power generation & energy electricity issues in Indonesia Iwan Agung Firstantara GM PT PLN (Persero) Unit Pembangkitan Jawa Bali Thermofluid VI 2014 Yogyakarta, April 29, 2014 Gajah Mada University
53

Power generation and energy - Electricity Issues in Indonesia

May 08, 2015

Download

Engineering

This is a presentation that I made for my boss since he become a keynote speaker in Thermofluid IV National Seminar @ Gajah Mada University. The presentation give a brief discuss about Indonesia’s latest issues on Macro Economic Perspective and Energy issues. It also discuss how technology could take part on solving electricity issues.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Power generation and energy - Electricity Issues in Indonesia

power generation

& energy electricity issues in

Indonesia

Iwan Agung Firstantara

GM PT PLN (Persero) Unit Pembangkitan Jawa Bali

Thermofluid VI 2014

Yogyakarta, April 29, 2014

Gajah Mada University

Page 2: Power generation and energy - Electricity Issues in Indonesia

About

Speaker

@ GM_UPJB

Iwan Agung Firstantara was born in Jogjakarta, on October 1969. He

graduated from Gajah Mada University with a major in Mechanical

Engineering in 1993, and Master of Management also in the same

University.

Iwan is a General Manager of PT PLN (Persero) Unit Pembangkitan

Jawa Bali, one of PLN’s Strategic Business Unit that respondsible for

the Operation & Maintenance of 14 Power Generation Unit across

Java-Bali Interconecting System (making it the biggest total asset

compared to IP, PJB &IPP)

Page 3: Power generation and energy - Electricity Issues in Indonesia

1

2

3

4

Macro Economic PerspectiveFacts of Indonesia’s Economic Situation

Indonesia’s Energy OutlookEnergy current Trends and Challenge

Power Generation issuesFast Track Program, Energy Mix, & Environment-Efficiency

How technology solve Eletricity’s IssueDeal with Capacity & Efficiency matters

Page 4: Power generation and energy - Electricity Issues in Indonesia

Macro Economic’s PerspectiveFacts of Indonesia’s Economic Situations

Images taken from http://hqwide.com/

#Jakarta View #Wisma46

#BNITower

Page 5: Power generation and energy - Electricity Issues in Indonesia

comes to your mind

Indonesia?Wh

at when you think of

Images taken from http:// globe-walls .com/

#HelloJakarta #Monas

#Istiqlalmosque

Page 6: Power generation and energy - Electricity Issues in Indonesia

Images taken from http://listofimages/

Biggest Countryi n S o u t h E a s t A s i a

1 7 . 0 0 0 i s l a n d s3 . 1 m i l l i o n s q . k m o f s e a1 . 9 m i l l i o n s q . k m o f l a n d2 4 7 m i l l i o n i n h a b i t a n t s ( 2 0 1 2 )

#RajaAmpat #Beach

#BeautifulIndonesia

Page 7: Power generation and energy - Electricity Issues in Indonesia

Images taken from http://wallpapersus

Biggest Economyi n S o u t h E a s t A s i a

G D P $ 8 7 8 b i l l i o n ( 2 0 1 2 )

G D P g r o w t h 6 , 2 % ( 2 0 1 2 )

I n f l a t i o n 4 , 3 % ( 2 0 1 2 )

#Jakarta@Night #Pancoran

#Patung Dirgantara

Page 8: Power generation and energy - Electricity Issues in Indonesia
Page 9: Power generation and energy - Electricity Issues in Indonesia

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012* 2013**

6,7

8

7,8

6

8,5

6

9,3

3

10

,48

12

,48

14

,82

17

,29 21

,36

23

,88

27

,03 30

,66 33

,53 37

,54

GDP

Source : BPS

Capita( m i l l i o n r u p i a h )

