TABLE OF CONTENTS
S. #DescriptionPage No.
1Pakistan Power Sector3
2Incentives for Investors - Development of Power Projects4
3Salient features Transmission Line Policy 20145
4Pakistan Power Park, Gaddani, Balochistana. Salient Featuresb.
Conceptual Viewc. Indicative Investment Estimates d. Business
Modele. Feasibility studyf. Investment Opportunities6-13
5Thar Coal Mining and Power Generation, Sindh14-15
6Initiatives by Government of Punjab16
7Investment in Pakistan Power Sector - A Promising
Opportunity17
8Private Power Infrastructure Board (PPIB) - A Facilitator18
8Investment Opportunities - Hydro Power Projects Turtonas-Uzghor
Hydro Power Project Neckerdim - Paur Hydro Power Project Azad
Pattan Hydro Power Project Chakothi Hattian Hydro Power Project
Madian Hydro Power Project Asrit - Kedam Hydro Power Project
19-31
9Hydro Power Projects Khyber PakhtunkhwaHydel Projects,
Pre-Feasibility Studies Completed
Nil Da Katha, Bhimbal Katha, Saiful Maluk Katha, Balkani,
Chowkel Khwar, Kedam Khwar, Gandigar, Ayun Gol, Barum Gol, Mastuj
River
Hydel Projects Through PPP Sharmai Hydropower Project, Distt.
Dir Shogo-Sin Hydropower Project, Chitral Shushgai Zhendoli
Hydropower Project, Chitral
32 - 50
11Contact information Board of Investment Private Power
Infrastructure Board (PPIB) Thar Coal and Energy Board Energy
Department, Government of Punjab Pakhtunkhwa Hydel Development
Organization
51-52
Pakistan Power Sector
Incentives for Investors Development of Power Projects
Exemption from Corporate Income Tax, Turnover Tax and
Withholding Tax, no Sales Tax, only 5% concessionary Import Duty on
plant & equipment not manufactured locally GOP Guarantees
obligations of power purchaser and provinces GOP provides
protection against Political Force Majeure, change in law and
Change in duties & taxes Power Purchaser to bear hydrological
risk for hydropower projects GOP allows 20% ROE for indigenous coal
based power projects, and 17% ROE on hydro power projects Payment
of compensation in case of termination due to GOP Event of Default
Tariff adjustments for variation in currency exchange rates and
fuel prices Tariff indexation for inflation (US CPI & Pak WPI)
Government ensures conversion of Pak Rupee & remittance of
foreign exchange for project-related payments
Salient Features Transmission Line Policy 2014 List of
Transmission System projects to be offered to Private Sector will
be prepared by GOP BOOT Model Policy to cover Transmission Line
& Grid Station projects of 220 KV voltage level and above
(EHVAC & HVDC) Land & Legal Right of way to be provided by
NTDC at no cost Project Term : 25-30 years Equity : 18 %
Transmission utility (NTDC) to pay Transmission Service Charge in
Rs./km/month/circuit Exemption from Corporate Income Tax and 5%
flat Custom Duties Utility to provide Basic Design & Functional
Performance Specifications Standardized Security Package (IA &
TSA) One Window facility by PPIB
Pakistan Power Park, Gaddani, BalochistanSalient Features
The Prime Minister of Pakistan approved the concept of 6,600
Pakistan Power Park at Gaddani on July 26, 2013
The Pakistan Power Park will have Dedicated deep Sea Jetty 2x
660 MWs in Public Sector 8x 660 MWs in Private Sector as IPPs
Transmission Network for evacuation of Power Common infrastructure
facilities of coal conveyer system, cooling water, switchyard, ash
disposal, and residential facilities etc
Conceptual view
Indicative Investment Estimates
Pakistan Power Park: Major Components Jetty and related Marine
InfrastructureUSD500700 million Parks Onshore InfrastructureUSD 100
million Transmission LineUSD 3 4.43 billion 2x660 MW Project in
public sectorUSD 1.8 billion 8x660 MW Projects in private sectorUSD
7.2 billion TotalUSD 13.8 billion
Note: These are very Preliminary and Rough Estimates and will
change considerably as design is finalized and costs are firmed
up.
