Top Banner
Power-Fill Power-Fill Operation Operation (See Installation and Operation Manual for detailed instructions)
20

Power-Fill Operation Power-Fill Operation (See Installation and Operation Manual for detailed instructions)

Mar 31, 2015

Download

Documents

Keanu Regis
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Power-Fill Operation Power-Fill Operation (See Installation and Operation Manual for detailed instructions)

Power-Fill Power-Fill OperationOperation

(See Installation and Operation Manual for detailed instructions)

Page 2: Power-Fill Operation Power-Fill Operation (See Installation and Operation Manual for detailed instructions)

2

Power-FillPower-Fill

• Refill apparatus foam cell from ground level– Safer– Economical

• Two models available– D.C. motor driven, on-

board mounted– A.C. motor driven,

portable

Stay off the top

Page 3: Power-Fill Operation Power-Fill Operation (See Installation and Operation Manual for detailed instructions)

3

D.C. Power-FillD.C. Power-Fill

• Pump mounted on apparatus

• 12 or 24 volt motor• Panel mounted

push-button control• Pre-plumbed piping

to foam cell

Page 4: Power-Fill Operation Power-Fill Operation (See Installation and Operation Manual for detailed instructions)

4

A.C. Power-FillA.C. Power-Fill

• Portable pump• 110 or 220 volt• Panel mounted

indicator light• Rocker switch

control in cord• Pre-plumbed piping

to foam cell

Page 5: Power-Fill Operation Power-Fill Operation (See Installation and Operation Manual for detailed instructions)

5

Power-Fill Plumbing DiagramPower-Fill Plumbing Diagram

Page 6: Power-Fill Operation Power-Fill Operation (See Installation and Operation Manual for detailed instructions)

6

Power-Fill DC Apparatus Mounted Power-Fill DC Apparatus Mounted Electrical SchematicElectrical Schematic

Page 7: Power-Fill Operation Power-Fill Operation (See Installation and Operation Manual for detailed instructions)

7

Power-Fill D.C. OperationPower-Fill D.C. Operation

• Connect pickup hose and wand to the off-board pickup fitting on the panel

• Place the wand end into the foam container

Page 8: Power-Fill Operation Power-Fill Operation (See Installation and Operation Manual for detailed instructions)

8

Power-Fill D.C. OperationPower-Fill D.C. Operation

• Turn the refill/flush valve counter-clockwise to the refill position stop

• Press the “GREEN” button once. The light will flash on and off while the pump is in operation

Page 9: Power-Fill Operation Power-Fill Operation (See Installation and Operation Manual for detailed instructions)

9

• When foam tank is full, “GREEN” light will illuminate solid and the pump will stop

• If the foam source runs out of fluid before the tank is full, press the “GREEN” button again to stop – Automatic “no flow” shut off feature. If no flow detected, flow

switch shuts off pump automatically

• Place wand in fresh container of foam and restart the operation by pressing the “GREEN” button. – Extended dry run will damage pump

• When the foam level drops in the foam tank, the “GREEN” light will go out

Power-Fill D.C. OperationPower-Fill D.C. Operation

Page 10: Power-Fill Operation Power-Fill Operation (See Installation and Operation Manual for detailed instructions)

10

Power-Fill D.C. Manual OperationPower-Fill D.C. Manual Operation• Press and hold RED

button to run pump– Button will illuminate

solid red while pump is running

• Solid GREEN light indicates full tank– Release RED button.

(Note: When operating manually, the pump will not shut off automatically when tank is full)

Page 11: Power-Fill Operation Power-Fill Operation (See Installation and Operation Manual for detailed instructions)

11

Power-Fill D.C. Flush OperationPower-Fill D.C. Flush Operation

• Turn the refill/flush valve clockwise to flush position stop

• Place pickup wand in container of fresh water

• Place empty container under flush drain line

Page 12: Power-Fill Operation Power-Fill Operation (See Installation and Operation Manual for detailed instructions)

12

Power-Fill D.C. Flush OperationPower-Fill D.C. Flush Operation

• Depress and hold RED button until discharge fluid is clear

• Release RED button• Drain Power-Fill

lines after flush to prevent freezing and/or foam contamination

Page 13: Power-Fill Operation Power-Fill Operation (See Installation and Operation Manual for detailed instructions)

13

A.C. Power-Fill Refill SystemA.C. Power-Fill Refill System

• Portable foam pump/motor assembly and a visual interface typically mounted on the apparatus panel

• Manually switched on and off with a momentary switch mounted in the power cord

• When the tank is full, indicator light on the panel illuminates

• Apparatus kits available to plumb other apparatus.

Page 14: Power-Fill Operation Power-Fill Operation (See Installation and Operation Manual for detailed instructions)

14

Power-Fill Refill SystemPower-Fill Refill System

• Both systems include:– Panel placard– Cam lock fittings for external connection– Foam pump/motor assembly– Suction wand with 6 feet of 1" ID hose– Side-mount level indicator switch

Page 15: Power-Fill Operation Power-Fill Operation (See Installation and Operation Manual for detailed instructions)

15

Power-Fill A.C. Portable SystemPower-Fill A.C. Portable SystemElectrical SchematicElectrical Schematic

Page 16: Power-Fill Operation Power-Fill Operation (See Installation and Operation Manual for detailed instructions)

16

Power-Fill Power-Fill A.C. Operating InstructionsA.C. Operating Instructions

• By following the steps listed, the AC powered portable Power-Fill system can be easily operated.

1. Connect refill hose from pump discharge to the outboard pickup fitting on the panel.

2. Place the wand end of the pump suction hose into the foam container.

3. Plug the electrical cord with GFI into a standard 120 VAC outlet.

Page 17: Power-Fill Operation Power-Fill Operation (See Installation and Operation Manual for detailed instructions)

17

Power-Fill Power-Fill A.C. Operating InstructionsA.C. Operating Instructions

4. Depress rocker switch on power cord. This will run the foam refill pump.

5. When tank is full, the “GREEN” light on the panel will illuminate.

6. Release the rocker switch and the switch will turn off the foam refill pump.

Page 18: Power-Fill Operation Power-Fill Operation (See Installation and Operation Manual for detailed instructions)

18

Power-Fill Power-Fill A.C. Operating InstructionsA.C. Operating Instructions

• Flush Operation

1. Place wand in container of fresh water.

2. Place end of pump discharge hose in empty container.

3. Run refill pump by depressing rocker switch, until discharged fluid is clear.

Page 19: Power-Fill Operation Power-Fill Operation (See Installation and Operation Manual for detailed instructions)

19

Power-Fill Power-Fill A.C. Operating InstructionsA.C. Operating Instructions

4. Release rocker switch.

5. Drain Power-Fill lines after each flush to prevent freezing and/or contamination of foam.

6. Unplug power cord from receptacle and store unit.

Page 20: Power-Fill Operation Power-Fill Operation (See Installation and Operation Manual for detailed instructions)

20

Power-Fill Refill SystemPower-Fill Refill SystemTroubleshootingTroubleshooting

• Most electrical system problems can be traced to faulty wiring

• Follow the diagrams in the I/O manuals and carefully check all connections

• Make sure proper power is being supplied and ground connections are clean and solid

• Excessive electrical interference or momentary low voltage on the power lines can cause erratic operation

• Troubleshooting guide provides quick diagnosis of problem and corrective action