(社)日本都市計画学会 都市計画報告集 No. 6 2007 年5 月 Reports of the City Planning Institute of Japan, No. 6, May, 2007 * ��������������������Graduate school of Systems and Information Engineering , University of Tsukuba� **��������������������Faculty of Systems and Information Engineering, University of Tsukuba � ��������� 2004 ������������������� �� 5 ����������� 2007 � 3 ���������������� Post Tsunami Reconstruction Process in Sri Lanka affected by 2004 Sumatra Tsunami, -Part 5- : Report on New Policy of Housing Reconstruction and Reconstruction Condition of damaged area as of March of 2007 ����*����** Hideaki NAKAZATO*�Osamu MURAO** In Sri Lanka, most of the tsunami victims began to resettle in reconstruction site according to the programs directed by the government and other organizations. In the process of recovery, Government of Sri Lanka revised the policy for housing reconstruction because there were some objections against the construction regulation in coastal area. The authors conducted a field survey to grasp housing reconstruction condition in Galle, Matara, and Hambantota as of March 2007. This paper reports on new revised policy and the reconstruction condition and problems in affected areas following the previous survey of November 2005. Keywords: 2004 �������������������������������� 2004 Sumatra Tsunami, Sri Lanka, reconstruction process, Revised Tsunami Housing Policy�Transitional House 1. ���� 2004 �12 ����������������������� ������ 10 ������������������� 50 ����������� 1) ����������������� ����2005 �2 ���������������Buffer Zone ���������100 ����������200 ������ ����������������������������� ����������� 2) ����������������� ����������������������������� ����������������������������� ���������������Buffer Zone �������� �������������������� (1) �������� ������������������������ ���������������������������� ����������������������������� ��2005 �11 ���������Galle � Matara �Hambantota � ��������������� 2007 � 3 � 24 ��� 31 �� ��� 2 ������������������2006 � 5 �� ���������������������������� ����������������������������� ����������� 2. ��������� 2) 2.1. ����������� �����1 ������2005 �11 ����������� ����������������������������� �������������������������� �TAFREN �Task Force for Rebuilding the Nation �������� ���������RADA �Rebuilding and Development Agency � ���RADA ���������RADA � TAFREN ����� ����������������������������� ������������� RADA ������������ �����������������THRU�Tsunami Housing Reconstruction Unit ���District (2) �������������� �� 2.2. ��������2005 � 2 ���� 1970 ������������������������� ��1981 �������The Coast Conservation Act No.57 of 1981 ����������������������������� ������������������ 1km ������ �CCZ � Coastal Conservation Zone �������������� ��Buffer Zone �������-1�� �������2 ����2005 �2 �27 ��������� ���������������� Emergency Shelter ������ �Transitional House �������Permanent House ��3 ���� ����������������������������� �������������������� 1) �������� Buffer Zone ���������100 ����������200 ����������������������������� ����������������������������� �������������������UDA � Urban Development Authority ������������������������� ��������������Buffer Zone ��������� - 22 -
6
Embed
Post Tsunami Reconstruction Process in Sri Lanka …2004 Sumatra Tsunami, Sri Lanka, reconstruction process, Revised Tsunami Housing Policy,Transitional House 1. はじめに...
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
(社)日本都市計画学会 都市計画報告集 No. 6 2007 年5 月 Reports of the City Planning Institute of Japan, No. 6, May, 2007
* 正会員・筑波大学システム情報工学研究科(Graduate school of Systems and Information Engineering , University of Tsukuba) **正会員・筑波大学システム情報工学研究科(Faculty of Systems and Information Engineering, University of Tsukuba)
スリランカにおける 2004年インド洋津波被災地の復興過程調査報告 その 5
-住宅再建指針の改訂と2007年3月時点における被災地の復興状況-
Post Tsunami Reconstruction Process in Sri Lanka affected by 2004 Sumatra Tsunami, -Part 5- : Report on New Policy of Housing Reconstruction and Reconstruction Condition of damaged area as of March of 2007
仲里英晃*・村尾修**
Hideaki NAKAZATO*・Osamu MURAO**
In Sri Lanka, most of the tsunami victims began to resettle in reconstruction site according to the programs directed by the government and other organizations. In the process of recovery, Government of Sri Lanka revised the policy for housing reconstruction because there were some objections against the construction regulation in coastal area. The authors conducted a field survey to grasp housing reconstruction condition in Galle, Matara, and Hambantota as of March 2007. This paper reports on new revised policy and the reconstruction condition and problems in affected areas following the previous survey of November 2005. Keywords: 2004年スマトラ沖津波,スリランカ,復興過程,新住宅再建指針,仮設住宅
2004 Sumatra Tsunami, Sri Lanka, reconstruction process, Revised Tsunami Housing Policy,Transitional House
(TAFREN:Task Force for Rebuilding the Nation)が設置され,後に再建開発委員会(RADA:Rebuilding and Development Agency,以降「RADA」)に再編された.RADAは TAFRENの業務を引き継ぎ,復興事業を統括,監視する機関となった.住宅再建事業