Page 1: power

BY ABHISHEK PANDEY

“11EBKIT001”

NUCLEAR POWER PLANT IN

INDIA

BY ABHISHEK

PANDEY “11EBKIT001”

Page 2: power

CONTENTSIntroductionNuclear reactionNuclear fission processNuclear chain reactionConstituents of Nuclear power plantNuclear Reactor(Main parts)Types of power reactors commonly usedNuclear energy deal in India

Page 3: power
Page 4: power

Nuclear Power Plants in India

Page 5: power

Nuclear Reaction:-A projectile is takenMass-Energy conversion acc. to Einstein’s equation

Page 6: power

Nuclear Fission process:-In this process heavy nucleus is splitted and release high energy1 fission of U-235 causes 230 mev energy

Page 7: power

Nuclear chain Reaction

When a neutron hits a U-235 3 neutrons produced“Chain reaction is defined as a fission reaction where neutron from the previous reaction continue to propagate and repeat the reaction”

Page 8: power
Page 9: power

Constituents of Nuclear power plant and layout

Page 10: power

Nuclear ReactorMain parts:- 1.Reactor core

2.Moderator 3.Control rods 4.Coolant 5.Reflector 6.Thermal shielding

Page 11: power

Power Reactors in common useBoiling water Reactor(BWR)Pressurized water Reactor(PWR)Heavy water cooled and moderated(CANDU TYPE) ReactorGas Cooled ReactorLiquid metal cooled Reactor

Page 12: power

1.Boiling Water ReactorFuel used is rich in uranium oxide.Ordinary water is used as both moderator and coolant.Low thermal efficiency.Can’t meet sudden increase of load.

Page 13: power

A BWR in Practice

Page 14: power

2: Pressurized Water Reactor(PWR)Advantages:

CompactnessIsolation of radio active system from main steam systemCheap light water used as both moderator and coolant

Disadvantages:Strong pressure vessel is requiredFormation of low temp. steam

High losses from heat exchangerHigh power consumption from auxilarities

Page 15: power

Advanced Reactor Designs Under Consideration

GE-Hitachi ABWR – NRC Certified (1997) Westinghouse AP1000 – NRC Certified (2005)GE-Hitachi ESBWR – Under NRC Review AREVA US-EPR – Under NRC review Mitsubishi US-APWR – Under NRC Review

Page 16: power

Indian Nuclear Program: The Present Status12 PHWR & 2 BWR now under operation4 PHWR and 2 LWR under commission2950 MW generation & 3000 MW under

commissionSuccessful experiments with Fast Breeder Test

Reactor (FBTR) Prototype Fast Breeder Reactor (PFBR) for

500MWe under constructionAdvanced Heavy Water Reactor (AHWR) using

(Pu-Th) O2 MOX for 300MWe: advanced stage of design approval; construction soon to begin.

Page 17: power

Reactor GenerationsGen I

Prototypes in 50’s & 60’s

Gen II70’s & 80’sToday’s Operational

ReactorsBWR, PWR, CANDU, …

Gen IIIABWR, APWRApproved 90’sSome Built around the

World

Gen III+Current Advanced

Designs in the Approval Process

Pebble Bed ReactorGen IV

Deploy in 2030EconomicalSafeMinimize WasteReduce Proliferation

Page 18: power

MAKING INDIA A NUCLEAR POWERIndia 1948:-It was pt.

Jawaharlal Nehru initiated India’s Nuclear energy program

India 1967:-It was Indira Gandhi initiated India’s Nuclear weapons program

Page 19: power

INDIA AFTER 2000India 2005:-It was Dr.

Manmohan Singh signed 123 agreement.

India 2009:-Manmohan Singh is again interested to increase India’s civilian Nuclear energy

India has signed “Civil Nuclear Trade Agreement”.

Page 20: power