In cooperation with: Goldwind • Over 20 years of experience • Market leader China • 100% growth every year • Annual installation 2700 MW • Top 5 global wind turbine manufacturer by 2013 Research findings Standardizing the construction process • Clear formats • Accurate data Delaying factors • Environment || strong wind, snow, rough terrain • Damage at parts || blade • Organization || logistics, position of the crane Culture difference report • Approach of internship Enormous growth rates • Fast developing products (R&D) • International expansion • Increasing sales figures Timeline internship Internship for: Goldwind Science and Technology Co., Ltd. Urumqi/China www.goldwind.cn INTERNSHIP AT GOLDWIND University of Applied Sciences Utrecht Utrecht, the Netherlands www.HU.nl Internship research ConstructionprocessofwindturbinesinInner-Mongolia. WORKSHOP WIND FARM OFFICE RESEARCH poster3.indd 3 12-05-10 00:53