ZUHAIR FAYEZ PARTNERSHIP MINISTRY OF HIGHER EDUCATION CONTRACTOR : RMC AL-RASHID & AL-MANG PROJECT NO: 357 LOCATION : TAIF UNIVERSITY - TAIF(K.S.A) PROJECT NAME : TAIF UNIVERSITY HOUSING (MALE). ( 1 ) WATER DEMAND ( 2 ) TOTAL DYNAMIC HEAD Prepared By Checked By Eng. Ahmed Hikal Eng. Aboobucker Sedi Mechanical Project Engineer Chief of Mechanical HYDRAULIC CALCULATION FOR POTABLE WATER BOOSTER PUMP Rev. 01
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
ZUHAIR FAYEZ PARTNERSHIP MINISTRY OF HIGHER EDUCATION CONTRACTOR :
RMCAL-RASHID & AL-MANGOUR CO
PROJECT NO: 357 LOCATION : TAIF UNIVERSITY - TAIF(K.S.A)PROJECT NAME : TAIF UNIVERSITY HOUSING (MALE).
( 1 ) WATER DEMAND
( 2 ) TOTAL DYNAMIC HEAD
Prepared By Checked By
Eng. Ahmed Hikal Eng. Aboobucker SediqMechanical Project Engineer Chief of Mechanical Dept.
HYDRAULIC CALCULATION FOR
POTABLE WATER BOOSTER PUMPRev. 01
CONTENTS:
SL.# DESCRIPTION
A Hydrolic calculations for potable water booster pumps.
A-1 Table of total fixtures.
A-2 Potable water booster pump demand.
A-3 Flow rate through the piping system to the farthest point.
A-4 Head loss calculations.
A-5 Conclusion of the hydrolic calculations for potable water booste pumps.
B Hydrolic calculations for flush water booster pumps.
B-1 Table of total fixtures.
B-2 Flush water booster pump demand.
B-3 Flow rate through the piping system to the farthest point.
B-4 Head loss calculations.
B-5 Conclusion of the hydrolic calculations for flush water booste pumps.
C Refrence sheets from Uniform Plumbing Code
D Water supply layout showing the farthest point.
PROJECT NAME : TAIF UNIVERSITY HOUSING (MALE).
Table of total fixtures
Fixture type : PRIVATE
FIXTURES / POINT NO. B1 G.F. F.F 2nd.F 3rd F 4th F. 5th F 6th F 7th F 8th F 9th F 10th F 11th F 12th F 13th F
Water closet (flush valve) 0
Water closet (flush tank) 0
Water Bidet 0
Hose for W.C 36 40 40 40 40 196
Lavatory (& H.B.) 64 80 80 80 80 384
Janitor Sink 0
Service sink 0
Shower 30 40 40 40 40 190
Bath tub 0
Kitchen sink 5 4 4 4 4 21
Drinking water cooler 5 5 5 5 5 25
Dishwashing machine
Laundry 0
Ablution (Public) 0
Urinal (1" flush valve) 0
Urinal (3/4" flush valve) 0
Urinal (flush tank) 0
Total fixtures
PROJECT NAME : TAIF UNIVERSITY HOUSING (MALE).
POTABLE WATER BOOSTER PUPM DEMAND
TOTAL DOMESTIC WATER DEMAND CALCULATION Fixtures type : PRIVATE
FIXTURESWeight in Fixture units
QuantityTotal weight in fixture units
Cold Hot Total Cold Hot Total
Water closet (flush valve) 6 0 6 0 0 0 0
Water closet (flush tank) 3 0 3 0 0 0 0
Water Bidet 0.75 0.75 1 0 0 0 0
Hose for W.C 0.75 0.75 1 196 147 147 196
Lavatory (& H.B.) 0.75 0.75 1 384 288 288 384
Janitor Sink 0.75 0.75 1 0 0 0 0
Service sink 1.5 1.5 2 0 0 0 0
Shower 1.5 1.5 2 190 285 285 380
Bath tub 1.5 1.5 2 0 0 0 0
Kitchen sink 1.5 1.5 2 21 31.5 31.5 42
Drinking water cooler 1 1 25 25 0 25
Dishwashing machine 0 1 1 0 0 0 0
Laundry 1.5 1.5 2 0 0 0 0
Ablution (Public) 1 1 1.5 0 0 0 0
Urinal (1" flush valve) 10 0 10 0 0 0 0
Urinal (3/4" flush valve) 5 0 5 0 0 0 0
Urinal (flush tank) 3 0 3 0 0 0 0
Total Fixture Units 776.5 751.5 1027WATER DEMAND ( GPM ) 174.0 GPM 170.2 GPM 211.5 GPM
39.50 m3/h 38.64 m3/h 48.00 m3/h
Booster pump capacity 211.5 gpm ( Assuming three pumps with 70 gpm )48.0013.33 l/s
WATER DEMAND ( m3/ h )
m3/h
PROJECT NAME : TAIF UNIVERSITY HOUSING (MALE).
POTABLE WATER PUMPS
Flow rate through the piping system to the farthest point Fixture type : PRIVATE