Business Model
Feasibility Study
NESPAK Completed Following Activities for Gaddani Power Park
Land Ownership Survey Topographic Survey Construction Material
Study On-shore Geotechnical Investigations Already Completed by
NESPAK Geophysical Survey on-shore Seismic Study Electric
Resistivity Survey
Master plan for Pakistan Power Park completed in collaboration
with specialist foreign and local firms
Feasibility Study of Gaddani Power Park is in Progress
Investment Opportunities
8 x 660 MW Power Plants in IPP mode on Build, Own & Operate
basis Construction of deep Sea Jetty and Marine Infrastructure
Development of infrastructure of Pakistan Power Park Construction
of Transmission Line Construction of access Roads
Thar Coal Mining and Power Generation
Total Potential of Thar 175 billion tonsAverage Area of Blocks
100 Sq KMAverage Seam Thickness 10-20 mOver Burden 114-137 mAverage
Stripping Ratio 6.2:1Fixed Carbon % 14.2-34.0Volatile matter %
23.1-36.6Moisture content % 29.6-55.5
Thar Coal Field Sindh Thar Coal Field is located in South
Eastern part of Sindh at about 380 kms east of Karachi, spreading
over an area of 9,100 sq. Km
The total potential of Thar is estimated at 175 billion tons of
lignite which is equivalent to 50 Billion TOE (i.e. more than Saudi
Arabia and Iran oil reserves) or 2,000 TCF gas (68 times higher
than Pakistans Gas Reserves)
Thar Coal Field is divided into thirteen blocks, out of which
four blocks have been allocated to the following projects /
companies: Sino Sindh Resources Private Limited (Block I) Sindh
Engro Coal Mining Company (Block II) Oracle Coalfields, PLC UK
(Block VI) Planning Commission (Block V)
Investors may approach Thar Coal Energy Board (TCEB) for
allocation of Thar Coal block for Mining
Investors may join hands with the existing sponsors of Thar coal
blocks and IPPs interested in developing Projects at Thar
Initiatives by Government of Punjab
Government of Punjab planned adding approximately 7200 MW in the
medium term (3-5 years) to the national grid through private or
public investment in imported coal based Power Plants Potential
projects include: 2 x 660 MW coal power project at following sites:
Qadirabad (Sahiwal), Bhikki (Sheikhupura), Haveli Bahadur Shah
(Jhang), Balloki (Kasur), Trinda Saway (Rahim Yar Khan) Mouza
Saddan Wali (Muzaffargarh)
Triplicate Security Package to be signed amongst the concerned
Provincial Government, Government of Pakistan and the Project
company
Investment in Pakistan Power Sector A Promising Opportunity
Due to growing power demand, there is dire need of Power
capacity addition. Pakistan has successfully attracted investment
worth billions of dollars from Private Sector for Power generation
World renowned power players are already operating in Pakistan.
One-Window facility provided at Federal level by PPIB Federal
Government guarantees the performance of the power purchaser and
provinces. Federal Government provides protection against political
force Majeure and change in law. Concessionary import duties and
tax free regime for Power Plants developed under the Policy.
Private Power Infrastructure Board (PPIB) A Facilitator
HYDROPOWER PROJECTS
Turtonas-Uzghor Hydropower Project
It is expected to be advertised in near future subject to
certain Codal Formalities between Federal Govt. and the Provincial
Government.
General:Project Name : Turtonas Uzghor Hydropower Project (Raw
Site)
Location: Golen Gol River near Uzghor Village (around 33 km from
Chitral Town)
Technical: Capacity: 58 MWGross Head: 351 mMean Annual Energy:
254 GWhProject Type : Run-of-River Design Discharge: 20.0
m3/secPlant Factor: 50%Estimated Cost: 87 Mill US$
Current StatusProject is expected to be advertised approval from
PPIB Board
PARTICIPATION REQUIREDProject Sponsors through International
Competitive Bidding (ICB)
Neckerdim - Paur Hydro Power Project
It is expected to be advertised in near future subject to
certain Codal Formalities between Federal Government and the
Provincial Government.
General Project Name: Neckerdim-Paur HPP (Raw Site)River :
Yarkun-a tributary of Mastuj River Location : Project area is 70 km
from Mastuj town Distance : 178km from Chitral town
TechnicalCapacity: 80 MWEnergy: 321 GWhProject Type :
Run-of-River Design Discharge: 30 m3/sGross Head: 341 m Plant
Factor: 45.8 % Estimated Cost:120 Mill US$
Current StatusProject Profile and Pre-Qualification Documents
are being prepared, EOI for development of the project will be
solicited through advertisement in the press shortly.
PARTICIAPTION REQUIRED:Project Sponsors through International
Competitive Bidding (ICB)
Investors support required in Equity Debt Financing, EPC and O
& M Contracts
Azad Pattan Hydro Power Project
This Project is already awarded to Private investors. They may
requires equity particiaption, EPC contracting etc. They can be
reached directly to seak opurtunity of investment.