Page 10: Power generation and energy - Electricity Issues in Indonesia

GDP

Source : BPS

Consumption

Government

Investment

Stat Discrepancy

X - M -2 %

5 %

32 %

9 %

54 %

o f 2 0 1 3

The BIG growth of Indonesia’s GDP was

driven primarily by domestic consumption“

Page 11: Power generation and energy - Electricity Issues in Indonesia

Emerging middle class in

Indonesia

Middle- & High- class inIndonesia has rose 5times higher in the last25 years

Source : BI (2013) Images taken from http://teropongbisnis.com/

Page 12: Power generation and energy - Electricity Issues in Indonesia

Indonesia’s middle-class

proportion:

Yellow: $ 2-4/ day

Source : BI (2013)

Page 13: Power generation and energy - Electricity Issues in Indonesia
Page 14: Power generation and energy - Electricity Issues in Indonesia

Indonesia’s Energy OutlookEnergy Current Trends & Challenge

Images taken from http://wallsave.com/

Page 15: Power generation and energy - Electricity Issues in Indonesia

Primary

Source : BP Statistical Review of World Energy 2011 & World Economic Outlook Database April 2011, IMF

in Some Country

Intensity

Page 16: Power generation and energy - Electricity Issues in Indonesia

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

Energy Consumption

Capita( B O E / C a p i t a )

3,4

6

Source : BPS

3,3

4

2,9

8

2,5

8

2,5

6

2,4

3

2,4

7

2,4

8

2,4

1

2,2

7

2,3

2

2,2

8

Page 17: Power generation and energy - Electricity Issues in Indonesia

11 11 12 13 15

17 18 21

23 25

27 28

34 36 37 36

40 42 44

46 48

46

51 55

31 33 34

36 39

41 44

47 50

55

60

65

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

Business Industry Household

Electricity

Consumption(in TWh)

Source : EMRPLN divided its customer into 5 segments: (1) Business, (2) Industry, (3) Household, (4) Social, (5) Government

Page 18: Power generation and energy - Electricity Issues in Indonesia

Images taken from http://globeimages.net/

#JakartaView #BunderanHI

#MonumenSelamatDatang

Since 2007Household has outreach the electricity

consumption among other PLN’s customer segments

Page 19: Power generation and energy - Electricity Issues in Indonesia

Energy demandhas been increasing faster than economic development and population growth

Images taken from natgeo society

Page 20: Power generation and energy - Electricity Issues in Indonesia

Electricity Shortage More than 70-80 million people

lack access to electricity

Images taken from http://phototony.com/

Page 21: Power generation and energy - Electricity Issues in Indonesia

1980 1985 1990 2000 2005 2006 2007 2008 2009 2010 2011 2012

Electrification Ratio( p e r c e n t )

73 76

67

66

65

63

62

57

43

28

16

8

Source : EMR

Highest : Jakarta (99,99%)Lowest : Papua (35,89%)

Page 22: Power generation and energy - Electricity Issues in Indonesia

Electricity is heaviliy subsidisedand currently customers pay forelectricity at far below marketprice.

Reliance on Subsidies

Images taken from natgeo

Page 23: Power generation and energy - Electricity Issues in Indonesia

Their estimated cost to government in 2013 is Rp 284 trillion and increasing to Rp 328,7 in 2014 (state budget plan).

subsidies have created a massive burden on the state budget.

Fuel &

Images taken from http:// 3.bp.blogspot.com/

Electricity

Source : Ministry of Finance

Page 24: Power generation and energy - Electricity Issues in Indonesia

60 57 57 53 57 55 51 50 49 48 47 48

13 15 15 19 17 19 23 27 23 23 24 27

23 22 24 24 21 21 22 19 24 25 23 21

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

Oil Coal Gas Hydropower Geothermal Biofuel

Primary Energy SupplyExclude Biomass

(in percent)

Source :CDI-EMR

Page 25: Power generation and energy - Electricity Issues in Indonesia

Driven by three main things:

