Pressure Unit

    Supply pressur

    ized o

    il to servomotor for open

    ing orclosing of guide vanes under the command of governor.

    To system

    oilairAir inlet

  • 8/4/2019 Power Plant Familiar is at Ion

    29/45

    Cooling Water

    Forcooling of

    GeneratorStator Windings

    Bearings

    Shaft Seals

    Transformer

    Fire Fighting

  • 8/4/2019 Power Plant Familiar is at Ion

    30/45

    Open Loop Cooling water System

    Booster

    Pump

    Shaft Seal

    Cooler

    (ForTurbine

    Bearings)

    Oil Coolers

    (for Gen Bearings)

    Air Coolers

    (For stator)

    Transformers

    Coolers

    Penstoc

    k

    Tail Race

  • 8/4/2019 Power Plant Familiar is at Ion

    31/45

    Close Loop Cooling Water System

    Booster

    Pump

    Shaft Seal

    Cooler

    (ForTurbine

    Bearings)

    Oil Coolers

    (for Gen Bearings)

    Air Coolers

    (For stator)

    Transformers

    Coolers

    Cooling Pond

    Tube

    WellSprinklers

  • 8/4/2019 Power Plant Familiar is at Ion

    32/45

  • 8/4/2019 Power Plant Familiar is at Ion

    33/45

    Dewatering System

    The dewatering

    system is generally

    meant to dewater the

    penstock, spiral caseand runner during

    their maintenance

    and inspection works.

  • 8/4/2019 Power Plant Familiar is at Ion

    34/45

    EOT Crane

    EOT

    Cranes are usedin powerhouses dur

    ing

    comm

    iss

    ion

    ing, ma

    intenan

    ceand repair of a hydro unit and their auxiliaries

  • 8/4/2019 Power Plant Familiar is at Ion

    35/45

    Fire Extinguishing Systems

    Types

    Automated sprinkler/spray protection

    Hydrant Service

    Hand appliancesGaseous systems for control rooms

    Sprinkler

    HosesPortable Extinguisher

  • 8/4/2019 Power Plant Familiar is at Ion

    36/45

    Operation of a Hydro Unit

    Pre Start Checks

    Start Sequence

    Synchronization Stop Sequence

    Monitoring during operation

    Tripping

    Emergency Handling

  • 8/4/2019 Power Plant Familiar is at Ion

    37/45

    Pre Start Checks

    Many of the start checks may be built up in the

    starting interlocks and starting sequence. The

    abnormality if any, will appearin MMI display

    and Unit ready to start indication does not

    appear. The list of activities/checks varies from

    station to station.

  • 8/4/2019 Power Plant Familiar is at Ion

    38/45

    ROTOR

    Tur

    Shaft

    Pole

    Coo

    lerIn

    Gate

    DT

    Gate

    GV

    GV

    Water

    Gen Shaft

    PoleStator W inding

    GGB

    Thrust Pad

    Cool

    Water

    Hot

    waterHS

    LUB

    cooler

    Water

    TRCM

    Oil

    DC Excitation

    Restore AC & DC supply to auxiliaries

    Reset relayOpen Draft Tube GateBrake releasedCooling chargedUnit ready to startOpen Intake gateH S Lub startOpen GVMachine start rolling100% speedVoltage Build up

    Unit

    Ready

    To

    Synchroniz

    START SEQUENCECheck PTW

    T

    R

    A

    NS

    F

    O

    R

    M

    E

    R

    11 KV220

  • 8/4/2019 Power Plant Familiar is at Ion

    39/45

    Synchronization

    Rotor

    Rotor Pole DCexcitation by closingFCB

    Trans

    Transmission line

    Close CB when V, F &Ph matches

    CB

    Stator

    +

    _

    11KV 220KV

  • 8/4/2019 Power Plant Familiar is at Ion

    40/45

    Monitoring during operation

    Operate machine as per schedule & water level Attend any alarm appearing in control room

    Temperature of bearings/stator/transformer

    Cooling water flow

    Leakage water level in turbine pit

    Operation of drainage pumps.

    Generator Voltage and reactive Power flow.

    Machine vibrations.

    Abnormal sound from the machine.

    Fill up hourly log sheet

  • 8/4/2019 Power Plant Familiar is at Ion

    41/45

    Stop Sequence

    Reverse to start sequence

  • 8/4/2019 Power Plant Familiar is at Ion

    42/45

    Tripping of Machine on Fault

    Stop machineStop machine

    Note down relayNote down relay

    Inform Maintenance staffInform Maintenance staff

  • 8/4/2019 Power Plant Familiar is at Ion

    43/45

    Emergency Handling

    Increase in water level inside Power House

    RaiseAlarm.

    Intimate PowerStation Incharge.

    Try to stop the source of leakage water.

    If the leakage is from the machine immediately close the intake gate after

    opening the generatorcircuit breaker and giving stop command to the

    machine.

    Ensure that PowerSupply to Drainage & Dewatering pumps is not shut

    down.

    Run the available drainage / dewatering pumps or any other available

    pumps to pump out the water.

  • 8/4/2019 Power Plant Familiar is at Ion

    44/45

    Emergency Handling

    Fire

    RaiseAlarm.

    If fire is in the machine orTransformer give stop command.

    Release CO2 or water through fire protection system . Intimate fire station. Inform PowerStation authority

    Try to isolate other equipment from the source of fire.

  • 8/4/2019 Power Plant Familiar is at Ion

    45/45

    Thank You.