GeneralProject Company: Alamgir Power Pvt LtdProject Sponsors:
Alamgir Power (Pvt.) Ltd (Main), Project Cost : US$ 1446.7 Million
as per Feasibility StudyProject Consultant : Scott Wilson
TechnicalCapacity : 640 MWEnergy: 3075 GWhLevelized Tariff: US
7.7125/kWh (as per Feasibility Study for 30 years)Expected COD:
June 2020Current StatusTariff negotiated b/w Sponsors and NTDC
PARTICIAPTION REQUIRED:Equity Partners Debt Financing EPC
Contractor Detailed Design Consultants Equipment SuppliersO & M
Contractor
Chakothi Hattian Hydro Power Project on Jhelum River
This Project is already awarded to Private investors. They may
requires equity particiaption, EPC contracting etc. They can be
reached directly to seak opurtunity of investment.
GeneralProject Sponsors: Suhail Jute Mills Ltd., Colony Sarhad
Textile MillsProject Cost : US$ 1176.5 Million as per Feasibility
StudyTechnicalCapacity : 500 MWEnergy: 2410 GWhLevelized Tariff: US
7.89/kWh (negotiated F.S for 30 yrs.)Expected COD: December
2020
Current StatusFeasibility Study has been approved by the Panel
of ExpertsFeasibility Level Tariff has been finalized between
Sponsors and NTDC; NTDC after approval from its Board will forward
the case to NEPRA for final approvalPARTICIAPTION REQUIRED:Equity
Partners, Debt Financing, EPC Contractor Detailed Design
Consultants, Equipment SuppliersO & M Contractor
Madian Hydro Power Project
This Project is already awarded to Private investors. They may
requires equity particiaption, EPC contracting etc. They can be
reached directly to seak opurtunity of investment.
GeneralProject Name : Madian Hydropower ProjectProject Company:
Cherat Cement Co. Ltd.Project Sponsors: i) CheratCement Co. Ltd.
ii) Shirazi Investment (Pvt) Ltd.Project Consultant: FICHTNER GmbH
(Germany)Location : Distt. Swat, Near Madian Town, Khyber
Pakhtunkhwa River: Swat RiverProject Cost : US$ 438 Million as per
Feasibility Study (2008)TechnicalCapacity : 157 MWGross Head: 214.8
m Tariff: US 8.92/kWh (Term 30 years at 2008 level cost)Current
StatusFeasibly Study has been completed, The Sponsors have been
advised by PPIB to approach NEPRA for Tariff Determination.
PARTICIAPTION REQUIRED:Equity Partners, Debt Financing, EPC
Contractor Detailed Design Consultants, Equipment Suppliers O &
M Contractor
Asrit - Kedam Hydro Power Project
This Project is already awarded to Private investors. They may
requires equity particiaption, EPC contracting etc. They can be
reached directly to seak opurtunity of investment.
GeneralProject Name : Asrit-Kedam Hydropower ProjectProject
Sponsors: Yunus Brothers GroupProject Consultant: i) RSW
International, Canada ii) NESPAKLocation : Near Kedam Town, Distt.
Swat, Khyber Pakhtunkhwa River: Swat RiverProject Cost : US$ 405.60
million as per Feasibility Study (2008)TechnicalCapacity : 215
MWGross Head: 214.8 m Tariff: US 7.83/kWh (Levelized Tariff for 30
years term at 2008 level)Current StatusFeasibly Study completed
PARTICIAPTION REQUIRED:Equity Partners, Debt Financing, EPC
Contractor, Detailed Design Consultants, Equipment Suppliers,
O& M Contractor
ContactsBoard of InvestmentPrime Ministers OfficeAtaturk Avenue,
Sector G-5/1, Islamabad, Pakistan.Tel: 0092-51-9204339, 9207031Fax:
0092-51-9218325, 9218323Website: www.boi.gov.pk
Private Power and Infrastructure Board (PPIB)50 Nazimuddin Road
, F7/4 , Islamabad, Pakistan.Tele: 0092(51) 9100118-129Fax:
0092(51) 9100131, 9100132Website: www.ppib.gov.pk
Energy Department,Government of the Punjab,Irrigation
Secretariat,Library Road, Old Anar Kali, Lahore, Pakistan.Phone:
0092 42-99213974-5Fax: 0092 42-99213906Website:
www.energy.punjab.gov.pk
Sindh Coal Energy Board,Government of Sindh1st Floor, State life
Building No.3Dr. Ziauddin Ahmed Road, Opp: CM House, Karachi,
Pakistan.Tel: 0092-21-99207528-31Fax: 0092-21-99207534Website:
www.sindhcoal.gos.pk
Pakhtunkhwa Hydel Development Organization (PHYDO)Plot # 38,
Sector B-2, Phase-5, Hayatabad, Peshawar.Tel: 0092-91-9217330,
9217294, 9217488Fax: 0092-91-9217295Website: www.shydo.gov.pk
34