1. Electrification programTo support government program to accelerate electrification ratio

2. Economic growthTo support manufacturing and service companies to produce products and services

3. Captive taking overMeet large consumer demand, to take over captive and to meet large customer demand

Demand of electricity is expected to grow fast

Images taken from http://touristrack.com/

Page 26: Power generation and energy - Electricity Issues in Indonesia

Power Generation IssuesFast Track Program, Energy Mix, & Environment-Efficiency

#LabuanCFSPP

#FTP-1 #2x300MW

Page 27: Power generation and energy - Electricity Issues in Indonesia

PLN P3B as “System Owner”and “Market Operator”

DistributionPower Generation (PLN or IPP)P3B as Transmission Provider

Primary Energy

Power Generation

Transmisi DistributionEnd

Customer

Availability of Primary Energy: quality, quantity,time, cost

Availability: reliable, safe, efficient, quality

Availability: reliable, safe, efficient, quality;Economic

optimisation;

Availability: reliable, safe, efficient, Sufficiency &

quality of supply

Services: simple, easy, quick, quality;

StandardService

StandardService

StandardService

StandardService

Standard of Public

Service

Electricity Supply Chain

Page 28: Power generation and energy - Electricity Issues in Indonesia

To meet Indonesia’s growing demand

Issue#1

#RembangCFSPP #FTP-1

#SubcriticalPulverized

PLN is mandated to implement Fast Track Program (FTP) for capacity expansion

Page 29: Power generation and energy - Electricity Issues in Indonesia

FTP Phase 1 :

42 Coal-Fired Steam Power Plants of PLN’s Project• 10 power plants with capacity of 6.900 MW in Java-Bali • 32 power plants with 2.252 MW outside Java-Bali

FTP Phase 2 :

93 power plants (Hydro, Geothermal, & Coal-Fired Power Plant)• 21 power plants of PLN’s Project • 72 power plants of Partnership Project

#TjAwar-awarCFSPP

#CoalHandling #StackerReclaimer

Issue#1

Page 30: Power generation and energy - Electricity Issues in Indonesia

Chinese’s Power Plants (FTP-1)

are cheaper than Japanese’s PP, but the quality has likely not yet proven.

PLN also suffer from project completion delay.

#PalabuanRatuProject

#Construction #FTP-1

Issue#1

Page 31: Power generation and energy - Electricity Issues in Indonesia

Even though

The FTP has improved thecompany's internal cash flowsand meet the 9% of electricitydemand growth.

It has also minimize the Fuelcontribution in PLN Fuel Mixfrom 22% in 2009 to 12% in2013.

Images taken from http://dl.bizhi.sogou.com/

Issue#1

Page 32: Power generation and energy - Electricity Issues in Indonesia

2%

58%18%

6%

16%

2019

Fuel Coal Gas Hydro Geo

36%

35%

17%

9%

3%

2008

Fuel Coal Gas Hydro Geo

Source :RUPTL 2010-2019

Fuel Mix

Issue#2

1% replacement of Fuel into Coal will generate financial efficiency up to Rp 1,74 T (in 2012) .

Page 33: Power generation and energy - Electricity Issues in Indonesia

Indonesia’s electricity is still rely on coal-based power plants

Contribute approximately 58% of the total electricity generated

Issue#2

Images taken from http:// ncealliance.com/

Page 34: Power generation and energy - Electricity Issues in Indonesia

Environment

Efficiency

Issue#3

Reciprocal Relationship in

coal power plant

Page 35: Power generation and energy - Electricity Issues in Indonesia

Images taken from http://ak2.picdn.net /

Clean Coal Technology

Every option capable of reducing emissions upstream, downstream, or within the power generation (energy conversion) process

Issue#3

Page 36: Power generation and energy - Electricity Issues in Indonesia

For new power plants

Images taken from http:// saistrip2010.webatu.com /

Could consider this following options:

#IGCC #CleanCoalTech

Supercritical & Ultra-supercritical (USC) pulverized coal technology

Circulating fluidized bed combustion (CFB)

Integrated gasification combined cycle (IGCC)

Issue#3

Page 37: Power generation and energy - Electricity Issues in Indonesia

For existing power plants

Could initiate rehabilitation & recondition, to:

Improve efficiency

Decrease hidden capacity

#MuaraKarang #CCPP

Issue#3

Page 38: Power generation and energy - Electricity Issues in Indonesia

How Technology Solve Electricity IssuesDeal with Capacity and Efficiency matters

Images taken from http:// www.iorise.com /

Page 39: Power generation and energy - Electricity Issues in Indonesia

Efficiency(%)

39

37

35

33

1 2 3 4 5 6 7 8

Lifetime(Years)

Annual Inspection

SI SI SI SIME SE MERehabilitationRecondition

Restore

New Technology

Improve

100

75

50

25

Capacity

(%)

Efficiency & capacity degradation

Page 40: Power generation and energy - Electricity Issues in Indonesia

How to deal with Capacity & Efficiency matters?

Capacity:• Coal Mixing• Coal Drying

Efficiency:• Tiny-oil Burner

• Heat Balance modelling

#PalabuanRatu #Construction

#FastTrackProgram

Page 41: Power generation and energy - Electricity Issues in Indonesia

Coal mixing

the process of blending two different typesof coal (low & medium range coal) to obtaina desired efficiency/ load profile.

Heating valueLow Range Coal = + 4.200 kCal/kgMedium Range Coal = + 4.900 kal/kg

Coal layering

The process of placing the med range coalat specific boiler burner layer to obtain adesired efficiency/ load profile.

Page 42: Power generation and energy - Electricity Issues in Indonesia

Coal dryingThe process of heating the coal feed to get a dry coal feed and

increase coal quality

Is being constructed at Labuan & Lontar CFSPP

Expected to increase coal quality up to 1000 kCal/kg

Images taken from http:// carzz.co /

Page 43: Power generation and energy - Electricity Issues in Indonesia

Tiny-oil burner

A modified boiler burner to obtainless fuel oil consumption.

Could reduce the fuel consumptionup to 85% (@Labuan CFSPP).

Original

burner

Tiny burner

Page 44: Power generation and energy - Electricity Issues in Indonesia

Heat balance

modellingImplemented through a Gatecycle, heat balance modelling discover all

of plant’s main equipment and predict the modelling.

The modelling help the management to develop more accurate Root Cause

Failure Analysis (RCFA).

Images taken from http:// st.gdefon.ru /

Page 45: Power generation and energy - Electricity Issues in Indonesia

PLN Generation Challenges

Page 46: Power generation and energy - Electricity Issues in Indonesia

Heat Rate Comparison in 2013( i n k C a l / k W h ) )

Tech challenge

Challenge#1

TJB (Non-FTP)

IMY(FTP)

2.732

2.403

Page 47: Power generation and energy - Electricity Issues in Indonesia

Turbine

efficiency

improvement

There has been no significant breakthrough on turbine efficiency improvement

Challenge#2

Images taken from http://deltatest.de /

Page 48: Power generation and energy - Electricity Issues in Indonesia

Heat Balance

Modelling

Challenge on:• Accuration• HR Competency• Alternative model

Challenge#3

Images taken from http:// img0.mxstatic.com /

Page 49: Power generation and energy - Electricity Issues in Indonesia

Source :World Bank TeamPBR (Performance Based Regulation) is given by the Government to determine PLN Allowed Revenue.

Challenge#4

Page 50: Power generation and energy - Electricity Issues in Indonesia

EpilogueEfficiency improvement in Power Generation represent the

largest opportunities in reducing subsidies, where thermofluid takes the most improtant role.

#Sunset #Fisherman

#BeautifulIndonesia Images taken from natgeo

Page 51: Power generation and energy - Electricity Issues in Indonesia
Page 52: Power generation and energy - Electricity Issues in Indonesia

An institution to bridge the interest between business (power generation) and universities has not yet established.